[go: up one dir, main page]

CN101833310B - Electricity consumption control system and method - Google Patents

Electricity consumption control system and method Download PDF

Info

Publication number
CN101833310B
CN101833310B CN200910127237A CN200910127237A CN101833310B CN 101833310 B CN101833310 B CN 101833310B CN 200910127237 A CN200910127237 A CN 200910127237A CN 200910127237 A CN200910127237 A CN 200910127237A CN 101833310 B CN101833310 B CN 101833310B
Authority
CN
China
Prior art keywords
subsystem
temperature
detector
power consumption
room area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200910127237A
Other languages
Chinese (zh)
Other versions
CN101833310A (en
Inventor
吕明光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai General Electric Power Mdt Infotech Ltd
CQ Inc
Original Assignee
CQ Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CQ Inc filed Critical CQ Inc
Priority to CN200910127237A priority Critical patent/CN101833310B/en
Publication of CN101833310A publication Critical patent/CN101833310A/en
Application granted granted Critical
Publication of CN101833310B publication Critical patent/CN101833310B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

本发明提供一种用电量管控系统及方法,用以控制一用电系统在一时间点的总用电量在一门槛值之下。使用者先行计算在一单位周期下,合理的用电度数或用电量,并将此合理的用电度数或用电量设定在用电量控管模块。此时用电量控管模块,根据设定的用电度数或用电量的预算,在一单位周期下,针对使用者的用电结构进行动态调整分配。

Figure 200910127237

The present invention provides a power consumption control system and method for controlling the total power consumption of a power consumption system at a time point below a threshold value. The user first calculates the reasonable power consumption or power consumption in a unit cycle, and sets the reasonable power consumption or power consumption in the power consumption control module. At this time, the power consumption control module dynamically adjusts and allocates the user's power consumption structure in a unit cycle according to the set power consumption or power consumption budget.

Figure 200910127237

Description

用电量管控系统及方法Electricity consumption control system and method

技术领域 technical field

本发明是有关于一种控制系统及其操作方法,且特别是有关于一种用以控制用电量的系统及其操作方法。The present invention relates to a control system and its operating method, and in particular to a system for controlling power consumption and its operating method.

背景技术 Background technique

由于全球油电及各项原物料价格齐涨,以及近年来因全球暖化造成的天气异常,促使各国政府政策均朝向降低温室气体排放的方向制定,“节能”、“减碳”以及“省钱”成为全人类追寻的目标。Due to the rising prices of oil, electricity and various raw materials around the world, as well as the abnormal weather caused by global warming in recent years, governments of all countries have made policies towards reducing greenhouse gas emissions. "Energy saving", "carbon reduction" and "saving Money" has become the goal pursued by all mankind.

尤其当电价高涨占据大部分生产作业成本时,若可在用电之前先行计划用电结构,并可进行动态调整分配用电支出,对各企业追求成本的合理化与最小化将有莫大的帮助。Especially when rising electricity prices account for most of the cost of production operations, if the structure of electricity consumption can be planned before electricity consumption, and the distribution of electricity consumption can be dynamically adjusted, it will be of great help to the rationalization and minimization of costs for various enterprises.

发明内容 Contents of the invention

因此本发明的主要目的就是在提供一种可期前计划的用电量管控系统与方法,使用者可在用电之前,根据一用电总量先行规划用电结构,以极大化用电效益。Therefore, the main purpose of the present invention is to provide a power consumption control system and method that can be planned in advance. Users can plan the power consumption structure according to a total power consumption before using electricity to maximize power consumption. benefit.

本发明的另一目的就是在提供一种可动态调整的用电量管控系统与方法,可根据外在环境条件随时变化用电状态。Another object of the present invention is to provide a dynamically adjustable power consumption control system and method, which can change the power consumption status at any time according to external environmental conditions.

根据一实施例,本发明的一种用电量管控系统,用以控制一用电系统在一时间点的总用电量在一门槛值之下,其中该用电系统包括多个子系统,每一该些子系统控制一室内区域并具有一调整温度开关以及一侦测器,该用电量管控系统至少包含:动态温度管理模块,当该总用电量大于该门槛值时,将至少一子系统的调整温度开关调升一第一温度,以及当该总用电量小于该门槛值,将该至少一子系统的调整温度开关调降一第二温度;一运转排程管理模块,排列该些子系统的调整温度顺序;一闲置空间管理模块,当该至少一子系统的侦测器侦测到无人使用该子系统时,将该至少一子系统的调整温度开关关闭;一外气引进管理模块,当该至少一子系统的侦测器侦测到该室内区域温度高于一室外温度时,引进该室外空气,以及当该至少一子系统的侦测器侦测到该室内区域温度低于该室外温度时,停止引进该室外空气;一热源监测管理模块,当该至少一子系统的侦测器侦测到一设施的温度高于该室内区域温度时,隔离该设施;以及一实时泄漏管理模块,当该至少一子系统的侦测器侦测到一室外温度高于该室内区域温度,且该至少一子系统的侦测器侦测到该室内区域的一门窗设施未关闭达一第一时间后,将该至少一子系统的调整温度开关调升一第三温度。According to an embodiment, a power consumption management and control system of the present invention is used to control the total power consumption of a power consumption system at a point in time to be below a threshold value, wherein the power consumption system includes a plurality of subsystems, each One of the subsystems controls an indoor area and has a temperature adjustment switch and a detector. The power consumption control system at least includes: a dynamic temperature management module. When the total power consumption is greater than the threshold value, at least one The adjustment temperature switch of the subsystem is adjusted to a first temperature, and when the total power consumption is less than the threshold value, the adjustment temperature switch of the at least one subsystem is lowered to a second temperature; an operation schedule management module, arranged The temperature adjustment sequence of these subsystems; an idle space management module, when the detector of the at least one subsystem detects that no one is using the subsystem, the adjustment temperature switch of the at least one subsystem is turned off; an external air introduction management module, when the detector of the at least one subsystem detects that the temperature of the indoor area is higher than an outdoor temperature, the outdoor air is introduced, and when the detector of the at least one subsystem detects that the indoor When the area temperature is lower than the outdoor temperature, stop introducing the outdoor air; a heat source monitoring management module, when the detector of the at least one subsystem detects that the temperature of a facility is higher than the indoor area temperature, isolate the facility; And a real-time leakage management module, when the detector of the at least one subsystem detects that an outdoor temperature is higher than the temperature of the indoor area, and the detector of the at least one subsystem detects a door and window facility in the indoor area After not being closed for a first time, the adjustment temperature switch of the at least one subsystem is raised to a third temperature.

根据一实施例,其中该用电系统为一空调系统,该空调系统具有一冰水主机,该空调系统还包括一系统效率管理模块,用以设定该冰水主机的出水温度,其中当该总用电量大于该门槛值时,调升该冰水主机的出水温度。According to an embodiment, the power consumption system is an air-conditioning system, the air-conditioning system has a chilled water main unit, and the air-conditioned system further includes a system efficiency management module for setting the outlet water temperature of the chilled water main unit, wherein when the When the total power consumption is greater than the threshold value, increase the outlet water temperature of the chilled water host.

根据一实施例,其中该用电系统为一空调系统,该空调系统具有第一与第二冰水主机,该空调系统还包括一系统效率管理模块,用以设定该第一与第二冰水主机的出水温度,其中先开启该第一冰水主机,以及当该空调系统提供的温度高于一要求温度时,开启该第二冰水主机。According to an embodiment, the power consumption system is an air conditioning system, the air conditioning system has first and second chilled water hosts, and the air conditioning system further includes a system efficiency management module for setting the first and second chilled water hosts. The outlet water temperature of the water host, wherein the first chilled water host is turned on first, and when the temperature provided by the air conditioning system is higher than a required temperature, the second chilled water host is turned on.

根据一实施例,其中该热源监测管理模块通知一使用者隔离该设施。According to an embodiment, the heat source monitoring management module notifies a user to isolate the facility.

根据一实施例,其中隔离该设施为关闭该设施电源。According to an embodiment, wherein isolating the facility is powering off the facility.

根据一实施例,其中隔离该设施为关闭门窗。According to an embodiment, wherein isolating the facility is closing doors and windows.

根据一实施例,其中该侦测器包括一温度传感器、一门窗传感器、一移动传感器。According to an embodiment, the detector includes a temperature sensor, a door and window sensor, and a motion sensor.

根据一实施例,其中该侦测器还包括一CO2浓度传感器。其中当该至少一子系统的该CO2浓度传感器侦测到该室内区域的CO2浓度高于一默认值时,该外气引进管理模块引进该室外空气至对应该至少一子系统的室内区域。According to an embodiment, the detector further includes a CO 2 concentration sensor. Wherein when the CO 2 concentration sensor of the at least one subsystem detects that the CO 2 concentration in the indoor area is higher than a default value, the outdoor air introduction management module introduces the outdoor air to the indoor area corresponding to the at least one subsystem .

根据一实施例,其中该默认值的设定为当该CO2浓度高于1200ppm该外气引进管理模块引进外气,以及当该CO2浓度低于1000ppm外气引进管理模块关闭外气。According to an embodiment, wherein the default value is set as the external air introduction management module introduces external air when the CO 2 concentration is higher than 1200ppm, and the external air introduction management module closes the external air when the CO 2 concentration is lower than 1000ppm.

根据一实施例,其中该默认值的设定为当该CO2浓度高于1500ppm该外气引进管理模块引进外气,及当该CO2浓度低于1200ppm该外气引进管理模块关闭外气。According to an embodiment, the default value is set as the external air introduction management module introduces external air when the CO 2 concentration is higher than 1500 ppm, and the external air introduction management module closes the external air when the CO 2 concentration is lower than 1200 ppm.

根据一实施例,其中该默认值的设定为当该CO2浓度高于2000ppm该外气引进管理模块引进外气,及当该CO2浓度低于1500ppm该外气引进管理模块关闭外气。According to an embodiment, wherein the default value is set as the external air introduction management module introduces external air when the CO 2 concentration is higher than 2000 ppm, and the external air introduction management module closes the external air when the CO 2 concentration is lower than 1500 ppm.

根据一实施例,还包括一设定模块用以设定该门槛值。According to an embodiment, a setting module is further included for setting the threshold.

根据一实施例,还包括一仿真分析模块用以仿真在该门槛值下,该时间点的用电状况。According to an embodiment, a simulation analysis module is also included for simulating the power consumption situation at the time point under the threshold value.

根据一实施例,其中该动态温度管理模块还包括设定该些子系统控制的对应室内区域舒适度要求的优先级。According to an embodiment, the dynamic temperature management module further includes setting the priorities of the comfort requirements of the corresponding indoor areas controlled by the subsystems.

根据一实施例,其中该动态温度管理模块根据该舒适度要求优先级调整该些子系统的调整温度开关。According to an embodiment, the dynamic temperature management module adjusts the adjustment temperature switches of the subsystems according to the comfort level priority.

根据一实施例,本发明还提供一种用电量管控方法,用以控制一用电系统在一时间点的总用电量在一门槛值之下,其中该用电系统包括多个子系统以及一第一冰水主机,每一该些子系统控制一室内区域并具有一调整温度开关以及一侦测器,该用电量管控方法至少包含:设定该第一用电度数;排列该些子系统的调整温度顺序;当该总用电量大于该门槛值时,将至少一子系统的调整温度开关调升一第一温度,以及当该总用电量小于该门槛值,将该至少一子系统的调整温度开关调降一第二温度;当该至少一子系统的侦测器侦测到无人使用该子方法时,将该至少一子系统的调整温度开关关闭;当该至少一子系统的侦测器侦测到该室内区域温度高于一室外温度时,引进该室外空气,以及当该至少一子系统的侦测器侦测到该室内区域温度低于该室外温度时,停止引进该室外空气;当该至少一子系统的侦测器侦测到一设施的温度高于该室内区域温度时,隔离该设施;  当该至少一子系统的侦测器侦测到一室外温度高于该室内区域温度,且该至少一子系统的侦测器侦测到该室内区域的一门窗设施未关闭达一第一时间后,将该至少一子系统的调整温度开关调升一第三温度;以及设定该第一冰水主机的出水温度,其中当该总用电量大于该门槛值时,调升该第一冰水主机的出水温度。According to an embodiment, the present invention also provides a power consumption control method for controlling the total power consumption of a power consumption system at a point in time to be below a threshold value, wherein the power consumption system includes a plurality of subsystems and A first ice water host, each of the subsystems controls an indoor area and has a temperature adjustment switch and a detector. The power consumption control method at least includes: setting the first power consumption degree; arranging the The temperature adjustment sequence of the subsystems; when the total power consumption is greater than the threshold value, the adjustment temperature switch of at least one subsystem is raised to a first temperature, and when the total power consumption is less than the threshold value, at least one subsystem The temperature adjustment switch of a subsystem lowers a second temperature; when the detector of the at least one subsystem detects that no one uses the subsystem, the temperature adjustment switch of the at least one subsystem is turned off; when the at least one subsystem introducing the outdoor air when a detector of a subsystem detects that the temperature of the indoor area is higher than an outdoor temperature, and when the detector of the at least one subsystem detects that the temperature of the indoor area is lower than the outdoor temperature , stop introducing the outdoor air; when the detector of the at least one subsystem detects that the temperature of a facility is higher than the temperature of the indoor area, isolate the facility; when the detector of the at least one subsystem detects a After the outdoor temperature is higher than the temperature of the indoor area, and the detector of the at least one subsystem detects that a door and window facility of the indoor area is not closed for a first time, the adjustment temperature switch of the at least one subsystem is raised a third temperature; and setting the outlet water temperature of the first chilled water main unit, wherein when the total power consumption is greater than the threshold value, the outlet water temperature of the first chilled water main unit is raised.

附图说明 Description of drawings

为了让本发明的上述和其它目的、特征、优点与实施例能更明显易懂,所附附图的详细说明如下:In order to make the above and other objects, features, advantages and embodiments of the present invention more comprehensible, the detailed description of the accompanying drawings is as follows:

图1绘示了根据本发明一较佳实施例的电量控管系统概略图标;Fig. 1 depicts a schematic diagram of a power control management system according to a preferred embodiment of the present invention;

图2所示为根据本发明一较佳实施例的用电量控制流程图。FIG. 2 is a flow chart of power consumption control according to a preferred embodiment of the present invention.

【主要组件符号说明】[Description of main component symbols]

100电量控管用电系统100 power control management power system

101设定目标节能金额或电度模块101 Set the target energy saving amount or electricity module

102仿真分析模块102 simulation analysis module

103用电量控管模块103 power consumption control module

1031动态温度管理模块1031 dynamic temperature management module

1032运转排程管理模块1032 operation scheduling management module

1033闲置空间管理模块1033 idle space management module

1034外气引进管理模块1034 external air introduction management module

1035热源监测管理模块1035 heat source monitoring management module

1036实时泄漏管理模块1036 real-time leakage management module

1037系统效率管理模块1037 system efficiency management module

201设定201 setting

202用户基本数据设定202 User basic data setting

203用电目标设定203 Electricity Goal Setting

204设施群组设定204 Facility group setting

205舒适度与优先权设定205 Comfort level and priority setting

206动态能源使用管理功能列表206 List of Dynamic Energy Usage Management Functions

300动态用电管控系统300 dynamic power management and control system

301设定管理功能301 setting management function

302图表分析302 chart analysis

3021空调用电金额比较图3021 air conditioner electricity consumption comparison chart

3022电源浪费原因分布图3022 Distribution Map of Power Waste Causes

303设施群组管理303 Facility Group Management

304舒适度与优先权管理304 Comfort and Priority Management

305动态用电管控策略305 Dynamic Power Consumption Control Strategy

306用户基本数据管理306 User basic data management

307用电目标管理307 Power Consumption Target Management

3051动态温度管理设定3051 dynamic temperature management setting

3052外气引进管理设定3052 External air introduction management setting

3053运转排程管理设定3053 operation schedule management setting

3054热源监测管理设定3054 heat source monitoring management settings

3055实时泄漏管理设定3055 real-time leak management settings

3056系统效率管理设定3056 System Efficiency Management Settings

3057闲置空间管理设定3057 Idle space management setting

30531设备排程设定30531 equipment scheduling settings

30532动态能源使用功能排程设定30532 Dynamic energy usage function scheduling setting

30533舒适度与优先权排程设定30533 comfort level and priority scheduling setting

具体实施方式 Detailed ways

图1绘示了根据本发明一较佳实施例的电量控管系统概略图标。根据一较佳实施例,此电量控管用电系统100包括:设定目标节能金额或电度模块101、仿真分析模块102以及用电量控管模块103。其中用电量控管模块103还包括七个管理模块,分别为动态温度管理模块1031、运转排程管理模块1032、闲置空间管理模块1033、外气引进管理模块1034、热源监测管理模块1035、实时泄漏管理模块1036以及系统效率管理模块1037。值得注意的是,在其它实施例中,亦可根据不同的控管系统增加其它不同功能的管理模块。本发明可根据历史、实时与预测的信息,帮助用户精密地调配每一段时期的空调用电量,让用户可订定每月或每季或一年的期望用电金额,若超出用户期望的空调用电预算时,计算机便根据负载优先级进行系统端与负载端空调设施的参数线性调整,甚至调整负载舒适度等,避免空调用电超出用户期望金额。FIG. 1 shows a schematic diagram of a power management system according to a preferred embodiment of the present invention. According to a preferred embodiment, the electricity consumption control system 100 includes: a module 101 for setting a target energy saving amount or electricity degree, a simulation analysis module 102 and an electricity consumption control module 103 . The power consumption control module 103 also includes seven management modules, namely the dynamic temperature management module 1031, the operation schedule management module 1032, the idle space management module 1033, the external air introduction management module 1034, the heat source monitoring management module 1035, the real-time Leakage Management Module 1036 and System Efficiency Management Module 1037 . It should be noted that in other embodiments, other management modules with different functions can also be added according to different control and management systems. According to the historical, real-time and forecast information, the present invention can help the user to precisely allocate the electricity consumption of the air conditioner in each period, so that the user can set the expected amount of electricity consumption per month, quarterly or one year. When air-conditioning power consumption is budgeted, the computer will linearly adjust the parameters of the system-side and load-side air-conditioning facilities according to the load priority, and even adjust the comfort of the load, etc., to prevent the power consumption of the air-conditioning from exceeding the user's expected amount.

根据本发明一实施例,设定目标节能金额或电度模块101,其主要是用以提供一使用者设定目标节能金额或用电度数。例如,对一企业用户,用电量或用电金额亦为成本管控的一环,用电量或用电金额减少即能间接增进获利或可调降终端商品售价,提高竞争度。此企业用户可先行精算在一单位周期下,例如以一季或一个月为单位,合理的用电度数或用电费用,并透过本发明的设定目标节能金额或电度模块101,将此合理的用电度数或用电量设定在用电量控管模块103中。此时用电量控管模块103即会透过所属的七个管理模块,根据设定的用电度数或用电量的预算,在一单位周期下,针对此企业用户的用电结构进行动态调整分配。利用期前的用电预算管控,可将用电量作最合理的配置并避免用电的浪费。According to an embodiment of the present invention, the module 101 for setting a target energy-saving amount or electricity consumption is mainly used to provide a user-set target energy-saving amount or electricity consumption. For example, for a corporate user, electricity consumption or the amount of electricity consumption is also a part of cost control. A reduction in electricity consumption or amount of electricity consumption can indirectly increase profits or reduce the price of terminal products and increase competition. The enterprise user can conduct an actuarial calculation in advance of a unit period, such as a quarter or a month, to determine the reasonable electricity consumption or electricity consumption cost, and use the energy-saving amount or the energy-saving module 101 of the present invention to convert this The reasonable power consumption degree or power consumption is set in the power consumption control module 103 . At this time, the power consumption control module 103 will dynamically monitor the power consumption structure of the enterprise user in a unit cycle according to the set power consumption degree or power consumption budget through its seven management modules. Adjust allocation. Using the pre-term electricity budget control, the electricity consumption can be allocated in the most reasonable way and the waste of electricity consumption can be avoided.

此外,用电量控管模块103在开始执行前,会先透过仿真分析模块102进行用电管控的仿真,将用电结构先行呈现出来,让使用者知道根据其设定的用电度数或用电量预算下,所规划出的用电结构并可进行微调。例如,对一企业用户而言,在一单位周期下,其设定的总用电量为1000度,本发明的仿真分析模块102可考虑历史用电数据、环境变量,例如温度、湿度,以及该企业用户在此时间周期间的排程计划,仿真出一用电结构,例如用电分配为下午可支用的度数高于上午可支用的度数1度,而此企业用户亦可对此仿真结果进行微调,例如调整上、下午间的可支用度数,或对某一特定日进行用电度数的调整。In addition, before the power consumption control and management module 103 starts to execute, it will first conduct a simulation of power consumption control through the simulation analysis module 102, and present the power consumption structure in advance, so that users can know the power consumption degree or Under the power consumption budget, the planned power consumption structure can be fine-tuned. For example, for an enterprise user, under one unit cycle, the total power consumption set by it is 1000 degrees, the simulation analysis module 102 of the present invention can consider historical power consumption data, environmental variables, such as temperature, humidity, and The business user's scheduling plan during this time period simulates a power consumption structure. For example, the electricity consumption allocation is 1 degree higher than the available power consumption in the morning, and the business user can also respond to this The simulation results are fine-tuned, such as adjusting the available degrees in the morning and afternoon, or adjusting the electricity consumption on a specific day.

本发明用电量控管模块103中包括七个管理模块,以下将以管理一空调的用电量为例,分述此七个管理模块的功能。此外,在其它的实施例中,此七个管理模块亦可用于管理其它不同的用电装置。The power consumption control and management module 103 of the present invention includes seven management modules. The functions of the seven management modules will be described below by taking the management of the power consumption of an air conditioner as an example. In addition, in other embodiments, the seven management modules can also be used to manage other different electrical devices.

动态温度管理模块1031,主要用来进行空调温度的管控,通过实时调整空调的设定温度,来达到总用电量的管控。动态温度管理模块1031,可依照用户所订定的目标用电金额,随时调整空调的设定温度。空调设定温度是影响空调设施运作与舒适度最重要的因子,随着不同的环境状态改变,应该对应不同的设定温度,才不会有过度使用或无效运转的情形发生。本发明的动态温度管理模块1031可以随着环境的变化机动调整空调温度,兼顾用户舒适度与能源高效使用。此外,若某些时段因热负载过高或设定温度过低,而导致空调系统侧供不应求,造成压缩机(或冰水阀)持续开启无法关闭,动态温度管理模块1031能够机动地调整到适当的设定温度,或是暂时关闭压缩机(或冰水阀),让空调系统进入较低负载的运作状态。The dynamic temperature management module 1031 is mainly used to control the temperature of the air conditioner, and to control the total power consumption by adjusting the set temperature of the air conditioner in real time. The dynamic temperature management module 1031 can adjust the set temperature of the air conditioner at any time according to the target electricity consumption amount set by the user. The set temperature of the air conditioner is the most important factor affecting the operation and comfort of the air conditioner. As different environmental conditions change, it should correspond to different set temperatures so that there will be no excessive use or ineffective operation. The dynamic temperature management module 1031 of the present invention can dynamically adjust the temperature of the air conditioner as the environment changes, taking into account user comfort and efficient use of energy. In addition, if the supply of the air-conditioning system is in short supply due to high thermal load or low set temperature during certain periods of time, causing the compressor (or ice water valve) to continue to open and cannot be closed, the dynamic temperature management module 1031 can automatically adjust to an appropriate temperature. set temperature, or temporarily shut down the compressor (or ice water valve), so that the air conditioning system enters a lower load operating state.

在一实施例中,动态温度管理模块1031的管控程序如图2所示,先提供给使用者以区域为单位进行舒适度要求的设定。例如,提供三个等级,“重要”、“普通”、“不重要”,让使用者设定各区域舒的适度要求。例如,办公室舒适度可设定为重要,事务间舒适度可设定为普通,电梯口舒适度可设定为不重要。而在其它实施例中,舒适度要求的等级不以三个等级为限。接着,使用者定义各区域舒适度调整的优先级,例如,分为最高、高、中、低等级。舒适度优先级低者,当超过无法达到节能目标门槛时,首先调整设定温度;舒适度优先级中者次之;舒适度优先级高者最后调整;而舒适度优先级最高者,以舒适度为主,不因节能需求改变舒适度或设定温度。以上调整周期以每15(视状况调整之)分钟重新设定一次。In one embodiment, the management and control program of the dynamic temperature management module 1031 is shown in FIG. 2 , which firstly provides the user with the setting of comfort requirements in units of regions. For example, three levels are provided, "important", "common", and "unimportant", allowing users to set comfort requirements for each area. For example, the office comfort can be set as important, the office comfort can be set as ordinary, and the elevator entrance comfort can be set as unimportant. However, in other embodiments, the required levels of comfort are not limited to three levels. Next, the user defines the priority of comfort level adjustment in each area, for example, it is divided into highest, high, middle, and low levels. Those with low comfort priority will adjust the set temperature first when the energy-saving target threshold cannot be reached; those with medium comfort priority will be the second; Do not change the comfort level or set temperature due to energy-saving requirements. The above adjustment cycle is reset every 15 minutes (adjusted according to the situation).

接着即可进行动态调整,动态温度管理模块1031会随时计算已使用的空调电费:根据空调设施使用的电度乘以该时段的每度电费(含平均基本电费),累积一段期间的金额。并记录使用者空调平均每天使用时间(小时)的数据,此数据可每天记录做为未来调整的参考,另系统亦可参考气象单位预报当日天气状况作为撷取数据库中类似天气状况的依据。自动产生月、周、日各时段的各区域的可用电费分配比例。系统将使用者希望的目标电费分12个月分别填入,系统自动根据月、周、日各时段的分配用电比例产生目标电费。使用者也可进入各月份进入调整各周别(如周一和周六目标电费可能不同)目标电费,或设定特定假日的目标电费。在一实施例中,使用者亦可进入单日调整各时段的目标电费。Then dynamic adjustment can be performed, and the dynamic temperature management module 1031 will calculate the used air-conditioning electricity fee at any time: according to the electricity used by the air-conditioning facility multiplied by the electricity fee per kilowatt-hour of the period (including the average basic electricity fee), the amount accumulated for a period of time. And record the average daily usage time (hours) of the user's air conditioner. This data can be recorded every day as a reference for future adjustments. In addition, the system can also refer to the meteorological unit's forecast of the weather conditions of the day as the basis for retrieving similar weather conditions in the database. Automatically generate the distribution ratio of available electricity charges in each region for each time period of the month, week, and day. The system fills in the target electricity charges desired by the user in 12 months, and the system automatically generates the target electricity charges based on the distribution of electricity consumption ratios in each period of the month, week, and day. Users can also enter each month to adjust the target electricity fee for each week (for example, the target electricity fee for Monday and Saturday may be different), or set the target electricity fee for a specific holiday. In one embodiment, the user can also enter a single day to adjust the target electricity charges for each time period.

例如早上7点到11点每小时的目标电费分配可能与早上11点到下午2点每小时的目标电费分配不同。每个小时内切分为60等份(每1分钟),即1/60。动态能源使用管理系统每1分钟累积一次已用电费,若该时间点的累积电费已低于目标电费,则设定温度保持在标准适中的舒适度范围,或是由使用者自订设定温度为主;若该时间点已用电费超过目标电费,则启用动态温度节能管理功能,第一次提高用户侧设定温度比前15分钟的平均回风温度高摄氏1度并同时提高风速,若仍无法低于目标电费,则再提高摄氏0.5度以此类推,最高至调至摄氏30度,以达到目标电费。For example, the hourly target electricity rate allocation from 7:00 am to 11:00 pm may be different from the hourly target electricity rate allocation from 11:00 am to 2:00 pm. Each hour is divided into 60 equal parts (every 1 minute), which is 1/60. The dynamic energy usage management system accumulates the used electricity charge every 1 minute. If the accumulated electricity charge at that point in time is lower than the target electricity charge, the set temperature will be kept within the standard moderate comfort range, or the set temperature can be set by the user Mainly; if the electricity charge at this point in time exceeds the target electricity charge, the dynamic temperature energy-saving management function will be enabled, and the set temperature on the user side will be raised for the first time by 1 degree Celsius higher than the average return air temperature in the previous 15 minutes and the wind speed will be increased at the same time. If it still cannot be lower than the target electricity rate, then increase the temperature by 0.5 degrees Celsius and so on, up to 30 degrees Celsius to achieve the target electricity rate.

运转排程管理模块1032是用以建立完整的空调运转排程,节省许多开关设备电源时间不精确所造成的浪费(例如提早开、延后关),也能够利用半夜凉爽的室外空气,在便宜的离峰时段电价,以风扇来进行因假日空调未运转所形成的室内蓄热做排除,避免次日利用空调在尖峰电价时段,花费较高的电费,将蓄热置换至建筑物之外。例如早上7点建筑物内温度未达预设温度时,可在7:25前运转排程管理模块1032先开启空调降温,至7:25关闭空调,上班时间再将空调开启,如此便不需要消耗多余的冷却量将蓄热排出。对于有建置外气引进系统的建筑物,运转排程管理模块1032还能在半夜或清晨将户外清新低温的空气引进,根本不需要开启空调也能达到排除建筑物隔夜蓄热的效果,让使用者一早进办公室便能享受舒适宜人的温度,也不会出现“用户一早把空调温度设最低,但过一整天却无人调整回来”等现象,这样一来一回便节省了许多不必要的用电。此外,运转排程管理可结合电子行事历系统(例如MicrosoftOutlook行事历)做为用电控管策略判断依据,系统能够更智能化的协助用户制定符合其舒适与节能需求的运转排程设定。The operation schedule management module 1032 is used to establish a complete air conditioner operation schedule, which saves a lot of waste caused by inaccurate power supply time of switching equipment (such as early opening and delayed closing), and can also take advantage of the cool outdoor air in the middle of the night. The electricity price during the off-peak period, the fan is used to eliminate the indoor heat storage caused by the non-operation of the air conditioner during the holiday, so as to avoid the high electricity cost of using the air conditioner during the peak electricity price period the next day, and replace the heat storage outside the building. For example, when the temperature in the building does not reach the preset temperature at 7 o'clock in the morning, the operation schedule management module 1032 can first turn on the air conditioner to cool down before 7:25, turn off the air conditioner at 7:25, and then turn on the air conditioner during working hours, so that there is no need Consumes excess cooling capacity to discharge heat storage. For buildings with an external air introduction system, the operation scheduling management module 1032 can also introduce fresh and low-temperature outdoor air in the middle of the night or early in the morning. It does not need to turn on the air conditioner to achieve the effect of eliminating the building’s overnight heat storage, so that Users can enjoy a comfortable and pleasant temperature as soon as they enter the office, and there will be no phenomenon that "the user sets the temperature of the air conditioner to the lowest level early in the morning, but no one adjusts it back after a whole day", which saves a lot of trouble. necessary electricity. In addition, the operation schedule management can be combined with an electronic calendar system (such as Microsoft Outlook calendar) as the basis for judging the power consumption control strategy. The system can more intelligently assist users to formulate operation schedule settings that meet their comfort and energy-saving needs.

闲置空间管理模块1033,使用效率提升,是一切能源管理的根本。空调与照明设施在无人时仍开启,占了建筑物中浪费因素中的38%,换句话说,就算系统的运作效率再佳,只要客户端使用效率不好,依然造成无谓的能源损失,因此“避免浪费”以及“合理化操作”才能釜底抽薪的降低用电量。建筑物内独立隔间环境,如小办公室、会议室、房间、厕所等,或是饭店的客房,利用移动传感器侦测环境是否闲置无人使用,来决定设施运作状态,可以节省许多不必要的浪费。例如使用者离开办公室后,移动传感器马上可以通知闲置空间管理模块1033将该环境中空调设施关闭,或是将环境舒适度(焓值)提高、将空调改变为送风模式等。The idle space management module 1033 improves the use efficiency and is the foundation of all energy management. Air-conditioning and lighting facilities are still on when no one is there, accounting for 38% of the waste factors in buildings. In other words, even if the operating efficiency of the system is good, as long as the efficiency of the client is not used, it will still cause unnecessary energy loss. Therefore, "avoiding waste" and "rational operation" can reduce electricity consumption by drastic measures. Independent compartment environments in buildings, such as small offices, meeting rooms, rooms, toilets, etc., or hotel rooms, use mobile sensors to detect whether the environment is idle and no one is using it to determine the operating status of the facility, which can save a lot of unnecessary waste. For example, after the user leaves the office, the mobile sensor can immediately notify the idle space management module 1033 to close the air-conditioning facilities in the environment, or improve the environmental comfort (enthalpy value), change the air-conditioning to the air supply mode, etc.

外气引进管理模块1034,因为空调使用有27%的负荷是来自外气,因此在动态的外气变化下“适时适量”的引进外气,对控管空调用电有莫大的帮助。External air introduction management module 1034, because 27% of the air-conditioning load comes from external air, so the "timely and appropriate" introduction of external air under the dynamic external air changes is of great help to control the electricity consumption of air-conditioning.

在一实施例中,外气引进管理模块1034每10分钟计算一次空调区域的所有温度传感器的平均值,当室外温度比室内温度平均值低3度以上,且室外焓值属于舒适范围或比室内焓值低,外气引进管理模块1034引进外气。此外为避免频繁的切换开关,可设定超过3度以上引进外气,2度以内关闭外气。当室外温度非比室内温度平均值低3度以上时,则关闭外气,除非所对应空调区域内任一的CO2传感器浓度所测得的CO2浓度超过所设定的上限时才引进外气,低于下限时关闭外气。其中CO2传感器浓度的上、下限预设定义为:依使用者定义的舒适度(与动态温度管理同样设定)有不同设定。例如,“重要”为1200ppm开启外气,1000ppm关闭外气、“普通”为1500ppm开启外气,1200ppm关闭外气、“不重要”为2000ppm开启外气,1500ppm关闭外气。外气引进管理模块1034可供使用者重新输入参数。In one embodiment, the external air introduction management module 1034 calculates the average value of all temperature sensors in the air-conditioned area every 10 minutes. The enthalpy value is low, and the external air introduction management module 1034 introduces external air. In addition, in order to avoid frequent switching of the switch, it can be set to introduce outside air above 3 degrees, and close the outside air within 2 degrees. When the outdoor temperature is not lower than the average indoor temperature by more than 3 degrees, the outside air is turned off, unless the CO2 concentration measured by any CO2 sensor concentration in the corresponding air-conditioned area exceeds the set upper limit. Air, close the external air when it is lower than the lower limit. The upper and lower limits of the concentration of the CO 2 sensor are preset as follows: there are different settings according to the comfort level defined by the user (the same setting as the dynamic temperature management). For example, "important" means that the external air is turned on at 1200ppm, and the external air is turned off at 1000ppm; "normal" is that the external air is turned on at 1500ppm and turned off at 1200ppm; The external air introduction management module 1034 allows the user to re-input parameters.

热源监测管理模块1035,建筑物周围发生的太阳辐射热交换,也是常见的传输损失,因此若能在建筑物外加装遮阳板、日光强烈时拉上窗帘、或是在建筑物内部周围设计风帘或加装出风口,便能减少辐射热交换所造成的损失。但环境是不断动态变化的,在炎热的气候下,上述情形确是如此,相反的,在寒冷的气候下,原本为热源的玻璃却成为冷源,建筑物内部周围的空调还可能因玻璃与墙壁传导的冷空气而降低负荷。在一实施例中,热源监测管理模块1035,每10分钟计算一次该侦测热源的温度传感器所对应设施的所有回风温度传感器的平均值,当热源温度传感器的读值比平均回风温度高或低于一特定温度之上时,则根据设定改变设施狀态。例如,开启或关闭窗帘。Heat source monitoring and management module 1035, the solar radiation heat exchange around the building is also a common transmission loss, so if you can install sunshades outside the building, draw the curtains when the sun is strong, or design wind around the building The loss caused by radiative heat exchange can be reduced by installing curtains or adding air outlets. But the environment is constantly changing dynamically. In a hot climate, the above situation is true. On the contrary, in a cold climate, the glass that was originally a heat source becomes a cold source, and the air conditioner around the building may also be affected by glass and The cooling air conducted by the wall reduces the load. In one embodiment, the heat source monitoring management module 1035 calculates the average value of all the return air temperature sensors of the facility corresponding to the temperature sensor detecting the heat source every 10 minutes, when the reading value of the heat source temperature sensor is higher than the average return air temperature Or below a certain temperature, the state of the facility is changed according to the setting. For example, opening or closing curtains.

实时泄漏管理模块1036,是用以根据环境是否产生泄漏来决定设施的运作状态,并同时发出告警给用户。空调管线泄漏为大楼所有能源浪费原因中的首要项目。泄漏损失的发生,有可能发生于传输管道之间,也有可能发生于用户环境,例如门窗该关未关,造成冷(暖)气大量流失。在一实施例中,实时泄漏管理模块1036每10分钟计算一次门窗传感器所对应设施的所有回风温度传感器的平均值,若室外温度较高且门窗开启一段时间后,便发出告警或改变空调运作状态,如提高设定温度或进入送风模式等。The real-time leak management module 1036 is used to determine the operating status of the facility according to whether the environment has leaks, and at the same time issue an alarm to the user. Air conditioning line leaks are the number one item among all causes of energy waste in buildings. Leakage loss may occur between the transmission pipelines or in the user environment, for example, the doors and windows are not closed, resulting in a large loss of cold (warm) air. In one embodiment, the real-time leakage management module 1036 calculates the average value of all the return air temperature sensors of the facility corresponding to the door and window sensors every 10 minutes. If the outdoor temperature is high and the doors and windows are opened for a period of time, an alarm will be issued or the operation of the air conditioner will be changed. status, such as increasing the set temperature or entering the air supply mode, etc.

系统效率管理模块1037,其主要功能是根据负载需求来决定系统主机开启的数量,让冰水主机可以维持在高效率运转狀态。因为,若以一台冰水主机便能提供足够的负载需求量,便不需要同时开启两台冰水主机,如此便能够减少一台冰水主机以及冷却水泵与冷却水塔可观的运转电力。在一实施例中,当客户端冰水主机只有单台时,系统效率管理模块1037可将初始出水温度设定值为7度C,每15分钟调整一次出水温度,例如出水温度最低为7度C,最高为15度C,使所对应空调设施的舒适度维持在该设定值的下限边缘,若单位时间使用金额已超出预算,则以调升出水温度为优先,再调升负载端空调温度。在另一实施例中,若客户端的冰水主机为两台并联控制时,系统效率管理模块1037可以采逐渐开启的方式,先开第一台,初始出水温度设定值为7度C,每15分钟调整一次出水温度,使所对应空调设施的舒适度维持在该设定值的下限边缘。当无法满足舒适度超过30分钟时,再开启第二台冰水主机,且需单位时间的使用金额不得超过预算的情况下才能开启。两台冰水主机同时设定为7度C,每15分钟调整一次第二台冰水主机出水温度,使所对应空调设施的舒适度维持在该设定值的下限边缘。当第二台冰水主机温度设定已到达15度C时,开始调升第一台水主机设定温度,若调升至10度C后15分钟仍可使所对应空调设施的舒适度维持在该设定值的下限边缘,则关闭第二台冰水主机,或单位时间的使用金额超过预算时也关闭,第一台冰水主机设定温度调回7度C。若客户端有三台冰水主机并联控制,控制逻辑则以此类推。值得注意的是上述仅为本发明的一实施例,在其它的实施例中亦可以其它的方式进行控制。The main function of the system efficiency management module 1037 is to determine the number of system hosts to be turned on according to the load demand, so that the chilled water hosts can maintain a high-efficiency operation state. Because, if one chilled water host can provide sufficient load demand, there is no need to turn on two chilled water hosts at the same time, which can reduce the considerable operating power of one chilled water host, cooling water pump and cooling water tower. In one embodiment, when there is only one chilled water host on the client side, the system efficiency management module 1037 can set the initial outlet water temperature to 7°C, and adjust the outlet water temperature every 15 minutes, for example, the lowest outlet water temperature is 7°C C, the maximum is 15 degrees C, so that the comfort of the corresponding air-conditioning facility is maintained at the lower limit of the set value. If the usage amount per unit time has exceeded the budget, the priority is to increase the outlet water temperature, and then increase the load-side air conditioner temperature. In another embodiment, if the chilled water hosts of the client are controlled in parallel by two units, the system efficiency management module 1037 can adopt the method of gradually opening, the first one is opened first, and the initial outlet water temperature is set to 7 degrees C, and each Adjust the outlet water temperature every 15 minutes to keep the comfort of the corresponding air-conditioning facility at the lower limit of the set value. When the comfort level cannot be satisfied for more than 30 minutes, the second ice water main unit will be turned on, and the usage amount per unit time must not exceed the budget. The two chilled water hosts are set to 7 degrees C at the same time, and the outlet water temperature of the second chilled water host is adjusted every 15 minutes to maintain the comfort of the corresponding air-conditioning facilities at the lower limit of the set value. When the temperature setting of the second ice water main unit has reached 15 degrees C, start to increase the set temperature of the first water main unit. If the temperature is raised to 10 degrees C, the comfort level of the corresponding air conditioning facility can still be maintained for 15 minutes. At the edge of the lower limit of the set value, the second ice water host is turned off, or when the usage amount per unit time exceeds the budget, it is also turned off, and the set temperature of the first ice water host is adjusted back to 7 degrees C. If the client has three chilled water hosts connected in parallel, the control logic can be deduced by analogy. It should be noted that the above is only an embodiment of the present invention, and in other embodiments, it can also be controlled in other ways.

参阅图2所示为本发明的用电量控制流程图。其中在步骤201~206为用户设定流程,其主要目的是让用户进行用电量的设定、用电控制群组的设定以及舒适度与优先权设定。首先在步骤201进入设定流程。步骤202,提供用户进行基本数据设定,例如统一编号的设定等,借以在后续进行搜寻时可依此编号进行维护。步骤203,提供用户进行用电量的设定,亦即用户设定用电的预算。步骤204提供用户进行用电控制群组的设定,由于一栋大楼单位很多,用户可将数个性质相同的单位合为一群组,共同进行管理,借以避免重复设定的麻烦。步骤205提供用户进行舒适度与优先权设定。当设定完后即进入本发明的动态用电管控系统300进行用电的管控。Referring to Fig. 2, it shows the flow chart of power consumption control in the present invention. Among them, steps 201-206 are the user setting process, the main purpose of which is to allow the user to set the power consumption, the power consumption control group, and the comfort level and priority setting. First enter into the setting process in step 201 . In step 202, the user is provided with basic data settings, such as the setting of a unified number, so that maintenance can be performed according to this number when subsequent searches are performed. In step 203, the user is provided with the setting of electricity consumption, that is, the user sets a budget for electricity consumption. Step 204 provides the user with the setting of the electricity control group. Since there are many units in a building, the user can group several units with the same nature into one group for joint management, so as to avoid the trouble of repeated settings. Step 205 provides the user with comfort and priority settings. After setting, enter the dynamic power consumption control system 300 of the present invention to control power consumption.

其中在设定管理功能的步骤301中,本发明会根据用户所进行的设定结果,在步骤302中进行模拟,并产生一仿真结果图表,其中会显示出空调用电的金额(步骤3021)以及可能造成用电浪费的原因(步骤3022)。根据此仿真的结果,用户可参考并选择是否回到设定步骤201进行重新设定。Wherein in the step 301 of setting the management function, the present invention will perform the simulation in the step 302 according to the setting result carried out by the user, and generate a simulation result chart, which will show the amount of electricity used by the air conditioner (step 3021) And possible causes of electricity waste (step 3022). According to the simulation result, the user can refer to and choose whether to go back to the setting step 201 for resetting.

在步骤303中,将用户在步骤204中所设定的用电控制群组加载动态用电管控系统300中。在步骤304将用户在步骤205中所设定的舒适度与优先权加载动态用电管控系统300中。在步骤306将用户在步骤202中所设定的基本数据加载动态用电管控系统300中。以及在步骤307中,会将用户在步骤203中所设定的用电量加载动态用电管控系统300中。In step 303 , the power consumption control group set by the user in step 204 is loaded into the dynamic power consumption management and control system 300 . In step 304 , the comfort level and priority set by the user in step 205 are loaded into the dynamic power management and control system 300 . In step 306 , the basic data set by the user in step 202 is loaded into the dynamic power consumption management and control system 300 . And in step 307 , the power consumption set by the user in step 203 is loaded into the dynamic power consumption management and control system 300 .

当加载完成后,进入步骤305根据加载动态用电管控系统300中的各项数据并搭配前述的七个管理模块进行用电的管理。其中包括七个管理步骤,分别为动态温度管理步骤3051、运转排程管理步骤组3053、闲置空间管理步骤3057、外气引进管理步骤3052、热源监测管理步骤3054、实时泄漏管理步骤3055以及系统效率管理步骤3056。运转排程管理步骤组3053还包括设备排程设定步骤30531,用以排列设备开启的先后顺序。动态能源使用功能排程设定步骤30532,其是用以排列设备用电量升降的顺序。舒适度与优先权排程设定30533,用以排程舒适度的优先权。After the loading is completed, go to step 305 to manage the power consumption according to loading various data in the dynamic power consumption management and control system 300 and collaborating with the aforementioned seven management modules. It includes seven management steps, namely dynamic temperature management step 3051, operation schedule management step group 3053, idle space management step 3057, external air introduction management step 3052, heat source monitoring management step 3054, real-time leakage management step 3055 and system efficiency Manage Step 3056. The operation schedule management step group 3053 also includes an equipment schedule setting step 30531, which is used to arrange the sequence of starting up the equipment. Dynamic energy usage function scheduling setting step 30532, which is used to arrange the sequence of equipment power consumption up and down. Comfort and priority scheduling setting 30533, used to schedule the priority of comfort.

以下将以一实施例说明应用本发明用电管控流程于一空调系统的应用。首先,一使用者先在步骤201中,在系统上输入基本数据(步骤202)、每个月的空调目标用电金额(步骤203)、设施群组设定(步骤204)以及各区域的舒适度与优先权(步骤205),当设定完成后,系统将此设定值加载用电管控系统中,并便根据设定值与对应的用电管理策略进行每月空调用电目标。The following will use an embodiment to illustrate the application of the power consumption management and control process of the present invention to an air conditioning system. First, in step 201, a user enters the basic data on the system (step 202), the monthly air-conditioning target electricity consumption amount (step 203), facility group settings (step 204) and the comfort of each area. Degree and priority (step 205), when the setting is completed, the system loads the set value into the power consumption management and control system, and sets the monthly air conditioner power consumption target according to the set value and the corresponding power consumption management strategy.

在一实施例中,本发明的运转排程管理模块会在早上7点至7点半之间,利用离峰电价将大楼内蓄热排除。而在冰水主机的设定上,本发明的系统效率管理模块会机动调整冰水主机设定温度,除非某天特别炎热,一台冰水主机出水温度设定再低都无法满足舒适度时,系统才会再开启第二台主机。In one embodiment, the operation scheduling management module of the present invention will use the off-peak electricity price to remove heat stored in the building between 7:00 am and 7:30 am. As for the setting of the chilled water host, the system efficiency management module of the present invention will automatically adjust the set temperature of the chilled water host, unless it is a particularly hot day, when the outlet temperature of a chilled water host cannot be set at a lower level to meet the comfort level , the system will start the second host again.

而在办公室的空调设定上,本发明的动态温度管理模块会进行机动调整,一旦当系统计算出累积用电金额超出事前设定值时,便会依据优先值的设定,公共区域、事务间与办公室的设定温度会依序慢慢提高,直到大楼累积空调用电又回到设定值以下为止。As for the air conditioner settings in the office, the dynamic temperature management module of the present invention will perform dynamic adjustments. Once the system calculates that the accumulated electricity consumption exceeds the pre-set value, it will be based on the priority value setting. The set temperature of rooms and offices will be gradually increased in sequence until the accumulated air-conditioning power consumption of the building returns below the set value.

在春、秋、冬季节中,可利用本发明的外气引进管理模块,将凉爽的外气引入大楼内,空调的负荷大为降低;而在夏季时,除非二氧化碳浓度超过上限,才会启动外气系统,当二氧化碳浓度降低时,便会立即关闭外气,以免高温的外气进入加重空调的负担。而对于门窗管理上,本发明的实时泄漏管理模块会发出警告冷气外泄的情形,甚至也会将浪费的能源列表出来,借以加强管理,避免许多不必要的浪费。In spring, autumn and winter, the external air introduction management module of the present invention can be used to introduce cool external air into the building, and the load of the air conditioner is greatly reduced; in summer, unless the carbon dioxide concentration exceeds the upper limit, it will not start External air system, when the concentration of carbon dioxide drops, it will immediately shut off the external air, so as to prevent the high temperature external air from entering and increasing the burden on the air conditioner. As for door and window management, the real-time leakage management module of the present invention will issue a warning of air-conditioning leakage, and even list the wasted energy, so as to strengthen management and avoid many unnecessary wastes.

另外,本发明的热源监测管理模块会通知使用者何时应该将窗帘打开或关上,让办公室空调负荷降低。当使用者因为会议而暂时离开座位,本发明的闲置空间管理模块,在使用者离开座位后,若是上班时段,会将空调改变为送风模式,若是下班时段,会将办公室空调关闭。In addition, the heat source monitoring and management module of the present invention will notify the user when to open or close the curtains, so as to reduce the load of the office air conditioner. When the user temporarily leaves the seat due to a meeting, the idle space management module of the present invention, after the user leaves the seat, will change the air conditioner to the air supply mode during the working hours, and turn off the office air conditioner during the off-duty hours.

此外本发明亦可根据预测的信息做为用电控管策略的依据,例如结合气象局未来一周的气象预测,电量控管系统可借此预估未来用电量的增减趋势,自动重新调整目标用电量。举例而言,若未来一周天气转凉,则空调用电应有降低的空间,电量控管系统可根据目前的用电情形调降下一周的目标用电设定值,帮助用户设定最佳的用电目标,此期间所节省下来的预算,也可做为未来天气转热所需较高空调费用的预备金使用。In addition, the present invention can also use the predicted information as the basis for the power consumption control strategy. For example, in combination with the weather forecast of the Meteorological Bureau for the next week, the power control management system can use this to predict the future increase and decrease trend of power consumption and automatically readjust. target power consumption. For example, if the weather turns cold in the coming week, there should be room to reduce the power consumption of the air conditioner. The power control system can lower the target power consumption setting value for the next week according to the current power consumption situation to help users set the best The electricity consumption target and the budget saved during this period can also be used as a reserve fund for higher air-conditioning costs in the future when the weather turns hot.

在另一实施例中,亦可结合行事历信息进行排程运转管理。例如,以Microsoft Outlook行事历为例,用户在行事历中登记的排程,可做为电量控管系统运转排程管理设定参考。若用户于早上9点到中午12点登记了会议室的行事历,则会议室该时段可自动转变为“启用闲置空间管理”,若有人进入开会则会开启,若该时段无人进入开会,空调和照明设施也不会启用;同时,会议室该时段的空调温度设定,可依据登记者喜爱的舒适度进行设定,让用户操作接口更智能、更贴心。In another embodiment, the schedule operation management can also be combined with the calendar information. For example, taking the Microsoft Outlook calendar as an example, the schedule registered by the user in the calendar can be used as a reference for the operation schedule management setting of the power control system. If the user registers the calendar of the meeting room from 9:00 am to 12:00 noon, the meeting room will automatically change to "Enable Idle Space Management" during this time period. If someone enters the meeting, it will be opened. If no one enters the meeting during this period, Air-conditioning and lighting facilities will not be enabled; at the same time, the temperature setting of the air-conditioning in the meeting room during this period can be set according to the comfort level that the registrants prefer, making the user interface smarter and more intimate.

此外,在舒适度设定的实施方式上,电量控管系统可提供用户操作接口,对于授权的个别用户可透过接口回馈对于该区域舒适度的感受,例如“希望温暖点”或“希望凉快点”,当用户回馈时,系统自动记录当时的环境温、湿度信息,并建立对照表,未来电量控管系统便依照对照表内容比对当时环境温、湿度,自动提供用户希望的舒适环境。In addition, in the implementation of comfort level setting, the power control system can provide a user operation interface, and through the interface, authorized individual users can feedback their feelings about the comfort level of the area, such as "hope warmer" or "hope cool When the user gives feedback, the system automatically records the environmental temperature and humidity information at that time, and establishes a comparison table. The future power control system will compare the current environmental temperature and humidity according to the content of the comparison table, and automatically provide the comfortable environment desired by the user.

虽然本发明已以一较佳实施例揭露如上,然其并非用以限定本发明,任何熟悉此技术的人员,在不脱离本发明的精神和范围内,当可作各种的更动与润饰,因此本发明的保护范围当以权利要求书所界定的范围为准。Although the present invention has been disclosed above with a preferred embodiment, it is not intended to limit the present invention. Any person familiar with this technology can make various changes and modifications without departing from the spirit and scope of the present invention. , so the protection scope of the present invention shall be determined by the scope defined in the claims.

Claims (18)

1. power consumption managing and control system; It is characterized in that; In order to control a using electricity system at the total electricity consumption of a time point under a threshold value; Wherein this using electricity system comprises a plurality of subsystems, and each those subsystem controls one room area also has an adjustment temperature switch and a detector, and this power consumption managing and control system comprises at least:
The dynamic temperature administration module; When this total electricity consumption during greater than this threshold value; The adjustment temperature switch of at least one subsystem is increased one first temperature, and when this total electricity consumption less than this threshold value, the adjustment temperature switch of this at least one subsystem is downgraded one second temperature; And
Running scheduling administration module, the adjustment temperature sequence and the operating state order of arranging those subsystems.
2. power consumption managing and control system according to claim 1 is characterized in that, also comprises an idle space administration module, when the detector of this at least one subsystem detects nobody this subsystem of use, adjusts the operating state of this at least one subsystem.
3. power consumption managing and control system according to claim 1; It is characterized in that; Comprise that also an outer gas introduces administration module,, introduce this outdoor air when the detector of this at least one subsystem detects this room area temperature when being higher than an outdoor temperature; And detect this room area temperature when being lower than this outdoor temperature when the detector of this at least one subsystem, stop to introduce this outdoor air.
4. power consumption managing and control system according to claim 3 is characterized in that this detector also comprises a CO 2Concentration sensor is as this CO of this at least one subsystem 2Concentration sensor detects the CO of this room area 2When concentration was higher than one first default value, this outer gas was introduced administration module and is introduced this outdoor air to room area that should at least one subsystem, and as this CO of this at least one subsystem 2Concentration sensor detects the CO of this room area 2When concentration was lower than one second default value, this outer gas was introduced administration module and is stopped to introduce this outdoor air to room area that should at least one subsystem.
5. power consumption managing and control system according to claim 1; It is characterized in that; Also comprise a thermal source monitoring management module, when the temperature that detects a facility when the detector of this at least one subsystem is higher than this room area temperature, isolates this facility or adjust the operating state of this subsystem.
6. power consumption managing and control system according to claim 1; It is characterized in that; Comprise that also one leaks administration module in real time; Be higher than this room area temperature when the detector of this at least one subsystem detects an outdoor temperature, and the detector of this at least one subsystem door and window facility that detects this room area do not close reach a very first time after, adjust the operating state of this subsystem.
7. power consumption managing and control system according to claim 1 is characterized in that, also comprises an idle space administration module, when the detector of this at least one subsystem detects nobody this subsystem of use, adjusts the operating state of this at least one subsystem; And one outer gas introduce administration module; When the detector of this at least one subsystem detects this room area temperature when being higher than an outdoor temperature; Introduce this outdoor air; And detect this room area temperature when being lower than this outdoor temperature when the detector of this at least one subsystem, stop to introduce this outdoor air.
8. power consumption managing and control system according to claim 1 is characterized in that, also comprises an idle space administration module, when the detector of this at least one subsystem detects nobody this subsystem of use, adjusts the operating state of this at least one subsystem; And one leak in real time administration module; When detecting an outdoor temperature, the detector of this at least one subsystem is higher than this room area temperature; And after the door and window facility that the detector of this at least one subsystem detects this room area is not closed and reached a very first time, adjust the operating state of this subsystem.
9. power consumption managing and control system according to claim 1 is characterized in that, also comprises an idle space administration module, when the detector of this at least one subsystem detects nobody this subsystem of use, adjusts the operating state of this at least one subsystem; And a thermal source monitoring management module, when the temperature that detects a facility when the detector of this at least one subsystem is higher than this room area temperature, isolates this facility or adjust the operating state of this subsystem.
10. power consumption managing and control system according to claim 1 is characterized in that, also comprises an idle space administration module, when the detector of this at least one subsystem detects nobody this subsystem of use, adjusts the operating state of this at least one subsystem; One thermal source monitoring management module when the temperature that detects a facility when the detector of this at least one subsystem is higher than this room area temperature, is isolated this facility or is adjusted the operating state of this subsystem; And one leak in real time administration module; When detecting an outdoor temperature, the detector of this at least one subsystem is higher than this room area temperature; And after the door and window facility that the detector of this at least one subsystem detects this room area is not closed and reached a very first time, adjust the operating state of this subsystem.
11. power consumption managing and control system according to claim 1 is characterized in that, also comprises an idle space administration module, when the detector of this at least one subsystem detects nobody this subsystem of use, adjusts the operating state of this at least one subsystem; One thermal source monitoring management module when the temperature that detects a facility when the detector of this at least one subsystem is higher than this room area temperature, is isolated this facility or is adjusted the operating state of this subsystem; And one outer gas introduce administration module; When the detector of this at least one subsystem detects this room area temperature when being higher than an outdoor temperature; Introduce this outdoor air; And detect this room area temperature when being lower than this outdoor temperature when the detector of this at least one subsystem, stop to introduce this outdoor air.
12. power consumption managing and control system according to claim 1 is characterized in that, also comprises an idle space administration module, when the detector of this at least one subsystem detects nobody this subsystem of use, adjusts the operating state of this at least one subsystem; One leaks administration module in real time; When detecting an outdoor temperature, the detector of this at least one subsystem is higher than this room area temperature; And after the door and window facility that the detector of this at least one subsystem detects this room area is not closed and reached a very first time, adjust the operating state of this subsystem; And one outer gas introduce administration module; When the detector of this at least one subsystem detects this room area temperature when being higher than an outdoor temperature; Introduce this outdoor air; And detect this room area temperature when being lower than this outdoor temperature when the detector of this at least one subsystem, stop to introduce this outdoor air.
13. power consumption managing and control system according to claim 1 is characterized in that, also comprises an idle space administration module, when the detector of this at least one subsystem detects nobody this subsystem of use, adjusts the operating state of this at least one subsystem; One leaks administration module in real time; When detecting an outdoor temperature, the detector of this at least one subsystem is higher than this room area temperature; And after the door and window facility that the detector of this at least one subsystem detects this room area is not closed and reached a very first time, adjust the operating state of this subsystem; One outer gas is introduced administration module; When the detector of this at least one subsystem detects this room area temperature when being higher than an outdoor temperature; Introduce this outdoor air; And detect this room area temperature when being lower than this outdoor temperature when the detector of this at least one subsystem, stop to introduce this outdoor air; And a thermal source monitoring management module, when the temperature that detects a facility when the detector of this at least one subsystem is higher than this room area temperature, isolates this facility or adjust the operating state of this subsystem.
14. power consumption managing and control system according to claim 1 is characterized in that, also comprises according to an information of forecasting changing this threshold value.
15. power consumption management-control method; It is characterized in that; In order to control a using electricity system at the total electricity consumption of a time point under a threshold value; Wherein this using electricity system comprises a plurality of subsystems and one first ice water host computer, and each those subsystem controls one room area also has an adjustment temperature switch and a detector, and this power consumption management-control method comprises at least:
Set this threshold value;
Arrange the adjustment temperature sequence and the operating state order of those subsystems;
When this total electricity consumption during greater than this threshold value, the adjustment temperature switch of at least one subsystem is increased one first temperature, and when this total electricity consumption less than this threshold value, the adjustment temperature switch of this at least one subsystem is downgraded one second temperature.
16. power consumption management-control method according to claim 15 is characterized in that, also comprises the priority of the respective chamber/chambers inner region comfort level requirement of setting those subsystem controls.
17. power consumption management-control method according to claim 16 is characterized in that, also comprises the adjustment temperature switch that requires those subsystems of priority adjustment according to this comfort level.
18. power consumption management-control method according to claim 15 is characterized in that, also comprises the adjustment temperature sequence and the operating state order of arranging those subsystems according to a calendar information.
CN200910127237A 2009-03-09 2009-03-09 Electricity consumption control system and method Active CN101833310B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910127237A CN101833310B (en) 2009-03-09 2009-03-09 Electricity consumption control system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910127237A CN101833310B (en) 2009-03-09 2009-03-09 Electricity consumption control system and method

Publications (2)

Publication Number Publication Date
CN101833310A CN101833310A (en) 2010-09-15
CN101833310B true CN101833310B (en) 2012-08-29

Family

ID=42717406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910127237A Active CN101833310B (en) 2009-03-09 2009-03-09 Electricity consumption control system and method

Country Status (1)

Country Link
CN (1) CN101833310B (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5927576B2 (en) * 2011-04-21 2016-06-01 パナソニックIpマネジメント株式会社 Energy management device and energy management system
TWI427889B (en) * 2011-06-09 2014-02-21 Aten Int Co Ltd A power management method of outlet port and the device thereof
JP5984456B2 (en) * 2012-03-30 2016-09-06 三菱重工業株式会社 Heat source system control device, heat source system control method, heat source system, power adjustment network system, and heat source machine control device
CN102620386A (en) * 2012-04-13 2012-08-01 北京海林节能设备股份有限公司 Air conditioning unit control method and air conditioning unit control system for comprehensive energy-saving buildings
US9062891B2 (en) 2012-07-09 2015-06-23 Guangdong Midea Refrigeration Appliances Co., Ltd. Energy saving controlling method and device of inverter air-conditioner
CN103206767B (en) * 2012-07-09 2014-09-03 广东美的制冷设备有限公司 Energy-saving control method and device for frequency conversion air conditioner
WO2014022955A1 (en) * 2012-08-05 2014-02-13 珠海派诺科技股份有限公司 Method for managing energy efficiency under periodic load in building
TWI489230B (en) * 2012-12-03 2015-06-21 Inst Information Industry Power monitoring device and power analysis method
CN103413381B (en) * 2013-08-12 2016-02-03 乐金电子研发中心(上海)有限公司 A kind of household energy management system and method for work thereof
CN103676846B (en) * 2013-11-20 2016-02-10 常州思普锐电力科技有限公司 A kind of intelligent control algorithm of Novel household energy management system
US20150198345A1 (en) * 2014-01-13 2015-07-16 Trane International Inc. Active Energy Budget Control Management
JP2016044855A (en) * 2014-08-21 2016-04-04 株式会社東芝 Air conditioning control device, air conditioning control method and air conditioning control program
CN104197479B (en) * 2014-09-03 2017-04-05 美的集团股份有限公司 Public air-conditioner and its control method, system
CN104460642A (en) * 2014-12-31 2015-03-25 珠海格力电器股份有限公司 Energy-saving control method, device and system for electrical appliance
CN105605730B (en) * 2015-12-18 2018-12-21 奥克斯空调股份有限公司 A kind of customized method of air conditioning electricity load
CN107765082A (en) * 2016-08-23 2018-03-06 佛山市顺德区顺达电脑厂有限公司 Smart power management system and its method
CN106440218B (en) * 2016-09-30 2019-05-07 广东美的制冷设备有限公司 Control method, controller, smart machine and air-conditioning is arranged in electricity
TWI617781B (en) * 2016-11-15 2018-03-11 財團法人工業技術研究院 Temperature control method, theparature control devive and temperature control system
CN112083746B (en) * 2020-09-25 2022-01-28 陕西科技大学 Intelligent power grid system
CN117878979B (en) * 2024-03-13 2024-05-17 华远电力集团有限公司 Power balance and dynamic compensation system based on electric energy storage

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1808321A (en) * 2005-10-21 2006-07-26 艾欧史密斯(中国)热水器有限公司 Electrical water heater capable of precisely controlling water amount and temperature, and control method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1808321A (en) * 2005-10-21 2006-07-26 艾欧史密斯(中国)热水器有限公司 Electrical water heater capable of precisely controlling water amount and temperature, and control method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2007-35341A 2007.02.08

Also Published As

Publication number Publication date
CN101833310A (en) 2010-09-15

Similar Documents

Publication Publication Date Title
CN101833310B (en) Electricity consumption control system and method
CN106681964B (en) Method of splitting energy consumption audit statistics for public buildings
Carpino et al. Behavioral variables and occupancy patterns in the design and modeling of Nearly Zero Energy Buildings
Lin et al. The energy-saving potential of an office under different pricing mechanisms–Application of an agent-based model
CN107169606A (en) A kind of Forecasting Methodology of office building refrigeration duty
Causone et al. Yearly operational performance of a nZEB in the Mediterranean climate
CN104101050A (en) Energy-saving management system for central air conditioner
Amin et al. Performance analysis of an experimental smart building: Expectations and outcomes
JP2004301505A (en) Air conditioning controller
Littlefair et al. A simulation of solar shading control on UK office energy use
Franchini et al. Monitored performance of the first energy+ autonomous building in Dubai
CN110543713A (en) A heat pump-floor heating system control method considering user comfort and building heat storage
Scofield Early performance of a green academic building
Ling et al. Simulation and optimization of the operation strategy of ASHP heating system: A case study in Tianjin
Yang et al. Heat flexibility evaluation and multi-objective optimized control of a low-energy building with district heating
TWI376855B (en) Electronic consumption control system and method thereof
Wang et al. Demand response via optimal pre-cooling combined with temperature reset strategy for air conditioning system: A case study of office building
CN103676812B (en) The control method and device of a kind of indoor environment
Fong et al. Residential building performance analysis at near extreme weather conditions in Hong Kong through a thermal-comfort-based strategy
Mikhail et al. Net-positive office commissioning and performance gap assessment: Empirical insights
JP6389599B2 (en) Operation plan creation device and operation plan creation method
TW201027014A (en) Method for managing air conditioning power consumption
Rashid et al. Performance analysis and investigation for the development of energy efficient building
Klein et al. Grid impact of a net zero energy building with BiPV using different energy management strategies
KR20210066583A (en) Building facility management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: Ruiguang road Taipei City Neihu district in Taiwan province China No. 168 7 floor 3

Applicant after: CQ Inc.

Address before: Ruiguang road Taipei City Neihu district in Taiwan province China No. 168 7 floor 3

Applicant before: CQ Inc.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CQ INC. TO: CQI ENERGY INFOCOM INC.

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI ZONGHENG ELECTRIC POWER INFORMATION TECHN

Free format text: FORMER OWNER: CQI ENERGY INFOCOM INC.

Effective date: 20150525

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; TO: 200031 XUHUI, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20150525

Address after: 200031, room 376, light industrial building, No. 1105 Jia Bang Road, Shanghai

Patentee after: Shanghai general electric power Mdt InfoTech Ltd.

Address before: Apia, Samoa

Patentee before: CQ Inc.

Effective date of registration: 20150525

Address after: Apia, Samoa

Patentee after: CQ Inc.

Address before: Ruiguang road Taiwan Taipei City Neihu district China No. 168 7 floor 3

Patentee before: CQ Inc.

CP02 Change in the address of a patent holder

Address after: 200030 P, 18, 999 lane, zhaojiaxin Road, Xuhui District, Shanghai.

Patentee after: Shanghai general electric power Mdt InfoTech Ltd.

Address before: 200031 room 1105, light industry mansion, 376 zhaojiaxin Road, Shanghai.

Patentee before: Shanghai general electric power Mdt InfoTech Ltd.

CP02 Change in the address of a patent holder