[go: up one dir, main page]

CN101698431A - Shipborne marine instrument shaft working platform device - Google Patents

Shipborne marine instrument shaft working platform device Download PDF

Info

Publication number
CN101698431A
CN101698431A CN200910229616A CN200910229616A CN101698431A CN 101698431 A CN101698431 A CN 101698431A CN 200910229616 A CN200910229616 A CN 200910229616A CN 200910229616 A CN200910229616 A CN 200910229616A CN 101698431 A CN101698431 A CN 101698431A
Authority
CN
China
Prior art keywords
cage
fixed
guide rail
vertical shaft
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910229616A
Other languages
Chinese (zh)
Other versions
CN101698431B (en
Inventor
吴德星
赵忠生
杨宝起
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Ocean Marine Energy Engineering Technology Ltd By Share Ltd
Original Assignee
Ocean University of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ocean University of China filed Critical Ocean University of China
Priority to CN2009102296165A priority Critical patent/CN101698431B/en
Publication of CN101698431A publication Critical patent/CN101698431A/en
Application granted granted Critical
Publication of CN101698431B publication Critical patent/CN101698431B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明涉及一种进行海上试验与海洋调查的海洋仪器的吊装固定装置,具体涉及一种船载海洋仪器竖井工作平台装置。包括竖井及其上的导轨和导轨下端的止环,其特征是它还包括由上固定盘上的顶杆底座、吊环与下固定盘构成的吊笼,三根固定在顶杆底座上的顶杆,顶杆的另一端连接锁紧螺母固定在井盖上,井盖以螺栓固定在竖井上端,钢缆连接吊环,经定滑轮连接在吊车上吊放吊笼,上固定盘和下固定盘的外沿上开有导向槽。上述导轨的下部呈楔面以卡在吊笼上阻止吊笼移动。本发明便于海洋仪器安装和拆卸,操作简便,可靠性高,将为我国海洋仪器试验及海洋调查发挥巨大作用。

Figure 200910229616

The invention relates to a hoisting and fixing device for marine instruments used for sea trials and marine surveys, in particular to a shaft working platform device for ship-borne marine instruments. It includes the vertical shaft and the guide rail on it and the stop ring at the lower end of the guide rail. It is characterized in that it also includes a cage composed of the ejector rod base on the upper fixed plate, the suspension ring and the lower fixed plate, and three ejector rods fixed on the ejector rod base. , the other end of the ejector rod is connected to the lock nut and fixed on the well cover, the well cover is fixed on the upper end of the shaft with bolts, the steel cable is connected to the lifting ring, and the hanging cage is connected to the crane through the fixed pulley, and the outer edge of the upper fixed plate and the lower fixed plate are on the There are guide grooves. The lower part of the above-mentioned guide rail is a wedge surface to be stuck on the cage to prevent the cage from moving. The invention is convenient for installation and disassembly of marine instruments, has simple and convenient operation and high reliability, and will play a great role in the test of marine instruments and ocean survey in our country.

Figure 200910229616

Description

Vertical shaft working platform device for shipborne oceanographic instrument
Technical field
The present invention relates to a kind of lifting anchor fitting that carries out the oceanographic instrumentation of sea test and oceanographic survey, be specifically related to a kind of vertical shaft working platform device for shipborne oceanographic instrument.
Background technology
The marine acoustics instrument installation requirement condition that is used for sea test and oceanographic survey is very harsh, must be installed in hull bottom, general boats and ships are difficult to reach, unless advancing dock ad hoc loads and unloads, and this need spend expensive expense, and in process of the test, often need instrument and equipment to be debugged and keeped in repair temporarily, very inconvenient.Therefore need a kind of platform that oceanographic instrumentation equipment is installed especially.
Summary of the invention
The purpose of this invention is to provide a kind of vertical shaft working platform device for shipborne oceanographic instrument, to remedy the deficiencies in the prior art.
The present invention includes vertical shaft and on guide rail and the stop ring of guide rail lower end, it is characterized in that it also comprises the cage that is made of push rod base, suspension ring and lower fixed disk on the last reaction plate, three push rods that are fixed on the push rod base, the other end of push rod connects jam nut and is fixed on the well lid, well lid is to be bolted to the vertical shaft upper end, wirerope connects suspension ring, is connected through fixed pulley and hangs cage on the crane, has guide groove on the outer of last reaction plate and lower fixed disk.
The bottom of above-mentioned guide rail is wedge surface and stops cage to move on the cage to be stuck in.
The oceanographic instrumentation Assembly ﹠Disassembly is convenient in the present invention, and is easy and simple to handle, and the reliability height will be played a great role for the test of China oceanographic instrumentation and oceanographic survey.
Description of drawings
Fig. 1 is an overall structure of the present invention.
Wherein: 1, crane; 2, wirerope; 3, fixed pulley; 4, jam nut; 5, bolt; 6, well lid; 7, push rod; 8, vertical shaft (borehole wall); 9, guide rail; 10, stop ring; 11, cage; 12 push rod bases; 13, go up reaction plate; 14, lower fixed disk; 15, suspension ring; 16, guide groove.
The specific embodiment
As Fig. 1, the present invention includes vertical shaft 8 and on guide rail 9 and the stop ring 10 of guide rail 9 lower ends, it is characterized in that it also comprises the cage 11 that is made of the push rod base 12 on the last reaction plate 13, suspension ring 15 and lower fixed disk 14, three push rods 7 that are fixed on the push rod base 12, the other end of push rod 7 connects jam nut 4 and is fixed on the well lid 6, well lid 6 is fixed on vertical shaft 8 upper ends with bolt 5, wirerope 2 connects suspension ring 15, be connected through fixed pulley 3 and hang cage 11 on the crane 1, have guide groove 16 on the outer of last reaction plate 13 and lower fixed disk 14.
The bottom of above-mentioned guide rail 9 is wedge surface and stops cage 11 to move on the cage 11 to be stuck in.
The present invention is arranged near the hull line of centers, and it is less to wave angle herein, and the space is bigger in the cabin, is convenient to the installation and the debugging of instrument and equipment.
During use, with the test the marine acoustics instrument or the oceanographic survey instrument and equipment be fixed on cage lower fixed disk 14 on, with crane 1 and wirerope 2 by fixed pulley 3 cage 11 put into vertical shaft the borehole wall 8 (because of the weight of cage 11 and instrument greater than 40kg), require cage guide groove 16 to align with directed guide rail 9 before putting into to determine the direction of cage 11, when cage 11 be put into cage stop ring 10 above the time, wirerope 2 can not relaxed the effect of holding cage 11.Cage stop ring 10 is held cage 11 at this moment, the instrument lower end on the cage 11 parallel with inner bottom hull (prevention is hung instrument and equipment by fishing net during navigation).Use push rod 7 according to the male and female head then, be inserted on the push rod base 12, be inserted in the square groove of following push rod 7 with another root push rod 7 again, uppermost push rod 7 is turned round upper locking nut 4, jam nut 4 is rotated to the inner end (clickwise) of push rod 7 screw threads, cover well lid 6, it is fixing to tighten well lid bolt 5, at last jam nut 4 is up rotated (inhour rotation).Cage 11 dieback (running into severe sea condition can not become flexible yet) on the borehole wall 8 of stop ring 10 and vertical shaft firmly, make the cage 11 and the borehole wall 8 of hull vertical shaft form whole with the inclined-plane, lower end of jam nut 4, push rod 7 and guide rail 9.
By sea test, the present invention has reached designing requirement, for huge effect has been brought into play in the test of China marine acoustics and oceanographic survey.

Claims (2)

1. vertical shaft working platform device for shipborne oceanographic instrument, comprise vertical shaft (8) and on guide rail (9) and the stop ring (10) of guide rail (9) lower end, it is characterized in that it also comprises by the push rod base (12) on the last reaction plate (13), the cage (11) that suspension ring (15) and lower fixed disk (14) constitute, three push rods (7) that are fixed on the push rod base (12), the other end of push rod (7) connects jam nut (4) and is fixed on the well lid (6), well lid (6) is fixed on vertical shaft (8) upper end with bolt (5), wirerope (2) connects suspension ring (15), be connected through fixed pulley (3) and hang cage (11) on the crane (1), have guide groove (16) on the outer of last reaction plate (13) and lower fixed disk (14).
2. vertical shaft working platform device for shipborne oceanographic instrument as claimed in claim 1, the bottom that it is characterized in that guide rail (9) are wedge surface and go up and stop cage (11) to move to be stuck in cage (11).
CN2009102296165A 2009-10-28 2009-10-28 Vertical shaft working platform device for shipborne oceanographic instrument Expired - Fee Related CN101698431B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102296165A CN101698431B (en) 2009-10-28 2009-10-28 Vertical shaft working platform device for shipborne oceanographic instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102296165A CN101698431B (en) 2009-10-28 2009-10-28 Vertical shaft working platform device for shipborne oceanographic instrument

Publications (2)

Publication Number Publication Date
CN101698431A true CN101698431A (en) 2010-04-28
CN101698431B CN101698431B (en) 2012-01-04

Family

ID=42146891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102296165A Expired - Fee Related CN101698431B (en) 2009-10-28 2009-10-28 Vertical shaft working platform device for shipborne oceanographic instrument

Country Status (1)

Country Link
CN (1) CN101698431B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102001428A (en) * 2010-11-12 2011-04-06 武汉理工大学 Fin lifting system of comprehensive marine science research ship
CN102426013A (en) * 2011-12-22 2012-04-25 潍坊河海水文科技有限公司 Flow measurement frame for bridge measurement
CN103791892A (en) * 2014-01-21 2014-05-14 国家海洋局第二海洋研究所 Shipborne view field adjustable sea level observation device and method
CN106627142A (en) * 2016-11-17 2017-05-10 绍兴丰源节能科技有限公司 Detachable automobile instrument

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3354733B2 (en) * 1994-12-14 2002-12-09 三菱重工業株式会社 Unmanned automatic water quality measurement device
CN2763674Y (en) * 2004-12-22 2006-03-08 中国海洋大学 Marine instrument bench
CN2760510Y (en) * 2004-12-30 2006-02-22 中国海洋大学 Steady hanging device for oceanographic instrumentation
CN201525497U (en) * 2009-10-28 2010-07-14 中国海洋大学 Shipborne marine instrument shaft working platform device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102001428A (en) * 2010-11-12 2011-04-06 武汉理工大学 Fin lifting system of comprehensive marine science research ship
CN102001428B (en) * 2010-11-12 2013-04-24 武汉理工大学 Fin lifting system of comprehensive marine science research ship
CN102426013A (en) * 2011-12-22 2012-04-25 潍坊河海水文科技有限公司 Flow measurement frame for bridge measurement
CN103791892A (en) * 2014-01-21 2014-05-14 国家海洋局第二海洋研究所 Shipborne view field adjustable sea level observation device and method
CN103791892B (en) * 2014-01-21 2017-02-08 国家海洋局第二海洋研究所 Shipborne view field adjustable sea level observation device and method
CN106627142A (en) * 2016-11-17 2017-05-10 绍兴丰源节能科技有限公司 Detachable automobile instrument
CN106627142B (en) * 2016-11-17 2019-01-01 绍兴丰源节能科技有限公司 A kind of easy-to-dismount automobile instrument

Also Published As

Publication number Publication date
CN101698431B (en) 2012-01-04

Similar Documents

Publication Publication Date Title
CN101857072B (en) Unconditional stability equipped deep-draft floating production platform and offshore installation method thereof
CN101508333B (en) Mechanical automatic docking release
CN101475048B (en) Novel sea deep water buoy platform
CN100516809C (en) Liftable Deep Well False Bottom System
CN101698431A (en) Shipborne marine instrument shaft working platform device
CN204666837U (en) Drop type multifunction seabed original position feeler inspection device
CN106290128B (en) A kind of multi-functional deep-marine-environment sample frame of big volume containing the sample, experimental rig and test method
CN101850831A (en) A hoisting method for the general section of the living area of a large-scale ocean-going offshore platform
CN103883273A (en) Method for utilizing two cranes on saturation diving support vessel to mount vertical pipe
CN103438870A (en) Method and device for dynamically monitoring microtopography and landforms near seabed
CN210948536U (en) A drill pipe anti-collision guide protection device without a riser
CN110823490A (en) Comprehensive guarantee platform for underwater explosion test of submersible vehicle model
RU2438913C2 (en) Disengageable mooring system
CN201400303Y (en) Mechanical automatic butt-joint and releasing device
CN108318382A (en) Offshore anti-liquefying ability in-situ measuring method
CN201525497U (en) Shipborne marine instrument shaft working platform device
CN102417012B (en) Floater system connected with floating production storage and offloading (FPSO) boat body
CN104724268A (en) Ocean wave driving automatic lifting underwater mechanical carrier
WO2012104309A2 (en) Production unit for use with dry christmas trees
KR20180076920A (en) Derrick Load Test System and Method
US8181589B2 (en) Gravity anchor
KR100967816B1 (en) Mounting thrusters of semi-submersible rigs
KR100978065B1 (en) Mounting thruster of drilling rig
CN206344958U (en) On-fixed installs vertical shaft working platform device for shipborne oceanographic instrument
CN203259649U (en) Portable folding frame of depthometer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: QINGDAO OCEAN UNIVERSITY OF CHINA HOLDINGS CO., LT

Free format text: FORMER OWNER: OCEAN UNIVERSITY OF CHINA

Effective date: 20140730

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 266100 QINGDAO, SHANDONG PROVINCE TO: 266071 QINGDAO, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140730

Address after: 266071 Hongkong East Road, Laoshan District, Shandong, China, No. 23, No.

Patentee after: Qingdao Ocean University of China Holdings Limited

Address before: 266100 Shandong Province, Qingdao city Laoshan District Songling Road No. 238

Patentee before: Ocean University of China

ASS Succession or assignment of patent right

Owner name: QINGDAO HAIDA OCEAN ENERGY ENGINEERING TECHNOLOGY

Free format text: FORMER OWNER: QINGDAO OCEAN UNIVERSITY OF CHINA HOLDINGS CO., LTD.

Effective date: 20150521

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150521

Address after: 266071 Hongkong East Road, Laoshan District, Shandong, China, No. 23, No.

Patentee after: Qingdao ocean marine energy engineering technology Limited by Share Ltd

Address before: 266071 Hongkong East Road, Laoshan District, Shandong, China, No. 23, No.

Patentee before: Qingdao Ocean University of China Holdings Limited

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120104

Termination date: 20151028

EXPY Termination of patent right or utility model