CN101832993B
CN101832993B CN 201010179323 CN201010179323A CN101832993B CN 101832993 B CN101832993 B CN 101832993B CN 201010179323 CN201010179323 CN 201010179323 CN 201010179323 A CN201010179323 A CN 201010179323A CN 101832993 B CN101832993 B CN 101832993B
Authority
CN
China
Prior art keywords
model
box
fixed
rod
guide rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010179323
Other languages
Chinese (zh)
Other versions
CN101832993A (en
Inventor
冯世进
胡斌
熊巨华
高丽亚
李夕林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN 201010179323 priority Critical patent/CN101832993B/en
Publication of CN101832993A publication Critical patent/CN101832993A/en
Application granted granted Critical
Publication of CN101832993B publication Critical patent/CN101832993B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention belongs to the technical field of rock-soil engineering, and in particular relates to a semi-module test box for dynamic compaction reinforced foundation model test. The semi-module test box consists of a chute, a fixed cross beam, a bracket, a guide rod, a semicircular model hammer, a limit rod, a fixed corner bracket, a model box, a soil pressure box and an acceleration sensor. The fixed cross beam is welded with a cross rod; and a vertical rod in the bracket is connected with an angle steel above the model box. The chute is fixed on the cross beam; a sliding bolt is embedded into the chute, the upper end of the guide rod is connected with the sliding bolt, and the lower end of the guide rod is suspended; and the guide rod passes through a central hole of the semicircular model hammer, the limit rod is positioned above the model box, the upper end of the limit rod is welded with the cross rod in the bracket, and the lower end of the limit rod is welded with the angle steel on the model box. The model box consists of the angle steel, an organic glass board, side panels, a back board and a bottom board; the soil pressure box is embedded in a soil sample; and the acceleration sensor is placed on the top of the soil sample. The semi-module test box ensures that the internal deformation of the soil under the action of dynamic compaction can be directly and conveniently observed, and can measure related data of dynamic stress and the like.

Description

强夯法加固地基模型试验半模试验箱Half-mold test box for foundation model test by dynamic tamping method

技术领域 technical field

本发明属岩土工程技术领域,具体涉及一种强夯法加固地基模型试验半模试验箱。The invention belongs to the technical field of geotechnical engineering, and in particular relates to a half-mold test box for foundation model tests reinforced by a dynamic compaction method.

背景技术 Background technique

强夯法是法国梅纳(Menard)技术公司于1969年首创的一种地基加固方法,通过夯锤夯击土体,使得土体变得更加密实,土体强度和承载能力得到较大提高,近年来强夯法在国内外地基处理工程中得到了广泛应用,已成为大面积地基处理的主要方法之一。但是,目前对于强夯法的加固机理,以及各种夯击参数对强夯加固效果的影响规律研究还较少。虽然,强夯法发展较快,但强夯法的设计和施工还处于半理论半经验状态,现场施工参数仍然需要通过大量的现场试验确定,缺乏必要的理论依据,存在较大的盲目性和不确定性。通过室内模型试验可以深入研究强夯法的加固机理,并提出强夯的优化设计方法,但由于缺乏合理的强夯室内模型试验装置,使得强夯法的室内模型试验难以进行,制约了强夯法的进一步发展和完善。The dynamic compaction method is a ground reinforcement method pioneered by the French Menard technology company in 1969. The soil is rammed with a rammer to make the soil more compact, and the strength and bearing capacity of the soil are greatly improved. In recent years, the dynamic compaction method has been widely used in foundation treatment projects at home and abroad, and has become one of the main methods for large-area foundation treatment. However, there are still few studies on the reinforcement mechanism of dynamic compaction and the influence of various tamping parameters on the effect of dynamic compaction. Although the dynamic compaction method has developed rapidly, the design and construction of the dynamic compaction method are still in a semi-theoretical and semi-empirical state, and the construction parameters on site still need to be determined through a large number of field tests, lacking the necessary theoretical basis, and there are large blindness and Uncertainty. Through the indoor model test, the reinforcement mechanism of the dynamic compaction method can be studied in depth, and the optimal design method of the dynamic compaction method can be proposed. However, due to the lack of a reasonable dynamic compaction indoor model test device, it is difficult to carry out the indoor model test of the dynamic compaction method, which restricts the dynamic compaction method. The further development and improvement of the law.

发明内容 Contents of the invention

本发明的目的在于提供一种强夯法加固地基模型试验半模试验箱。The object of the present invention is to provide a half-form test box for foundation model test reinforced by dynamic tamping method.

本发明提出的强夯法加固地基模型试验半模试验箱,由固定螺栓1、滑动槽2、固定横梁3、支架4、滑动螺栓5、导向杆6、半圆模型锤7、限位杆8、固定角架9、模型箱10、土压力盒11和加速度传感器12组成,其结构如图1、图2和图3所示。其中,固定螺栓1、滑动槽2、固定横梁3、支架4、滑动螺栓5、导向杆6、半圆模型锤7、限位杆8、固定角架9组成加载系统。支架4是由竖杆13和横杆14焊接而成的框架结构,固定横梁3固定于横杆14上方;支架4中的竖杆13位于模型箱10上方,通过螺栓与位于模型箱10上方的角钢15连接,并由固定角架9焊接固定;滑动槽2通过固定螺栓1固定在横梁3上;滑动螺栓5嵌入滑动槽2中,滑动螺栓5可沿滑动槽2滑动,能够方便安装不同直径的半圆模型锤7,能将半圆模型锤7提升到不同的起始高度;导向杆6上端与滑动螺栓5连接,下端悬空放置;导向杆6穿过半圆模型锤7的中心孔,限制半圆模型锤7下落过程中的摇摆,导向杆6直径可根据半圆模型锤7的中心孔直径进行调整。限位杆8位于模型箱10的上方,限位杆8上端与支架4中的横杆14焊接,下端与模型箱10上的角钢15焊接;模型箱10由角钢15、有机玻璃板16、侧面板17、背面板18和底板19组成,有机玻璃板16、两块侧面板17、背面板18和底板19连接组成模型箱框架,模型箱框架的四周嵌入角钢15中;土压力盒11埋设于土样21中,土压力盒11的数量视具体情况而定;加速度传感器12放置于土样21顶部。The half-form test box for strengthening the foundation model test proposed by the present invention consists of a fixed bolt 1, a slide groove 2, a fixed beam 3, a support 4, a slide bolt 5, a guide rod 6, a semicircle model hammer 7, a limit rod 8, The fixed angle frame 9, the model box 10, the earth pressure box 11 and the acceleration sensor 12 are composed, and its structure is shown in Fig. 1, Fig. 2 and Fig. 3 . Among them, the fixed bolt 1, the sliding groove 2, the fixed beam 3, the bracket 4, the sliding bolt 5, the guide rod 6, the semicircle model hammer 7, the limit rod 8, and the fixed angle frame 9 form the loading system. Support 4 is the frame structure that is welded by vertical bar 13 and cross bar 14, and fixed cross beam 3 is fixed on the top of cross bar 14; The angle steel 15 is connected and fixed by welding with the fixed angle frame 9; the sliding groove 2 is fixed on the beam 3 through the fixing bolt 1; the sliding bolt 5 is embedded in the sliding groove 2, and the sliding bolt 5 can slide along the sliding groove 2, which can facilitate the installation of different diameters The semicircle model hammer 7 can lift the semicircle model hammer 7 to different initial heights; the upper end of the guide rod 6 is connected with the sliding bolt 5, and the lower end is suspended in the air; the guide rod 6 passes through the center hole of the semicircle model hammer 7 to limit the semicircle model Swing in the falling process of hammer 7, guide rod 6 diameters can be adjusted according to the central hole diameter of semicircle model hammer 7. Limit bar 8 is positioned at the top of model case 10, and limit bar 8 upper end is welded with cross bar 14 in support 4, and the lower end is welded with angle steel 15 on the model box 10; Model box 10 is made of angle steel 15, plexiglass plate 16, side The panel 17, the back panel 18 and the base plate 19 are composed of a plexiglass plate 16, two side panels 17, the back panel 18 and the base plate 19 to form a model box frame, and the surroundings of the model box frame are embedded in the angle steel 15; the earth pressure box 11 is embedded in In the soil sample 21 , the number of earth pressure cells 11 depends on the specific situation; the acceleration sensor 12 is placed on the top of the soil sample 21 .

本发明中,支架4中的竖杆13和横杆14分别为4根,形成一个框架结构,放置在模型箱10上部。In the present invention, there are four vertical bars 13 and cross bars 14 in the bracket 4 respectively, forming a frame structure, which is placed on the top of the model box 10 .

本发明中,模型箱10中的角钢15共12根,分别位于模型箱框架顶部、底部和中间,各为4根。In the present invention, there are 12 angle steels 15 in the model box 10, which are respectively located at the top, bottom and middle of the model box frame, and each is 4 pieces.

本发明中,半圆模型锤7沿导向杆6自由下落,并由限位杆8保证半圆模型锤7的竖直下落,避免碰撞到有机玻璃板16。In the present invention, the semicircle model hammer 7 falls freely along the guide rod 6, and the vertical drop of the semicircle model hammer 7 is guaranteed by the limit rod 8, so as to avoid hitting the plexiglass plate 16.

本发明中,模型箱10的正面是有机玻璃板16,上面刻画刻度线20,可直接观测土样21的内部变形,刻度线的稀疏程度可根据具体试验制定。In the present invention, the front of the model box 10 is a plexiglass plate 16 on which a scale line 20 is drawn, so that the internal deformation of the soil sample 21 can be directly observed, and the degree of sparseness of the scale line can be formulated according to specific tests.

本发明中,滑动螺栓5嵌入滑动槽2中,以便适应不同直径的半圆模型锤7。In the present invention, the sliding bolt 5 is embedded in the sliding groove 2 so as to adapt to semicircular model hammers 7 of different diameters.

本发明的工作过程如下:Working process of the present invention is as follows:

在模型箱10中装入土样21,根据实际试验需要,分层填埋土样21,并在填埋土层间设置带有颜色的土样作为标记线。试样中埋设若干数量的土压力盒11,试样上部安装放置加速度传感器12。土压力盒11和加速度传感器12通过导线与外部数据采集系统连接,采集数据。将导向杆6穿入半圆模型锤7中,半圆模型锤7沿导向杆6提升至试验所需高度,然后让半圆模型锤7自由下落夯击土体,并可进行多次夯击。在整个试验过程中,土样21内部的应力可通过土压力盒11测试;土样21的内部变形,可通过刻画有刻度线20的有机玻璃板16直接读取。得到强夯作用下土样21内部的受力与变形,就可以分析强夯法的加固机理,研究各种夯击参数对强夯加固效果的影响规律,提出强夯加固的优化设计方法。The soil samples 21 are loaded into the model box 10, and the soil samples 21 are buried layer by layer according to actual test requirements, and colored soil samples are set between the soil layers as marking lines. A number of earth pressure cells 11 are embedded in the sample, and an acceleration sensor 12 is installed on the upper part of the sample. The earth pressure cell 11 and the acceleration sensor 12 are connected to an external data acquisition system through wires to collect data. The guide rod 6 is penetrated into the semicircle model hammer 7, and the semicircle model hammer 7 is raised to the height required for the test along the guide rod 6, and then the semicircle model hammer 7 is allowed to fall freely to ram the soil, and can perform multiple times of ramming. During the whole test process, the stress inside the soil sample 21 can be tested by the earth pressure cell 11 ; the internal deformation of the soil sample 21 can be directly read through the plexiglass plate 16 marked with the scale line 20 . By obtaining the internal force and deformation of soil sample 21 under dynamic compaction, the reinforcement mechanism of dynamic compaction can be analyzed, the influence of various tamping parameters on the effect of dynamic compaction can be studied, and an optimal design method for dynamic compaction can be proposed.

本发明的有益效果:Beneficial effects of the present invention:

本发明装置的最大优点是可直接方便的观测强夯作用下土体内部变形,并可测得动应力等相关数据,解决了现有的强夯法室内模型试验装置存在的较多不足。The greatest advantage of the device of the present invention is that it can directly and conveniently observe the internal deformation of the soil under the action of dynamic compaction, and can measure relevant data such as dynamic stress, which solves the many shortcomings of the existing dynamic compaction method indoor model test device.

附图说明 Description of drawings

图1为本发明的前视图。Figure 1 is a front view of the present invention.

图2为本发明的俯视图。Figure 2 is a top view of the present invention.

图3为本发明的侧视图。Figure 3 is a side view of the present invention.

图中标号:1为固定螺栓,2为滑动槽,3为固定横梁,4为支架,5为滑动螺栓,6为导向杆,7为半圆模型锤,8为限位杆,9为固定角架,10为模型箱,11为土压力盒,12为加速度传感器,13为竖杆,14为横杆,15为角钢,16为有机玻璃板,17为侧面板,18为背面板,19为底板,20为刻度线,21为土样。Numbers in the figure: 1 is the fixing bolt, 2 is the sliding groove, 3 is the fixed beam, 4 is the bracket, 5 is the sliding bolt, 6 is the guide rod, 7 is the semicircle model hammer, 8 is the limit rod, 9 is the fixed angle bracket , 10 is the model box, 11 is the earth pressure box, 12 is the acceleration sensor, 13 is the vertical bar, 14 is the horizontal bar, 15 is the angle steel, 16 is the plexiglass plate, 17 is the side panel, 18 is the back panel, 19 is the bottom plate , 20 is the scale line, and 21 is the soil sample.

具体实施方式 Detailed ways

下面通过实施例进一步描述本发明。The present invention is further described below by way of examples.

实施例1,模型箱10中角钢15的长度为1000毫米,宽度为25毫米,厚度为4毫米。模型箱10的侧面板17、背面板18和底板19均为厚度30毫米的木板,模型箱10的正面为厚度10毫米的有机玻璃板16,各块面板、底板的长度和宽度为1000毫米,模型箱框架的四周嵌入角钢15中,并通过螺栓与角钢15相连。有机玻璃板16上刻画刻度线20,刻度线每个方格尺寸为10毫米×10毫米。支架4由4根竖杆13和4根横杆14焊接而成,竖杆13和横杆14都为长度1000毫米,外径20毫米,壁厚2毫米的钢管。支架4中的4根竖杆13位于模型箱10的上方,通过螺栓与位于模型箱10上方的角钢15连接,并通过固定角架9焊接固定,固定角架9为长度300毫米,宽度20毫米,厚度5毫米的钢条。固定横梁3的两端焊接在支架4中横杆14的中部。固定横梁3为厚度10毫米,宽度20毫米,长度为1000毫米的钢材。滑动槽2厚度为20毫米,宽度为30毫米,长度为1000毫米;在滑动槽2内部,沿长度方向开凿一宽度为20毫米,深度为5毫米的槽,整个滑动槽2横截面为凹字型;在滑动槽2的凹字型开口处宽度缩小,滑动螺栓5的顶部可嵌入滑动槽2中,并可沿滑动槽2滑动和固定。限位杆8上端与支架4中的横杆14焊接,下端与模型箱10上的角钢15焊接,4根限位杆8都为直径5毫米、长度为1000毫米的光滑钢杆。导向杆6为光滑的钢杆,直径为6毫米,长度为950毫米,导向杆6的顶部与滑动螺栓5焊接,下部为自由端。半圆模型锤7为半圆柱形,直径为120毫米、厚度30毫米,半圆模型锤7的重心位置钻有直径为6毫米的孔洞,以便导向杆6的穿入。通过移动滑动螺栓5控制导向杆6与限位杆8的间距,使得半圆模型锤7的侧面与限位杆8相切。模型箱中装满土样21,在土样21内部埋置13个土压力盒11,并在土样21顶部放置3个加速度传感器12。参照图1~图3,本领域的技术人员均能顺利实施。Embodiment 1, the length of the angle steel 15 in the model box 10 is 1000 mm, the width is 25 mm, and the thickness is 4 mm. The side panels 17 of the model box 10, the back panel 18 and the base plate 19 are planks with a thickness of 30 millimeters, and the front of the model box 10 is a plexiglass plate 16 with a thickness of 10 millimeters, and the length and width of each panel and the base plate are 1000 millimeters. The surroundings of the model box frame are embedded in the angle steel 15, and are connected with the angle steel 15 by bolts. Graduation lines 20 are drawn on the plexiglass plate 16, and each grid size of the graduation lines is 10 mm×10 mm. Support 4 is welded by 4 vertical bars 13 and 4 cross bars 14, and vertical bars 13 and cross bars 14 are all 1000 millimeters in length, 20 millimeters in outer diameter, the steel pipe of wall thickness 2 millimeters. The four vertical rods 13 in the bracket 4 are located above the model box 10, connected with the angle steel 15 positioned above the model box 10 by bolts, and fixed by welding the fixed angle bracket 9, the fixed angle bracket 9 is 300 mm in length and 20 mm in width , a steel bar with a thickness of 5 mm. The two ends of fixed crossbeam 3 are welded in the middle part of crossbar 14 in support 4. The fixed beam 3 is steel with a thickness of 10 mm, a width of 20 mm and a length of 1000 mm. The sliding groove 2 has a thickness of 20 mm, a width of 30 mm, and a length of 1000 mm; inside the sliding groove 2, a groove with a width of 20 mm and a depth of 5 mm is excavated along the length direction, and the cross section of the entire sliding groove 2 is concave type; the width of the concave opening of the sliding groove 2 is reduced, and the top of the sliding bolt 5 can be embedded in the sliding groove 2, and can slide and be fixed along the sliding groove 2. The cross bar 14 welding in the stop rod 8 upper ends and the support 4, the angle steel 15 welding on the lower end and the model case 10, 4 stop rods 8 are all the smooth steel rods that diameter 5 millimeters, length are 1000 millimeters. Guide rod 6 is smooth steel rod, and diameter is 6 millimeters, and length is 950 millimeters, and the top of guide rod 6 is welded with sliding bolt 5, and the bottom is free end. Semicircle model hammer 7 is semicylindrical, and diameter is 120 millimeters, thickness 30 millimeters, and the center of gravity position of semicircle model hammer 7 is drilled with diameter and is the hole of 6 millimeters, so that the penetration of guide rod 6. The distance between the guide rod 6 and the limit rod 8 is controlled by moving the slide bolt 5 so that the side of the semicircle model hammer 7 is tangent to the limit rod 8 . The model box is filled with soil samples 21, 13 earth pressure cells 11 are embedded inside the soil samples 21, and three acceleration sensors 12 are placed on the top of the soil samples 21. Referring to Fig. 1 to Fig. 3, those skilled in the art can implement it smoothly.

Claims (3)

1.一种强夯法加固地基模型试验半模试验箱,由固定螺栓(1)、滑动槽(2)、固定横梁(3)、支架(4)、滑动螺栓(5)、导向杆(6)、半圆模型锤(7)、限位杆(8)、固定角架(9)、模型箱(10)、土压力盒(11)和加速度传感器(12)组成,其特征在于固定螺栓(1)、滑动槽(2)、固定横梁(3)、支架(4)、滑动螺栓(5)、导向杆(6)、半圆模型锤(7)、限位杆(8)和固定角架(9)组成加载系统,支架(4)是由竖杆(13)和横杆(14)焊接而成的框架结构,固定横梁(3)固定于横杆(14)上方;支架(4)中的竖杆(13)位于模型箱(10)上方,通过螺栓与位于模型箱(10)上方的角钢(15)连接,并由固定角架(9)焊接固定;滑动槽(2)通过固定螺栓(1)固定在横梁(3)上;滑动螺栓(5)嵌入滑动槽(2)中,滑动螺栓(5)可沿滑动槽(2)滑动,能够方便安装不同直径的半圆模型锤(7),能将半圆模型锤(7)提升到不同的起始高度;导向杆(6)上端与滑动螺栓(5)连接,下端悬空放置;导向杆(6)穿过半圆模型锤(7)的中心孔,限制半圆模型锤(7)下落过程中的摇摆,导向杆(6)直径可根据半圆模型锤(7)的中心孔直径进行调整;限位杆(8)位于模型箱(10)的上方,限位杆(8)上端与支架(4)中的横杆(14)焊接,下端与模型箱(10)上的角钢(15)焊接;模型箱(10)是由角钢(15)、正面的有机玻璃板(16)、侧面板(17)、背面板(18)和底板(19)组成,有机玻璃板(16)、两块侧面板(17)、背面板(18)和底板(19)连接组成模型箱框架,模型箱框架的四周嵌入角钢(15)中;土压力盒(11)埋设于土样(21)中,加速度传感器(12)放置于土样(21)顶部。1. A half-form test box for reinforced foundation model test by dynamic tamping method, consisting of fixed bolt (1), slide groove (2), fixed beam (3), support (4), slide bolt (5), guide rod (6 ), a semicircle model hammer (7), a limit rod (8), a fixed angle frame (9), a model box (10), an earth pressure cell (11) and an acceleration sensor (12), and is characterized in that the fixing bolt (1 ), sliding groove (2), fixed beam (3), bracket (4), sliding bolt (5), guide rod (6), semicircle model hammer (7), limit rod (8) and fixed angle bracket (9 ) to form a loading system, the bracket (4) is a frame structure welded by vertical bars (13) and cross bars (14), the fixed beam (3) is fixed above the cross bar (14); the vertical bars in the bracket (4) The rod (13) is located above the model box (10), connected with the angle steel (15) located above the model box (10) through bolts, and fixed by welding the fixed angle bracket (9); the sliding groove (2) is connected by the fixing bolt (1 ) is fixed on the beam (3); the sliding bolt (5) is embedded in the sliding groove (2), and the sliding bolt (5) can slide along the sliding groove (2), which can facilitate the installation of semicircular model hammers (7) of different diameters, and can Lift the semicircle model hammer (7) to different starting heights; the upper end of the guide rod (6) is connected with the slide bolt (5), and the lower end is suspended in the air; the guide rod (6) passes through the center hole of the semicircle model hammer (7), To limit the swing of the semicircle model hammer (7) during its fall, the diameter of the guide rod (6) can be adjusted according to the diameter of the center hole of the semicircle model hammer (7); The upper end of the position bar (8) is welded with the cross bar (14) in the support (4), and the lower end is welded with the angle steel (15) on the model box (10); the model box (10) is made of angle steel (15), the organic Composed of glass plate (16), side panel (17), back panel (18) and bottom plate (19), organic glass plate (16), two side panels (17), back panel (18) and bottom plate (19) are connected A model box frame is formed, and the surroundings of the model box frame are embedded in angle steel (15); the earth pressure cell (11) is buried in the soil sample (21), and the acceleration sensor (12) is placed on the top of the soil sample (21). 2.根据权利要求1所述的强夯法加固地基模型试验半模试验箱,其特征在于支架(4)中的竖杆(13)和横杆(14)分别为4根,形成一个框架结构,放置在模型箱(10)上部。2. according to claim 1, the half-mold test box for reinforced foundation model test by dynamic tamping method is characterized in that the vertical bars (13) and cross bars (14) in the support (4) are respectively 4, forming a frame structure , placed on the model box (10) top. 3.根据权利要求1所述的强夯法加固地基模型试验半模试验箱,其特征在于模型箱(10)中的角钢(15)共12根,分别位于模型箱框架顶部、底部和中间,各为4根。3. the half-mold test box for strengthening foundation model test by dynamic compaction method according to claim 1, is characterized in that the angle steel (15) in the model box (10) totally 12, is respectively positioned at the model box frame top, bottom and the middle, Each is 4.
CN 201010179323 2010-05-20 2010-05-20 Half-mold test box for foundation model test by dynamic tamping method Expired - Fee Related CN101832993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010179323 CN101832993B (en) 2010-05-20 2010-05-20 Half-mold test box for foundation model test by dynamic tamping method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010179323 CN101832993B (en) 2010-05-20 2010-05-20 Half-mold test box for foundation model test by dynamic tamping method

Publications (2)

Publication Number Publication Date
CN101832993A CN101832993A (en) 2010-09-15
CN101832993B true CN101832993B (en) 2013-06-26

Family

ID=42717135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010179323 Expired - Fee Related CN101832993B (en) 2010-05-20 2010-05-20 Half-mold test box for foundation model test by dynamic tamping method

Country Status (1)

Country Link
CN (1) CN101832993B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102032896B (en) * 2010-10-19 2012-04-25 电子科技大学 Dynamic compaction engineering automatic monitoring method based on laser ranging and image recognition
CN102493499A (en) * 2011-11-16 2012-06-13 中南大学 Model test device for measuring composite foundation lateral deformation and layered sedimentation
CN102704459B (en) * 2012-03-30 2014-06-04 温州大学 Test device of indoor model for reinforcing soft soil foundation by dynamic compaction
CN103374931B (en) * 2012-04-25 2015-06-03 同济大学 Test device for simulating wind power base affected by three-way coupling loads
CN105986582B (en) * 2015-01-29 2018-11-13 山东大学 Forced ramming reinforcing difference level of ground water ground indoor model device and test method
CN104749054B (en) * 2015-03-13 2017-05-03 同济大学 Three-dimensional controllable dynamic compaction simulated centrifuge testing mechanical arm device
CN105783975A (en) * 2016-03-03 2016-07-20 同济大学 Centrifuge test forced tamping simulation auxiliary test device
CN106836317B (en) * 2017-02-24 2018-07-03 同济大学 A kind of pile sinking model test apparatus for considering soil plug effect and its application
CN108037267B (en) * 2017-12-06 2020-08-11 湖南大学 An experimental device for simulating road collapse induced by water leakage, erosion and scouring of pipelines
CN112832226B (en) * 2021-01-11 2022-02-18 长沙理工大学 Method and device for determining evaluation index of effective reinforcement range
CN113431102A (en) * 2021-06-23 2021-09-24 长安大学 In-hole dynamic compaction device in physical model test and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2635546A1 (en) * 1988-08-16 1990-02-23 Menard Soltraitement Method and machine for the dynamic compacting of ground.
CN201436323U (en) * 2009-06-12 2010-04-07 广东省第一建筑工程有限公司 Drainage structure of dynamic compaction foundation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0678610B2 (en) * 1987-09-14 1994-10-05 大末建設株式会社 Dynamic compaction method and dynamic compaction device
EP0819385B1 (en) * 1996-07-16 2002-09-18 Societe Des Produits Nestle S.A. Process for extracting terpenes from spent coffee grounds

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2635546A1 (en) * 1988-08-16 1990-02-23 Menard Soltraitement Method and machine for the dynamic compacting of ground.
CN201436323U (en) * 2009-06-12 2010-04-07 广东省第一建筑工程有限公司 Drainage structure of dynamic compaction foundation

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
干砂强夯动力特性的细观颗粒流分析;贾敏才 等;《岩土力学》;20090430;第30卷(第4期);871-878 *
砂性土宏细观强夯加固机制的试验研究;贾敏才 等;《岩石力学与工程学报》;20090531;第28卷(第增1期);3282-3290 *
贾敏才 等.干砂强夯动力特性的细观颗粒流分析.《岩土力学》.2009,第30卷(第4期),871-878.
贾敏才 等.砂性土宏细观强夯加固机制的试验研究.《岩石力学与工程学报》.2009,第28卷(第增1期),3282-3290.

Also Published As

Publication number Publication date
CN101832993A (en) 2010-09-15

Similar Documents

Publication Publication Date Title
CN101832993B (en) Half-mold test box for foundation model test by dynamic tamping method
CN107179396B (en) Multifunctional assembled geotechnical engineering physical similarity test system
CN104374648B (en) A kind of experimental rig and method for testing dynamic shear characteristic between pile tube and the slip casting soil body
CN102704459B (en) Test device of indoor model for reinforcing soft soil foundation by dynamic compaction
CN107100210B (en) The pile-soil interaction mechanical behavior of controllable ambient stress tests system
CN103234830B (en) Anchoring property experiment platform of anchor rod
CN105986582B (en) Forced ramming reinforcing difference level of ground water ground indoor model device and test method
CN110805076B (en) Test device and method for simulating reinforcement of passive area of foundation pit
CN106596268B (en) A kind of multi-water immersion working condition simulation test model box and test method
CN110940571B (en) Test device for simulating dynamic soil arch effect of shed frame structure
CN108797660A (en) The experimental rig and test method of Collapsible Loess District Long-short Pile Group model
CN203795485U (en) Horizontal bearing characteristics test model of prestressed concrete pipe pile
CN104374650A (en) Testing device and method for testing static force shear property between tubular pile and grouting soil body
CN111733903A (en) Semi-modular model test device and test method for impact of hammering pile group
CN211571804U (en) Test device for simulating reinforcement of passive zone of foundation pit
CN104034306A (en) Experimental box for testing local subsidence of underlying soil as well as liner deformation of refuse landfill
CN101736761A (en) Indoor model test device by dynamic replacement method
CN105241648A (en) Loading device simulating loess tunnel lock foot anchor pipe end stress and use method thereof
CN106400857B (en) For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile
CN105842094A (en) Pile box foundation level cyclic load shear deformation testing device
CN107268690A (en) A kind of detection method of carrier pile bearing capacity
CN103835319B (en) On-site observable real pile test method under compression state of concrete expanded half-face pile
CN205749172U (en) Piled-box foundaton horizontal whirl-sprayed pile detrusion assay device
CN107460862B (en) Combined testing device for substrate bearing capacity and frictional resistance
CN107190788A (en) A kind of pile foundation self-balanced static-load testing displacement observation device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130626

Termination date: 20160520