CN101832035B - 一种加固混凝土柱的构造及施工方法 - Google Patents

一种加固混凝土柱的构造及施工方法 Download PDF

Info

Publication number
CN101832035B
CN101832035B CN2010101851845A CN201010185184A CN101832035B CN 101832035 B CN101832035 B CN 101832035B CN 2010101851845 A CN2010101851845 A CN 2010101851845A CN 201010185184 A CN201010185184 A CN 201010185184A CN 101832035 B CN101832035 B CN 101832035B
Authority
CN
China
Prior art keywords
concrete column
prestressing force
intensity
incorporation
force bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010101851845A
Other languages
English (en)
Other versions
CN101832035A (zh
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SANJIAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
朱虹
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 朱虹 filed Critical 朱虹
Priority to CN2010101851845A priority Critical patent/CN101832035B/zh
Publication of CN101832035A publication Critical patent/CN101832035A/zh
Application granted granted Critical
Publication of CN101832035B publication Critical patent/CN101832035B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

本发明公开了一种加固混凝土柱的构造及施工方法,其特征是包括预应力杆、钢丝、纤维混凝土、角钢、钢垫板、螺帽、U形箍、环氧树脂水泥浆,柱四个侧面均设置预应力杆,预应力杆外围缠绕钢丝,U形箍将预应力杆固定在混凝土柱上,预应力杆与钢丝之间设置纤维混凝土,柱顶设置角钢作为预应力杆张拉装置,预应力杆张拉后用螺帽固定,角钢与螺帽之间设置钢垫板。混凝土柱四角去掉棱角,混凝土柱表面凿毛处理。预应力杆及钢丝外围用高强环氧树脂水泥浆封闭。本发明安全可靠,实用性强。

Description

一种加固混凝土柱的构造及施工方法
技术领域
本发明涉及一种加固混凝土柱的构造及施工方法,适用于建筑领域。
背景技术
当混凝土柱强度达不到要求时必须采用加固,可以采用外加预应力杆的方法对混凝土柱进行加固,通过预应力手段强迫预应力杆受力,避免了加固结构中特有的应力应变滞后的现象,使后加部分与原混凝土柱能较好的共同工作,混凝土的承载力可以显著地提高。
发明内容
本发明解决的技术问题是提供一种加固混凝土柱的构造及施工方法,解决混凝土柱加固结构中的应力应变滞后的问题。
本发明包括预应力杆、钢丝、纤维混凝土、角钢、钢垫板、螺帽、U形箍、环氧树脂水泥浆。柱四个侧面均设置预应力杆,预应力杆外围缠绕钢丝,U形箍将预应力杆固定在混凝土柱上,预应力杆与钢丝之间设置纤维混凝土,柱顶设置角钢作为预应力杆张拉装置,预应力杆张拉后用螺帽固定,角钢与螺帽之间设置钢垫板。混凝土柱四角去掉棱角,混凝土柱表面凿毛处理。预应力杆及钢丝外围用高强环氧树脂水泥浆封闭。
钢丝直径根据混凝土柱强度等级而定,对于强度为C30的混凝土柱,钢丝直径为4mm,对于强度为C35的混凝土柱,钢丝直径为5mm,对于强度为C40的混凝土柱,钢丝直径为5.5mm,对于强度为C40以上的混凝土柱,钢丝直径为6mm。沿混凝土柱竖直方向每间隔0.8~1.2m设置一个U形箍。纤维混凝土中钢纤维长度为20~35mm,纤维混凝土掺入量根据混凝土强度等级进行调整,对于强度为C30的混凝土柱,掺入量为20~23kg/m3,对于强度为C35的混凝土柱,掺入量为23~26kg/m3,对于强度为C40的混凝土柱,掺入量为26~29kg/m3,对于强度为C40以上的混凝土柱,掺入量为29~32kg/m3
预应力杆张拉过程分两个阶段进行:第一阶段将预应力杆张拉至2/3的预加内力,用U形箍固定钢丝并控制结构的稳定,第二阶段将将预应力杆张拉至预加内力。
本发明安全可靠,实用性强。
附图说明
图1混凝土柱加固平面图
图2混凝土柱加固立面图
附图标志:1、预应力杆,2、钢丝,3、纤维混凝土,4、混凝土柱,5、角钢,6、钢垫板,7、螺帽,8、U形箍,9、环氧树脂水泥浆
具体实施方式
以下结合附图对本实施例进行详细描述。
图1为混凝土柱加固平面图,图2为混凝土柱加固立面图。本实施例包括预应力杆1、钢丝2、纤维混凝土3、角钢5、钢垫板6、螺帽7、U形箍8、环氧树脂水泥浆9。混凝土柱4四个侧面均设置预应力杆1,预应力杆1外围缠绕钢丝2,U形箍8将预应力杆1固定在混凝土柱4上,预应力杆1与钢丝2之间设置纤维混凝土3,柱顶设置角钢5作为预应力杆1张拉装置,预应力杆1张拉后用螺帽7固定,角钢5与螺帽7之间设置钢垫板6。混凝土柱4四角去掉棱角,混凝土柱4表面凿毛处理。预应力杆1及钢丝2外围用强度为C35环氧树脂水泥浆9封闭。
加固混凝土柱4强度为C30,钢丝2直径为4mm,沿加固混凝土柱4竖直方向每间隔1m设置一个U形箍。纤维混凝土3中钢纤维长度为20~35mm,纤维混凝土3掺入量为20~23kg/m3
张拉时,通过特制的千斤顶拉动预应力杆1移动,待张拉至控制力后,拧紧螺帽7,锚固住预应力杆1,从而建立预加拉力。为减小张拉过程中引起的应力损失,预应力杆1张拉过程分两个阶段进行:第一阶段将预应力杆1张拉至2/3的预加内力,用U形箍8固定钢丝2并控制结构的稳定,第二阶段将将预应力杆1张拉至预加内力。

Claims (10)

1.一种加固混凝土柱的构造及施工方法,其特征是包括包括预应力杆、钢丝、纤维混凝土、角钢、钢垫板、螺帽、U形箍、环氧树脂水泥浆,柱四个侧面均设置预应力杆,预应力杆外围缠绕钢丝,U形箍将预应力杆固定在混凝土柱上,预应力杆与钢丝之间设置纤维混凝土,柱顶设置角钢作为预应力杆张拉装置,预应力杆张拉后用螺帽固定,角钢与螺帽之间设置钢垫板,混凝土柱四角去掉棱角,混凝土柱表面凿毛处理,预应力杆及钢丝外围用高强环氧树脂水泥浆封闭。
2.根据权利要求1所述的加固混凝土柱的构造及施工方法,其特征是钢丝直径根据混凝土柱强度等级而定,对于强度为C30的混凝土柱,钢丝直径为4mm,对于强度为C35的混凝土柱,钢丝直径为5mm,对于强度为C40的混凝土柱,钢丝直径为5.5mm,对于强度为C40以上的混凝土柱,钢丝直径为6mm。
3.根据权利要求1所述的加固混凝土柱的构造及施工方法,其特征是沿混凝土柱竖直方向每间隔0.8~1.2m设置一个U形箍。
4.根据权利要求2所述的加固混凝土柱的构造及施工方法,其特征是沿加固混凝土柱竖直方向每间隔0.8~1.2m设置一个U形箍。
5.根据权利要求1所述的加固混凝土柱的构造及施工方法,其特征是纤维混凝土中钢纤维长度为20~35mm,纤维混凝土掺入量根据混凝土强度等级进行调整,对于强度为C30的混凝土柱,掺入量为20~23kg/m3,对于强度为C35的混凝土柱,掺入量为23~26kg/m3,对于强度为C40的混凝土柱,掺入量为26~29kg/m3,对于强度大于C40的混凝土柱,掺入量为29~32kg/m3
6.根据权利要求2所述的加固混凝土柱的构造及施工方法,其特征是纤维混凝土中钢纤维长度为20~35mm,纤维混凝土掺入量根据混凝土强度等级进行调整,对于强度为C30的混凝土柱,掺入量为20~23kg/m3,对于强度为C35的混凝土柱,掺入量为23~26kg/m3,对于强度为C40的混凝土柱,掺入量为26~29kg/m3,对于强度大于C40的混凝土柱,掺入量为29~32kg/m3
7.根据权利要求3所述的加固混凝土柱的构造及施工方法,其特征是纤维混凝土中钢纤维长度为20~35mm,纤维混凝土掺入量根据混凝土强度等级进行调整,对于强度为C30的混凝土柱,掺入量为20~23kg/m3,对于强度为C35的混凝土柱,掺入量为23~26kg/m3,对于强度为C40的混凝土柱,掺入量为26~29kg/m3,对于强度大于C40的混凝土柱,掺入量为29~32kg/m3
8.根据权利要求1所述的加固混凝土柱的构造及施工方法,其特征是预应力杆张拉过程分两个阶段进行:第一阶段将预应力杆张拉至2/3的预加内力,用U形箍固定钢丝并控制结构的稳定,第二阶段将预应力杆张拉至预加内力。
9.根据权利要求2所述的加固混凝土柱的构造及施工方法,其特征是预应力杆张拉过程分两个阶段进行:第一阶段将预应力杆张拉至2/3的预加内力,用U形箍固定钢丝并控制结构的稳定,第二阶段将预应力杆张拉至预加内力。
10.根据权利要求3所述的加固混凝土柱的构造及施工方法,其特征是预应力杆张拉过程分两个阶段进行:第一阶段将预应力杆张拉至2/3的预加内力,用U形箍固定钢丝并控制结构的稳定,第二阶段将预应力杆张拉至预加内力。
CN2010101851845A 2010-05-15 2010-05-15 一种加固混凝土柱的构造及施工方法 Expired - Fee Related CN101832035B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101851845A CN101832035B (zh) 2010-05-15 2010-05-15 一种加固混凝土柱的构造及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101851845A CN101832035B (zh) 2010-05-15 2010-05-15 一种加固混凝土柱的构造及施工方法

Publications (2)

Publication Number Publication Date
CN101832035A CN101832035A (zh) 2010-09-15
CN101832035B true CN101832035B (zh) 2011-05-11

Family

ID=42716233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101851845A Expired - Fee Related CN101832035B (zh) 2010-05-15 2010-05-15 一种加固混凝土柱的构造及施工方法

Country Status (1)

Country Link
CN (1) CN101832035B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI596264B (zh) * 2011-06-02 2017-08-21 Formosa Taffeta Co Ltd Reinforcement jacket and concrete columns of the reinforcement method
CN105696805B (zh) * 2016-03-10 2017-11-28 叶长青 砖柱加固方法
CN108277998A (zh) * 2018-04-04 2018-07-13 四川森宇建筑工程有限公司 一种混凝土加固墙体结构

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2323944C (en) * 1998-03-24 2007-01-23 University Of Ottawa Retrofitting existing concrete columns by external prestressing
CN1546823A (zh) * 2003-11-28 2004-11-17 广东省建筑科学研究院 混凝土柱预应力包钢加固法
CN101397854B (zh) * 2008-01-23 2012-01-11 贵州大学 外包预应力紧固式钢管混凝土柱及加固的方法

Also Published As

Publication number Publication date
CN101832035A (zh) 2010-09-15

Similar Documents

Publication Publication Date Title
US9783987B2 (en) Pre-tensioned centrifugal concrete structure with steel strands
CN100480482C (zh) 外置横向预应力钢筋混凝土梁
CN101812924B (zh) 一种预应力钢绞线加固混凝土柱体的张拉锚固系统
CN101832035B (zh) 一种加固混凝土柱的构造及施工方法
CN112012491A (zh) 一种缓粘结预应力的施工工法
US11674323B2 (en) Device and method for reinforcing round section wood beam by combination of prestressed FRP sheet and high strength steel wire rope
CN2739290Y (zh) 钢绞线竖向预应力锚固体系
CN101487344B (zh) 预应力纤维布加固混凝土柱的横向张拉方法
CN102561591A (zh) 缓粘结预应力型钢混凝土梁
CN101922238A (zh) 预应力钢绞线加固混凝土受弯构件的简便张拉锚固系统
CN106121268B (zh) 预应力钢丝绳综合加固梁板柱的系统及方法
CN102661055A (zh) 一种采用预应力索加固钢筋混凝土柱的装置及使用方法
CN102619338B (zh) 超长环梁的预应力筋的施工方法
CN202081581U (zh) 一种环向预应力钢绞线自锁锚固装置
CN203296268U (zh) 十字搭接扣
CN204715750U (zh) 利用方形杆件的组合式模板
KR101471648B1 (ko) 하이브리드 텐던 구조를 갖는 콘크리트 구조체 및 이의 제작 방법
CN106436587A (zh) 环链式预应力钢丝绳自动同步张拉系统及方法
KR20140059941A (ko) 지점부에 강봉을 이용한 압축력이 도입된 거더 연속화 시공방법 및 이것을 이용한 교량
KR101265544B1 (ko) 디본딩 방식을 적용한 프리텐션 피에스씨 i형 거더
CN205591554U (zh) 一种模板位置控制装置
CN115534099A (zh) 一种钢绞线先张法预应力锚固体系及其施工方法
CN205259621U (zh) 预制梁钢绞线吊环
CN211472142U (zh) 一种转体斜拉桥桥墩及其加固装置
KR101535180B1 (ko) 교량상부구조용 콘크리트거더

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SANJIAN CONSTRUCTION ENGINEERING GROUP CO., LTD.

Free format text: FORMER OWNER: ZHU HONG

Effective date: 20120328

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 325024 WENZHOU, ZHEJIANG PROVINCE TO: 325000 WENZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120328

Address after: 325000 No. 5, Lane 26, Yang Fu Road, Wenzhou, Zhejiang

Patentee after: Sanjian Construction Engineering Group Co., Ltd.

Address before: Hit street town of Longwan District of Wenzhou city in Zhejiang province 325024 standard Road 71 Lane 2

Patentee before: Zhu Hong

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110511

Termination date: 20200515