CN101503892B - 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 - Google Patents
钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 Download PDFInfo
- Publication number
- CN101503892B CN101503892B CN200910028251XA CN200910028251A CN101503892B CN 101503892 B CN101503892 B CN 101503892B CN 200910028251X A CN200910028251X A CN 200910028251XA CN 200910028251 A CN200910028251 A CN 200910028251A CN 101503892 B CN101503892 B CN 101503892B
- Authority
- CN
- China
- Prior art keywords
- groove
- shear wall
- precast beam
- reinforced concrete
- steel reinforced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910028251XA CN101503892B (zh) | 2009-02-04 | 2009-02-04 | 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910028251XA CN101503892B (zh) | 2009-02-04 | 2009-02-04 | 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101503892A CN101503892A (zh) | 2009-08-12 |
CN101503892B true CN101503892B (zh) | 2011-02-16 |
Family
ID=40976257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910028251XA Expired - Fee Related CN101503892B (zh) | 2009-02-04 | 2009-02-04 | 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101503892B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102168455B (zh) * | 2011-03-15 | 2012-09-19 | 东南大学 | 装配剪力墙结构水平缝u型闭合筋连接构造 |
CN102926463A (zh) * | 2012-11-09 | 2013-02-13 | 沈阳建筑大学 | 装配式混凝土框架核心筒结构现浇剪力墙与预制梁平面外连接结构 |
CN103397696B (zh) * | 2013-08-16 | 2016-01-20 | 威海建设集团股份有限公司 | 耐震、预制的钢筋桁架剪力墙混合结构建筑物 |
CN104164922B (zh) * | 2014-07-22 | 2016-05-18 | 南京长江都市建筑设计股份有限公司 | 一种非预应力叠合板与支座的连接结构及其连接方法 |
CN108018972B (zh) * | 2017-12-01 | 2024-09-13 | 沈阳建筑大学 | 全预制楼板与叠合楼板组合结构、制作及装配方法 |
CN108412079A (zh) * | 2018-05-18 | 2018-08-17 | 华南理工大学 | 一种装配式剪力墙水平连接结构及施工方法 |
CN108930411A (zh) * | 2018-07-26 | 2018-12-04 | 中国二十冶集团有限公司 | 一种叠合梁上部钢筋的穿设方法 |
CN111502033A (zh) * | 2020-05-06 | 2020-08-07 | 无锡锡晟建设有限公司 | 全预制高强度pc楼板与钢梁快速安装结构 |
CN113719030A (zh) * | 2021-09-03 | 2021-11-30 | 江苏万斯达建筑科技有限公司 | 一种薄底槽型预应力混凝土叠合梁 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1189564A (zh) * | 1997-01-30 | 1998-08-05 | 周长春 | 一种楼板端部连接方法 |
CN2349275Y (zh) * | 1997-12-08 | 1999-11-17 | 中美合资北京福安水泥制品有限公司 | 预应力空心板与混凝土剪力墙及梁的连接节点 |
CN201395870Y (zh) * | 2009-02-04 | 2010-02-03 | 南通建筑工程总承包有限公司 | 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 |
-
2009
- 2009-02-04 CN CN200910028251XA patent/CN101503892B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1189564A (zh) * | 1997-01-30 | 1998-08-05 | 周长春 | 一种楼板端部连接方法 |
CN2349275Y (zh) * | 1997-12-08 | 1999-11-17 | 中美合资北京福安水泥制品有限公司 | 预应力空心板与混凝土剪力墙及梁的连接节点 |
CN201395870Y (zh) * | 2009-02-04 | 2010-02-03 | 南通建筑工程总承包有限公司 | 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 |
Non-Patent Citations (2)
Title |
---|
JP特开平8-93135A 1996.04.09 |
JP特开平9-177240A 1997.07.08 |
Also Published As
Publication number | Publication date |
---|---|
CN101503892A (zh) | 2009-08-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101503892B (zh) | 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 | |
CN102808450A (zh) | 一种装配整体式剪力墙建筑结构及建造方法 | |
CN109252727B (zh) | 隔震层橡胶支座与柱、梁板体系一体化装配节点与方法 | |
CN110439109B (zh) | 一种预应力装配式混凝土梁柱连接节点及工法 | |
CN201395870Y (zh) | 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 | |
CN106703197B (zh) | 一种大跨度多层抗震框架结构体系及其施工方法 | |
CN101503888B (zh) | 外剪力墙与板及剪力墙层间连接节点 | |
CN101503887B (zh) | 内剪力墙与板及剪力墙层间连接节点 | |
CN111691580A (zh) | 空腔内配置大直径边缘构件竖向受力钢筋的叠合暗柱及预制墙 | |
CN201395859Y (zh) | 内剪力墙与板及剪力墙层间连接节点 | |
CN212562033U (zh) | 空腔内配置大直径竖向受力钢筋的叠合暗柱及预制墙 | |
JPH11293945A (ja) | 高層建築物の免震構造 | |
Mota | Voided Slabs Then and now. | |
CN219118399U (zh) | 一种固定在混凝土短柱上的外包式钢柱脚施工结构 | |
CN106639054A (zh) | 基于预制钢结构的装配式钢板网外包混凝土剪力墙结构 | |
CN114790787B (zh) | 多摇摆界面自复位墙高层结构体系 | |
CN201433465Y (zh) | 外剪力墙与板及剪力墙层间连接节点 | |
CN117468748A (zh) | 工业厂房室内加层新增角柱、圈梁及其施工方法 | |
CN215888962U (zh) | 一种薄底槽型预应力混凝土叠合梁 | |
CN215977672U (zh) | 一种装配式梁柱连接节点 | |
GuNawardeNa et al. | Performance of multi-storey prefabricated modular buildings with infill concrete walls subjected to earthquake loads | |
CN109469104B (zh) | 地下室及其建筑 | |
CN210105041U (zh) | 自承式预制钢骨混凝土墙板构件、墙、结构体系 | |
CN111851787A (zh) | 一种带洞口叠合剪力墙纵横墙侧面出筋连接节点构造 | |
KR20210148677A (ko) | 무바닥판 커플채널 합성거더 및 그의 시공방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: KANNUOC (SHANGHAI ) ENGINEERING TECHNOLOGY ADVICE |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Sam.Sigelman Inventor after: Hou Haiquan Inventor after: Dong Niancai Inventor after: Zhang Jun Inventor before: Sam.Sigman Inventor before: Hou Haiquan Inventor before: Dong Niancai Inventor before: Zhang Jun |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: SAM SIGMAN HOU HAIQUAN DONG NIANCAI ZHANG JUN TO: SAM SAIGMAN HOU HAIQUAN DONG NIANCAI ZHANG JUN |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20100603 Address after: 226124 Jiangsu Province Haimen Changle Town Applicant after: Nantong Construction General Contractor Co., Ltd. Co-applicant after: Nantong Construction General Contractor Co., Ltd. Address before: 226124 Jiangsu Province Haimen Changle Town Applicant before: Nantong Construction General Contractor Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110216 Termination date: 20190204 |
|
CF01 | Termination of patent right due to non-payment of annual fee |