CN101546894A - Method for replacing 220KV steel pipe tower composite insulator electrifiedly - Google Patents
Method for replacing 220KV steel pipe tower composite insulator electrifiedly Download PDFInfo
- Publication number
- CN101546894A CN101546894A CN200910031465A CN200910031465A CN101546894A CN 101546894 A CN101546894 A CN 101546894A CN 200910031465 A CN200910031465 A CN 200910031465A CN 200910031465 A CN200910031465 A CN 200910031465A CN 101546894 A CN101546894 A CN 101546894A
- Authority
- CN
- China
- Prior art keywords
- tower
- electrician
- synthetic insulator
- insulation
- leading screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明公开了一种带电更换220KV高压输电线路钢管塔合成绝缘子的方法。属电气技术领域。所采用的工具有:起吊工具一套:包括横担固定用的卡具、丝杠、绝缘钩镰枪和取销器;辅助工具:绝缘绳索和后备保护绳等;本方法是采用新型卡具在横担上生根、采用单吊点进行带电作业。本发明的有益效果是:克服了钢管塔作业空间狭小的问题,塔上只需两名作业人员作业;解决了钢管塔上无处生根的难题,卡具固定良好,操作简便。
The invention discloses a method for replacing a composite insulator of a steel pipe tower of a 220KV high-voltage transmission line with electricity. It belongs to the field of electrical technology. The tools used are: a set of lifting tools: including clamps for fixing the cross arm, lead screws, insulating hooks, sickle guns and pin removers; auxiliary tools: insulating ropes and backup protection ropes; Rooting on the cross arm, using a single lifting point for live work. The beneficial effects of the invention are: the problem of narrow working space of the steel pipe tower is overcome, only two operators are required to work on the tower;
Description
技术领域 technical field
本发明涉及一种带电更换220KV高压输电线路钢管塔合成绝缘子的方法。属电气技术领域。The invention relates to a method for replacing a synthetic insulator of a steel pipe tower of a 220KV high-voltage transmission line with electricity. It belongs to the field of electrical technology.
背景技术 Background technique
随着城市用电负荷的不断加强,220KV变电站相继在各大城市市区出现。为节约城市市区用地,市区内220KV变电站的出线均采用钢管塔。同时为了节省线路通道,钢管塔上往往采用同塔多回路的方式。钢管塔上作业空间本来就过于狭窄,这些都给钢管塔线路检修作业带来了不便。With the continuous strengthening of urban electricity load, 220KV substations have appeared in urban areas of major cities one after another. In order to save land in urban areas, steel pipe towers are used for outgoing lines of 220KV substations in urban areas. At the same time, in order to save line channels, the steel pipe tower often adopts the method of multiple circuits on the same tower. The working space on the steel pipe tower is too narrow, which brings inconvenience to the maintenance work of the steel pipe tower line.
高压输电线路合成绝缘子悬挂在输电线路杆塔上,通过球头、碗头合成绝缘子与钢管塔的横担、导线相联,合成绝缘子具有很高的电气和机械强度,保证了输电线路的可靠运行。运行过程中由于雷击、污闪、劣化等原因,需随时进行更换。为不因更换绝缘子而将线路停电,就需要在高压输电线路上进行带电作业,目前的带电更换绝缘子的方法是:由工人直接接触高压导线或借助于绝缘工具进行作业,把劣化的合成绝缘子更换,必须使用一种中间绝缘,两头带有收紧装置的专用卡具,目的是将导线拉力转移到起吊工具上,使合成绝缘子从拉紧状态(因所悬挂导线的若干吨的重量而使绝缘子串处于绷紧状态)变为松弛状态。由于钢管塔与常规塔塔型结构不同,造成横担上起吊工具无法生根,同时钢管塔横担过于狭窄,塔上只限一人操作,一人进行辅助,因而无法完成更换作业。The composite insulator of the high-voltage transmission line is suspended on the transmission line tower, and is connected with the cross arm and wire of the steel pipe tower through the ball end and bowl head composite insulator. The composite insulator has high electrical and mechanical strength, which ensures the reliable operation of the transmission line. Due to lightning strikes, pollution flashover, deterioration and other reasons during operation, it needs to be replaced at any time. In order not to cut off the line power due to the replacement of insulators, it is necessary to carry out live work on the high-voltage transmission line. The current method of live insulator replacement is: the workers directly contact the high-voltage wires or use insulation tools to perform operations, and replace the deteriorated synthetic insulators. , a kind of intermediate insulation must be used, and a special clamp with a tightening device at both ends, the purpose is to transfer the tension of the wire to the lifting tool, so that the composite insulator can be pulled from the tensioned state (due to the weight of several tons of the suspended wire, the insulator The string is in a state of tension) to a state of slack. Because the structure of the steel pipe tower is different from that of conventional towers, the lifting tools on the cross arm cannot be rooted. At the same time, the cross arm of the steel pipe tower is too narrow, and only one person can operate on the tower, and one person can assist, so the replacement operation cannot be completed.
发明内容 Contents of the invention
为解决上述技术问题,本发明提供一种带电更换220KV钢管塔合成绝缘子的方法,本方法是采用新型卡具在横担上生根、采用单吊点进行带电作业。解决了钢管塔上无处生根的难题。In order to solve the above-mentioned technical problems, the present invention provides a method for live replacement of composite insulators of 220KV steel pipe towers. This method adopts a new clamp to root on the cross arm and uses a single lifting point for live work. Solved the problem of nowhere to take root on the steel pipe tower.
本发明是以如下技术方案实现的:一种带电更换220KV钢管塔合成绝缘子的方法,所采用的工具有:起吊工具一套:包括横担固定卡具、收紧省力丝杠、绝缘钩镰枪和取销器;辅助工具:绝缘绳索和后备保护绳等。The present invention is realized by the following technical scheme: a method for replacing the composite insulator of a 220KV steel pipe tower with electricity, the tools used include: a set of lifting tools: including a cross-arm fixing fixture, a tightening labor-saving lead screw, and an insulating hook sickle gun And remover; Auxiliary tools: insulating rope and backup protection rope, etc.
具体更换方法步骤如下:The specific replacement method steps are as follows:
1、进入横担侧:塔上操作电工和塔上辅助电工依次进入横担侧;1. Enter the cross-arm side: the operating electrician on the tower and the auxiliary electrician on the tower enter the cross-arm side in turn;
2、起吊、安装工具:地面电工通过绝缘传递绳将工具依次送至横担侧,塔上辅助电工将工具逐一递给操作电工,由操作电工进行工具的安装;操作电工先将卡具穿过挂板,卡具下端穿入螺栓,接着将丝杠穿入卡具的丝杠安装孔中,随后连接绝缘钩镰枪,丝杠下端用螺丝连接;2. Lifting and installing tools: the electrician on the ground sends the tools to the side of the cross arm in turn through the insulating transmission rope, and the auxiliary electrician on the tower passes the tools one by one to the operating electrician, and the operating electrician installs the tools; the operating electrician passes the clamps first Hang the plate, insert the bolt at the lower end of the fixture, then insert the lead screw into the lead screw installation hole of the fixture, then connect the insulating hook and sickle gun, and connect the lower end of the lead screw with screws;
4、收紧丝杠:操作电工待绝缘钩镰枪的两个绝缘挂钩钩住导线后开始收紧丝杠,使待更换合成绝缘子上的荷重转移到整套起吊工具上;4. Tighten the lead screw: the operating electrician starts to tighten the lead screw after the two insulating hooks of the insulating hook gun hook the wire, so that the load on the synthetic insulator to be replaced is transferred to the whole set of lifting tools;
5、摘螺丝:塔上操作电工待丝杠收紧后开始用取销器将合成绝缘子下端球头处的弹簧销拔出,使球头与碗头分离;接着塔上操作电工用绝缘绳将合成绝缘子下端拉起来,并摘除上端与挂板的连接;5. Picking screws: After the lead screw is tightened, the electrician operating on the tower starts to pull out the spring pin at the ball head of the lower end of the composite insulator with a pin remover, so that the ball head is separated from the bowl head; Pull up the lower end of the insulator, and remove the connection between the upper end and the hanging plate;
6、落下旧合成绝缘子,起吊新合成绝缘子:地面人员通过绝缘传递绳将旧合成绝缘子松放到地面,将新合成绝缘子起吊至横担处;6. Drop the old synthetic insulator and lift the new synthetic insulator: the ground personnel loosen the old synthetic insulator to the ground through the insulation transfer rope, and lift the new synthetic insulator to the cross arm;
7、安装新合成绝缘子:塔上操作电工先将新合成绝缘子的上端与挂板处相联,接着通过碗头扶正器将碗头扶正,使合成绝缘子下端球头进入碗头,随后用取销器将弹簧销装入;7. Install the new synthetic insulator: the electrician operating on the tower first connects the upper end of the new synthetic insulator to the hanging plate, and then straightens the bowl head through the bowl head centralizer, so that the ball end of the lower end of the synthetic insulator enters the bowl head, and then uses the pin remover Insert the spring pin;
8、拆除作业工具:塔上操作电工依次拆除作业工具,塔上辅助电工将工具通过绝缘传递绳松至地面。8. Removal of working tools: The operating electrician on the tower removes the working tools in turn, and the auxiliary electrician on the tower loosens the tools to the ground through the insulating transmission rope.
本发明的有益效果是:(1)克服了钢管塔作业空间狭小的问题,塔上只需两名作业人员作业;(2)解决了钢管塔上无处生根的难题,卡具固定良好,操作简便。The beneficial effects of the present invention are: (1) overcome the problem of the narrow working space of the steel pipe tower, only two workers are required to work on the tower; easy.
附图说明 Description of drawings
下面结合附图和实施例对本发明进一步详细说明:Below in conjunction with accompanying drawing and embodiment the present invention is described in further detail:
图1是工具整体布置图;Figure 1 is the overall layout of the tool;
图2是卡具主视图;Fig. 2 is the front view of fixture;
图3是俯视图。Fig. 3 is a plan view.
图中:1、钢管塔横担,2、挂板,3、横担固定卡具,3-1、丝杠安装孔,3-2、螺栓孔,3-3、安装间隙,4、螺栓,5、丝杠,6、合成绝缘子,7、绝缘钩镰枪和取销器,8、球头,9、碗头,10、导线,11、螺杆及U型挂环。In the figure: 1. Steel pipe tower cross arm, 2. Hanging plate, 3. Cross arm fixing fixture, 3-1. Lead screw installation hole, 3-2. Bolt hole, 3-3. Installation clearance, 4. Bolt, 5. Lead screw, 6. Synthetic insulator, 7. Insulation hook gun and pin remover, 8. Ball head, 9. Bowl head, 10. Lead wire, 11. Screw rod and U-shaped hanging ring.
具体实施方式 Detailed ways
如图1工具整体布置图所示,使用的工具有起吊工具一套有横担固定卡具3、丝杠5、绝缘钩镰枪7和取销器;辅助工具有绝缘绳索和后备保护绳等。As shown in the overall layout of the tool in Figure 1, the tools used include a set of lifting tools, a set of
如图2和图3所示,横担固定的卡具整体呈弯折的L形,在其水平部位的端头有一丝杠安装孔3-1,在翘起的弯折部位有安装间隙3-3和穿过安装间隙的螺栓孔3-2。As shown in Fig. 2 and Fig. 3, the jig fixed by the cross arm is in the shape of a bent L as a whole, and there is a screw mounting hole 3-1 at the end of the horizontal part, and there is a
首先,塔上操作人员将横担固定卡具3的安装间隙3-3套进挂板2,横担固定卡具3的拐弯处搁在与挂板2联接的螺杆及U型挂环11上,然后将螺栓4安装好。再将丝杠5穿过卡具中的丝杠安装孔3-1,最后将丝杠5的下端与绝缘钩镰枪7的上端通过螺栓联接在一起。工具完装完毕后,将绝缘钩镰枪7下端的两个挂钩钩住二分裂导线10,然后慢慢起吊丝杠5,将合成绝缘子6承受的荷重转移到绝缘钩镰枪7上来。待合成绝缘子6不再承受荷重后,用取销器拔下球头8与碗头9间的弹簧销,并晃动合成绝缘子6,使球头8从碗头9中脱出。随后摘除合成绝缘子与挂板间的联接,即更换下了旧合成绝缘子。安装新合成绝缘子时,待合成绝缘子与挂板间联接好后,用碗头9扶正器将碗头9扶正,使球头8进入碗头9中,然后用取销器将弹簧销装入球头8与碗头9间,即完成了整个更换作业。First, the operator on the tower inserts the installation gap 3-3 of the
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910031465 CN101546894B (en) | 2009-04-29 | 2009-04-29 | Method for replacing 220KV steel pipe tower composite insulator electrifiedly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910031465 CN101546894B (en) | 2009-04-29 | 2009-04-29 | Method for replacing 220KV steel pipe tower composite insulator electrifiedly |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101546894A true CN101546894A (en) | 2009-09-30 |
CN101546894B CN101546894B (en) | 2011-03-23 |
Family
ID=41193854
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200910031465 Expired - Fee Related CN101546894B (en) | 2009-04-29 | 2009-04-29 | Method for replacing 220KV steel pipe tower composite insulator electrifiedly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101546894B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101916972A (en) * | 2010-03-23 | 2010-12-15 | 福建省电力有限公司厦门电业局 | Straight line tower closed hanging wire board insulator series ground potential live replacement device |
CN101916971A (en) * | 2010-03-23 | 2010-12-15 | 福建省电力有限公司厦门电业局 | Straight-line tower flip-type hanging wire board insulator series ground potential live replacement device |
CN102340114A (en) * | 2011-09-23 | 2012-02-01 | 四川省电力公司达州电业局 | High-voltage power transmission line lifter for live working |
CN104600629A (en) * | 2015-02-12 | 2015-05-06 | 中国南方电网有限责任公司超高压输电公司百色局 | Compact-circuit six-bundled conductor linkage plate fixture and application thereof |
CN105098658A (en) * | 2015-09-18 | 2015-11-25 | 国网上海市电力公司 | Insulator exchange device |
CN108448480A (en) * | 2018-03-30 | 2018-08-24 | 江西电力职业技术学院 | Mounting equipment for tower insulators of overhead transmission lines |
CN110416912A (en) * | 2019-07-05 | 2019-11-05 | 国家电网有限公司 | Hanging ring connection combined UHV insulator string cross-arm side live work replacement tool |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85204196U (en) * | 1985-09-28 | 1986-06-11 | 鞍山电业局 | Clamps for change straight-line whole serial insulators on live wire work |
CN2219555Y (en) * | 1994-12-08 | 1996-02-07 | 都匀市供电局 | Universal rear gripper for hot-line working of 35-220KV electric transmission line |
CN100464474C (en) * | 2007-03-23 | 2009-02-25 | 上海市电力公司超高压输变电公司 | Method and device for live replacement of tension insulator strings for high-voltage transmission lines |
CN201118147Y (en) * | 2007-10-30 | 2008-09-17 | 重庆市电力公司超高压局 | Device for live replacement of high voltage transmission line insulator strings |
CN101174761B (en) * | 2007-10-30 | 2010-06-23 | 重庆市电力公司超高压局 | High-voltage power line tension insulator string forward spin live-wire altering method |
CN100566059C (en) * | 2008-04-02 | 2009-12-02 | 云南电网公司大理供电局 | The method of a kind of charged for replacement 500kV circuit " L " insulator string |
CN201219185Y (en) * | 2008-06-06 | 2009-04-08 | 宁夏电力公司银川供电局 | Special tool for replacing insulator string |
-
2009
- 2009-04-29 CN CN 200910031465 patent/CN101546894B/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101916972A (en) * | 2010-03-23 | 2010-12-15 | 福建省电力有限公司厦门电业局 | Straight line tower closed hanging wire board insulator series ground potential live replacement device |
CN101916971A (en) * | 2010-03-23 | 2010-12-15 | 福建省电力有限公司厦门电业局 | Straight-line tower flip-type hanging wire board insulator series ground potential live replacement device |
CN101916971B (en) * | 2010-03-23 | 2012-09-26 | 福建省电力有限公司厦门电业局 | Earth potential live replacing device for tangent tower inverted insulator string on attachment plate |
CN101916972B (en) * | 2010-03-23 | 2012-11-21 | 福建省电力有限公司厦门电业局 | Earth potential live replacing device for tangent tower closed type insulator string on attachment plate |
CN102340114A (en) * | 2011-09-23 | 2012-02-01 | 四川省电力公司达州电业局 | High-voltage power transmission line lifter for live working |
CN104600629A (en) * | 2015-02-12 | 2015-05-06 | 中国南方电网有限责任公司超高压输电公司百色局 | Compact-circuit six-bundled conductor linkage plate fixture and application thereof |
CN105098658A (en) * | 2015-09-18 | 2015-11-25 | 国网上海市电力公司 | Insulator exchange device |
CN105098658B (en) * | 2015-09-18 | 2017-07-14 | 国网上海市电力公司 | A kind of insulator exchange apparatus |
CN108448480A (en) * | 2018-03-30 | 2018-08-24 | 江西电力职业技术学院 | Mounting equipment for tower insulators of overhead transmission lines |
CN110416912A (en) * | 2019-07-05 | 2019-11-05 | 国家电网有限公司 | Hanging ring connection combined UHV insulator string cross-arm side live work replacement tool |
Also Published As
Publication number | Publication date |
---|---|
CN101546894B (en) | 2011-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101546894A (en) | Method for replacing 220KV steel pipe tower composite insulator electrifiedly | |
WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
CN201323409Y (en) | Tool for live line replacing of high voltage transmission line V-shaped insulator chain | |
CN104505766B (en) | The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings | |
CN102185265B (en) | Construction method for replacing cross arm of 35kV line linear rod | |
WO2012088986A1 (en) | Maintenance tool used for direct current transmission line | |
CN105356371A (en) | Same-tower multi-loop power transmission line strain insulator string electrification replacing method and device | |
CN106450835A (en) | Shoe manufacturer high voltage wire landing device | |
CN105162028A (en) | Method for replacing linear insulator of 220kV steel pipe tower in live working state | |
CN102623927B (en) | Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method | |
CN102646945B (en) | Method for 500kV live replacement of composite insulators | |
CN110707599B (en) | A special tool for live adjustment of 220kv vertically arranged double-split conductor sag | |
CN202602171U (en) | A tool for power-on replacing multi-loop double split conductor insulator of 220kV line | |
CN202978103U (en) | Insulator fixture | |
CN102227062B (en) | Operating tool for hot-line replacement of ring-type mount-point suspended insulator and operating method thereof | |
CN102208776B (en) | Working tool for live-line replacement of insulator chain of triangle link plate hanging point type and working method thereof | |
CN111697487A (en) | Voltage-measurable live-line double-insulator-string replacing device and operation method | |
CN217641824U (en) | Quick earthing device of rigidity contact net busbar | |
CN212366644U (en) | Tool used during assembly and disassembly of grounding wire of overhead transmission line | |
CN203039295U (en) | Working tool used for hot-line replacement of three-hole duplex plate linear insulator chain | |
CN108847617A (en) | The device and method of UHV transmission line live-line replacing strain wire jumper insulator chain | |
CN201234089Y (en) | Protective interval for live operation on 1000kV AC very high voltage line | |
CN105977860B (en) | A kind of replacement overhead transmission line composite cross-arm insulator device and method | |
CN204144800U (en) | The special cross-arm card of a kind of ZML type tower | |
CN201312079Y (en) | Clamping apparatus for live line replacement of suspended insulator in middle of 500KV untypical tangent tower via splicing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: JIANGSU ELECTRIC POWER CO. STATE ELECTRIC NET CROP Effective date: 20121029 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20121029 Address after: 221005 No. 20 Jiefang North Road, Jiangsu, Xuzhou Patentee after: XUZHOU POWER SUPPLY COMPANY OF JIANGSU ELECTRIC POWER Co. Patentee after: JIANGSU ELECTRIC POWER Co. Patentee after: State Grid Corporation of China Address before: 221005 No. 20 Jiefang North Road, Jiangsu, Xuzhou Patentee before: XUZHOU POWER SUPPLY COMPANY OF JIANGSU ELECTRIC POWER Co. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110323 |
|
CF01 | Termination of patent right due to non-payment of annual fee |