[go: up one dir, main page]

CN101738591B - On-site CVT integrated verification system - Google Patents

On-site CVT integrated verification system Download PDF

Info

Publication number
CN101738591B
CN101738591B CN200810197635XA CN200810197635A CN101738591B CN 101738591 B CN101738591 B CN 101738591B CN 200810197635X A CN200810197635X A CN 200810197635XA CN 200810197635 A CN200810197635 A CN 200810197635A CN 101738591 B CN101738591 B CN 101738591B
Authority
CN
China
Prior art keywords
standard
voltage
capacitor
transformer
cvt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200810197635XA
Other languages
Chinese (zh)
Other versions
CN101738591A (en
Inventor
章述汉
周峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Electric Power Research Institute
Original Assignee
State Grid Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Electric Power Research Institute filed Critical State Grid Electric Power Research Institute
Priority to CN200810197635XA priority Critical patent/CN101738591B/en
Publication of CN101738591A publication Critical patent/CN101738591A/en
Application granted granted Critical
Publication of CN101738591B publication Critical patent/CN101738591B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

本发明提供了一种现场CVT一体化校验系统,包括试验电源、标准器具、测量仪器和车载式试验平台,试验电源由串联电抗器、励磁变压器和调压器组成,标准器具包括高压套管、标准电压互感器及标准电容器;其中高压套管、标准电压互感器、标准电容器及串联电抗器设计成一体化的六氟化硫SF6封闭式组合电器GIS,其中标准电压互感器设计为SF6气体绝缘半卧式结构;本发明可以在无需卸车的情况下对现场220kV~500kV CVT(电容式电压互感器)的比例误差、电容分压器的电容量及介质损耗等进行方便、准确和可靠的校验,由测量系统引入的附加误差相对固定且易于测量,其变化量≤0.02%。

The invention provides an on-site CVT integrated calibration system, which includes a test power supply, standard appliances, measuring instruments and a vehicle-mounted test platform. The test power supply is composed of a series reactor, an excitation transformer and a voltage regulator, and the standard appliances include high-voltage bushings. , standard voltage transformer and standard capacitor; among them, the high-voltage bushing, standard voltage transformer, standard capacitor and series reactor are designed as an integrated sulfur hexafluoride SF 6 closed combined electrical appliance GIS, and the standard voltage transformer is designed as SF 6. Gas-insulated semi-horizontal structure; the present invention can conveniently and accurately analyze the ratio error of the on-site 220kV~500kV CVT (capacitive voltage transformer), the capacitance and dielectric loss of the capacitor voltage divider without unloading the truck. Reliable calibration, the additional error introduced by the measurement system is relatively fixed and easy to measure, and its variation is ≤0.02%.

Description

现场CVT一体化校验系统On-site CVT integrated calibration system

技术领域 technical field

本发明涉及一种现场CVT一体化校验系统,属于对电力设备的校准、检定与检测领域。The invention relates to an on-site CVT integrated verification system, which belongs to the field of calibration, verification and detection of electric equipment.

背景技术 Background technique

CVT(电容式电压互感器)是电网中的重要电气设备,主要由电容分压器和中压变压器组成,电容分压器由瓷套和装在其中的若干串联电容器组成,中压变压器由装在密封油箱内的变压器,补偿电抗器和阻尼装置组成,用阻尼装置抑制谐振,阻尼装置由电阻和电抗器组成。在发电厂与变电站中,对投入运行的CVT进行可靠性和安全性试验以减少事故发生几率是十分必要的。近年来,随着电力行业不断改革,发电与输配电企业分开运营,CVT在关口计量中的作用突显出来,其准确度直接影响着电能的贸易结算,因此CVT尤其是关口计量用CVT的准确度试验越来越受到重视。在《GB1207—1997电压互感器》及《GB/T4703—2001电容式电压互感器》中要求对电容分压器的电容量、介质损耗以及CVT的比例误差进行校验。目前,对于已经安装或投运的220kV~500kV CVT基本上都是采用卸装式现场校验的方式,即通过把试验电源,标准器具及测量仪器运输到现场,然后重新卸载、组装后开展校验。但这种方式由于要经过卸载——组装——校验——装车一连串繁琐的环节,既容易造成试验设备损坏,同时也浪费了巨大的人力物力,而且每次进行现场组装时,由于试验电源,标准器具及测量仪器间的相对位置都不尽相同,增大了分布参数的不确定度,从而导致由测量系统引入的附加误差很不固定,有时严重影响到测量结果甚至影响到对试品性能的判定。而且,随着CVT电压等级越高,试验设备的体形越大,这种方式对开展现场校验工作的制约也越来越大。CVT (capacitive voltage transformer) is an important electrical equipment in the power grid. It is mainly composed of a capacitor voltage divider and a medium-voltage transformer. The capacitor voltage divider is composed of a porcelain sleeve and a number of series capacitors installed in it. The transformer in the sealed oil tank is composed of a compensation reactor and a damping device, and the resonance is suppressed by the damping device, and the damping device is composed of a resistor and a reactor. In power plants and substations, it is very necessary to conduct reliability and safety tests on CVTs in operation to reduce the probability of accidents. In recent years, with the continuous reform of the power industry, power generation and transmission and distribution companies operate separately, and the role of CVT in gateway measurement has become prominent. Its accuracy directly affects the trade settlement of electric energy. Therefore, the accuracy of CVT, especially CVT for gateway measurement Degree testing is gaining more and more attention. In "GB1207-1997 Voltage Transformer" and "GB/T4703-2001 Capacitive Voltage Transformer", it is required to check the capacitance, dielectric loss and proportional error of CVT of the capacitor voltage divider. At present, the 220kV ~ 500kV CVTs that have been installed or put into operation basically adopt the unloading on-site calibration method, that is, the test power supply, standard appliances and measuring instruments are transported to the site, and then re-unloaded and assembled to carry out calibration . However, because this method has to go through a series of cumbersome steps of unloading-assembly-checking-loading, it is easy to cause damage to the test equipment, and it also wastes huge manpower and material resources. The relative positions of the power supply, standard instruments and measuring instruments are not the same, which increases the uncertainty of the distribution parameters, thus causing the additional error introduced by the measurement system to be very unstable, sometimes seriously affecting the measurement results and even affecting the test results. Judgment of product performance. Moreover, with the higher CVT voltage level, the larger the size of the test equipment, this method has become more and more restrictive to the on-site verification work.

发明内容 Contents of the invention

本发明的目的是:针对现有的用于对现场CVT进行校验的校验方式及校验系统在运输、测量上存在的不足进行了改进,提供一种现场CVT一体化校验系统,可以在无需卸车的情况下对现场220kV~500kV CVT的比例误差、电容分压器的电容量及介质损耗等进行方便、准确和可靠的校验,由测量系统引入的附加误差相对固定且易于测量,其变化量≤0.02%。The purpose of the present invention is to improve the existing verification methods and verification systems for on-site CVT verification in terms of transportation and measurement, and to provide an on-site CVT integrated verification system that can It is convenient, accurate and reliable to check the proportional error of the 220kV~500kV CVT on site, the capacitance of the capacitor voltage divider and the dielectric loss without unloading the truck. The additional error introduced by the measurement system is relatively fixed and easy to measure. Its variation is ≤0.02%.

本发明的技术方案是:现场CVT一体化校验系统,其特征在于:包括试验电源、标准器具、测量仪器和车载式试验平台,试验电源由串联电抗器、励磁变压器和调压器组成,标准器具包括高压套管、标准电压互感器及标准电容器,测量仪器包括高压电容电桥、互感器校验仪和两个负荷箱,除测量仪器外的所有设备都固定安装在车载式试验平台上,且高压套管、标准电压互感器、标准电容器、串联电抗器、励磁变压器和调压器顺序连接,其后是测量区,测量仪器摆放在测量区;The technical solution of the present invention is: an on-site CVT integrated calibration system, characterized in that it includes a test power supply, a standard appliance, a measuring instrument and a vehicle-mounted test platform, and the test power supply is composed of a series reactor, an excitation transformer and a voltage regulator. Appliances include high-voltage bushings, standard voltage transformers and standard capacitors. Measuring instruments include high-voltage capacitor bridges, transformer calibrators and two load boxes. All equipment except measuring instruments are fixed on the vehicle-mounted test platform. And the high-voltage bushing, standard voltage transformer, standard capacitor, series reactor, excitation transformer and voltage regulator are connected in sequence, followed by the measurement area, and the measuring instruments are placed in the measurement area;

高压套管、标准电压互感器、标准电容器及串联电抗器设计成一体化的六氟化硫SF6封闭式组合电器GIS,其中标准电压互感器设计为SF6气体绝缘半卧式结构,串联电抗器设计为SF6气体绝缘、倒置式串联结构,带调感抽头,采用开关切换。The high-voltage bushing, standard voltage transformer, standard capacitor and series reactor are designed as an integrated sulfur hexafluoride SF 6 closed combination appliance GIS, in which the standard voltage transformer is designed as a SF 6 gas-insulated semi-horizontal structure, and the series reactor The device is designed as an SF 6 gas insulated, inverted series structure, with a tap for adjusting the sense, which is switched by a switch.

如上所述的现场CVT一体化校验系统,其特征在于:高压导体依次通过高压套管、标准电压互感器和标准电容器的中间,标准电容器上下两侧包括标准电容低压电极,标准电压互感器与串联电抗器连通处的高压导体与标准电容低压电极形成电容,作为标准电容器。The above-mentioned on-site CVT integrated calibration system is characterized in that: the high-voltage conductor passes through the middle of the high-voltage bushing, the standard voltage transformer and the standard capacitor in sequence, the upper and lower sides of the standard capacitor include standard capacitor low-voltage electrodes, the standard voltage transformer and the standard capacitor The high-voltage conductor at the connection point of the series reactor and the low-voltage electrode of the standard capacitor form a capacitor, which is used as a standard capacitor.

如上所述的现场CVT一体化校验系统,其特征在于:标准电压互感器包含220kV~500kV CVT的所有额定变压比。The above-mentioned on-site CVT integrated calibration system is characterized in that: the standard voltage transformer includes all rated transformation ratios of 220kV-500kV CVT.

如上所述的现场CVT一体化校验系统,其特征在于:车载式试验平台为车箱箱体。The above-mentioned on-site CVT integrated verification system is characterized in that: the vehicle-mounted test platform is a car box body.

本发明的有益效果是:1、标准电压互感器设计为SF6气体绝缘半卧式结构,降低垂直高度的同时为车载运输提供了方便;2、把高压套管、标准电压互感器、标准电容器及串联电抗器设计成一体化GIS结构,大大降低制造成本;3、采用一体化设计后,无需卸车即可开展校验工作,提高了工作率;4、测量时,试验电源、标准器具及测量仪器在试验平台上的位置相对固定,降低了在测量中由校验系统自身引入的附加误差的不确定度。The beneficial effects of the present invention are: 1. The standard voltage transformer is designed as an SF 6 gas-insulated semi-horizontal structure, which provides convenience for vehicle transportation while reducing the vertical height; 2. The high-voltage bushing, standard voltage transformer, and standard capacitor And the series reactor is designed into an integrated GIS structure, which greatly reduces the manufacturing cost; 3. After adopting the integrated design, the calibration work can be carried out without unloading the truck, which improves the work rate; 4. During the measurement, the test power supply, standard equipment and measurement The position of the instrument on the test platform is relatively fixed, which reduces the uncertainty of the additional error introduced by the calibration system itself in the measurement.

附图说明 Description of drawings

图1,本发明实施例的现场CVT一体化校验系统的设备布局示意图。Fig. 1 is a schematic diagram of equipment layout of an on-site CVT integrated calibration system according to an embodiment of the present invention.

图2,图1中的测量区设备布局示意图。Figure 2, a schematic diagram of the equipment layout in the measurement area in Figure 1.

图3,图1中的高压套管、标准电压互感器、标准电容器及串联电抗器组成一体化GIS内部结构示意图。Figure 3, a schematic diagram of the internal structure of the integrated GIS composed of high-voltage bushings, standard voltage transformers, standard capacitors and series reactors in Figure 1.

图4(a),本发明实施例的CVT比例误差测量线路图。Fig. 4(a) is a circuit diagram of CVT proportional error measurement according to the embodiment of the present invention.

图4(b),本发明实施例的CVT中电容分压器的电容量及介质损耗测量线路图。Fig. 4(b) is a circuit diagram for measuring the capacitance and dielectric loss of the capacitive voltage divider in the CVT of the embodiment of the present invention.

具体实施方式 Detailed ways

以下结合附图和实施例对本发明现场CVT一体化校验系统做进一步的说明。The on-site CVT integrated verification system of the present invention will be further described below in conjunction with the accompanying drawings and embodiments.

图1中的标记:1-高压套管,2-标准电压互感器,3-标准电容器,4-串联电抗器,5-励磁变压器,6-调压器,7-车载式试验平台。Marks in Figure 1: 1-high voltage bushing, 2-standard voltage transformer, 3-standard capacitor, 4-series reactor, 5-excitation transformer, 6-voltage regulator, 7-vehicle-mounted test platform.

图3中的标记:8-高压导体,9-地电位屏蔽电极,10-互感器一次绕组,11-互感器二次绕组,12-互感器铁芯,13-标准电容低压电极,14-调感切换开关,15-电抗器铁芯,16-电抗器电感线圈,17-箱体,18-定位连接孔,r1-高压导体半径,r2-内半径。Marks in Figure 3: 8-high-voltage conductor, 9-ground potential shielding electrode, 10-transformer primary winding, 11-transformer secondary winding, 12-transformer core, 13-standard capacitor low-voltage electrode, 14-adjustment Inductive switch, 15-reactor core, 16-reactor inductance coil, 17-box, 18-positioning connection hole, r1-radius of high voltage conductor, r2-inner radius.

图4中的标记:C1、C2—被测CVT的分压电容,Lk—CVT中的补偿电抗器,Y1、Y2—负荷箱,QS-高压电容电桥,HE-互感器校验仪。Marks in Figure 4: C1, C2—divider capacitance of the tested CVT, Lk—compensation reactor in the CVT, Y1, Y2—load box, QS—high voltage capacitor bridge, HE—transformer calibrator.

本发明实施例的现场CVT一体化校验系统的设备布局示意图如图1所示,现场CVT一体化校验系统,包括试验电源、标准器具、测量仪器和车载式试验平台7,试验电源由串联电抗器4、励磁变压器5和调压器6组成,标准器具包括高压套管1、半卧式多变比标准电压互感器2及高压标准电容器3,除测量仪器外的所有设备都固定安装在车载式试验平台7上,且高压套管1、半卧式多变比标准电压互感器2、高压标准电容器3、串联电抗器4、励磁变压器5和调压器6顺序连接,其后是测量区,测量仪器摆放在测量区,车载式试验平台7为车箱箱体。The schematic diagram of the equipment layout of the on-site CVT integrated calibration system of the embodiment of the present invention is shown in Figure 1. The on-site CVT integrated calibration system includes a test power supply, a standard appliance, a measuring instrument and a vehicle-mounted test platform 7, and the test power supply is connected in series. Reactor 4, excitation transformer 5 and voltage regulator 6. Standard appliances include high-voltage bushing 1, semi-horizontal multi-ratio standard voltage transformer 2 and high-voltage standard capacitor 3. All equipment except measuring instruments are fixed on the On the vehicle-mounted test platform 7, the high-voltage bushing 1, the semi-horizontal multi-ratio standard voltage transformer 2, the high-voltage standard capacitor 3, the series reactor 4, the excitation transformer 5 and the voltage regulator 6 are connected in sequence, and then the measurement area, the measuring instruments are placed in the measuring area, and the vehicle-mounted test platform 7 is the box body of the carriage.

在图2中可见,测量仪器中的高压电容电桥、互感器校验仪和两个负荷箱顺序摆放在测量区。It can be seen in Figure 2 that the high-voltage capacitor bridge, transformer calibrator and two load boxes in the measuring instrument are placed in the measurement area in sequence.

如图3所示,高压套管1内壁两侧有地电位屏蔽电极9,标准电压互感器2中互感器一次绕组10绕在互感器二次绕组11外且共绕在互感器铁芯12上,它们处于标准电压互感器2的中间位置,可以横放为半卧式;标准电容器3上下两侧包括标准电容低压电极13,串联电抗器4的箱体17中调感切换开关14、电抗器电感线圈16、电抗器铁芯15和电抗器电感线圈16顺序排列,高压导体8依次通过高压套管1、标准电压互感器2和标准电容器3的中间后,与调感切换开关14连接,标准电压互感器2与串联电抗器4连通处的高压导体8与标准电容低压电极13形成电容,作为系统校验用标准电容器3。As shown in Figure 3, there are ground potential shielding electrodes 9 on both sides of the inner wall of the high-voltage bushing 1, and the primary winding 10 of the transformer in the standard voltage transformer 2 is wound outside the secondary winding 11 of the transformer and co-wound on the core 12 of the transformer , they are in the middle of the standard voltage transformer 2, and can be placed horizontally as a semi-horizontal type; the upper and lower sides of the standard capacitor 3 include standard capacitor low-voltage electrodes 13, and the inductance switching switch 14 and reactor in the box 17 of the series reactor 4 The inductance coil 16, the reactor core 15 and the reactor inductance coil 16 are arranged in order, and the high-voltage conductor 8 passes through the middle of the high-voltage bushing 1, the standard voltage transformer 2 and the standard capacitor 3 in turn, and is connected with the induction switching switch 14, the standard The high-voltage conductor 8 at the connection between the voltage transformer 2 and the series reactor 4 forms a capacitor with the standard capacitor low-voltage electrode 13, which is used as the standard capacitor 3 for system verification.

如图4(b)所示电容分压器的电容量及介质损耗测量试验回路实施例中,CVT的额定电压 U N = 500 / 3 kV , 高压对地电容与回路电容之和约为5000pF。调压器6为380V/420V,30kVA。励磁变压器5容量为25kVA,输出电压0~20kV,输出额定电流1.25A。串联电抗器4设计为四只串联,单节容量100kV/1A,其中一节带4个均分抽头a,b,c,d,通过调感切换开关14切换。标准电容器3设计时,记标准电容低压电极长L、内半径r2,高压导体半径r1,取L=0.327m,r1=0.03m,r2=0.09m,则 Cs = 2 π ϵ 0 L / ln ( r 2 r 1 ) = 20 pF , 其中,ε0=8.854×10-12F/m。调节调压器6电压,把串联谐振装置(调感切换开关14,电抗器铁芯15,电抗器电感线圈16)输出电压升至0.9~1.1UN,即可用高压电容电桥QS测量出CVT中电容分压器的电容量C1,C2及介质损耗tgδ。In the embodiment of the capacitance and dielectric loss measurement test circuit of the capacitor voltage divider as shown in Figure 4 (b), the rated voltage of the CVT u N = 500 / 3 kV , The sum of high voltage ground capacitance and loop capacitance is about 5000pF. Voltage regulator 6 is 380V/420V, 30kVA. The excitation transformer 5 has a capacity of 25kVA, an output voltage of 0-20kV, and an output rated current of 1.25A. The series reactor 4 is designed to be four connected in series, with a capacity of 100kV/1A in a single section, one of which has 4 equalizing taps a, b, c, d, which are switched by the induction switch 14 . When designing the standard capacitor 3, record the length L of the low-voltage electrode of the standard capacitor, the inner radius r2, and the radius r1 of the high-voltage conductor, and take L=0.327m, r1=0.03m, r2=0.09m, then Cs = 2 π ϵ 0 L / ln ( r 2 r 1 ) = 20 pF , Among them, ε 0 =8.854×10 -12 F/m. Adjust the voltage of the voltage regulator 6, and increase the output voltage of the series resonance device (inductance adjustment switch 14, reactor iron core 15, reactor inductance coil 16) to 0.9~1.1U N , then the CVT can be measured by the high voltage capacitor bridge QS Capacitance C1, C2 and dielectric loss tgδ of the medium capacitance voltage divider.

如图4(a)所示,把标准电容器3低压端接地,使用《电力互感器规程》中的“使用标准电压互感器2的比较法线路”即通过互感器校验仪HE测出CVT的比例误差。As shown in Figure 4(a), ground the low-voltage end of the standard capacitor 3, and use the "comparison circuit using standard voltage transformer 2" in the "Power Transformer Regulations" to measure the CVT through the transformer calibrator HE scale error.

Claims (4)

1.现场CVT一体化校验系统,其特征在于:包括试验电源、标准器具、测量仪器和车载式试验平台,试验电源由串联电抗器、励磁变压器和调压器组成,标准器具包括高压套管、标准电压互感器及标准电容器,测量仪器包括高压电容电桥、互感器校验仪和两个负荷箱,除测量仪器外的所有设备都固定安装在车载式试验平台上,且高压套管、标准电压互感器、标准电容器、串联电抗器、励磁变压器和调压器顺序连接,其后是测量区,测量仪器摆放在测量区;1. On-site CVT integrated calibration system, which is characterized in that it includes test power supply, standard appliances, measuring instruments and vehicle-mounted test platform. The test power supply is composed of series reactors, excitation transformers and voltage regulators. The standard appliances include high-voltage bushings , standard voltage transformer and standard capacitor, measuring instruments include high-voltage capacitor bridge, transformer calibrator and two load boxes, all equipment except measuring instruments are fixedly installed on the vehicle-mounted test platform, and high-voltage bushing, Standard voltage transformers, standard capacitors, series reactors, excitation transformers and voltage regulators are connected in sequence, followed by the measurement area, where the measuring instruments are placed; 高压套管、标准电压互感器、标准电容器及串联电抗器设计成一体化的六氟化硫SF6封闭式组合电器GIS,其中标准电压互感器设计为SF6气体绝缘半卧式结构,串联电抗器设计为SF6气体绝缘、倒置式串联结构,带调感抽头,采用开关切换。The high-voltage bushing, standard voltage transformer, standard capacitor and series reactor are designed as an integrated sulfur hexafluoride SF 6 closed combination appliance GIS, in which the standard voltage transformer is designed as a SF 6 gas-insulated semi-horizontal structure, and the series reactor The device is designed as an SF 6 gas insulated, inverted series structure, with a tap for adjusting the sense, which is switched by a switch. 2.根据权利要求1所述的现场CVT一体化校验系统,其特征在于:高压导体依次通过高压套管、标准电压互感器和标准电容器的中间,标准电容器上下两侧包括标准电容低压电极,标准电压互感器与串联电抗器连通处的高压导体与标准电容低压电极形成电容,作为标准电容器。2. The on-site CVT integrated calibration system according to claim 1, characterized in that: the high-voltage conductor passes through the middle of the high-voltage bushing, the standard voltage transformer and the standard capacitor in sequence, and the upper and lower sides of the standard capacitor include standard capacitor low-voltage electrodes, The high-voltage conductor at the connection between the standard voltage transformer and the series reactor forms a capacitor with the low-voltage electrode of the standard capacitor, which is used as a standard capacitor. 3.根据权利要求1所述的现场CVT一体化校验系统,其特征在于:标准电压互感器包含220kV~500kV CVT的所有额定变压比。3. The on-site CVT integrated calibration system according to claim 1, characterized in that: the standard voltage transformer includes all rated transformation ratios of 220kV-500kV CVT. 4.根据权利要求1所述的现场CVT一体化校验系统,其特征在于:车载式试验平台为车箱箱体。4. The on-site CVT integrated verification system according to claim 1, characterized in that: the vehicle-mounted test platform is a car box body.
CN200810197635XA 2008-11-13 2008-11-13 On-site CVT integrated verification system Active CN101738591B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810197635XA CN101738591B (en) 2008-11-13 2008-11-13 On-site CVT integrated verification system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810197635XA CN101738591B (en) 2008-11-13 2008-11-13 On-site CVT integrated verification system

Publications (2)

Publication Number Publication Date
CN101738591A CN101738591A (en) 2010-06-16
CN101738591B true CN101738591B (en) 2013-12-04

Family

ID=42462313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810197635XA Active CN101738591B (en) 2008-11-13 2008-11-13 On-site CVT integrated verification system

Country Status (1)

Country Link
CN (1) CN101738591B (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102043099A (en) * 2010-10-28 2011-05-04 河南省电力公司平顶山供电公司 Device for testing dielectric loss at high voltage
CN102901866A (en) * 2011-07-27 2013-01-30 苏州华电电气股份有限公司 Vehicular automatic capacitance and inductance tester
CN102323562A (en) * 2011-08-12 2012-01-18 山东泰开互感器有限公司 Complete set of error checking device for ultrahigh/extra-high voltage capacitor voltage transformer
CN102608432A (en) * 2012-03-16 2012-07-25 辽宁省电力有限公司沈阳供电公司 Field high-voltage dielectric loss measurement device
CN102854486B (en) * 2012-09-26 2014-12-03 湖北省电力公司电力科学研究院 On-site initiative error-verification system for voltage transformer and method thereof
CN103605040A (en) * 2013-11-04 2014-02-26 国家电网公司 GIS-equipment built-in lightning-arrester alternating current leakage current test method
CN103640514A (en) * 2013-11-15 2014-03-19 益和电气集团股份有限公司 GIS equipment transport fixing block
CN103552495B (en) * 2013-11-21 2016-03-16 国家电网公司 Automatic unfolding high-voltage mutual inductor on-site proving car
CN104375112B (en) * 2014-11-07 2017-09-26 三峡大学 One kind is based on SF6The voltage transformer on-line testing system of parallel plate capacitor
CN106157789A (en) * 2015-04-17 2016-11-23 国网技术学院 Relative dielectric loss and capacitance detection tutoring system
CN105372615B (en) * 2015-12-08 2018-04-03 武汉磐电科技股份有限公司 A kind of anti-interference 1000kV extra-high voltage transformers are vehicle-mounted to verify platform and its method of calibration
CN105372617A (en) * 2015-12-11 2016-03-02 国网四川省电力公司电力科学研究院 Three-phase capacitor type voltage transformer error integral verification method
CN105467350B (en) * 2015-12-28 2018-09-07 国网山东省电力公司电力科学研究院 A kind of vehicle-mounted extra-high voltage CVT verifications Z-type lifting gear and method
CN105425189B (en) * 2016-01-15 2018-06-22 武汉磐电科技股份有限公司 Extra-high voltage transformer separate type verifies platform and its installation and checking method
CN105609277B (en) * 2016-02-18 2017-07-18 武汉磐电科技有限公司 1000kV extra-high voltages CVT the verification fixed REgulatable reactor of multi-tap and implementation method
CN107015186A (en) * 2017-05-24 2017-08-04 国家电网公司 A kind of grid-connected power generator outlet side transformer intelligent verification voltage-regulating system
CN107422291A (en) * 2017-09-14 2017-12-01 中国电力科学研究院 A kind of AC extra high voltage voltage transformer error check system and method
CN107728096B (en) * 2017-09-28 2024-03-22 山东泰开互感器有限公司 Capacitive voltage transformer test system
CN111141932A (en) * 2019-12-27 2020-05-12 云南治邦科技有限公司 Synchronous inductance regulating device for three-stage series resonance reactor
CN114518478B (en) * 2021-12-31 2024-11-19 扬州市鑫源电气股份有限公司 Vehicle-mounted resonant device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE515388C2 (en) * 1995-09-14 2001-07-23 Abb Research Ltd Device for sensing electrical discharges in a sample object
CN2612956Y (en) * 2003-04-17 2004-04-21 山西省机电设计研究院 Voltage transformer on-site calibrating apparatus
CN100501440C (en) * 2005-10-14 2009-06-17 安徽省电力科学研究院 High-voltage electrical equipment insulation on-line monitoring system calibrator
CN201285439Y (en) * 2008-11-13 2009-08-05 国网武汉高压研究院 Integrated verification equipment for field CVT

Also Published As

Publication number Publication date
CN101738591A (en) 2010-06-16

Similar Documents

Publication Publication Date Title
CN101738591B (en) On-site CVT integrated verification system
CN201285439Y (en) Integrated verification equipment for field CVT
CN102253257B (en) Integrated standard device for field calibration of extra/ultra high voltage capacitor voltage transformer (CVT)
CN105044479B (en) Large Oil immersion transformer is empty, loads test complex and method
CN102096060B (en) Circuit for checking on-site accuracy of current transformer under condition of underload operations
CN106872752B (en) A Capacitive Voltage Transformer
CN202110270U (en) Integrated standard device for on-site verification of EHV/UHV CVT
CN101256895B (en) Novel high voltage combined independent electronic type current, voltage mutual inductor
CN102087347A (en) Charged test method for current transformer and application thereof
CN101819868B (en) Extra-high-voltage equal potential shielded capacitor voltage transformer
WO2017016370A1 (en) Method of designing ultra-high voltage ct coil having self-calibration function
CN105093159B (en) A kind of vehicle-mounted easy care voltage transformer error method of calibration
CN107462858A (en) A kind of voltage transformer magnitude tracing method and device
CN104502882A (en) Standard device for tracing 10kV-35kV high voltage electric energy value
CN201134349Y (en) Novel high-voltage combined independent electronic current, voltage mutual inductor
CN101493509B (en) Verifying apparatus for measuring extra-high voltage transformer error
CN202330691U (en) Field calibrating equipment for voltage transformer
CN101957161A (en) Routine testing method of saturation reactor
CN104459370A (en) Converter transformer broadband electromagnetic transient analysis model based on double transmission line structures
CN105277913A (en) Capacitive-type voltage transformer testing method
CN204331013U (en) A kind of 10kV ~ 35kV high voltage electric energy magnitude tracing standard set-up
CN104155627A (en) Error characteristic detection method of extra high voltage capacitive voltage transformer
CN105699929B (en) A kind of equivalent leakage current error influences experimental rig and its test method
CN201373913Y (en) Calibration device for error measurement of UHV voltage transformer
CN100549699C (en) Single Phase Power Transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant