CN101871842B - Method for directly testing speed diversity factor and stagnant rate of turbine electro-hydraulic control system - Google Patents
Method for directly testing speed diversity factor and stagnant rate of turbine electro-hydraulic control system Download PDFInfo
- Publication number
- CN101871842B CN101871842B CN2010101451912A CN201010145191A CN101871842B CN 101871842 B CN101871842 B CN 101871842B CN 2010101451912 A CN2010101451912 A CN 2010101451912A CN 201010145191 A CN201010145191 A CN 201010145191A CN 101871842 B CN101871842 B CN 101871842B
- Authority
- CN
- China
- Prior art keywords
- load
- unit
- speed
- diversity factor
- curve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Control Of Turbines (AREA)
Abstract
本发明涉及一种汽轮机电液控制系统速度不等率、迟缓率测试方法。它采取了直接测试方式,提高了测试的准确度、简化了测试过程、降低了操作难度,其步骤为:1)确定负荷测点;2)确保机组主蒸汽压力、温度、机组真空在额定值并保持稳定;3)阶跃变化机组转速给定值,作为第一次记录;4)保持机组参数稳定的前提下,通过调整调门开度逐步降低负荷,记录测试数据,直至空负荷;5)以同样顺序逐步增加负荷,直至满负荷,记录相应数据;6)得出汽轮发电机组的 N -δ、 N -ε关系曲线;7)根据 N -δ、 N -ε关系曲线检验机组的速度不等率和迟缓率参数是否满足汽轮机调速特性的要求;8)根据 N -δ关系曲线修正阀门流量补偿曲线或阀门重叠度曲线。
The invention relates to a method for testing the speed unequal rate and sluggish rate of an electro-hydraulic control system of a steam turbine. It adopts a direct test method, which improves the accuracy of the test, simplifies the test process, and reduces the difficulty of operation. The steps are: 1) Determine the load measurement point; 2) Ensure that the main steam pressure, temperature, and vacuum of the unit are at the rated value And keep it stable; 3) Step change the given value of the unit speed, as the first record; 4) On the premise of keeping the unit parameters stable, gradually reduce the load by adjusting the opening of the door, record the test data until the load is empty; 5) Gradually increase the load in the same order until full load, and record the corresponding data; 6) Obtain the N -δ , N -ε relationship curve of the turbo-generator set; 7) Check the speed of the unit according to the N -δ, N -ε relationship curve Whether the parameters of droop rate and retardation rate meet the requirements of steam turbine speed regulation characteristics; 8) Correct the valve flow compensation curve or valve overlap curve according to the N -δ relationship curve.
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101451912A CN101871842B (en) | 2010-04-13 | 2010-04-13 | Method for directly testing speed diversity factor and stagnant rate of turbine electro-hydraulic control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101451912A CN101871842B (en) | 2010-04-13 | 2010-04-13 | Method for directly testing speed diversity factor and stagnant rate of turbine electro-hydraulic control system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101871842A CN101871842A (en) | 2010-10-27 |
CN101871842B true CN101871842B (en) | 2011-08-10 |
Family
ID=42996837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101451912A Active CN101871842B (en) | 2010-04-13 | 2010-04-13 | Method for directly testing speed diversity factor and stagnant rate of turbine electro-hydraulic control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101871842B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103089342B (en) * | 2011-11-04 | 2014-11-12 | 华北电力科学研究院有限责任公司 | Steam turbine and speed regulating system model parameter correcting method thereof |
CN102999673B (en) * | 2012-11-30 | 2015-03-18 | 上海电气电站设备有限公司 | Method for plotting water temperature-power output curve of generator |
CN103671361A (en) * | 2013-12-20 | 2014-03-26 | 广东电网公司电力科学研究院 | Dead band property measuring device and method for steam turbine electro-hydraulic regulating system |
CN105322561B (en) * | 2014-06-10 | 2018-11-09 | 国网山西省电力公司电力科学研究院 | Primary frequency modulation control method and device based on the fluctuating range dynamic adjustment of net frequency |
CN108843409B (en) * | 2018-04-17 | 2021-01-05 | 国网浙江省电力有限公司电力科学研究院 | A method for obtaining local speed unequal rate of steam turbine running on grid |
CN109782584B (en) * | 2019-01-21 | 2022-05-17 | 杭州澎康自动化科技有限公司 | Self-tuning control method for back-extraction steam turbine |
CN113657738A (en) * | 2021-08-05 | 2021-11-16 | 国网天津市电力公司电力科学研究院 | Method for checking whether actual measurement load curve of coal-fired unit reaches standard |
CN118584822B (en) * | 2024-08-09 | 2024-11-29 | 南京易信同控制设备科技有限公司 | Electromechanical and hydraulic system management method and system based on digital twin |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3960420B2 (en) * | 2002-04-02 | 2007-08-15 | 独立行政法人交通安全環境研究所 | Engine test equipment |
CN101629496A (en) * | 2009-07-30 | 2010-01-20 | 杭州和利时自动化有限公司 | Digital electrohydraulic control system of steam turbine with isolated network operation |
-
2010
- 2010-04-13 CN CN2010101451912A patent/CN101871842B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3960420B2 (en) * | 2002-04-02 | 2007-08-15 | 独立行政法人交通安全環境研究所 | Engine test equipment |
CN101629496A (en) * | 2009-07-30 | 2010-01-20 | 杭州和利时自动化有限公司 | Digital electrohydraulic control system of steam turbine with isolated network operation |
Non-Patent Citations (2)
Title |
---|
刘全社.汽轮机调速系统速度变动率和迟缓率的探讨.《汽轮机技术》.2001,第43卷(第4期),244-247. * |
杨培成.国产切换型汽轮机功频电液控制系统功率开环方式下速度不等率测试及整定.《河南电力》.1997,(第1期),59-61. * |
Also Published As
Publication number | Publication date |
---|---|
CN101871842A (en) | 2010-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101871842B (en) | Method for directly testing speed diversity factor and stagnant rate of turbine electro-hydraulic control system | |
CN102748080B (en) | Main steam pressure change-based thermal power generating unit load control method | |
EP2936643B1 (en) | Coordinated control method of generator and svc for improving power plant active power throughput and controller thereof | |
WO2016011751A1 (en) | Speed adjustment method based on combined circulation gas turbine system model | |
CN108227500A (en) | A kind of control method for coordinating and system of the quick peak regulation of fired power generating unit | |
CN107240918B (en) | An Equivalent Simplification Method for Power System Connected to Wind Power | |
CN103743560A (en) | Turbine DEH system high-pressure regulating valve flow characteristic testing and setting method | |
CN109861251A (en) | A comprehensive control method for doubly-fed fans for microgrid transient steady-state frequency optimization | |
CN101446807A (en) | Realization method for heat-engine plant speed regulating system model in power system simulation | |
CN102080819A (en) | Model-based dynamically decoupling turbine-boiler coordination control method for thermal power unit | |
CN102629762A (en) | Floating frequency difference regulation and variable rate load instruction modification-based primary frequency regulation method | |
JP2007306770A (en) | Load frequency control device, load frequency control method, EDC correction request amount calculation device, and EDC correction request amount calculation method | |
CN105927976A (en) | Direct energy balance coordinated control system used for large circulating fluid bed unit | |
CN104089762A (en) | Flow characteristic test method of turbine governing valve | |
CN208142845U (en) | A kind of system for being inhibited to circulation of virtual synchronous machine when grid-connected | |
CN112152234B (en) | Dynamic refined primary frequency modulation control strategy for thermal power generating unit | |
CN108288858A (en) | Main passive frequency response method for handover control | |
CN105114141A (en) | Unit plant coordinative control method and system | |
CN108808707A (en) | A kind of computational methods of main steam pressure adaptive equalization primary frequency modulation control accuracy | |
CN111092440B (en) | A method and system for coordinating control of primary frequency modulation and AGC of hydroelectric unit | |
CN105022299A (en) | Method for improving AGC load response rapidity | |
CN110173308A (en) | A kind of the primary frequency modulation control method and its device of steam turbine for nuclear power station | |
CN110716425B (en) | Electric heat coordination control method for cogeneration unit | |
CN105134312A (en) | Method for determining running valve position of subcritical nozzle governing steam turbine | |
CN106899027A (en) | A Compensation Method for Primary Frequency Regulation Capability of Flow Dynamic Nonlinearity of Steam Turbine High Adjustment Valve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20130106 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20130106 Address after: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500 Patentee after: SHANDONG ELECTRIC POWER Research Institute Patentee after: State Grid Corporation of China Address before: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500 Patentee before: SHANDONG ELECTRIC POWER Research Institute |
|
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong Patentee after: Shandong Electric Power Research Institute Patentee after: State Grid Corporation of China Address before: 250002, No. 500, South Second Ring Road, Shizhong District, Shandong, Ji'nan Patentee before: Shandong Electric Power Research Institute Patentee before: State Grid Corporation of China |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong Patentee after: SHANDONG ELECTRIC POWER Research Institute Patentee after: STATE GRID CORPORATION OF CHINA Address before: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong Patentee before: SHANDONG ELECTRIC POWER Research Institute Patentee before: State Grid Corporation of China |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220127 Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co. Patentee after: STATE GRID CORPORATION OF CHINA Address before: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong Patentee before: SHANDONG ELECTRIC POWER Research Institute Patentee before: STATE GRID CORPORATION OF CHINA |