[go: up one dir, main page]

CN101788233B - Heating-furnace cogeneration system and method thereof - Google Patents

Heating-furnace cogeneration system and method thereof Download PDF

Info

Publication number
CN101788233B
CN101788233B CN2010101143447A CN201010114344A CN101788233B CN 101788233 B CN101788233 B CN 101788233B CN 2010101143447 A CN2010101143447 A CN 2010101143447A CN 201010114344 A CN201010114344 A CN 201010114344A CN 101788233 B CN101788233 B CN 101788233B
Authority
CN
China
Prior art keywords
heating furnace
waste heat
boiler
steam
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010101143447A
Other languages
Chinese (zh)
Other versions
CN101788233A (en
Inventor
张效鹏
汪洪涛
张延平
马泽军
李国玮
岳勇
杨天助
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Group Co Ltd
Original Assignee
Shougang Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Corp filed Critical Shougang Corp
Priority to CN2010101143447A priority Critical patent/CN101788233B/en
Publication of CN101788233A publication Critical patent/CN101788233A/en
Application granted granted Critical
Publication of CN101788233B publication Critical patent/CN101788233B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/14Combined heat and power generation [CHP]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • Y02P80/15On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)
  • Air Supply (AREA)

Abstract

一种加热炉余热发电系统及其方法,属于余能余热回收利用领域,系统包括加热炉、加热炉余热锅炉、加热炉空气预热器、加热炉热管式煤气预热器、加热炉尾吸风机、过热蒸汽锅炉、汽轮发电机组、化学水系统;在加热炉尾部沿着烟气流向依次布置加热炉余热锅炉、加热炉空气预热器、加热炉热管式煤气预热器、加热炉尾吸风机,回收加热炉烟气余热;加热炉余热锅炉进行发电;化学水系统加热炉余热锅炉和过热蒸汽锅炉提供补充水。优点在于,使过热蒸汽锅炉在加热炉待轧的情况下仍能保证余热发电系统低负荷稳定运行,利用过热蒸汽锅炉提高了加热炉余热发电设备蒸汽参数,提高了发电效率;最后本发明对加热炉余热进行了最大限度的回收,有很好的经济效益和环境效益,并具有较好的应用和推广价值。

Figure 201010114344

A heating furnace waste heat power generation system and method thereof, belonging to the field of waste energy and waste heat recovery and utilization, the system includes a heating furnace, a heating furnace waste heat boiler, a heating furnace air preheater, a heating furnace heat pipe type gas preheater, and a heating furnace tail suction fan , superheated steam boiler, steam turbine generator set, chemical water system; at the tail of the heating furnace, arrange the waste heat boiler of the heating furnace, the air preheater of the heating furnace, the heat pipe type gas preheater of the heating furnace, and the exhaust suction of the heating furnace The fan recovers the waste heat of the flue gas of the heating furnace; the waste heat boiler of the heating furnace generates power; the waste heat boiler of the chemical water system heating furnace and the superheated steam boiler provide supplementary water. The advantage is that the superheated steam boiler can still ensure the low-load stable operation of the waste heat power generation system when the heating furnace is waiting for rolling, and the steam parameters of the waste heat power generation equipment of the heating furnace are improved by using the superheated steam boiler, and the power generation efficiency is improved; The waste heat of the furnace is recovered to the greatest extent, which has good economic and environmental benefits, and has good application and promotion value.

Figure 201010114344

Description

一种加热炉余热发电系统及其方法A heating furnace waste heat power generation system and method thereof

技术领域 technical field

本发明属于余能余热回收利用领域,特别涉及一种加热炉余热发电系统及其方法,适用于钢铁厂轧钢加热炉余热发电。The invention belongs to the field of recovery and utilization of waste energy and waste heat, and in particular relates to a heating furnace waste heat power generation system and a method thereof, which are suitable for power generation by waste heat of a steel rolling heating furnace in a steel plant.

背景技术 Background technique

钢铁企业轧钢加热炉作为能耗大户直接影响着企业的生产成本。一般加热炉作为一种加热设备的热效率普遍在30%左右,能耗高、能源利用水平低,造成了大量的能源浪费。因此回收加热炉余热既有很好的经济效益又有一定的环境效益。As a major energy consumer, steel rolling heating furnaces in iron and steel enterprises directly affect the production costs of enterprises. Generally, as a heating equipment, the thermal efficiency of a heating furnace is generally about 30%, and the energy consumption is high and the energy utilization level is low, resulting in a large amount of energy waste. Therefore, recovering the waste heat of the heating furnace has both good economic benefits and certain environmental benefits.

目前,钢铁企业多采用汽化冷却步进梁式加热炉,一般燃料为混合煤气,排烟方式为自然排烟。加热炉预热段排烟温度一般在850-900℃,通常使用掺冷风机来降低排烟温度保护空气预热器和煤气预热器。在掺冷风机投运的情况下加热炉尾排烟温度仍在400℃以上。目前主要采取余热回收方式是利用加热炉排烟在尾部烟道内进行空气预热、煤气预热,或者在尾部烟道布置余热锅炉产生蒸汽,直接发电。这些余热回收方式在实际运行过程中存在一些问题:(1)采用空气预热、煤气预热只回收了部分烟气热量,回收余热能力有限。(2)采用余热回收蒸汽直接发电,由于余热锅炉所产生的蒸汽参数低,直接发电效率低。(3)由于加热炉经常待轧,造成余热锅炉产生的蒸汽不连续,余热发电系统不能稳定运行。At present, most iron and steel enterprises use vaporization cooling walking beam heating furnace, the general fuel is mixed gas, and the smoke exhaust method is natural smoke exhaust. The exhaust gas temperature in the preheating section of the heating furnace is generally 850-900°C, and a cooling fan is usually used to reduce the exhaust gas temperature to protect the air preheater and gas preheater. In the case of putting the cooling fan into operation, the exhaust gas temperature at the tail of the heating furnace is still above 400°C. At present, the waste heat recovery method is mainly to use the exhaust smoke of the heating furnace to preheat the air and gas in the tail flue, or arrange the waste heat boiler in the tail flue to generate steam and directly generate electricity. These waste heat recovery methods have some problems in the actual operation process: (1) Air preheating and gas preheating only recover part of the flue gas heat, and the recovery of waste heat is limited. (2) Using waste heat recovery steam to directly generate electricity, because the parameters of the steam generated by the waste heat boiler are low, the efficiency of direct power generation is low. (3) Since the heating furnace is often waiting for rolling, the steam generated by the waste heat boiler is not continuous, and the waste heat power generation system cannot operate stably.

鉴于上述缺陷,应改进加热炉余热回收方式,其核心问题就是要尽可能高效利用回收的余热,同时解决加热炉待轧与加热炉余热发电系统需连续运行之间的矛盾。In view of the above defects, the waste heat recovery method of the heating furnace should be improved. The core problem is to use the recovered waste heat as efficiently as possible, and at the same time solve the contradiction between the heating furnace waiting for rolling and the continuous operation of the heating furnace waste heat power generation system.

发明内容 Contents of the invention

本发明的目的在于提供加热炉余热发电系统及其方法,首先通过对过热蒸汽锅炉燃烧系统的配置,使过热蒸汽锅炉在加热炉待轧的情况下仍能保证余热发电系统低负荷稳定运行,解决了加热炉待轧时生产不连续而导致的余热发电系统无法连续运行的问题;其次利用过热蒸汽锅炉提高了加热炉余热发电设备蒸汽参数,提高了发电效率;最后本发明对加热炉余热进行了最大限度的回收,有很好的经济效益和环境效益,并具有较好的应用和推广价值。最大可能回收加热炉烟气余热;尽可能提高余热发电效率;解决加热炉待轧与加热炉余热发电系统需连续运行之间的矛盾。The purpose of the present invention is to provide a heating furnace waste heat power generation system and its method. Firstly, through the configuration of the superheated steam boiler combustion system, the superheated steam boiler can still ensure the low load and stable operation of the waste heat power generation system when the heating furnace is waiting to be rolled. It solves the problem that the waste heat power generation system cannot run continuously due to the discontinuous production of the heating furnace when it is waiting for rolling; secondly, the steam parameters of the waste heat power generation equipment of the heating furnace are improved by using the superheated steam boiler, and the power generation efficiency is improved; finally, the waste heat of the heating furnace is improved by the present invention. The maximum recovery has good economic and environmental benefits, and has good application and promotion value. Recover the waste heat of the flue gas of the heating furnace as much as possible; improve the efficiency of waste heat power generation as much as possible; solve the contradiction between the heating furnace waiting for rolling and the continuous operation of the heating furnace waste heat power generation system.

本发明的系统包括加热炉、加热炉余热锅炉、加热炉空气预热器、加热炉热管式煤气预热器、加热炉尾吸风机、过热蒸汽锅炉、汽轮发电机组、化学水系统等。本发明在加热炉尾部沿着烟气流向依次布置加热炉余热锅炉、加热炉空气预热器、加热炉热管式煤气预热器、加热炉尾吸风机,充分回收加热炉烟气余热。加热炉余热锅炉产生的饱和蒸汽进入过热蒸汽锅炉进一步提高温度后进入汽轮发电机组进行发电。化学水系统主要为加热炉余热锅炉和过热蒸汽锅炉提供补充水。The system of the present invention includes a heating furnace, a heating furnace waste heat boiler, a heating furnace air preheater, a heating furnace heat pipe gas preheater, a heating furnace tail suction fan, a superheated steam boiler, a steam turbine generator set, a chemical water system, and the like. The invention arranges the waste heat boiler of the heating furnace, the air preheater of the heating furnace, the heat pipe type gas preheater of the heating furnace, and the suction fan at the tail of the heating furnace in sequence along the flue gas flow direction at the tail of the heating furnace to fully recover the waste heat of the flue gas of the heating furnace. The saturated steam produced by the waste heat boiler of the heating furnace enters the superheated steam boiler to further increase the temperature and then enters the turbogenerator unit for power generation. The chemical water system mainly provides supplementary water for the waste heat boiler of the heating furnace and the superheated steam boiler.

本发明所述的化学水系统主要是对原水进行处理,降低水的硬度和含盐量,为加热炉余热锅炉和过热蒸汽锅炉提供化学补充水。The chemical water system of the present invention mainly treats the raw water, reduces the hardness and salt content of the water, and provides chemical supplementary water for the waste heat boiler of the heating furnace and the superheated steam boiler.

本发明余热发电的工艺包括加热炉烟气余热回收流程和汽轮发电机组的汽水循环流程;具体工艺如下:The technology of waste heat power generation of the present invention comprises the waste heat recovery process of heating furnace flue gas and the steam-water circulation process of steam turbine generator set; the specific process is as follows:

加热炉烟气余热回收流程:加热炉预热段排烟温度1000℃-850℃(视进料温度情况有所差别),经过加热炉余热锅炉回收热量产生饱和蒸汽后,排烟温度为650℃-550℃。烟气经过加热炉空气预热器预热空气后,排烟温度为300℃-250℃。烟气经过加热炉煤气预热器预热煤气后,排烟温度降为150℃。加热炉烟气最后经过加热炉尾吸风机排入加热炉烟囱,最终排入大气。在本发明中,原有的掺冷风机不必运行。Heating furnace flue gas waste heat recovery process: the exhaust gas temperature in the preheating section of the heating furnace is 1000°C-850°C (depending on the feed temperature), and after the heat is recovered by the waste heat boiler of the heating furnace to generate saturated steam, the exhaust gas temperature is 650°C -550°C. After the flue gas passes through the air preheater of the heating furnace to preheat the air, the exhaust gas temperature is 300°C-250°C. After the flue gas passes through the gas preheater of the heating furnace to preheat the gas, the exhaust gas temperature drops to 150°C. The flue gas from the heating furnace is finally discharged into the chimney of the heating furnace through the tail suction fan of the heating furnace, and finally discharged into the atmosphere. In the present invention, the original mixed cooling fan does not need to operate.

汽轮发电机组的汽水循环流程:加热炉余热锅炉产生的饱和蒸汽送入过热蒸汽锅炉的过热器入口联箱,饱和蒸汽经过过热达到汽轮发电机组额定参数后送入汽轮发电机组进行发电。汽轮发电机组产生的凝结水经凝结水泵送入低压加热器,低压加热器的热源由加热炉水梁汽化冷却汽包产生的饱和蒸汽提供,被加热的凝结水进入高压除氧器除氧后,由给水泵送入高压加热器。高压给水分别送入过热蒸汽锅炉和加热炉余热锅炉进行汽水循环。低压加热器的疏水自流入低位水箱后,由疏水泵送至低压除氧器,进入加热炉水梁汽化冷却循环系统。加热炉水梁汽化冷却所产饱和蒸汽不再直接对厂区管网供应,改由汽轮发电机组的调节抽汽供应。The steam-water circulation process of the turbo-generator unit: the saturated steam generated by the waste heat boiler of the heating furnace is sent to the superheater inlet header of the superheated steam boiler, and the saturated steam is superheated to reach the rated parameters of the turbo-generator unit and then sent to the turbo-generator unit for power generation. The condensed water produced by the steam turbine generator set is sent to the low-pressure heater through the condensed water pump. The heat source of the low-pressure heater is provided by the saturated steam generated by the vaporization cooling drum of the water beam of the heating furnace. The heated condensed water enters the high-pressure deaerator after deaeration , sent to the high-pressure heater by the feed water pump. The high-pressure feed water is sent to the superheated steam boiler and the waste heat boiler of the heating furnace respectively for steam-water circulation. After the drainage of the low-pressure heater flows into the low-level water tank, it is sent to the low-pressure deaerator by the drainage pump, and then enters the heating furnace water beam vaporization cooling circulation system. The saturated steam produced by the vaporization cooling of the water beam of the heating furnace is no longer directly supplied to the pipe network in the plant area, but is supplied by the regulated extraction steam of the turbogenerator unit.

本发明的主要创新点是:Main innovation of the present invention is:

(1)利用过热蒸汽锅炉蒸发量的调节,解决加热炉待轧与加热炉余热发电系统需连续运行之间的矛盾。(1) Use the adjustment of the evaporation capacity of the superheated steam boiler to solve the contradiction between the heating furnace waiting for rolling and the heating furnace waste heat power generation system needing continuous operation.

(2)通过过热蒸汽锅炉提高发电系统蒸汽参数,提高余热回收蒸汽的发电效率。(2) Improve the steam parameters of the power generation system through the superheated steam boiler, and improve the power generation efficiency of waste heat recovery steam.

(3)加热炉排烟温度降低至150℃,加热炉余热回收达到极限水平。(3) The exhaust gas temperature of the heating furnace is reduced to 150°C, and the waste heat recovery of the heating furnace reaches the limit level.

本发明的积极效果如下:The positive effects of the present invention are as follows:

(1)加热炉余热锅炉与过热蒸汽锅炉所产蒸汽混合后过热,确保发电系统的稳定运行。在加热炉发生待轧,加热炉余热锅炉产汽量下降的情况下。过热蒸汽锅炉产生一部分蒸汽作为补充,确保了发电系统所需蒸汽的稳定。这样解决了加热炉待轧与加热炉余热发电系统需连续运行之间的矛盾。(1) The waste heat boiler of the heating furnace and the steam produced by the superheated steam boiler are mixed and superheated to ensure the stable operation of the power generation system. When the heating furnace is waiting for rolling, the steam production of the waste heat boiler of the heating furnace decreases. The superheated steam boiler produces part of the steam as a supplement, which ensures the stability of the steam required by the power generation system. This solves the contradiction between the heating furnace waiting for rolling and the heating furnace waste heat power generation system needing continuous operation.

(2)加热炉余热锅炉产生的饱和蒸汽通过过热蒸汽锅炉提高蒸汽参数,提高余热发电效率。加热炉余热锅炉产生的饱和蒸汽与过热蒸汽锅炉所产生的饱和蒸汽在过热蒸汽锅炉的过热器入口联箱混合,送到过热蒸汽锅炉中进行过热,达到机组要求参数后进入发电系统进行发电。(2) The saturated steam generated by the waste heat boiler of the heating furnace is passed through the superheated steam boiler to improve the steam parameters and improve the efficiency of waste heat power generation. The saturated steam produced by the waste heat boiler of the heating furnace and the saturated steam produced by the superheated steam boiler are mixed in the superheater inlet header of the superheated steam boiler, and sent to the superheated steam boiler for superheating. After reaching the required parameters of the unit, it enters the power generation system for power generation.

(3)过热蒸汽锅炉采用移动火焰中心燃烧系统,确保过热蒸汽锅炉在低负荷下稳定运行。过热蒸汽锅炉火焰中心能够随工况变化上下移动。当加热炉正常运行时,火焰中心上移,锅炉的蒸发量下降;当加热炉待轧时,火焰中心下移锅炉蒸发量增加。保证了汽轮发电机组的稳定运行。(3) The superheated steam boiler adopts a moving flame center combustion system to ensure the stable operation of the superheated steam boiler under low load. The flame center of the superheated steam boiler can move up and down with the change of working conditions. When the heating furnace is running normally, the center of the flame moves up, and the evaporation of the boiler decreases; when the heating furnace is waiting for rolling, the center of the flame moves down, and the evaporation of the boiler increases. This ensures the stable operation of the steam turbine generator set.

(4)梯级利用加热炉烟气余热,按照不同的温度要求依次布置余热锅炉、空气预热器、煤气预热器,排烟温度降低到150℃,使余热回收达到极限。(4) Cascade utilizes the waste heat of the flue gas of the heating furnace, and arranges waste heat boilers, air preheaters, and gas preheaters in sequence according to different temperature requirements, and the exhaust gas temperature is reduced to 150°C, so that the waste heat recovery reaches the limit.

(5)用加热炉汽化冷却步进梁所产蒸汽代替将原有低压加热器抽汽,进一步高效利用加热炉余热提高发电效率。(5) Use the steam produced by the heating furnace to vaporize and cool the walking beam instead of extracting steam from the original low-pressure heater, and further efficiently utilize the waste heat of the heating furnace to improve power generation efficiency.

本发明的主要技术优点:(1)利用过热蒸汽锅炉,确保了余热发电系统的稳定运行。(2)通过过热蒸汽锅炉,提高了余热回收蒸汽的参数,提高了发电效率。另外,本发明不对加热炉进行大的改动,不影响加热炉原有性能,投资回收周期短,见效快。Main technical advantages of the present invention: (1) The stable operation of the waste heat power generation system is ensured by using the superheated steam boiler. (2) Through the superheated steam boiler, the parameters of waste heat recovery steam are improved, and the power generation efficiency is improved. In addition, the invention does not make major changes to the heating furnace, does not affect the original performance of the heating furnace, and has a short investment recovery period and quick results.

本发明对现有加热炉余热发电工艺进行了重要改进,具有很好的应用和推广价值。The invention significantly improves the existing waste heat power generation process of the heating furnace, and has good application and popularization value.

附图说明 Description of drawings

图1为本发明的加热炉余热回收发电设备系统示意图。其中,加热炉1、加热炉余热锅炉2、加热炉空气预热器3、加热炉煤气预热器4、加热炉尾吸风机5、加热炉鼓风机6、汽轮发电机组7、凝结水泵8、低压加热器9、高压除氧器10、给水泵11、高压加热器12、过热蒸汽锅炉13、低位疏水箱14、疏水泵15、低压除氧器16、汽化冷却汽包17、水梁冷却循环泵18、掺冷风机19、加热炉烟囱20。Fig. 1 is a schematic diagram of the heating furnace waste heat recovery power generation equipment system of the present invention. Among them, heating furnace 1, heating furnace waste heat boiler 2, heating furnace air preheater 3, heating furnace gas preheater 4, heating furnace tail suction fan 5, heating furnace blower 6, steam turbine generator set 7, condensate water pump 8, Low pressure heater 9, high pressure deaerator 10, feed water pump 11, high pressure heater 12, superheated steam boiler 13, low drain tank 14, drain pump 15, low pressure deaerator 16, vaporization cooling drum 17, water beam cooling cycle Pump 18, mixed cooling fan 19, heating furnace chimney 20.

具体实施方式 Detailed ways

下面结合附图对本发明做进一步说明。The present invention will be further described below in conjunction with the accompanying drawings.

本发明的系统包括加热炉1、加热炉余热锅炉2、加热炉空气预热器3、加热炉热管式煤气预热器4、加热炉尾吸风机5、过热蒸汽锅炉13、汽轮发电机组7、化学水系统等。本发明在加热炉1尾部沿着烟气流向依次布置加热炉余热锅炉2、加热炉空气预热器3、加热炉热管式煤气预热器4、加热炉尾吸风机5,充分回收加热炉烟气余热。加热炉余热锅炉2产生的饱和蒸汽进入过热蒸汽锅炉13进一步提高温度后进入汽轮发电机组7进行发电。化学水系统主要为加热炉余热锅炉和过热蒸汽锅炉提供补充水。The system of the present invention includes a heating furnace 1, a heating furnace waste heat boiler 2, a heating furnace air preheater 3, a heating furnace heat pipe type gas preheater 4, a heating furnace tail suction fan 5, a superheated steam boiler 13, and a steam turbine generator set 7 , chemical water system, etc. In the present invention, the waste heat boiler 2 of the heating furnace, the air preheater 3 of the heating furnace, the heat pipe type gas preheater 4 of the heating furnace, and the suction fan 5 at the tail of the heating furnace are sequentially arranged at the tail of the heating furnace 1 along the flow direction of the flue gas to fully recover the fume from the heating furnace. Air waste heat. The saturated steam generated by the waste heat boiler 2 of the heating furnace enters the superheated steam boiler 13 to further raise the temperature, and then enters the turbogenerator unit 7 for power generation. The chemical water system mainly provides supplementary water for the waste heat boiler of the heating furnace and the superheated steam boiler.

参见附图1,本发明的加热炉余热回收发电设备系统示意图。加热炉烟气余热回收流程:加热炉1预热段排烟温度1000℃-850℃(视进料温度情况有所差别),经过加热炉余热锅炉2回收热量产生饱和蒸汽后,排烟温度约为650℃-550℃。烟气经过加热炉空气预热器3预热空气后,排烟温度约为300℃-250℃。烟气经过加热炉煤气预热器4预热煤气后,排烟温度降为150℃左右。加热炉烟气最后经过加热炉尾吸风机5排入加热炉烟囱20,最终排入大气。在本发明中,原有的掺冷风机19不必运行。汽轮发电机组的汽水循环流程:加热炉余热锅炉2产生的饱和蒸汽送入过热蒸汽锅炉13的过热器入口联箱,饱和蒸汽经过过热达到汽轮发电机组额定参数后送入汽轮发电机组7进行发电。汽轮发电机组7产生的凝结水经凝结水泵8送入低压加热器9,低压加热器9的热源由加热炉水梁汽化冷却汽包17产生的饱和蒸汽提供,被加热的凝结水进入高压除氧器10除氧后,由给水泵11送入高压加热器12。高压给水分别送入过热蒸汽锅炉13和加热炉余热锅炉2进行汽水循环。低压加热器9的疏水自流入低位水箱14后,由疏水泵15送至低压除氧器16,进入加热炉水梁汽化冷却循环系统。加热炉水梁汽化冷却所产饱和蒸汽不再直接对厂区管网供应,改由汽轮发电机组7的调节抽汽供应。Referring to accompanying drawing 1, it is a schematic diagram of the waste heat recovery power generation equipment system of the heating furnace of the present invention. Heating furnace flue gas waste heat recovery process: The exhaust gas temperature in the preheating section of heating furnace 1 is 1000°C-850°C (depending on the temperature of the feed material). It is 650°C-550°C. After the flue gas passes through the heating furnace air preheater 3 to preheat the air, the exhaust gas temperature is about 300°C-250°C. After the flue gas passes through the heating furnace gas preheater 4 to preheat the gas, the exhaust gas temperature drops to about 150°C. The flue gas of the heating furnace is finally discharged into the chimney 20 of the heating furnace through the tail suction fan 5 of the heating furnace, and finally discharged into the atmosphere. In the present invention, the original mixed cooling air blower 19 does not have to operate. The steam-water circulation process of the steam turbine generator set: the saturated steam generated by the waste heat boiler 2 of the heating furnace is sent to the superheater inlet header of the superheated steam boiler 13, and the saturated steam is sent to the steam turbine generator set 7 after overheating to reach the rated parameters of the steam turbine generator set To generate electricity. The condensed water produced by the steam turbine generator unit 7 is sent to the low-pressure heater 9 through the condensed water pump 8, and the heat source of the low-pressure heater 9 is provided by the saturated steam generated by the vaporization cooling drum 17 of the heating furnace water beam, and the heated condensed water enters the high-pressure removal After deoxygenation by the oxygen tank 10, it is sent to the high-pressure heater 12 by the feed water pump 11. The high-pressure feed water is respectively sent to the superheated steam boiler 13 and the waste heat boiler 2 of the heating furnace for steam-water circulation. After the drainage of the low-pressure heater 9 flows into the low-level water tank 14, it is sent to the low-pressure deaerator 16 by the drainage pump 15, and enters the heating furnace water beam vaporization cooling circulation system. The saturated steam produced by the vaporization cooling of the water beam of the heating furnace is no longer directly supplied to the pipe network in the plant area, but is supplied by the regulated extraction steam of the turbogenerator unit 7 .

本发明可以灵活适应加热炉的各种运行工况,并且不影响加热炉的原有生产工况。提高了加热炉余热锅炉的运行参数,提高余热发电效率。综上所述,本发明有着很好的经济效益,具有很好的应用和推广价值。The invention can flexibly adapt to various operating conditions of the heating furnace without affecting the original production conditions of the heating furnace. The operating parameters of the waste heat boiler of the heating furnace are improved, and the efficiency of waste heat power generation is improved. In summary, the present invention has good economic benefits and good application and popularization value.

Claims (3)

1.一种加热炉余热发电系统,包括加热炉、加热炉余热锅炉、加热炉空气预热器、加热炉热管式煤气预热器、加热炉尾吸风机、过热蒸汽锅炉、汽轮发电机组、化学水系统;其特征在于,在加热炉(1)尾部沿着烟气流向依次布置加热炉余热锅炉(2)、加热炉空气预热器(3)、加热炉热管式煤气预热器(4)、加热炉尾吸风机(5),回收加热炉烟气余热;加热炉余热锅炉产生的饱和蒸汽进入过热蒸汽锅炉进一步提高温度后进入汽轮发电机组进行发电;化学水系统为加热炉余热锅炉和过热蒸汽锅炉提供补充水。1. A heating furnace waste heat power generation system, including a heating furnace, a heating furnace waste heat boiler, a heating furnace air preheater, a heating furnace heat pipe type gas preheater, a heating furnace tail suction fan, a superheated steam boiler, a steam turbine generator set, Chemical water system; it is characterized in that, at the tail of the heating furnace (1), the waste heat boiler (2), the air preheater of the heating furnace (3), the heat pipe type gas preheater of the heating furnace (4 ), the exhaust fan (5) at the tail of the heating furnace recovers the waste heat of the flue gas of the heating furnace; the saturated steam generated by the waste heat boiler of the heating furnace enters the superheated steam boiler to further increase the temperature and then enters the turbogenerator unit for power generation; the chemical water system is the waste heat boiler of the heating furnace and superheated steam boiler to provide make-up water. 2.根据权利要求1所述的系统,其特征在于,所述的化学水系统对原水进行处理,降低水的硬度和含盐量。2. The system according to claim 1, characterized in that the chemical water system treats the raw water to reduce the hardness and salt content of the water. 3.一种采用权利要求1所述系统进行余热发电的方法,其特征在于,余热发电的工艺包括加热炉烟气余热回收流程和汽轮发电机组的汽水循环流程;3. A method for waste heat power generation using the system according to claim 1, characterized in that the process of waste heat power generation comprises a heating furnace flue gas waste heat recovery process and a steam-water circulation process of a steam turbine generator set; 加热炉烟气余热回收流程:加热炉(1)预热段排烟温度1000℃-850℃,经过加热炉余热锅炉(2)回收热量产生饱和蒸汽后,排烟温度为650℃-550℃;烟气经过加热炉空气预热器(3)预热空气后,排烟温度为300℃-250℃;烟气经过加热炉煤气预热器(4)预热煤气后,排烟温度降为150℃;加热炉烟气最后经过加热炉尾吸风机(5)排入加热炉烟囱(20),最终排入大气;Heating furnace flue gas waste heat recovery process: the exhaust gas temperature in the preheating section of the heating furnace (1) is 1000°C-850°C, and after the heat is recovered by the heating furnace waste heat boiler (2) to generate saturated steam, the exhaust gas temperature is 650°C-550°C; After the flue gas passes through the heating furnace air preheater (3) to preheat the air, the exhaust gas temperature is 300°C-250°C; after the flue gas passes through the heating furnace gas preheater (4) to preheat the gas, the exhaust gas temperature drops to 150°C ℃; the heating furnace flue gas is finally discharged into the heating furnace chimney (20) through the heating furnace tail suction fan (5), and finally discharged into the atmosphere; 汽轮发电机组的汽水循环流程:加热炉余热锅炉(2)产生的饱和蒸汽送入过热蒸汽锅炉(13)的过热器入口联箱,饱和蒸汽经过过热达到汽轮发电机组额定参数后送入汽轮发电机组(7)进行发电;汽轮发电机组(7)产生的凝结水经凝结水泵(8)送入低压加热器(9),低压加热器(9)的热源由加热炉水梁汽化冷却汽包(17)产生的饱和蒸汽提供,被加热的凝结水进入高压除氧器(10)除氧后,由给水泵(11)送入高压加热器(12);将高压给水分别送入过热蒸汽锅炉(13)和加热炉余热锅炉(2)进行汽水循环;低压加热器(9)的疏水自流入低位水箱(14)后,由疏水泵(15)送至低压除氧器(16),进入加热炉水梁汽化冷却循环系统;加热炉水梁汽化冷却所产饱和蒸汽不再直接对厂区管网供应,改由汽轮发电机组的调节抽汽供应。The steam-water circulation process of the steam turbine generator set: the saturated steam generated by the waste heat boiler (2) of the heating furnace is sent to the inlet header of the superheater of the superheated steam boiler (13), and the saturated steam is sent to the steam turbine generator set after superheating to reach the rated parameters. The turbine generator set (7) generates electricity; the condensed water produced by the turbogenerator set (7) is sent to the low-pressure heater (9) through the condensate pump (8), and the heat source of the low-pressure heater (9) is vaporized and cooled by the water beam of the heating furnace The saturated steam generated by the steam drum (17) is provided, and the heated condensed water enters the high-pressure deaerator (10) to remove oxygen, and then is sent to the high-pressure heater (12) by the feed water pump (11); the high-pressure feed water is respectively sent to the superheated The steam boiler (13) and the waste heat boiler (2) of the heating furnace carry out the steam-water circulation; the drainage of the low-pressure heater (9) flows into the low-level water tank (14), and is sent to the low-pressure deaerator (16) by the drainage pump (15), Enter the water beam vaporization cooling circulation system of the heating furnace; the saturated steam produced by the water beam vaporization cooling of the heating furnace is no longer directly supplied to the pipe network of the plant area, but is supplied by the regulated extraction steam of the steam turbine generator set.
CN2010101143447A 2010-02-25 2010-02-25 Heating-furnace cogeneration system and method thereof Active CN101788233B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101143447A CN101788233B (en) 2010-02-25 2010-02-25 Heating-furnace cogeneration system and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101143447A CN101788233B (en) 2010-02-25 2010-02-25 Heating-furnace cogeneration system and method thereof

Publications (2)

Publication Number Publication Date
CN101788233A CN101788233A (en) 2010-07-28
CN101788233B true CN101788233B (en) 2012-07-25

Family

ID=42531547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101143447A Active CN101788233B (en) 2010-02-25 2010-02-25 Heating-furnace cogeneration system and method thereof

Country Status (1)

Country Link
CN (1) CN101788233B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101968307B (en) * 2010-11-04 2013-04-24 吴春平 Thermal energy utilization system of reverberatory furnace
CN102345982A (en) * 2011-01-10 2012-02-08 沈阳东大工业炉有限公司 Heating furnace waste heat recovery generating device
CN102121405A (en) * 2011-02-28 2011-07-13 无锡三达环保科技有限公司 Low-grade smoke organic rankine cycle waste heat generating system of heating furnace in steel rolling plate plant
CN102168590A (en) * 2011-03-15 2011-08-31 中国电力工程顾问集团西南电力设计院 Gas turbine generating system using flue gas waste heat organic hydrocarbon mixture
CN103291390A (en) * 2013-06-20 2013-09-11 华效资源有限公司 Heating furnace flue gas and steam waste heat recycling and power generating system and power generating method
CN103471408B (en) * 2013-09-06 2015-08-05 鞍钢股份有限公司 Heating furnace high-temperature flue gas waste heat utilization system and method
CN103743251B (en) * 2014-01-02 2016-05-18 莱芜钢铁集团有限公司 The short flow process of a kind of energy-conserving and environment-protective compact is smelted casting production system
CN105331379A (en) * 2015-11-13 2016-02-17 北京神雾环境能源科技集团股份有限公司 Power generation system and power generation method
CN106765036A (en) * 2016-12-07 2017-05-31 北京京诚科林环保科技有限公司 condensed water circulation heating device
CN106979695A (en) * 2017-04-07 2017-07-25 首钢总公司 A kind of waste heat recovery system of heating furnace
CN114526612A (en) * 2022-03-21 2022-05-24 江苏道和环保科技有限公司 CSP heating furnace flue gas recirculation waste heat recovery system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2528938Y2 (en) * 1991-12-13 1997-03-12 株式会社トーホー Rod mill
CN101344360A (en) * 2008-08-20 2009-01-14 首钢总公司 CO2 circulating and coal gas compensation combustion type power generation method by sintered waste heat
CN101344359A (en) * 2008-08-20 2009-01-14 首钢总公司 Sintering ring cold waste heat cascade recovery power generation system and technology
CN101545726A (en) * 2009-05-15 2009-09-30 首钢总公司 Sintering waste heat and pure burning blast-furnace gas combined generating system
CN101509729B (en) * 2009-01-15 2010-08-25 江苏东能环保能源科技有限公司 Sintered power generation by waste heat system with by-product gas afterburning

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2528938Y2 (en) * 1991-12-13 1997-03-12 株式会社トーホー Rod mill
CN101344360A (en) * 2008-08-20 2009-01-14 首钢总公司 CO2 circulating and coal gas compensation combustion type power generation method by sintered waste heat
CN101344359A (en) * 2008-08-20 2009-01-14 首钢总公司 Sintering ring cold waste heat cascade recovery power generation system and technology
CN101509729B (en) * 2009-01-15 2010-08-25 江苏东能环保能源科技有限公司 Sintered power generation by waste heat system with by-product gas afterburning
CN101545726A (en) * 2009-05-15 2009-09-30 首钢总公司 Sintering waste heat and pure burning blast-furnace gas combined generating system

Also Published As

Publication number Publication date
CN101788233A (en) 2010-07-28

Similar Documents

Publication Publication Date Title
CN101788233B (en) Heating-furnace cogeneration system and method thereof
CN103089341B (en) Power generating equipment
CN104534539A (en) Gas steam combined cycle central heating device and heating method
CN201443978U (en) Carbon calciner waste heat power generation system
CN101392992A (en) Silicon smelting electric furnace waste heat power generation process flow and configuration
CN201819201U (en) Glass kiln pure low temperature waste heat power generation system
CN203431826U (en) Steam turbine water supply heat regeneration system for recovering waste heat steam
CN112611010A (en) Flexible adjusting system and method for power generation load of multi-heat-source cogeneration unit
CN202810961U (en) Low-temperature smoke gas afterheat recovery combined heat and power generation system of coke oven
CN205156647U (en) Power generation system is jointly retrieved to improved generation sintering waste heat
CN102345982A (en) Heating furnace waste heat recovery generating device
CN109296413B (en) Bypass secondary reheating power generation device and method cooled by deep seawater
CN106500082A (en) A kind of gas generating system based on steel mill's saturated vapor Optimum utilization
CN208042106U (en) A gas high temperature and high pressure power generation system
CN205714295U (en) Based on supercritical carbon dioxide and the thermal electric generator of Steam Combined Cycle
CN203443379U (en) Over-saturated steam generating system for high-temperature residual-heat condensing turbine of smelting furnace
CN101699038A (en) Sintering ore cooling waste gas full combustion-supporting generating set
CN101706215A (en) Method and device for double-source power cogeneration with sintering waste heat
CN105973016A (en) System of step-by-step recycling and gradient utilization for sintering residual heat resources
CN111288810A (en) A device and method for high-efficiency power generation with waste heat steam of a converter
CN203452860U (en) Electrical power generating system comprehensively utilizing waste heat of smoke of ferroalloy submerged arc furnace and casting process
CN203239407U (en) Lignite predrying-air preheating-waste heat utilization combination coal-fired power generation system
CN110529834A (en) A kind of dry coke quenching superhigh temperature super-pressure parameter co-generation unit and method
CN206593491U (en) A kind of mineral heating furnace flue waste heat recovery generating system
CN204960997U (en) Waste heat turbo generator set

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100041 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing

Patentee after: Shougang Group Co. Ltd.

Address before: 100041 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing

Patentee before: Capital Iron & Steel General Company

CP01 Change in the name or title of a patent holder