[go: up one dir, main page]

CN101586452B - Method of monitoring coal mining solid pack pressure - Google Patents

Method of monitoring coal mining solid pack pressure Download PDF

Info

Publication number
CN101586452B
CN101586452B CN2009100324739A CN200910032473A CN101586452B CN 101586452 B CN101586452 B CN 101586452B CN 2009100324739 A CN2009100324739 A CN 2009100324739A CN 200910032473 A CN200910032473 A CN 200910032473A CN 101586452 B CN101586452 B CN 101586452B
Authority
CN
China
Prior art keywords
pressure
filling
filling body
row
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009100324739A
Other languages
Chinese (zh)
Other versions
CN101586452A (en
Inventor
张吉雄
黄艳利
巨峰
安泰龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2009100324739A priority Critical patent/CN101586452B/en
Publication of CN101586452A publication Critical patent/CN101586452A/en
Application granted granted Critical
Publication of CN101586452B publication Critical patent/CN101586452B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

一种采煤固体充填体压力监测方法,适用于井工矿山固体充填采煤过程中对采空区充填体的压力情况进行监测。采用在充填综采采空区布置多个充填体压力监测仪,分排布置,各排充填体压力监测仪均沿工作面均匀布置;数据采集时,将每排充填体压力监测仪通讯线通过接线盒与运煤巷中的通讯主线相连,即充填体压力监测仪通讯线通过接线盒连接至通讯主线上,然后经通讯主线接入通讯主站,最后经电话线将通讯主站的数据传入地面数据接受系统中,对固体充填体的压力情况进行在线监测,并通过监测主机对压力数据进行分析,防止采空区充填物对其造成损坏。其方法简单,易操作,准确性高,可提高充填效果,避免安全隐患。

The invention discloses a method for monitoring the pressure of a coal mining solid filling body, which is suitable for monitoring the pressure of a goaf filling body during solid filling coal mining in an underground mine. Multiple filling body pressure monitors are arranged in the filling mechanized goaf, arranged in rows, and each row of filling body pressure monitors is evenly arranged along the working face; when data is collected, the communication lines of each row of filling body pressure monitors are passed through The junction box is connected to the communication main line in the coal transportation lane, that is, the communication line of the filling body pressure monitor is connected to the communication main line through the junction box, and then connected to the communication master station through the communication main line, and finally the data of the communication master station is transmitted through the telephone line. Into the ground data receiving system, the pressure of the solid filling body is monitored online, and the pressure data is analyzed through the monitoring host to prevent the gob filling from being damaged. The method is simple, easy to operate and high in accuracy, can improve the filling effect and avoid potential safety hazards.

Description

采煤固体充填体压力监测方法Pressure Monitoring Method of Solid Filling Body in Coal Mining

技术领域technical field

本发明涉及一种压力监测方法,尤其是一种适用于井工矿山固体充填采煤技术的采煤固体充填体压力监测方法。The invention relates to a pressure monitoring method, in particular to a method for monitoring the pressure of a coal mining solid filling body suitable for solid filling coal mining technology in underground mines.

技术背景technical background

目前,固体充填采煤技术以其减少覆岩关键层变形,降低地表沉降、充分利用废弃矸石等废料的优越性,越来越多的被国内外应用,并产生了良好的经济效益和社会效益。在固体充填采煤技术中,当充填体充入采空区后,随着工作面的推进,对于采空区充填体的压实情况究竟如何,目前还没有一个解决这一问题的方法,如果能够及时掌握采空区充填体的压力情况,不仅有利于分析掌握充填效果,而且也便于通过改变充填体性质(配比、含水量)和夯实情况等方法,可随时对充填的工艺进行改进,提高充填效果,避免安全隐患。At present, the solid filling coal mining technology is more and more applied at home and abroad because of its advantages of reducing the deformation of the key layer of the overlying rock, reducing the surface settlement, and making full use of waste such as waste gangue, and has produced good economic and social benefits . In the solid filling coal mining technology, after the filling body is filled into the goaf, with the advancement of the working face, there is no method to solve this problem at present. Being able to grasp the pressure of the filling body in the goaf in time is not only beneficial to analyze and grasp the filling effect, but also facilitates the filling process to be improved at any time by changing the properties of the filling body (proportion, water content) and compaction, etc. Improve the filling effect and avoid potential safety hazards.

发明内容Contents of the invention

技术问题:本发明的目的是提供一种方法简单,易操作,能准确对充填体的压力情况进行监测的采煤固体充填体压力监测方法。Technical problem: The purpose of the present invention is to provide a method for monitoring the pressure of coal mining solid filling body which is simple, easy to operate, and can accurately monitor the pressure of the filling body.

技术方案:本发明的采煤固体充填体压力监测方法:Technical solution: The coal mining solid filling body pressure monitoring method of the present invention:

a、在跟随采煤工作面推进的预充填的采空区内,分多排间隔埋设多个充填体压力监测仪;a. In the pre-filled goaf following the advance of the coal mining face, multiple filling body pressure monitors are buried in multiple rows at intervals;

b、用压力监测仪通讯线将各排在的每个充填体压力监测仪连线引至运煤巷的接线盒内;b. Use the pressure monitor communication line to lead the connection line of each filling body pressure monitor in each row to the junction box of the coal transportation lane;

c、逐排进行固体充填;c. Carry out solid filling row by row;

d、利用通讯主线将多排引线的接线盒串连至井下通讯主站,构成井下工作面数据采集系统;d. Use the communication main line to connect the junction box with multiple rows of leads in series to the underground communication master station to form a data acquisition system for the underground working face;

e、利用电话线将井下通讯主站的数据传输至由监测主机接收单元和监测主机接收单元之相连的监测主机构成的地面数据收集系统,通过地面数据收集系统对固体充填体的压力情况进行实时监测,并通过监测主机对压力数据进行分析,确定固体充填的效果。e. Use the telephone line to transmit the data of the underground communication master station to the ground data collection system composed of the monitoring host receiving unit and the monitoring host connected to the monitoring host receiving unit, and monitor the pressure of the solid filling body in real time through the ground data collection system Monitor, and analyze the pressure data through the monitoring host to determine the effect of solid filling.

所述分多排间隔埋设的充填体压力监测仪为2~4排,排与排之间的距离为25~35m,第一排离切眼的距离约为15m,每排埋设的充填体压力监测仪为3~6个;所述的充填体压力监测仪沿工作面均匀分布。The filling body pressure monitors buried in multiple rows at intervals are 2 to 4 rows, the distance between the rows is 25 to 35m, the distance between the first row and the incision is about 15m, and the filling body pressure buried in each row is about 15m. There are 3 to 6 monitors; the filling body pressure monitors are evenly distributed along the working face.

有益效果:采用在充填综采采空区布置多个充填体压力监测仪,分排布置,各排充填体压力监测仪均沿工作面均匀布置;数据采集时,将每排充填体压力监测仪通讯线通过接线盒与运煤巷中的通讯主线相连,即充填体压力监测仪通讯线通过接线盒连接至通讯主线上,然后经通讯主线接入通讯主站,最后经电话线将通讯主站的数据传入地面数据接受系统中,对固体充填体的压力情况进行在线监测,并通过监测主机对压力数据进行分析,确定固体充填的效果。该监测方法不仅可以对充填体压力进行准确监测,而且可以将数据同步传输进行分析,以便及时了解掌握固体充填采煤的充填效果。其方法简单,易操作,准确性高,可提高充填效果,避免安全隐患,具有广泛的实用性。Beneficial effects: a plurality of filling body pressure monitors are arranged in the fully mechanized mined-out area of filling, arranged in rows, and each row of filling body pressure monitors is evenly arranged along the working face; when data is collected, each row of filling body pressure monitors The communication line is connected to the communication main line in the coal transportation lane through the junction box, that is, the communication line of the filling body pressure monitor is connected to the communication main line through the junction box, and then connected to the communication main station through the communication main line, and finally connected to the communication main station through the telephone line. The data is transmitted to the ground data receiving system, and the pressure of the solid filling body is monitored online, and the pressure data is analyzed through the monitoring host to determine the effect of the solid filling. The monitoring method can not only accurately monitor the pressure of the filling body, but also transmit and analyze the data synchronously, so as to know the filling effect of solid filling coal mining in time. The method is simple, easy to operate, high in accuracy, can improve the filling effect, avoid potential safety hazards, and has wide practicability.

附图说明Description of drawings

附图是本发明的结构示意图。Accompanying drawing is the structural representation of the present invention.

图中1-运煤巷,2-充填体压力监测仪,3-切眼,4-采空区,5-接线盒,6-通讯主线,7-通讯主站,8-压力监测仪通讯线,9-监测主机接收单元,10-电话线,11-监测主机。In the figure, 1-coal transport roadway, 2-filling body pressure monitor, 3-cut hole, 4-goaf, 5-junction box, 6-communication main line, 7-communication master station, 8-communication line of pressure monitor , 9-monitoring host receiving unit, 10-telephone line, 11-monitoring host.

具体实施方式Detailed ways

下面结合附图对本发明的一个实施例作进一步的描述:An embodiment of the present invention will be further described below in conjunction with accompanying drawing:

本发明的采煤固体充填体压力监测方法:在充填开采工作面推进的预充填的采空区4内,布置3排充填体压力监测仪2,每排布置3个,排与排之间的距离为25m~35m,第一排离切眼3的距离约为15m,充填开采工作面平均埋深为350m,面长为50m,推进长度为460m。根据现场实际需要,充填体压力监测仪2可以为2~4排,每排间隔埋设3~6个,用压力监测仪通讯线8将各排中的每个充填体压力监测仪2连线引至运煤巷1的接线盒5内,为保护充填体压力监测仪通讯线8,在其埋设位置挖一条沟槽,并进行预埋,当充填物从上部落下后时可避免充填体对压力监测仪通讯线8的冲击破坏。然后对埋设了充填体压力监测仪2的采空区逐排进行固体充填,充填体压力监测仪2沿工作面均匀分布。每排充填体压力监测仪通讯线8均通过接线盒5与运煤巷1中的通讯主线6相连。当充填体压力监测仪2布置为2排时,则通过2个接线盒5连接至通讯主线6上,当充填体压力监测仪2布置为3排时,则通过3个接线盒5连接至通讯主线6上,当充填体压力监测仪2布置为4排时,则通过4个接线盒5连接至通讯主线6上,所有充填体压力监测仪2的数据经压力监测仪通讯线8汇集至接线盒5,并通过通讯主线6传至通讯主站7,再由电话线10传送到地面数据收集系统,地面数据接受系统采用KJ216-J型监测主机接收单元9和联想天工监测主机11构成,通过软件编程,由监测主机11对收集到的压力数据进行分析,工作人员可在地面数据收集系统对采空区4内固体充填体的压力情况进行实时监测,确定固体充填的效果,以及充填体压力监测仪2显示充填体的压力数据。The coal mining solid filling body pressure monitoring method of the present invention: in the pre-filled goaf 4 advanced by the filling and mining working face, 3 rows of filling body pressure monitors 2 are arranged, and each row is arranged with 3, and the pressure monitor 2 between the rows The distance is 25m-35m, the distance from the first row to the cutting hole 3 is about 15m, the average buried depth of the filling mining face is 350m, the face length is 50m, and the advancing length is 460m. According to the actual needs of the site, the filling body pressure monitor 2 can be arranged in 2 to 4 rows, and each row is buried with 3 to 6 pieces at intervals, and each filling body pressure monitor 2 in each row is connected with a pressure monitor communication line 8 In the junction box 5 of the coal transportation lane 1, in order to protect the communication line 8 of the filling body pressure monitor, a trench is dug at its embedding position and pre-buried, so that the filling body can be avoided when the filling material falls from the top. Impact damage to the communication line 8 of the pressure monitor. Then solid filling is performed row by row in the goaf where the filling body pressure monitor 2 is buried, and the filling body pressure monitor 2 is evenly distributed along the working face. Each row of filling body pressure monitor communication lines 8 is connected to the communication main line 6 in the coal transportation lane 1 through the junction box 5 . When the filling body pressure monitors 2 are arranged in two rows, they are connected to the communication main line 6 through two junction boxes 5; when the filling body pressure monitors 2 are arranged in three rows, they are connected to the communication main line 6 through three junction boxes 5 On the main line 6, when the filling body pressure monitors 2 are arranged in 4 rows, they are connected to the communication main line 6 through 4 junction boxes 5, and the data of all filling body pressure monitors 2 are collected to the wiring through the pressure monitor communication line 8 Box 5, and transmitted to the communication master station 7 through the communication main line 6, and then transmitted to the ground data collection system by the telephone line 10, the ground data receiving system is composed of a KJ216-J monitoring host receiving unit 9 and Lenovo Tiangong monitoring host 11, Through software programming, the monitoring host 11 analyzes the collected pressure data, and the staff can monitor the pressure of the solid filling body in the goaf 4 in real time in the ground data collection system to determine the effect of the solid filling and the filling effect of the filling body. The pressure monitor 2 displays the pressure data of the filling body.

Claims (3)

1. method of monitoring coal mining solid pack pressure is characterized in that:
A, in the goaf (4) of following the pre-filling that coal-face advances, divide many rows to bury a plurality of obturation pressure monitors (2) at interval underground;
B, with pressure monitor connection (8) with each row in each obturation pressure monitor (2) line cause fortune coal road (1) junction box (5) in;
C, carry out solid filling by row;
D, the junction box (5) of utilizing communication main line (6) will arrange lead-in wire are contacted to downhole communication main website (7) more, constitute the mining face under mine data collecting system;
E, utilize telephone wire (10) with the transfer of data of downhole communication main website (7) to ground data gathering system by monitoring main frame receiving element (9) and monitoring main frame (11) formation that links to each other with monitoring main frame receiving element (9), by the ground data gathering system pressure condition of solid filling body is monitored in real time, and by the monitoring main frame (11) pressure data is analyzed, determine the effect of solid filling.
2. method of monitoring coal mining solid pack pressure according to claim 1, it is characterized in that: it is 2~4 rows that described branch is arranged the obturation pressure monitor of burying underground at interval (2) more, distance between row and row is 25~35m, first row is about 15m from the distance of cutting eye (3), and the obturation pressure monitor (2) that every row buries underground is 3~6.
3. method of monitoring coal mining solid pack pressure according to claim 1 and 2 is characterized in that: described obturation pressure monitor (2) evenly distributes along work plane.
CN2009100324739A 2009-06-17 2009-06-17 Method of monitoring coal mining solid pack pressure Expired - Fee Related CN101586452B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100324739A CN101586452B (en) 2009-06-17 2009-06-17 Method of monitoring coal mining solid pack pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100324739A CN101586452B (en) 2009-06-17 2009-06-17 Method of monitoring coal mining solid pack pressure

Publications (2)

Publication Number Publication Date
CN101586452A CN101586452A (en) 2009-11-25
CN101586452B true CN101586452B (en) 2011-09-14

Family

ID=41370857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100324739A Expired - Fee Related CN101586452B (en) 2009-06-17 2009-06-17 Method of monitoring coal mining solid pack pressure

Country Status (1)

Country Link
CN (1) CN101586452B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102116174A (en) * 2010-12-27 2011-07-06 淄博矿业集团有限责任公司 System for monitoring pressure of paste-filling pipeline on line
CN103063513B (en) * 2011-10-18 2017-01-11 江苏师范大学 Testing device for testing lateral tamping effect of fragmented rock body
CN103940669B (en) * 2014-04-14 2016-09-28 中国矿业大学 A kind of solid filling characteristic of material mechanics method of testing
CN104065927B (en) * 2014-06-25 2018-04-13 中国矿业大学 A kind of solid filling, which mines to feed intake, conveys monitoring system
CN104533527A (en) * 2014-12-25 2015-04-22 淄博矿业集团有限责任公司岱庄煤矿 Pressure monitoring system of paste filling pipeline
CN109973143B (en) * 2019-04-01 2020-03-27 中国矿业大学 A real-time monitoring system and monitoring method for cement filling rate
CN112594003B (en) * 2020-12-15 2022-07-22 安徽理工大学 Intelligent matching grouting method for coal-based solid waste paste

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4709900A (en) * 1985-04-11 1987-12-01 Einar Dyhr Choke valve especially used in oil and gas wells
WO2000004269A3 (en) * 1998-07-15 2000-04-20 Deep Vision Llc Subsea wellbore drilling system for reducing bottom hole pressure
WO2000079092A3 (en) * 1999-06-22 2001-06-28 Shell Int Research Drilling system
US20020112888A1 (en) * 2000-12-18 2002-08-22 Christian Leuchtenberg Drilling system and method
CN200978672Y (en) * 2006-10-17 2007-11-21 中国石油化工股份有限公司 Downhole crack pressure monitoring instrument

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4709900A (en) * 1985-04-11 1987-12-01 Einar Dyhr Choke valve especially used in oil and gas wells
WO2000004269A3 (en) * 1998-07-15 2000-04-20 Deep Vision Llc Subsea wellbore drilling system for reducing bottom hole pressure
WO2000079092A3 (en) * 1999-06-22 2001-06-28 Shell Int Research Drilling system
US20020112888A1 (en) * 2000-12-18 2002-08-22 Christian Leuchtenberg Drilling system and method
CN200978672Y (en) * 2006-10-17 2007-11-21 中国石油化工股份有限公司 Downhole crack pressure monitoring instrument

Also Published As

Publication number Publication date
CN101586452A (en) 2009-11-25

Similar Documents

Publication Publication Date Title
CN101586452B (en) Method of monitoring coal mining solid pack pressure
CN108952796B (en) Comb-shaped bottom plate through-layer drilling fracturing permeability-increasing-based modular extraction method
CN104454010B (en) A kind of deep-well tunnel tunneling construction dynamic comprehensive monitor and early warning system and method for early warning
CN103362552A (en) Distributed fiber bragg grating anchor rod group stress monitoring system for coal mine tunnel
CN104500078B (en) A kind of method of construction optimization tunnel regional stress field outside lane
CN102587983B (en) Comprehensive early-warning observation method for coal mine rock burst
CN110439618B (en) Mining optical fiber roof dynamic monitoring and crushing treatment system
CN111123365B (en) Goaf lagging water inrush early warning system based on natural potential method and application method thereof
CN102654062A (en) Top plate dynamical monitoring method for comprehensive mechanical filling and mining gob
CN102955025B (en) Method for determining height and range of stope overlying rock beam fracture zone of coal mine
CN110821475B (en) Drilling resistivity monitoring method for coal mine working face bottom plate and cable pushing device
CN107345484B (en) Integrity detection and control method of layered "mixed roof" under thick coal seam
CN106968671B (en) The filling of underground coal mine coal working face return channel withdraws method
CN106679735B (en) A kind of more water kind real-time monitoring devices in ore deposit refuse dump and application method
CN102777185A (en) Inclined well shaft construction technology
CN206668328U (en) A kind of hole drilling type rock stratum sedimentation monitoring system
CN102691520A (en) Monitoring system for heading face
CN104196448A (en) Intelligent on-line deep hole drill carriage for coal mine
CN102562057B (en) Construction method for cutting solution fissure of salt ore
CN106401652A (en) Tandem type network construction method for tunnel remote on-line remote-measuring system
CN201857953U (en) Advanced abutment pressure monitoring device on coal face
CN202362466U (en) Height detecting device for water flowing fracture zone on coal extraction working surface
CN102691521A (en) Installation method for driving working face monitoring system
CN105298542B (en) A kind of method and system for being used to monitor roof of coal face
CN102373953B (en) Construction-bypass moving technique of fully-mechanized coal face

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20091125

Assignee: XUZHOU ZHONAN SCIENCE & TECHNOLOGY CO., LTD.

Assignor: China University of Mining & Technology

Contract record no.: 2016320000117

Denomination of invention: Method of monitoring coal mining solid pack pressure

Granted publication date: 20110914

License type: Exclusive License

Record date: 20160311

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110914

Termination date: 20210617