CN101851925A - Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method - Google Patents
Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method Download PDFInfo
- Publication number
- CN101851925A CN101851925A CN 201010195079 CN201010195079A CN101851925A CN 101851925 A CN101851925 A CN 101851925A CN 201010195079 CN201010195079 CN 201010195079 CN 201010195079 A CN201010195079 A CN 201010195079A CN 101851925 A CN101851925 A CN 101851925A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pile
- deep
- stressed steel
- pipe concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention provides a deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method. The method comprises the following steps: (1) constructing the deep mixing pile; (2) grouting at an anchoring end; and (3) forming the micro pre-stressed steel pipe concrete pile. The method has the advantages that as the deep mixing pile is equipped with the micro pre-stressed steel pipe pile and an anchor rod or an anchor rope, the bending and shearing bearing capacity thereof is improved; the antidumping and anti-slip capability of the wall body of the mixing pile is improved under the condition of not exceeding a land red line; and meanwhile the combined support method has the advantages of short construction period, low noise, no pollution and no soil squeezing and is very beneficial to environmental protection during the construction process, thus being a novel combined support member and a method which are worth to be popularized and applied.
Description
Technical field
The present invention relates to technical field of buildings, a kind of specifically deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method.
Background technology
The safety of foundation ditch is directly connected to the safety of life and property, how to guarantee the safety of foundation ditch under the condition of economical rationality, and crucial problem depends on the reliability of support system.And the conventional deep-mixed pile gravity barricade that uses, it is all relatively poor that its bending resistance, shearing resistance, overturning or slip resistance analysis and antiskid move ability, is easy to produce under the soil pressure effect destroy, and influences the safety of foundation ditch and surrounding building, therefore, is necessary prior art is improved.
Summary of the invention
The objective of the invention is to develop and a kind ofly can effectively improve the bending resistance of deep-mixed pile gravity barricade, shearing resistance, overturning or slip resistance analysis and antiskid and move ability, and easy construction, deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method that cost is low.
Deep-mixed pile of the present invention+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method, its step is as follows:
1, construction deep-mixed pile;
2, Deep Mixing Piles Construction was finished in 12 hours, with engineering driller pore-forming in agitation pile, anchor pole or anchor cable was inserted the anchored end soil layer, carried out anchored end slip casting;
3, treat slurries solidify after with steel pipe socket at the bottom of passing the agitation pile endoporus on anchor pole or the anchor cable and inserting deep-mixed pile, build the concrete cover plate and solidify the post tensioning anchor pole or anchor cable applies prestressing force and locks with ground tackle, cement injection or pea gravel concreten in steel pipe form the micro pre-stressed steel pipe concrete stake again.
Described anchored end external diameter, outer diameter of steel pipes are identical with agitation pile endoporus external diameter.
Steel pipe can be round steel pipe or square steel pipe in the described deep-mixed pile.
Described anchor pole is a Ribbed Bar, and described anchor cable is a steel hinge line.
The advantage of deep-mixed pile of the present invention+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method is: because micro pre-stressed steel pipe stake and anchor pole or anchor cable are set in deep-mixed pile, improved its bending resistance, shear-carrying capacity, the overturning or slip resistance analysis and the antiskid that improve the agitation pile body of wall simultaneously under the situation that does not exceed the land used red line move ability.This combination supporting worker method duration in work progress is short, noise is little, pollution-free, soil compaction not, and is very favourable to environmental protection, is a kind of novel combination supporting member and method that is worthy of promotion and application therefore.
Description of drawings
Fig. 1 is the engineering effort figure of deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method.
Fig. 2 is that the engineering of deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method is overlooked design sketch.
The specific embodiment
Embodiment one
According to Fig. 1, shown in Figure 2, a kind of deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method, its step is as follows:
1, construction deep-mixed pile;
2, Deep Mixing Piles Construction was finished in 12 hours, with engineering driller pore-forming in agitation pile, Ribbed Bar was inserted the anchored end soil layer, carried out anchored end slip casting;
3, treat slurries solidify after with round steel pipe be enclosed within pass the agitation pile endoporus on the Ribbed Bar and insert deep-mixed pile at the bottom of, build the concrete cover plate and solidify the post tensioning Ribbed Bar and apply prestressing force and lock with ground tackle, cement injection in round steel pipe forms the micro pre-stressed steel pipe concrete stake again.
Described anchored end external diameter, outer diameter of steel pipes are identical with agitation pile endoporus external diameter.
Embodiment two
According to Fig. 1, shown in Figure 2, a kind of deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method, its step is as follows:
1, construction deep-mixed pile;
2, Deep Mixing Piles Construction was finished in 12 hours, with engineering driller pore-forming in agitation pile, steel hinge line was inserted the anchored end soil layer, carried out anchored end slip casting;
3, treat slurries solidify after with square steel pipe be enclosed within pass the agitation pile endoporus on the steel hinge line and insert deep-mixed pile at the bottom of, build the concrete cover plate and solidify the post tensioning steel hinge line and apply prestressing force and lock with ground tackle, in square steel pipe, annotate pea gravel concreten again, form the micro pre-stressed steel pipe concrete stake.
Described anchored end external diameter, outer diameter of steel pipes are identical with agitation pile endoporus external diameter.
The invention is not restricted to above embodiment, can realize a plurality of different embodiment as required.
Claims (2)
1. deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method, it is characterized in that: its step is as follows:
(1) construction deep-mixed pile;
(2) Deep Mixing Piles Construction was finished in 12 hours, with engineering driller pore-forming in agitation pile, anchor pole or anchor cable was inserted the anchored end soil layer, carried out anchored end slip casting;
(3) treat slurries solidify after with steel pipe socket at the bottom of passing the agitation pile endoporus on anchor pole or the anchor cable and inserting deep-mixed pile, build the concrete cover plate and solidify the post tensioning anchor pole or anchor cable applies prestressing force and locks with ground tackle, cement injection or pea gravel concreten in steel pipe form the micro pre-stressed steel pipe concrete stake again.
2. deep-mixed pile according to claim 1+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method is characterized in that: described anchored end external diameter, outer diameter of steel pipes are identical with agitation pile endoporus external diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010195079 CN101851925A (en) | 2010-06-03 | 2010-06-03 | Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010195079 CN101851925A (en) | 2010-06-03 | 2010-06-03 | Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101851925A true CN101851925A (en) | 2010-10-06 |
Family
ID=42803595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010195079 Pending CN101851925A (en) | 2010-06-03 | 2010-06-03 | Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101851925A (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561363A (en) * | 2012-02-08 | 2012-07-11 | 上海强劲地基工程股份有限公司 | Prestressed gravity type cement parapet wall and construction method thereof |
CN102839659A (en) * | 2012-09-25 | 2012-12-26 | 吴良斌 | Construction method for leading anchor pipe and minitype steel pipe pile |
CN103352477A (en) * | 2013-07-12 | 2013-10-16 | 青岛理工大学 | Vertical prestressed anchor rod gravity type composite retaining wall and design and construction method thereof |
CN103526773A (en) * | 2013-10-22 | 2014-01-22 | 青岛理工大学 | Cantilever type vertical anchor rod composite retaining wall and design and construction method thereof |
CN104452771A (en) * | 2014-11-06 | 2015-03-25 | 左克伟 | Counterfort type row pile supporting method for foundation pit |
CN104563111A (en) * | 2014-12-01 | 2015-04-29 | 浙江省岩土基础公司 | Construction method for rock embedding of inclined pile |
CN104711991A (en) * | 2013-12-12 | 2015-06-17 | 中国核工业第五建设有限公司 | Foundation near foundation pit slope and reinforcement method thereof |
CN104727322A (en) * | 2015-03-20 | 2015-06-24 | 济南轨道交通集团有限公司 | Recoverable device for fixing anchor rod with steel pipe pile and construction method |
CN106337418A (en) * | 2015-07-10 | 2017-01-18 | 华北冶建工程建设有限公司 | Supporting structure and supporting method of deep foundation pit in narrow area |
CN106759266A (en) * | 2017-01-09 | 2017-05-31 | 王立明 | Combination reinforcement diaphragm wall and its construction method |
CN106759322A (en) * | 2017-01-12 | 2017-05-31 | 兰州理工大学 | Rib Reinforced reinforced anchor bolt lockset and application method |
CN106968245A (en) * | 2017-05-18 | 2017-07-21 | 重庆科技学院 | The uplift pile of prestress anchorage cable manually digging hole and its construction method |
CN107338792A (en) * | 2017-06-16 | 2017-11-10 | 中建市政工程有限公司 | Prestressed cement mixing pile and construction method thereof |
CN109853598A (en) * | 2019-03-29 | 2019-06-07 | 西安工业大学 | A kind of mini pile rigid connection structure and construction method for having both landslide-proofing and producing road |
CN109930609A (en) * | 2019-04-09 | 2019-06-25 | 大连交通大学 | A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground |
CN110130360A (en) * | 2019-05-10 | 2019-08-16 | 中国建筑西南勘察设计研究院有限公司 | A kind of post-tensioned prestressing supporting construction and its construction method |
CN114108694A (en) * | 2021-11-11 | 2022-03-01 | 中冶集团武汉勘察研究院有限公司 | Micro-disturbance anti-floating underground cylindrical structure and construction method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56125528A (en) * | 1980-03-06 | 1981-10-01 | Nittoku Kensetsu Kk | Construction of in-situ driven pile |
JPH06330524A (en) * | 1993-05-20 | 1994-11-29 | Taisei Corp | Construction method of on-site piles that also serve as anchors |
CN101619574A (en) * | 2009-07-28 | 2010-01-06 | 朱奎 | Prestress pulling resistant anchor pile and constructing method thereof |
CN101629422A (en) * | 2009-08-06 | 2010-01-20 | 朱奎 | Construction method for supporting foundation ditch of reinforced cement earth wall |
-
2010
- 2010-06-03 CN CN 201010195079 patent/CN101851925A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56125528A (en) * | 1980-03-06 | 1981-10-01 | Nittoku Kensetsu Kk | Construction of in-situ driven pile |
JPH06330524A (en) * | 1993-05-20 | 1994-11-29 | Taisei Corp | Construction method of on-site piles that also serve as anchors |
CN101619574A (en) * | 2009-07-28 | 2010-01-06 | 朱奎 | Prestress pulling resistant anchor pile and constructing method thereof |
CN101629422A (en) * | 2009-08-06 | 2010-01-20 | 朱奎 | Construction method for supporting foundation ditch of reinforced cement earth wall |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561363A (en) * | 2012-02-08 | 2012-07-11 | 上海强劲地基工程股份有限公司 | Prestressed gravity type cement parapet wall and construction method thereof |
CN102839659A (en) * | 2012-09-25 | 2012-12-26 | 吴良斌 | Construction method for leading anchor pipe and minitype steel pipe pile |
CN102839659B (en) * | 2012-09-25 | 2015-11-18 | 吴良斌 | The construction method of a kind of advanced anchor tube and miniature steel pipe pile |
CN103352477A (en) * | 2013-07-12 | 2013-10-16 | 青岛理工大学 | Vertical prestressed anchor rod gravity type composite retaining wall and design and construction method thereof |
CN103526773A (en) * | 2013-10-22 | 2014-01-22 | 青岛理工大学 | Cantilever type vertical anchor rod composite retaining wall and design and construction method thereof |
CN104711991A (en) * | 2013-12-12 | 2015-06-17 | 中国核工业第五建设有限公司 | Foundation near foundation pit slope and reinforcement method thereof |
CN104452771A (en) * | 2014-11-06 | 2015-03-25 | 左克伟 | Counterfort type row pile supporting method for foundation pit |
CN104563111A (en) * | 2014-12-01 | 2015-04-29 | 浙江省岩土基础公司 | Construction method for rock embedding of inclined pile |
CN104563111B (en) * | 2014-12-01 | 2016-06-22 | 浙江省岩土基础公司 | A kind of construction method of taper pile anchor rock |
CN104727322A (en) * | 2015-03-20 | 2015-06-24 | 济南轨道交通集团有限公司 | Recoverable device for fixing anchor rod with steel pipe pile and construction method |
CN106337418A (en) * | 2015-07-10 | 2017-01-18 | 华北冶建工程建设有限公司 | Supporting structure and supporting method of deep foundation pit in narrow area |
CN106759266A (en) * | 2017-01-09 | 2017-05-31 | 王立明 | Combination reinforcement diaphragm wall and its construction method |
CN106759266B (en) * | 2017-01-09 | 2019-11-05 | 王立明 | Combine reinforcement diaphragm wall and its construction method |
CN106759322A (en) * | 2017-01-12 | 2017-05-31 | 兰州理工大学 | Rib Reinforced reinforced anchor bolt lockset and application method |
CN106968245A (en) * | 2017-05-18 | 2017-07-21 | 重庆科技学院 | The uplift pile of prestress anchorage cable manually digging hole and its construction method |
CN107338792A (en) * | 2017-06-16 | 2017-11-10 | 中建市政工程有限公司 | Prestressed cement mixing pile and construction method thereof |
CN109853598A (en) * | 2019-03-29 | 2019-06-07 | 西安工业大学 | A kind of mini pile rigid connection structure and construction method for having both landslide-proofing and producing road |
CN109930609A (en) * | 2019-04-09 | 2019-06-25 | 大连交通大学 | A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground |
CN110130360A (en) * | 2019-05-10 | 2019-08-16 | 中国建筑西南勘察设计研究院有限公司 | A kind of post-tensioned prestressing supporting construction and its construction method |
CN114108694A (en) * | 2021-11-11 | 2022-03-01 | 中冶集团武汉勘察研究院有限公司 | Micro-disturbance anti-floating underground cylindrical structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101851925A (en) | Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method | |
CN104179178B (en) | A flexible umbrella-shaped support bolt and its method for supporting soil slopes | |
CN202559345U (en) | Bottom-expanded pre-stress anti-floating anchor rod | |
CN204080802U (en) | A kind of flexible umbrella support anchor rod | |
CN203741868U (en) | Reinforced concrete retaining wall structure with combined anchor wire | |
CN101775814B (en) | Anti-slip cement soil pile soil blocking structure and construction method thereof | |
CN103437354A (en) | Water drainage anchor rod and construction method | |
CN101694098B (en) | Recyclable prestressed tendon for soft oil support and construction method thereof | |
CN201730091U (en) | Cast-in-situ pile | |
CN111980038A (en) | Novel structure for preventing and treating landslide and construction method thereof | |
CN102535458A (en) | Reinforced cement-soil anchor bolt and construction method thereof | |
CN113123373A (en) | Pressure-bearing uplift pile with rear-inserted unbonded steel strand U-shaped pipe and construction method thereof | |
CN210395412U (en) | Prestressed anchor pile uplift foundation suitable for overhead transmission line in mountain area | |
CN110616740A (en) | Structure for expanding subway section in subway mine method construction interval and construction method thereof | |
CN203049577U (en) | Complete recovery type non-grouting anchor grasping anchor cable timbering structure | |
CN203867598U (en) | Anchor cable capable of applying prestress repeatedly | |
CN103883339A (en) | Anchor cable supporting method for repeated application of prestress | |
CN209211459U (en) | Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA | |
CN203846399U (en) | Combined type rock anchor with buckling anchor system | |
CN207846456U (en) | A kind of prestressing force base expanding and base expanding anchor cable blower foundation for Rock Region | |
CN214784243U (en) | Back-inserted unbonded steel strand U-shaped pipe pressure-bearing uplift pile | |
CN213539004U (en) | Novel structure for preventing and treating landslide | |
CN104929101A (en) | Bottom expanding-multisection side expanding anti-pull prestressed anchoring gravel pile and construction method | |
CN102080376B (en) | Built-in composite anchor rod construction method and composite anchor rod drilling tool used by same | |
CN102235017A (en) | Lateral force resisting method for soft soil foundation building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20101006 |