CN101595028A CNA2007800500566A CN200780050056A CN101595028A CN 101595028 A CN101595028 A CN 101595028A CN A2007800500566 A CNA2007800500566 A CN A2007800500566A CN 200780050056 A CN200780050056 A CN 200780050056A CN 101595028 A CN101595028 A CN 101595028A
Authority
CN
China
Prior art keywords
indication
electric power
crane
action
predictor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007800500566A
Other languages
Chinese (zh)
Other versions
CN101595028B (en
Inventor
辻恒充
丰永雅史
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
TSUJI CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TSUJI CO Ltd filed Critical TSUJI CO Ltd
Publication of CN101595028A publication Critical patent/CN101595028A/en
Application granted granted Critical
Publication of CN101595028B publication Critical patent/CN101595028B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/22Control systems or devices for electric drives
    • B66C13/23Circuits for controlling the lowering of the load
    • B66C13/26Circuits for controlling the lowering of the load by AC motors
    • B66C13/28Circuits for controlling the lowering of the load by AC motors utilising regenerative braking for controlling descent of heavy loads and having means for preventing rotation of motor in the hoisting direction when load is released
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/52Floating cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Jib Cranes (AREA)
  • Control And Safety Of Cranes (AREA)

Abstract

The invention discloses a kind of control setup, is a plurality of deck cranes 122,124,126,128 that have electrical motor and electric power regeneration unit 350 respectively being equipped with; In the freighter 100 of the cond 260 of accumulating the electric power that electric power regeneration unit 350 takes place, control deck crane 122,124,126, the control setup 410 of 128 actions, have: receive deck crane 122,124,126, the action of each of 128 indication and with its preservation, calculate the indication acceptance division 412 of the predictor of the regenerated electric power when having carried out action, free space and predictor comparison with the cond 260 that will obtain from cond 260, if predictor surpasses power capacity, during till the available power capacity surpasses predictor, pass on other the deck crane 122 of issuing the action of following power consumption earlier, 124,126, the indication reception and registration portion 414 of 128 indication.

Description

Control setup
Technical field
The present invention relates to a kind of control setup.The present invention be more particularly directed at the control setup that has the action of control crane on the ship of deck crane.The application is relevant with following Japanese publication.Enroll the designated state of content for approval by the reference of document, by enrolling the application, as the application's a part with reference to the content of following application record.
1. November 17 2006 patent application 2006-312231 applying date
Background technology
The boats and ships (for example, patent documentation 1) of the deck crane that existing loading handling goods is used.These deck cranes can be driven respectively, under many circumstances, are driven by indivedual operators, work alone.In addition, such deck crane much is to be propulsion source with the electrical motor, directly or by hydraulic circuit etc. drives.
On the other hand, except crane, also have lights machine, communicating machine and positioning apparatus etc. on the ship, also have a lot of electric apparatuss such as mooring winch, windlass in addition.Drive the electric power of these electric apparatuss, except in pulling in to shore, supplying with some electric power, with the generator for electricity generation that the prime power or the special-purpose marine engine of its ship drives, power supply in board with land commercial electric power.Therefore, the increase of consumption of power, the increase that has brought rate of fuel consumption.So preferably globality reduces power consumption in the ship.
In order to reduce power consumption, have the ship'ssupply device (for example, patent documentation 2) that is provided with solar battery cell.This ship'ssupply has the electrical generator commonly used that connects the ship internal burden by the switch board that comprises distribution circuit, and as the electric power supply source, can also have solar battery apparatus.In view of the above, boats and ships can effectively utilize the energy that obtains from sunray, suppress the consumption of fuel of generating usefulness.Also have at the big fuel cell of hydrofoil boat stowage capacity, from the electric power (for example, patent documentation 3) of fuel cell supply at electric apparatus in the ship berthing.
[patent documentation 1] spy opens flat 10-250678 communique
[patent documentation 2] spy opens flat 10-032942 communique
[patent documentation 3] spy opens the 2004-066917 communique
Yet, load solar battery cell or fuel cell, will very big cost takes place, come cost recovery to be difficult to by those device generatings.Simultaneously, the generating efficiency of solar battery apparatus is low, and the electric power of its acquisition is difficult to satisfy the electricity consumption needs of electric apparatus in the ship.On the other hand, fuel cell is the cost height of himself not only, and must load the brand new device, therefore is the device of introducing easily anything but.Like this, in the motion in the past that the electric power supply system on relevant ship is raised the efficiency, seldom load, do not have practicality.
Thereby, have in the ship of the electric crane that loads the regenerated electric power drg, the regenerated electric power of regenerated electric power drg generation is stored into the motion of the electric power supply system that is used in the electric storage means of secondary battery, cond etc.This electric power supply system, because utilize the crane generating that is loaded at first aboard ship, so primary cost is seldom, cost recovery is easy.Yet in real-world operation, regenerated electric power not necessarily mates rightly with consumption electric power, has the technical matters that charge of a capacitor is excessive or generation is discharged fully.
Summary of the invention
As first scheme of the present invention, a kind of control setup is provided, be in the ship that is equipped with a plurality of cranes and cond, the control setup of the action of control crane, described a plurality of crane has separately when moving the loading and unloading object, consumes the electrical motor of electric power and when braking loading and unloading object mobile as propulsion source, the electric power regeneration unit of regenerated electric power takes place, and moves according to the outside indication; Described cond is accumulated the electric power that described electric power regeneration unit takes place, and at least a portion of the electric power of described electrical motor consumption is provided; Described control setup is equipped with: the indication acceptance division, and it receives the action indication to each crane, and it is preserved, the predictor of the regenerated electric power when calculating execution according to the action of described each indication; Indication reception and registration portion, it obtains and can compare in the available power capacity and the described predictor of charge of a capacitor from described cond, surpass under the situation of described available power capacity in described predictor, during till the available power capacity surpasses described predictor, before described crane will be conveyed to corresponding to the indication of described predictor, will convey to described other cranes to the action indication of following power consumption of other cranes earlier.
In addition, the control setup that provides as alternative plan of the present invention, be to comprise, have respectively when moving the loading and unloading object, during as the electrical motor of propulsion source consumed power and braking loading and unloading object mobile, the electric power regeneration unit of regenerated electric power takes place, and the power charge that takes place according to a plurality of cranes of outside indication work and by the electric power regeneration unit also stores, and the control setup of the action of control crane is provided in the ship of cond of the electric power that a part of electrical motor consumes at least; It has: the indication acceptance division receives the action indication at each crane, and it is preserved, the predictor of consumed power when calculating the action of having carried out according to each indication; And indication reception and registration portion, to compare from capacitor storage amount that has been recharged and the predictor that cond obtains, if predictor surpasses charge capacity, rise to above during till the predictor at charge capacity, before will conveying to corresponding crane, will convey to corresponding other cranes to the indication of the action of the generation regenerated electric power of other cranes earlier with the cooresponding indication of this predictor.
And as the 3rd form of the present invention, a kind of control setup is provided, be to have respectively when moving the loading and unloading object in outfit, electrical motor as the propulsion source consumed power, with when braking loading and unloading object mobile, the electric power regeneration unit of regenerated electric power takes place, and according to the control setup of the action of control crane in the ship of a plurality of cranes of outside indication work; It has: the indication acceptance division, and receive action indication, and it is preserved at each crane, when judgement has been carried out according to the action of each indication, follow to consume electric power or follow regenerated electric power; Indication reception and registration portion, judge basis when the indication acceptance division consumption electric power is followed in the action of the indication of one of crane, and when basis is followed regenerated electric power to the action of the indication of another crane, to carry out overlapping sequential during this action, the indication of the action indication of a crane of reception and registration and the action of another crane.
In addition, the summary of foregoing invention does not list the whole of essential feature of the present invention, and the secondary combined of these syndromes also can constitute the present invention.
Description of drawings
Figure 1 shows that the stereoscopic figure of the freighter 100 that an embodiment relates to.
Fig. 2 is the mode chart of the electric apparatus 200 in expression freighter 100 ships.
Fig. 3 is the mode chart of the electrical structure of expression hoisting crane 300.
Fig. 4 is the mode chart of electric apparatus 200 coupled condition in the expression ship.
Fig. 5 is that the electric weight of expression electric apparatus 200 is passed curve.
Fig. 6 is illustrated in the mode chart of handling control setup 410 structures of configuration between seat 322,324,326,328 and the deck crane 122,124,126,128.
Fig. 7 is the diagram of circuit F100 of a control program in the expression control setup 410.
Fig. 8 is the diagram of circuit F200 of other control programs in the expression control setup 410.
Reference numeral
100 freighters, 110 hulls, 121 loading and unloading objects, 122,124,126,128 deck cranes, 130 bridges, 140 electrical generators, 142 electrical generators commonly used, 144 promptly use electrical generator, 150 switch boards, 152 buses, 154,156 circuit breakers, 200 electric apparatuss, 210 windlass, 212 anchors, 220 mooring winches, 222 mooring guies, 230 electronic hatch, 232 hatch boards, 240 residential development electric apparatuss, 241,252,262 control setups, 242 blowing engines, 244 flare-aircrafts, 246 room lights, 248 range lights, 250 secondary batterys, 260 conies, 300 hoisting cranes, 310 rotary columns, 320,322,324,326,328 handle seat, 330 cantilevers, 340 inverse converters, 342 cantilever electrical motors, 344 promote electrical motor, 346 turning motors, 350 electric power regeneration units, 360 slip rings, 410 control setups, 412 indication acceptance divisions, 414 indication reception and registration portions
The specific embodiment
The present invention will be described by the following examples, but interest field of the present invention is not limited to following examples, and the combination of features that illustrates among the embodiment might not all be an essential feature of the present invention.
Fig. 1 is the stereoscopic figure of the freighter 100 that relates to of an embodiment of the invention.As shown in the drawing, this freighter 100, at a plurality of cargo holds of hull 110 inner outfits, the end face of each cargo hold is by hatch board 232 sealings that can open and close.Simultaneously, near each hatch board 232, deck crane 122,124,126,128 is set respectively.Equipped the freighter 100 of such device, the state in that hatch board 232 is opened by making deck crane 122,124,126,128 work, can will load and unload object 121 and transport or transport to the cabin of hull 110 the insides.
And near hull 110 rearward end of freighter 100, configuration comprises the bridge 130 of the residential development that the crewman takes.Simultaneously, electrical generator 140 described later and switch board 150 have been loaded in hull 110 the insides below bridge 130.Switch board 150 is powered by the each several part in 152 pairs of ships of bus described later.
Fig. 2 is the mode chart of the electric apparatus 200 in expression freighter 100 ships.As shown in the drawing, the electric apparatus 200 of this freighter 100 has a plurality of deck cranes 122,124,126,128, windlass 210, mooring winch 220, the electrically powered machine of electronic hatch 230,232 etc., and the related control setup of controlling 410 with these electrically powered machines.
Each of deck crane 122,124,126,128 has the rotary column 310 that is installed in fixing basic courses department 301 upper ends of relative hull 110.Rotary column 310 can rotate.And rotary column 310, respectively have can lifting cantilever 330.Cantilever 330 when making own lifting, can also make loading and unloading object 121 liftings of lifting wire rope top suspension by the rolling or putting down of the steel rope that hangs down from its top.
In addition, when deck crane 122,124,126,128 rises loading and unloading object 121, consume the cooresponding a large amount of electric power of weight with loading and unloading object 121.On the other hand, when loading and unloading object 121 is descended, with loading and unloading object 121 and the antagonism of cantilever 330 weight, an edge trig moving meter, with appropriate speed make it landing on one side.
Simultaneously, this freighter 100 has windlass 210, mooring winch 220 etc. and consumes very high-performance device.Windlass 210 is if it is very big to roll very heavy weight anchor 212 consumption electric power.Simultaneously, if mooring winch 220 when rolling mooring guy 222 (mooring sprocket wheel), also consumes very big power.These electric apparatuss are by bus 152 connections of this freighter 100.
Blowing engine 242 is equipped with on the other hand,, at the residential development of bridge 130, flare-aircraft 244, room light 246, range light 248 grades still consume the residential development electric apparatus 240 of electric power.The not shown residential development electric apparatus 240 that goes out comprises that also other are such as a lot of machines such as communicating machine, radar, navigational aid, cooking machine.These electric apparatuss are connected with bus 152, accept power supply.But, because relatively power consumption is less, and to have much be to be the machine of prerequisite manufacturing with land with source power supply, and therefore, residential development electric apparatus 240 can be powered by 100V voltage.
In addition, this freighter 100 is equipped with secondary battery 250, cond 260 and the electrical generator 140 etc. that take place or keep offering the electric power of above-mentioned electrical equipment.Electrical generator 140 is connected with bus 152.By bus 152 each power supply in ship.Like this, in boats and ships, owing to have and bus 152 bonded assembly electrical generators 140, electrical equipment and electrical equipment drive when providing high-power in requiring ship, can allow electrical generator 140 work, and enough electric power is provided.
Secondary battery 250 and cond 260 connection bus 152.By bus 152, the power charge by electrical generator 140 takes place also has, and secondary battery 250 and cond 260 are connected with bus 152 by other control setup 252,262 respectively, and is overcharged etc. to prevent.Also have, secondary battery 250 mainly uses when residential development electric apparatus 240 provides electric power in berthing.
Cond 260 has the capacity also bigger than secondary battery 250, accumulates high-power that as described later electric power regeneration unit 350 takes place.Like this, can accumulate bigger electric power, the electric power when additional in board power consumption increases is supplied with.The peak generating capacity that in other words, can suppress electrical generator 140 by mounting condenser 260.
For the cond 260 that uses with such purposes, the preferred electric energy storage device that uses electric double layer capacitor that adopts.Electric double layer capacitor is stored in the electric charge of the electrical double layer of electrode and the generation of electrolytical border.The limit of suitable 1 molecule is thin stitches electrical double layer because form, so, can the very large electric power of energy accumulation density.But external voltage surpasses when withstand voltage, and electrical double layer is breakdown, so and the control setup 262 of management external voltage be combined to form electrical storage device.
Fig. 3 is the electrical structure mode chart of the hoisting crane 300 that uses as deck crane 122,124,126,128 of Figure 1 and Figure 2.Shown in Fig. 3 is rotary column 310.
As shown in the drawing, in the outside of rotary column 310, be provided with the manipulation seat 320 that comprises hoisting crane 300 operating controls.In addition, in the side in the outside of rotary column 310 cantilever 330 has been installed.
In addition, the inside at rotary column 310 has respectively: make cantilever 330 liftings cantilever electrical motor 342, roll suspension the lifting electrical motor 344 of the bands of hook arranged, make the rotating machine 346 of rotary column 310 from the body rotation.In addition, also equipped the electric power of supplying with by control bus 152, to cantalever motor 342, promote the inverse converter 340 that electrical motor 344, rotating machine 346 provide.The electric power that drives each motor is supplied with by the slip ring 360 that is arranged on rotary column 310 bottoms by bus 152.
Further, rotary column 310 is equipped with electric power regeneration unit 350.Electric power regeneration unit 350 converts electric energy to by the kinetic energy that will load and unload object 121 and cantilever 330 when the loading and unloading object 121 that hoisting crane 300 is handled descends, the sinking speed of loading and unloading object 121 and cantilever 330 is slowed down.The electric power that electric power regeneration unit 350 is taken place turns back to the bus 152 in the hull 110 by slip ring 360.
Even when not hanging loading and unloading object 121, hoisting crane 300 also descends cantilever 330 because the top of the weight of cantilever 330 and line has been mounted the weight of suspension hook, thereby makes electric power regeneration unit 350 generation electric power.In this case, the electric power of generation also is stored in cond 260 and the secondary battery 250, can use for the electric apparatus 240 of other residential developments in the ship.
Fig. 4 is the pattern diagram of coupled condition of electric apparatus 200 in the ship of expression freighter 100.As shown in the figure, in this electric apparatus 200, each of electric apparatus 200 is connected with bus 152 on being set at switch board 150 by circuit breaker 156.In addition, cond 260 and secondary battery 250 also are connected on the bus 152 by control setup 241,252,262 respectively.And electrical generator 140 also is connected on the bus 152 by circuit breaker 154.In addition, electrical generator 140 includes electrical generator 142 commonly used and non-common electrical generator 144, and is connected on the bus 152 by circuit breaker 154 one by one respectively.
In aforesaid electric apparatus 200, circuit breaker 154,156 and control setup 241,252,262 short of disconnections are electrically connected, and each of electric apparatus 200 just is coupled with bus 152 respectively.Thereby, as long as, can supply with enough electric power, just can drive electric apparatus 200 by as with respect in electrical generator 140, secondary battery 250, cond 260 and the inferior electric power regeneration unit 350 of the power supply of this bus 152 any one.
Simultaneously, as the big machine works of the power consumption of deck crane 122,124,126,128, windlass 210, mooring winch 220, electronic hatch 230 time, allow electrical generator 140 work, look the electric weight of required consumption and power.In addition, in berthing, in the time of only a small amount of power consumption such as display lamp, can be by the electric power of secondary battery 250 storeship internal consumptions.
On the one hand, for example,, can allow 4 to overlap deck cranes 122,124,126,128 intensive work because in loading and unloading operation, so, require the electric machine of electric apparatus 200 is supplied with electric power cooresponding with it.In order to supply with such electric power from electrical generator 140, must the big electrical generator 140 of equipment electric energy generated.Therefore, the capacity of electric apparatus 200 will consider that the consumption of current when deck crane 122,124,126,128 carries out the handling goods operation is determined.
Secondly, the deck crane 122,124,126,128 of each ship, as shown in Figure 3, by the operator's individual drive that rides on the cargo-carring manipulation seat 320 of operating control.Yet, handle between seat 320 and each deck crane 122,124,126,128 at each, control setup 410 is set.Though it is independent separately to handle seat 320 and deck crane 122,124,126,128, but, as described later, control setup 410 and whole deck crane 122,124,126,128 action associated.Simultaneously, also monitoring the electric power storage state of cond 260.
Fig. 5 is the schematic graph that the electric weight when expression allows any one action of deck crane 122,124,126,128 in the freighter 100 shown in Figure 1 is passed.In addition, as cond 260, used electric energy storage device with the very little electric double layer capacitor of internal resistance.
As shown in Figure 5, in the deck crane 122,124,126,128 one will load and unload object 121 and roll, puts down and when carrying out the lifting of cantilever 330, and will be initial in the action beginning, because of the reasons such as rush current of electrical motor, make power consumption surpass 250kW.Subsequently, when making loading and unloading object 121 or cantilever 330 vertical motions, power consumption is continuing, and still, regenerated electric power takes place when the action that makes its landing.In addition, even make loading and unloading object 121 or making in cantilever 330 vertical motions, regenerated electric power takes place also the latter stage during each action.
Like this, comprising lifting, cantilever rising, descending, and in a series of action of the deck crane 122,124,126,128 of cantilever decline, in its each stroke, the consumption of power that generation causes because of the initial impact electric power of motor starting and occurring in makes the regenerated electric power in the braking that each stroke stops.Yet,, in the lifting of rising, cantilever such as raise up at the action that loading and unloading object 121 even loads are risen, consume electric power if when the globality of each stroke is seen; Simultaneously, descending degradation to make in the action that descends as loading and unloading object 121 grades of load, produce regenerating power.
Fig. 6 is the pattern block diagram of expression control setup 410 inner structures.As shown in the drawing, control setup 410, have the deck crane of being arranged on 122,124,126,128 and handle between the seat 322,324,326,328, receive the indication acceptance division 412 of handling the action indication information that seat 322,324,326,328 sends separately and will convey to the indication reception and registration portion 414 of deck crane 122,124,126,128 from the indication that the indication acceptance division receives.
Here, indication acceptance division 412 receives from each and handles information and the preservation at each deck crane 122,124,126,128 that seat 322,324,326,328 is sent.According to this, during the 412 preservation indications of indication acceptance division, keep the action of deck crane 122,124,126,128.Simultaneously, judge the instruction content that receives, generate according to its indication the predictor of the regenerated electric power amount that the driving deck crane took place at 122,124,126,128 o'clock when indication acceptance division 412.Indication reception and registration described later portion this predictor of 414 usefulness judges whether to pass on indication.
On the other hand, indication reception and registration portion 414 from indicating acceptance division 412, obtains the deck crane 122,124,126,128 of appointment is taken place the information of indication, and indicates the predictor of action based on it.Simultaneously, from the control setup 262 of cond 260, the value of the free space that reception cond 260 at that time stays.Relatively these predictors and free space value judge whether the regenerated electric power that takes place can have no to be accumulated in lavishly in the cond 260 when carrying out action.When the result who judges is when carrying out this indication, pass on indication to corresponding deck crane 122,124,126,128.
Fig. 7 is the operational flowchart F100 of the control program of above-mentioned control setup 410.As shown in the figure, control setup 410 makes the action of deck crane 122,124,126,128 whether regenerated electric power (step S101) take place as if receiving the indication of handling seat 322,324,326,328, at first investigating based on its indication.When regenerated electric power not taking place according to its indication (step S101:NO), the other control to the indication of following the power consumption action shown in Figure 8 is transferred in control.On the other hand, when its indication is (step S101:YES) when the action of regenerated electric power takes place, when indication acceptance division 412 is preserved indication (step S102), calculate the predictor (step S103) of the regenerated electric power that has taken place when having carried out its action.
Secondly, in indication reception and registration portion 414, above-mentioned predictor compares (step S104) with 260 free spaces of cond at that time.Here, if free space is fully big, cond 260 can be put aside whole regenerated electric powers (step S104:YES) that predictor relates to, then indicate reception and registration portion 414, convey to one in the deck crane 122,124,126,128 that should indicate, make it to carry out and indicate the action (step S105) of reply.In this case, because the regenerated electric power that takes place based on the action of indicating all is stored in the cond 260.
On the other hand, when cond 260 does not have to store the free space of the whole regenerated electric powers that taken place (step S104:NO), whether action indication (step S106) has taken place to other deck crane 122,124,126,128 in indication reception and registration portion 414 at first retrieval.If when the indication that takes place at other deck cranes 122,124,126,128 is arranged (step S106:YES), whether investigation is accompanied by power consumption (step S107) based on the action of its indication.Here, if the action that other deck crane 122,124,126,128 is indicated is accompanied by power consumption (step S107:YES), keep the initial indication that receives, making the indication that this power consumption takes place convey to deck crane 122,124,126,128 (step S108).Electric power is consumed like this, and the free space of cond 260 increases (step S108).Then, the processing of indication reception and registration portion 414 turns back to the step (step S104) of comparison prediction value and free space, comparison prediction value and free space again.
In addition, under not having to take place (step S106:NO) to other the situation of indication of deck crane 122,124,126,128, or, though indication (step S106:YES) has taken place, but the words (step S107:NO) of power consumption are not followed in the action of its indication appointment, wait for that described indication takes place.Do like this, can prevent regenerated electric power, can not store and the thing of its power wastage is taken place with respect to the surplus of cond 260 capacity.With this, can improve the comprehensive energy efficiency of this freighter 100.
Like this, control setup 410 can be provided, be to have: have respectively make loading and unloading object 121 when moving as the electrical motor of propulsion source consumed power with the electric power regeneration unit 350 of regenerated electric power takes place when braking loading and unloading object 121 is moved, and according to a plurality of cranes of outside indication work; Electric power with 350 generations of store power regeneration unit, and in the ship of the cond 260 of at least a portion of the electric power of supply electrical motor consumption, the control setup 410 of the action of control crane, it comprises: receive at the indication of the action of each crane and with it and preserve, calculate the indication acceptance division 412 of the predictor of consumed power when carrying out the action that each indication produced or regenerating power; And, to obtain to be charged to the available power capacity and the predictor comparison of cond 260 from cond 260, when predictor is when surpassing the regenerated electric power of power capacity, during before the available power capacity surpasses predictor, the indication to other cranes of following the action of power consumption is conveyed to any one indication reception and registration portion 414 in the crane earlier.With this, can avoid surpassing cond 260 capacity and the regenerated electric power that takes place is used as heat energy and spreads in vain, the energy efficiency in the osed top energy resource system aboard ship is improved.
In addition, handle deck crane 122,124,126,128 by control setup 410.Yet in handling seat 322,324,326,328, the operator who handles deck crane 122,124,126,128 looks to deck crane 122,124,126,128 direct controls.Simultaneously, action by above-mentioned control setup 410, till indication reception and registration portion 414 conveys to indication deck crane 122,124,126,128, sometimes produce time-delay, but, as shown in Figure 5, deck crane the 122,124,126, the 128th, with ten several seconds to tens of second be that unit carries out work, so, the time-delay about the several seconds, almost imperceptible as the operator.
On the other hand, after having handled operating control, arrive the time-delay till deck crane 122,124,126,128 is worked, when length has reached the degree that makes the operator feel difference if it is delayed time, produce the situation of manipulative capability reduction and cargo handing decrease in efficiency sometimes.Therefore, as the step S109 among Fig. 7 is represented, control setup 410 is provided with the time limitation that continues to keep indication, when the holding time had surpassed binding hours (step S109:YES), control indication reception and registration portion 414 preferably carried out forcibly indication being conveyed to deck crane 122,124,126,128.The energy efficiency of deck crane 122,124,126,128 is improved.
Like this, indication reception and registration portion 414, even under the situation of predictor above the regenerated electric power of available power capacity, after indication acceptance division 412 received indication, specific time one process just can be passed on crane and indicate.Like this, can make its imperceptible reservation shortcoming of the action of indication relatively, energy efficiency is improved.In addition, can easily the regenerated electric power that surpasses the generation of cond 260 capacitance of storage be discharged as heat energy.The resistor that so superfluous regenerated electric power is discharged can be arranged on the control setup 262 of subsidiary cond 260.
Fig. 8 is illustrated in the control program shown in Figure 7, being instructed to the indication that acceptance division 412 receives, is operational flowchart F200 (step S101:NO), that be illustrated in the control program in the control setup 410 when making deck crane 122,124,126,128 follow the action of power consumption.As shown in the drawing, the indication that indication acceptance division 412 receives is (step S101:NO) when following the action of power consumption, indication acceptance division 412 when preserving indication (step S202), calculates the predictor (step S203) of the consumption of power of carrying out its action.
Secondly, in indication reception and registration portion 414, the predictor of the consumption of power compares (step S204) with 260 charge capacities of cond at that time.Here, if charge capacity is enough big, during whole consumes power (step S204:YES) of can the availability forecast value relating to by cond 260, indication reception and registration portion 414 conveys to the deck crane 122,124,126,128 that should indicate one of them with it, makes it to carry out and indication cooresponding action (step S205).This situation, deck crane 122,124,126,128 can be used the electric power execution of supplying with from cond 260.
On the other hand, if based on the indication execution, but in the time of (the step S204:NO) of the charge capacity deficiency of cond 260, the indication (step S206) that whether has taken place other deck crane 122,124,126,128 actions is at first retrieved by indication reception and registration portion 414.Secondly, if when the indication that other deck crane 122,124,126,128 is taken place is arranged (step S206:YES), whether regenerated electric power (step S207) takes place based on the action of its indication in investigation.Here, if action generation regenerated electric power (step S207:YES) to other deck crane 122,124,126,128 indications, then keep the initial indication original state that receives, preferentially the indication that this regenerated electric power takes place is conveyed to corresponding deck crane 122,124,126,128 (step S208).With this, accumulate electric power, make cond 260 charge capacities increase (step S208).Afterwards, the processing of indication reception and registration portion 414 turns back to the step (step S204) of comparison prediction value and charge capacity, comparison prediction value and charge capacity again.
In addition, under not having to take place (step S206:NO) to the situation of the indication of other deck cranes 122,124,126,128, or, though indication (step S206:YES) has taken place, but when not following regenerated electric power (step S207:NO), wait described indication to take place according to the action of its indication appointment.Do like this, till making the electric power finished based on the action of originally indication by cond 260 storages, by passing on the indication of other actions that regenerated electric power can take place, used the electric power that stores in the cond 260 to finish the action of deck crane 122,124,126,128.
In addition,, do time-delay till the action to deck crane 122,124,126,128 if after the manipulation device, elongated to bringing inharmonious sense to the operator when, produced the deterioration of maneuvering performance or the decrease in efficiency of cargo handing work often.Here, S209 is represented as step, control setup 410 is provided with the time length restriction that keeps indication, when the holding time has surpassed binding hours (step S209:YES), even the charge capacity deficiency, also preferably indication is passed on to deck crane 122,124,126,128 forcibly by control indication reception and registration portion 414.Like this, make it the shortcoming that imperceptible action postpones, can make deck crane 122,124,126,128 energy efficiencies improve.In addition, no matter whether the charge capacity of cond 260 is not enough, when being instructed to follow the action of power consumption, can deck crane 122,124,126,128 not had work stagnantly by powering from deck crane 122,124,126,128 common bus 152 bonded assembly electrical generators 140.
Do like this, can be provided for being controlled at and have respectively when loading and unloading object 121 is moved, consume the electrical motor of electric power and when braking loading and unloading object 121 moves, the electric power regeneration unit 350 of regenerated electric power takes place as propulsion source, and indicate a plurality of cranes of action according to the outside; And the power charge that electric power regeneration unit 350 is taken place and storing, and supply with the control setup 410 of the action of the crane in the ship of cond 260 of the electric power that the part electrical motor consumes at least.Control setup 410 comprises: reception is at the indication of the action of each crane and with its preservation, calculate the indication acceptance division 412 of the predictor of consumed power when carrying out the action that each indication produced or regenerating power, with will obtain by cond 260 electrically-charged savings electric weight and predictor comparison from cond 260, when predictor is put aside consumption of electric electric power for surpassing, during till savings electric power amount surpasses predictor, the indication of the action that will take place the indication regenerated electric power of other cranes preferentially conveys to the indication reception and registration portion 414 of one of them crane.With this, can reduce electrical generator 140 load on the ship, reduce comprehensive consumption of fuel in its ship.
In addition,, do time-delay till the action to deck crane 122,124,126,128 if handle after the operating control, elongated to bringing inharmonious sense to the operator when, be to have produced the deterioration of maneuvering performance or the decrease in efficiency of cargo handing work sometimes.Here, S209 is represented as step, control setup 410 is provided with the time length restriction that keeps indication, when the holding time has surpassed binding hours (step S209:YES), even the charge capacity deficiency, also preferably indication is passed on to deck crane 122,124,126,128 forcibly by control indication reception and registration portion 414.Like this, make it the shortcoming that imperceptible action postpones, can make deck crane 122,124,126,128 energy efficiencies improve.Moreover, no matter whether the charge capacity of cond 260 is not enough, when being instructed to follow the action of power consumption, can deck crane 122,124,126,128 not had work stagnantly by powering from deck crane 122,124,126,128 common bus 152 bonded assembly electrical generators 140.
Like this, even be to surpass when accumulating consumption of electric power in predictor, indication reception and registration portion 414 also can be after indication acceptance division 412 receives indication, and specific time one process is just passed on crane and indicated.Like this, the imperceptible reservation shortcoming of the action of indication relatively can be made it, above-mentioned effect can also be enjoyed.
With this, in hoisting crane 300, when loading and unloading object 121 is descended, can reclaim expeditiously as the d/d energy of heat energy, utilize in the driving of in board electric apparatus 200.Simultaneously, because can reduce the consumption of fuel that is used for electric power supply, except reducing bunkerage, add the discharge rate that can suppress carbon dioxide, oxides of nitrogen, oxysulfide etc. again, so can also reduce environmental pressure.
And in above-mentioned a series of control, if indication acceptance division 412 has been imported the indication that the action of consumption of power takes place simultaneously, in the time of with the both sides of the indication of the action that regenerated electric power takes place, indication reception and registration portion 414 can with the term of execution time limit control that overlaps, pass on indication to deck crane 122,124,126,128.In view of the above, on bus 152, power consumption and regeneration electricity are cancelled out each other, and can discharging and recharging of cond 260 not lost ground, effectively utilize regenerated electric power.Simultaneously, in this case, produce the overcharged of cond 260 or the excessive possibility of discharging are also become very low.
But electrical motors such as the cantilever electrical motor 342 that deck crane 122,124,126,128 is equipped separately, lifting electrical motor 344, turning motor 346 take place in starting because the peak value power consumption that rush current causes.Simultaneously, when stopping, taking place because the peak value of the regenerated electric power that regenerative brake causes.Therefore, preferably indicate reception and registration portion 414, the time limit control that the indication of reception and registration takes to make the peak value of same kind not overlap.Like this, can suppress the more than needed of all peaking capacities of electric apparatus 200.
In addition, control setup 410 can be handled on the seat 322,324,326,328 and dispose input part at each, and it is preferential to import between electric power adjustment and the operability which by the operator.As an example of this input part, be to select the switch that an input electric power is adjusted mode of priority or operability mode of priority.In this case, in the input part of the manipulation seat 322 of specific deck crane 122, be transfused to electric power when adjusting mode of priority, control setup 410 is deferred to the control program of above-mentioned Fig. 7 and Fig. 8, this deck crane 122 is passed on the indication of action.On the other hand, when this deck crane 122 is handled in the input part of seat 322, when being transfused to the operability mode of priority, if control setup 410 is received the action indication from this manipulation seat 322, then do not defer to the control program of above-mentioned Fig. 7 and Fig. 8, former state is passed on this indication to this deck crane 122 unchangeably.Like this, just, can select the precedence of electric power adjustment and operability.Further, as input part, can use one of them the indexing pate of degree of adjustment of preferential input electric power and operability to replace the above-mentioned switch of choosing one.At this moment, control setup 410 is handled in the seat 322 at specific deck crane 122, input electric power adjustment indexing pate value more preferably, and then Fig. 7 step S109 and Fig. 8 step S209 standby time prolong.Thus, can more fine select the precedence of electric power adjustment and operability.And control setup 410 can also automatically be judged the precedence of electric power adjustment and operability by the joystick of handling seat, the operation of action button etc.For example, control setup 410 can be handled greatly more according to joystick, or the acceleration/accel of operating lever operation is more little, and the priority level that is judged as the electric power adjustment is high more.
More than by embodiment the present invention has been described, but the scope of technology of the present invention is not limited to the scope that the foregoing description is put down in writing.Those skilled in the art can be to various changes or the improvement in addition of aforesaid embodiment.Scope according to claim can understand that such embodiment that has applied the change improvement is also included within the technical scope of the present invention.

Claims (7)

1, a kind of control setup, be in the ship that is equipped with a plurality of cranes and cond, control the control setup of the action of described crane, described a plurality of crane has separately when moving the loading and unloading object, consume the electrical motor of electric power as propulsion source, with when braking loading and unloading object mobile, the electric power regeneration unit of regenerated electric power takes place, and move according to the outside indication; Described cond is accumulated the electric power that described electric power regeneration unit takes place, and at least a portion of the electric power of described electrical motor consumption is provided; Described control setup is equipped with:
The indication acceptance division, it receives the action indication to each crane, and it is preserved, the predictor of the regenerated electric power when calculating execution according to the action of described each indication;
Indication reception and registration portion, it obtains and can compare in the available power capacity and the described predictor of charge of a capacitor from described cond, surpass under the situation of described available power capacity in described predictor, during till the available power capacity surpasses described predictor, before described crane will be conveyed to corresponding to the indication of described predictor, will convey to described other cranes to the action indication of following power consumption of other cranes earlier.
2, the control setup of putting down in writing according to claim 1,
Described indication reception and registration portion, even in described predictor is to surpass under the situation of regenerated electric power of described available power capacity, described indication acceptance division receives after the described indication, and specific time one process is promptly passed on and the cooresponding described indication of described predictor described crane.
3, a kind of control setup, it is the control setup of the action of the described crane of control in the ship that is equipped with a plurality of cranes and cond, described a plurality of crane has respectively when moving the loading and unloading object, consume the electrical motor of electric power as propulsion source, with when braking loading and unloading object mobile, the electric power regeneration unit of regenerated electric power takes place, and moves according to the outside indication; And described charge of a capacitor and store the electric power that the electric power regeneration unit takes place, and provide at least a portion of the electric power that described electrical motor consumes; Described control setup has:
The indication acceptance division receives the action indication at each described crane, and it is preserved, the predictor of the consumption electric power when calculating the action of having carried out according to each described indication;
Indication reception and registration portion, obtain the charge capacity that described cond is recharged from described cond, compare with predictor, surpass under the situation of described charge capacity in described predictor, during till surpassing predictor to described charge capacity, before will conveying to described crane with the cooresponding described indication of described predictor, the indication of the action that will take place other the regenerated electric power of crane earlier conveys to described other cranes.
4, the control setup of putting down in writing according to claim 3,
Described indication reception and registration portion, even in described predictor is to surpass under the situation of consumption electric power of described charge capacity, if described indication acceptance division receives after the described indication, specific time one process is promptly passed on and the cooresponding described indication of described predictor described crane.
5, a kind of control setup, be to have respectively when moving the loading and unloading object in outfit, electrical motor as the propulsion source consumed power, and during braking loading and unloading object mobile, the electric power regeneration unit of regenerated electric power takes place, indicate according to the outside in the ship of a plurality of cranes that move, control the control setup of the action of described crane; Have:
The indication acceptance division receives the action indication at each crane, and it is preserved, and judges when the action of having carried out according to each described indication, follows to consume electric power or follow regenerated electric power;
Indication reception and registration portion, when judging: follow consumption electric power according to the action that the indication of one of described crane is carried out by described indication acceptance division, and when following regenerated electric power according to the action that the indication of another crane is carried out, action indication with a described crane, with the action indication of described another crane, pass on overlapping sequential during the execution corresponding actions.
6, the control setup of putting down in writing according to claim 5,
Described indication reception and registration portion, the sequential that the rush current during with motor starting that described crane is had separately staggered between the emergence period is passed on each described indication.
7, the control setup of putting down in writing according to claim 5,
Described indication reception and registration portion, during with the electrical motor that has separately at the described crane of braking, regenerated electric power take place during the sequential that staggers, pass on each described indication.
CN200780050056.6A 2006-11-17 2007-11-14 Controller Expired - Fee Related CN101595028B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2006312231A JP4402678B2 (en) 2006-11-17 2006-11-17 Control device
JP312231/2006 2006-11-17
PCT/JP2007/072108 WO2008059884A1 (en) 2006-11-17 2007-11-14 Controller

Publications (2)

Publication Number Publication Date
CN101595028A true CN101595028A (en) 2009-12-02
CN101595028B CN101595028B (en) 2013-03-20

Family

ID=39401688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200780050056.6A Expired - Fee Related CN101595028B (en) 2006-11-17 2007-11-14 Controller

Country Status (3)

Country Link
JP (1) JP4402678B2 (en)
CN (1) CN101595028B (en)
WO (1) WO2008059884A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102795548A (en) * 2011-05-23 2012-11-28 株式会社安川电机 Loading and unloading system
CN107371364A (en) * 2015-03-25 2017-11-21 莱尔德技术股份有限公司 Coordinate safety interlock system and method
CN109245136A (en) * 2018-09-27 2019-01-18 南通航运职业技术学院 A kind of electric network protection system applied in ship crane

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010006591A (en) * 2008-06-30 2010-01-14 Sekigahara Seisakusho:Kk Crane device for marine vessel
JP2010132112A (en) * 2008-12-04 2010-06-17 Ihi Marine United Inc Power generation device using hull vibration
DE202010011257U1 (en) * 2010-08-11 2010-10-21 D-I Davit International Gmbh Bereitschaftsboot- / Rettungsinseldavit
JP5830841B2 (en) * 2010-09-10 2015-12-09 シンフォニアテクノロジー株式会社 Low oscillating offshore cargo handling system or offshore floating body equipped with the same
JP5615111B2 (en) * 2010-09-17 2014-10-29 三菱重工業株式会社 Power storage system and ship
JP5649178B2 (en) * 2011-03-24 2015-01-07 大成建設株式会社 Demolition plan decision method
DE102011007663A1 (en) * 2011-04-19 2012-10-25 Kirow Ardelt Gmbh Hoist and method of operating the hoist
JP5450554B2 (en) * 2011-10-07 2014-03-26 三菱重工パーキング株式会社 Mechanical parking device, control method for mechanical parking device, and control program for mechanical parking device
JP6044922B2 (en) * 2012-03-30 2016-12-14 国立研究開発法人 海上・港湾・航空技術研究所 Ship hybrid operation system and hybrid operation ship
KR101925396B1 (en) * 2012-10-29 2019-02-27 대우조선해양 주식회사 Offshare structure and method for crane motor starting thereof
JP6706667B2 (en) * 2016-03-16 2020-06-10 日本郵船株式会社 Ship
JP6569141B2 (en) * 2016-12-07 2019-09-04 三菱造船株式会社 Ship navigation method and ship
NL2020553B1 (en) * 2018-03-08 2019-09-13 Itrec Bv Pedestal mounted crane with flywheel energy storage
WO2021084726A1 (en) * 2019-10-31 2021-05-06 株式会社大島造船所 Crane device for ships
FR3126224B1 (en) * 2021-08-17 2023-11-17 Reel Active compensation system, intended to at least partially compensate for the effect of undulatory movement on a load

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5529907U (en) * 1978-08-11 1980-02-27
JP4124855B2 (en) * 1998-03-16 2008-07-23 東芝三菱電機産業システム株式会社 Ship power supply
JP4750432B2 (en) * 2005-02-22 2011-08-17 株式会社Ihi Load drive device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102795548A (en) * 2011-05-23 2012-11-28 株式会社安川电机 Loading and unloading system
CN102795548B (en) * 2011-05-23 2014-11-26 株式会社安川电机 Loading and unloading system
CN107371364A (en) * 2015-03-25 2017-11-21 莱尔德技术股份有限公司 Coordinate safety interlock system and method
CN107371364B (en) * 2015-03-25 2019-03-15 莱尔德技术股份有限公司 The system and method coordinated safety interlock system, coordinate safety interlocking
CN109245136A (en) * 2018-09-27 2019-01-18 南通航运职业技术学院 A kind of electric network protection system applied in ship crane

Also Published As

Publication number Publication date
JP4402678B2 (en) 2010-01-20
CN101595028B (en) 2013-03-20
WO2008059884A1 (en) 2008-05-22
JP2008126776A (en) 2008-06-05

Similar Documents

Publication Publication Date Title
CN101595028B (en) Controller
KR100953906B1 (en) Ship's power supply system
US10822067B2 (en) Power system of ship
KR101823168B1 (en) Crane comprising a hybrid drive system
JP6676276B2 (en) Storage battery propulsion system and storage battery propulsion ship
CN216861215U (en) Energy storage system
CN102148513B (en) Power feeding device and rubber tired gantry crane including the same
JP4071767B2 (en) Method of transporting electrical energy
KR20110082478A (en) Self-propelled ship
CN102211657A (en) Ship electric propulsion system with hybrid power supply of diesel generator set and power battery
KR102739576B1 (en) Electric power supply system for vessel
CA2811480C (en) Ship having an opening for removing a power supply system
CN108382232A (en) A kind of Dynamic design method of quarry tipper
CN104037927A (en) Marine electric power system capable of supplying power by novel hybrid power source
JP2010115009A (en) Port microgrid
CN117977773A (en) Intelligent photovoltaic controller, related method and storage medium and computer program
JP5615111B2 (en) Power storage system and ship
CN115347549B (en) Flow battery energy storage system on electric ship and control method
CN109301898A (en) A water charging system
CN101652310A (en) Crane device
JP2010133333A (en) Control device for cargo handling machine and control method for cargo handling machine
WO2021084726A1 (en) Crane device for ships
CN119176237A (en) Electric propulsion ship with double machines and double paddles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: IKNOW MACHINERY CO., LTD.

Free format text: FORMER OWNER: INDUSTRY CO., LTD.

Effective date: 20101025

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: NAGASAKI PREFECTURE, JAPAN TO: NAGASAKI, JAPAN

TA01 Transfer of patent application right

Effective date of registration: 20101025

Address after: Nagasaki, Japan

Applicant after: IHI Corp.

Address before: Nagasaki County, Japan

Applicant before: Tsuji Industry Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130320

Termination date: 20211114