Suspension tunnel model test unit in a kind of water that continuously changes the anchor cable inclination angle
Technical field
The present invention relates to the model test apparatus of submerged floating tunnel in a kind of water.
Background technology
Submerged floating tunnel in the water claims unit of Archimedes bridge again, be a kind of dive bubble through the water column down certain depth, to utilize himself buoyancy be to support, a kind of novel waters traffic plan of fixing by anchor cable, pile etc. of striding.To such an extent as to the very big or unstable area that should not build bridge and subaqueous tunnel of geology for the waters span, or environmental protection requirement area, unit of Archimedes bridge are arranged is to cross over the preferred version that the waters connects.Still there is not at present submerged floating tunnel in the water that builds up in the world.For this novel transport structure, carry out model test targetedly, to studying its structural dynamic characteristic, verifying that safety of structure is crucial.The submerged floating tunnel test model can only be realized specific anchor cable arrangement form in the existing water.In experiment,, must make that the process of the test complexity is time-consuming respectively to various particular form designs, placement model for submerged floating tunnel in the water of studying different anchor cable forms.Do not solve at present the problem that how to realize continuously changing the anchor cable inclination angle in the water in the submerged floating tunnel test model well.
Summary of the invention
At the deficiency of existing experimental technique, the object of the present invention is to provide suspension tunnel model test unit in a kind of water that can continuously change the anchor cable inclination angle.
Submerged floating tunnel test unit in a kind of water that continuously changes the anchor cable inclination angle is characterized in that: comprise slidably suspension tunnel model and anchor cable in base, top-support and the water; Suspension tunnel model is fixed by anchor cable in the water, and the underwater depth of immersion of suspension tunnel model is fixed, and anchor cable and sliding bottom are slidingly connected, and the end of anchor cable is fixed on the top-support.
Further, described slidably base comprises pedestal, guide rail, gear train and two slides.
Further, part has the screw thread that sense of rotation is opposite, pitch is identical about described guide rail, and described slide inside is provided with screw thread with matching.
Further, described two slides are installed in guide rail the right and left symmetrically, and during adjusting, described slide will move to guide rail both sides or center symmetrically along guideway centreline.
Further, described slidably base guarantees the synchronous interaction of slide on two guide rails by gear train.
Further, described gear train also comprises control lever, and this control lever stretches out the water surface, is installed in tank along last.
Further, control lever rotates by the gear driven guide rail, has reflection to rotate the gauge point of the number of turns on the control lever.
Further, described top-support comprises base, be arranged on leading screw and the transmission height adjustment mechanism that is arranged on the leading screw on the base, the crossbeam of top-support is arranged on the height adjustment mechanism, and can change its position in vertical direction with described height adjustment mechanism; Anchor cable can be fixed on the described crossbeam; Described transmission height adjustment mechanism can be used for regulating the height of described crossbeam, and matches with base slidably, guarantees when changing at the anchor cable inclination angle that the underwater depth of immersion of empirical model is constant.
Further, described anchor cable length is fixed, and is fixed on the support by the snap ring that is arranged on the described support, force transducer is set on snap ring measures suspension tunnel model anchor cable tension force in the water.
Further, in the described water suspension tunnel model self buoyancy greater than gravity.
Description of drawings
Fig. 1 for the present invention slidably in base and the water master of suspension tunnel model look synoptic diagram;
Fig. 2 is the present invention's schematic top plan view of suspension tunnel model in base and the water slidably;
Fig. 3 looks synoptic diagram for the master of top-support of the present invention;
Fig. 4 looks synoptic diagram for the left side of top-support of the present invention;
Fig. 5 can continuously change the 3 dimensional drawing of suspension tunnel model test unit in the water at anchor cable inclination angle for a kind of among the present invention.
Embodiment
The present invention can continuously change in the water at anchor cable inclination angle the suspension tunnel model test unit and comprise slidably suspension tunnel model and anchor cable in base, top-support and the water.
As shown in Figure 1, 2, slidably base comprises base 4, is arranged on the guide rail 5 on the base, and the slide 7 that can move on guide rail is fixed on pulley 3 and rotation drive machine on the slide 7.Slidably base should have enough weight, can be in water be moved under the anchor cable pulling force effect of submerged floating tunnel test model to guarantee base in test.And, slidably the pedestal 4 of base and guide rail 5 should be selected suitable length according to the anchor cable inclination angle scope of the required adjusting of test, slidably the guide rail 5 of base can be divided into left side and right-hand part by position in the middle of it, two parts are provided with the screw thread that sense of rotation is opposite, pitch is identical, and are provided with screw thread with matching in slide 7 inside.Two slidably slides 7 of base are set in the experimental provision, and its length should be not less than suspension tunnel model length in the water, be not more than the experimental trough width.Two slides 7 are installed in guide rail the right and left symmetrically.Gear train is made up of control lever 6a, gear and connecting rod.
Shown in Fig. 3,4, top-support comprises base 9, be arranged on leading screw 10 and the transmission height adjustment mechanism 11 that is arranged on the leading screw 10 on the base 9, the crossbeam 14 of top-support, be arranged on the snap ring 15 that is used for fixing anchor cable 2 tops on the top cross-bar, top-support should have enough rigidity, does not influence experiment measuring bigger distortion can not take place under the tension force effect that guarantees support suspension tunnel model anchor cable in water.
The shape of suspension tunnel model, size, material etc. customize according to testing requirements.The buoyancy of suspension tunnel model is greater than self gravitation in the water, and by anchor cable balance surplus buoyancy, anchor cable is slidingly connected by pulley on the slide and base, and extends the water surface, and the end is fixedly connected on the top-support.
During experiment, shown in Fig. 1,2,3,4,5, top-support is arranged on the experimental trough edge 13 by its base 9; Slidably base is placed on the experimental trough bottom, and suspension tunnel model 1 is fixing by anchor cable 2 in the water; Anchor cable 2 lays out the water surface 8 through pulley 3, and the anchor cable end uses snap ring 15 to be fixed on the crossbeam 14 of top-support.When needing in the experiment to change the anchor cable inclination angle, drive guide rail by the control lever 6a of rotational fixation on the tank edge by gear and rotate, on guide rail 5, move to the guide rail both sides or to guideway centreline symmetrically thereby drive two slides 7.There is reflection to rotate the gauge point of the number of turns on the control lever 6a, the anchor cable inclination angle of in experiment, realizing accurately changing empirical model by the rotation number of turns of controlling control lever 6a.Because the total length of this test unit stream line is fixed, in the inclination angle that changes anchor cable 2, should correspondingly regulate support height, to guarantee that suspension tunnel model 1 underwater depth of immersion is constant in the water.Support can be regulated height by producing relative motion between rotation height adjustment mechanism 11 and the leading screw 10.The anchor cable end of empirical model is fixed on the crossbeam 14 of top-support with snap ring 15.Can on snap ring 15, measure tension force in the anchor cable by the installing force sensor.