Summary of the invention
The object of the present invention is to provide the preceding quick identification method for permanent fault of a kind of single-phase reclosing of power transmission line, can be based on the reliable and stable electric parameters in recovery voltage stage, utilize the low frequency free component amplitude characteristic that disconnects the reactor current that is in parallel, discern the single-phase permanent fault of transmission line more reliably, the reliability that solves existing method is low, the differentiation time long, the problem of poor practicability.
In order to achieve the above object, the present invention is achieved by the following technical solutions.
Quick identification method for permanent fault before a kind of single-phase reclosing of power transmission line, at least one end of its transmission line is provided with parallel three phase reactor and the little reactor of neutral point, it is characterized in that, may further comprise the steps:
(1) the real-time current i of collection parallel three phase reactor
L φ(t), its amplitude is I
FL φ, wherein φ=A, B, C have and only have one to satisfy formula I mutually
FL φ≤ (0.70~080) I
LeThe time be defined as single-phase fault and corresponding fault is separate, I wherein
LeRunning current amplitude for the parallel three phase reactor; And real-time current amplitude I when the single-phase fault phase
TL φ, satisfy formula I
TL φ≤ (0.40~050) I
LeWhen φ=A, B, C, judge that this fault is in the tripping operation off-state mutually, for disconnecting phase;
Disconnect the low frequency self-vibration component frequencies omega of the reactor current that is in parallel when (2) calculating transient fault
L,
Wherein:
L
P, L
nBe respectively the equivalent inductance of shunt reactor and the little reactor of neutral point,
C
m, C
0Be respectively alternate electric capacity of total track length and direct-to-ground capacitance;
(3) disconnect the reactor current i that is in parallel after the default circuit transient fault blow-out
L φ(t) least square fitting model is
Wherein, I
LBe the be in parallel low frequency free oscillation component initial magnitude of reactor current of disconnection, I
1Be power frequency component amplitude, λ
LBe the inverse of low frequency free oscillation component damping time constant, θ
LBe low frequency free oscillation component initial phase, θ
1Be power frequency component initial phase, ω
LBe low frequency free oscillation component frequency, ω
1Be power frequency;
Order
Be 1, simplification least square fitting model is
i
Lφ(t)=[I
L?cosθ
L?sin(ω
Lt)+I
L?sinθ
L?cos(ω
Lt)]+[I
1?cosθ
1?sin(ω
1t)+I
1?sinθ
1?cos(ω
1t)]
For sampled value i
L φ(t
1), i
L φ(t
2) ..., i
L φ(t
N) constitute N equation, can be expressed as following matrix form equation
Wherein:
X=[I
L?cosθ
L,I
L?sinθ
L,I
1?cosθ
1,I
1?sinθ
1]
T,
B=[i
Lφ(t
1),i
Lφ(t
2),…,i
Lφ(t
N)]
T,
A is a coefficient matrix, and X is parameter matrix to be asked, and comprises 4 parameters to be asked; B serves as reasons and disconnects the real-time current i of the reactor that is in parallel
L φ(t) constant matrices that sampled value constitutes; N 〉=4;
Find the solution and wait to ask parameter matrix X=[I
LCos θ
L, I
LSin θ
L, I
1Cos θ
1, I
1Sin θ
1]
T
By following formula
The low frequency free oscillation component initial magnitude I that disconnects the reactor current that is in parallel is obtained in calculating
LWith power frequency component amplitude I
1
(4) if I
L<K
kI
1, safety factor K wherein
k=0.1~0.3, will disconnect and be judged to permanent fault mutually, send the reclosing block order; Otherwise, be judged to transient fault, send the reclosing order.
Further improvement of the present invention is, in the step (4), if I
L<K
kI
1Continue to set up 100~200ms, will disconnect and be judged to permanent fault mutually, send the reclosing block order; Otherwise, be judged to transient fault, send the reclosing order.
Quick identification method for permanent fault before the single-phase reclosing of power transmission line that the present invention proposes, based on the be in parallel low frequency free component amplitude characteristic of reactor current of disconnection, utilize the least-squares calculation result of the low frequency free component amplitude that disconnects the reactor current that is in parallel, realize the differentiation of transient fault and permanent fault.The transmission line that this method can be used for one end/two ends band shunt reactor carries out the single-phase fault property identification, is not subjected to the influence of position of failure point, transition resistance, load current on the principle, continues to judge in the long period before can extremely overlapping behind fault phase trip.Compared with prior art, the present invention has following remarkable advantage:
(1) only utilization disconnects the reactor current amount that is in parallel, and has guaranteed to utilize the high reliability of electric signal, and not influenced by passage, all can independently realize the differentiation of single-phase fault character for both-end band shunt reactor circuit both sides.Transmission line for the band shunt reactor, the shunt reactor side is equipped with the high current transformer of the little certainty of measurement of no-load voltage ratio usually, measurement disconnects the little magnitude of current of reactor amplitude that is in parallel and has higher precision, and relative voltage amount method of discrimination has more the engineering Practical significance.
(2) the least square fitting model of default shunt reactor electric current utilizes short data window can calculate low frequency free component initial magnitude and the power frequency component amplitude that disconnects the reactor current that is in parallel fast; The influence of beat frequency characteristic when not being subjected to transient fault, having solved existing differentiation algorithm extraction power frequency component preferably need be than the deficiency of long data window.
(3) this method has favorable applicability, is applicable to the permanent failure judgement of an end, the single-phase fault of two ends band shunt reactor circuit under diverse location, different transition resistance, different compensativity.
Embodiment
With reference to Fig. 1, the reactor at transmission line MN two ends has been installed reactor protection respectively respectively, and current transformer TA1, TA2 detect the real-time current of M end, N end parallel three phase reactor respectively.In the frame of broken lines is hardware configuration, is made of data acquisition system, microcomputer main system, input-output system three parts, and method of the present invention is realized by microcomputer DSP main system by programming.With the N side is example, input variable is a parallel three phase reactor current amount, TA2 obtains by shunt reactor side current transformer, the analog quantity of the parallel three phase reactor current that obtains is after preposition low-pass filtering, sampling maintenance and A/D conversion, deliver to microcomputer DSP main system, at first carry out fault by this method and select phase, confirmation form phase fault and tripping operation calculate the low frequency self-vibration component initial magnitude that disconnects the reactor current that is in parallel afterwards; According to low frequency self-vibration component initial magnitude result of calculation, judge that the single-phase fault that circuit takes place is transient fault or permanent fault then.
Concrete steps of the present invention are as follows:
(1) fault reaches the tripped condition affirmation mutually
Gather the real-time current i of parallel three phase reactor
L φ(t), its amplitude is I
FL φ, wherein φ=A, B, C have and only have one to satisfy formula I mutually
FL φ≤ (0.70~0.80) I
LeConfirmation form phase fault and fault are separate, wherein I
LeRunning current amplitude for the parallel three phase reactor; And real-time current amplitude I when the single-phase fault phase
TL φ, satisfy formula I
TL φ≤ (0.40~0.50) I
LeWhen φ=A, B, C, judge that this fault is in the tripping operation off-state mutually, for disconnecting phase.
Because the present invention is the permanent failure judgement of single-phase reclosing of power transmission line, can not be suitable for for phase-to phase fault.Therefore, after line fault, rapid and reliable confirmation form phase fault and tripped condition are particularly important, then do not carry out single-phase fault character for phase-to phase fault and differentiate by the existing policy action that overlaps.
A) the separate affirmation of single-phase fault
Behind the line failure, the normal operating voltage of fault phase voltage reduces to some extent, and the corresponding fault normal operating current of reactor current that is in parallel also reduces to some extent; Then approaching for the non-fault reactor current that is in parallel with running current.
Characteristics provide formula (1) and carry out the separate differentiation of single-phase fault in view of the above.Promptly
I
FLφ≤(0.70~0.80)I
Le (φ=A、B、C) (1)
Wherein: I
FL φBe parallel three phase reactor current initial magnitude; I
LeBe parallel three phase reactor running current amplitude.Has only parallel three phase reactor current I
FL φHave and only have one to satisfy formula (1) mutually, then be judged to single-phase fault and confirm that fault is separate; Otherwise, be judged to non-single-phase fault and do not carry out single-phase permanent failure judgement.
B) the single-phase fault tripped condition is confirmed
After treating that single-phase fault trips mutually, fault is in parallel, and normally operating voltage is little for the reactor terminal voltage, and reactor current amplitude and running current are approaching but not fault is in parallel.Provide formula (2) and carry out the fault phase trip state confirmation:
I
TLφ≤(0.40~0.50)I
Le (φ=A、B、C) (2)
Wherein: I
TL φBe parallel three phase reactor current amplitude; I
LeBe parallel three phase reactor running current amplitude.Have only the parallel three phase reactor current to have and only have fault to satisfy formula (2) mutually, then be judged to fault and trip mutually; Otherwise single-phase fault does not trip or is external area error, does not then carry out single-phase permanent failure judgement.
(2) nature of trouble is differentiated
During ultra-high/extra-high voltage transmission line generation permanent fault, because the fault point exists always, line mutual-ground capacitor reliably discharges, and disconnects being in parallel reactor current mainly based on power frequency component, does not contain the low frequency free component.And when transient fault, disconnect the LC oscillation circuit that the phase loop is made of shunt reactor and line capacitance behind the pending fault point arc extinction and produced the low frequency free component of frequency near power frequency, the disconnection of the correspondence reactor current that is in parallel has comprised low frequency free component and two kinds of periodic components of power frequency component.By the analysis of front as can be known, the existence of low frequency free component is to cause the transient fault electric current to have the immediate cause of beat frequency phenomenon, and only comprises the power frequency period component during permanent fault.Therefore, can realize the differentiation of single-phase fault instantaneity and permanent fault according to these characteristics of low frequency free component.
A) calculate low frequency self-vibration component frequencies omega
L
Circuit for most shunt reactors, because the reactor parameter is the fixed constant parameter, the free component frequency is only determined by the intrinsic physical parameter in the equivalent loop of transient fault blow-out, substantially be not subjected to system impedance and position of failure point variable effect, but this free oscillation frequency off-line calculates accurately.Can calculate by formula (3):
Wherein:
L
P, L
nEquivalent inductance for shunt reactor and the little reactor of neutral point;
C
m, C
0Be alternate electric capacity of total track length and direct-to-ground capacitance.
B) calculating disconnects each the component amplitude I of reactor current that is in parallel
L, I
1
In theory, disconnect the amplitude I of the low frequency free oscillation component of the reactor current amount that is in parallel during transient fault
LNear or greater than the amplitude I of power frequency component
1And during permanent fault, disconnecting the reactor current amount that is in parallel is principal mode with the power frequency period component, does not have low frequency free oscillation component, the low frequency free oscillation component amplitude I that this moment is corresponding
LShould be near 0.In fact, the error of calculation of free oscillation component frequency can influence power frequency, free oscillation component amplitude computational accuracy, therefore adopted least-square fitting approach, can reduce the influence that free oscillation component frequency error brings to a certain extent with good stability.
Shunt reactor current i after the default circuit transient fault blow-out
L φ(t) least square fitting model, promptly
In the formula (4), I
LBe low frequency free oscillation component initial magnitude, I
1Be power frequency component amplitude, λ
LFor low frequency free oscillation component sorrow subtracts time constant T
sInverse, θ
LBe low frequency free oscillation component initial phase, θ
1Be power frequency component initial phase, ω
LBe low frequency free oscillation component angular frequency, ω
1Be power frequency.
It is longer that low frequency free oscillation component sorrow during ultra-high/extra-high voltage transmission system transient fault subtracts the time, then can ignore the influence that the amplitude sorrow subtracts for the short data window algorithm,
Can be similar to and get 1.Thus, order
Be 1, simplify least square fitting modular form (4) for being following form
i
Lφ(t)=[I
L?cosθ
L?sin(ω
Lt)+I
L?sinθ
L?cos(ω
Lt)]+[I
1?cosθ
1?sin(ω
1t)+I
1?sinθ
1?cos(ω
1t)] (5)
Obviously, disconnect the reactor current i that is in parallel during transient fault
L φ(t) each sampled value constantly all satisfies formula (5).For sampled value i
L φ(t
1), i
L φ(t
2) ..., i
L φ(t
N) constitute N equation, can be expressed as following matrix form equation
Wherein:
X=[I
L?cosθ
L,I
L?sinθ
L,I
1?cosθ
1,I
1?sinθ
1]
T
B=[i
Lφ(t
1),i
Lφ(t
2),…,i
Lφ(t
N)]
T
A is a coefficient matrix, but calculated off-line is finished; X is parameter matrix to be asked, and comprises 4 parameters to be asked; B serves as reasons and disconnects the real-time current i of the reactor that is in parallel
L φ(t) constant matrices that sampled value constitutes; N 〉=4.
In theory, for the parameter in the formula (6) can by 4 independently linear equation finish, but usually take to enlarge the redundancy approach of matrix A scale in order to improve computational accuracy.Corresponding asking for of matrix X can be finished by formula (7)
In the formula (7),
Be generalized inverse matrix, its concrete computational methods can be finished with reference to relevant mathematical method, repeat no more.
Can try to achieve I among the matrix X by formula (7)
LCos θ
L, I
LSin θ
L, I
1Cos θ
1, I
1Sin θ
1, can obtain the low frequency free oscillation component initial magnitude I that disconnects the reactor current that is in parallel by formula (8)
L, and power frequency component amplitude I
1:
C) permanent failure judgement
The permanent fault criterion:
I
L<K
kI
1 (9)
Consider various errors and nargin, wherein safety factor K
k=0.1~0.3.
With the disconnection reactor current low frequency self-vibration component initial magnitude I that is in parallel
LWith power frequency component amplitude I
1Result of calculation substitution formula (9) judge.When formula (9) is set up, send the reclosing block order; Otherwise, be judged to transient fault, send the reclosing order.In order to improve the reliability of above-mentioned criterion, if I
L<K
kI
1Continue to set up 100ms~200ms, be judged to permanent fault, send the reclosing block order; Otherwise, be judged to transient fault, send the reclosing order.