CN101477207B - An Intelligent Geological Disaster Comprehensive Monitoring System and Multi-level Forecasting and Analysis Method - Google Patents
An Intelligent Geological Disaster Comprehensive Monitoring System and Multi-level Forecasting and Analysis Method Download PDFInfo
- Publication number
- CN101477207B CN101477207B CN2009100581969A CN200910058196A CN101477207B CN 101477207 B CN101477207 B CN 101477207B CN 2009100581969 A CN2009100581969 A CN 2009100581969A CN 200910058196 A CN200910058196 A CN 200910058196A CN 101477207 B CN101477207 B CN 101477207B
- Authority
- CN
- China
- Prior art keywords
- monitoring
- disaster
- forecast
- unit
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A90/00—Technologies having an indirect contribution to adaptation to climate change
- Y02A90/10—Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation
Landscapes
- Emergency Alarm Devices (AREA)
- Alarm Systems (AREA)
Abstract
本发明公开了一种智能型地质灾害综合监测系统及多级预报分析方法。该系统是一种按需可组合、拆卸的,适合于野外安装的监测装置,其安装组合完成后为一杆状物,定时测量并地面无线发射斜坡地下深部变形信息于系统信息分析控制单元,结合采用激光扫描器,定时连续扫描得到监测区域内图像,同时还增设多点定点激光测距仪,对选定物体进行精确测距。它以地质灾害体地下深部变形和地表直接变形位移为主要监测预报依据,结合物理与化学场变化辅助参数与诱发因素,将灾害预报划成预备级、预警级、前期预报级、灾害预报四级,就地一体化地完成监测、分析、预报功能。
The invention discloses an intelligent geological disaster comprehensive monitoring system and a multi-level forecasting and analysis method. The system is a monitoring device that can be combined and disassembled on demand, and is suitable for field installation. After the installation and combination are completed, it becomes a rod-shaped object, which regularly measures and wirelessly transmits the deep underground deformation information of the slope to the system information analysis control unit. Combined with the use of laser scanners, the images in the monitoring area can be obtained by regular and continuous scanning. At the same time, a multi-point fixed-point laser rangefinder is added to accurately measure the distance of the selected object. It takes the deep underground deformation of the geological disaster body and the direct surface deformation and displacement as the main monitoring and forecasting basis, and combines the auxiliary parameters and inducing factors of physical and chemical field changes to divide the disaster forecast into four levels: preparation level, early warning level, early forecast level, and disaster forecast. , and complete the monitoring, analysis, and forecast functions in an integrated manner on the spot.
Description
技术领域technical field
本发明属于物理的自动化控制技术领域,特别是一种智能型地质灾害综合监测系统及多级预报分析方法。The invention belongs to the technical field of physical automatic control, in particular to an intelligent geological disaster comprehensive monitoring system and a multi-level forecasting and analysis method.
背景技术Background technique
地质灾害监测是集地质灾害形成机理、监测仪器、时空技术和预测预报技术为一体的综合技术。当前国内外地质灾害的监测技术方法研究与应用多是围绕崩塌、滑坡、泥石流等突发性地质灾害进行的。Geological disaster monitoring is a comprehensive technology that integrates the formation mechanism of geological disasters, monitoring instruments, space-time technology and prediction and forecasting technology. At present, the research and application of monitoring technology methods for geological disasters at home and abroad are mostly carried out around sudden geological disasters such as collapses, landslides, and debris flows.
监测方法主要以针对检测的参数类型来分成四大类。首先是灾害体变形监测,包括以测量位移形变信息为主的监测方法:如灾害体地下深部变形、地表变形和相对位移监测、地表绝对位移监测,该类技术目前较为成熟,精度较高,常作为常规技术用于地质灾害监测;由于获得的是直观、直接信息,特别是位移变形量,往往成为预测预报的主要依据之一。Monitoring methods are mainly divided into four categories based on the type of parameters for detection. The first is disaster body deformation monitoring, including monitoring methods that mainly measure displacement and deformation information: such as deep underground deformation of disaster bodies, surface deformation and relative displacement monitoring, and surface absolute displacement monitoring. This type of technology is currently relatively mature and has high accuracy. As a conventional technology, it is used for geological disaster monitoring; because it obtains intuitive and direct information, especially the displacement and deformation, it often becomes one of the main basis for forecasting.
其次是监测灾害体物理、化学场等场变化信息,如应力监测、地声监测、放射性元素(氡气、汞气)测量、地球化学方法以及地脉动测量。目前国际上用于监测滑坡等灾害体所含放射元素(铀、镭)衰变产物(如氡气)浓度、化学元素及其物理场的变化,地质灾害体的物理、化学场发生变化,往往同灾害体的变形破坏联系密切,相对于位移变形,具有超前性。The second is to monitor the changes in the physical and chemical fields of the disaster body, such as stress monitoring, geoacoustic monitoring, radioactive element (radon, mercury) measurement, geochemical methods, and geopulsation measurement. At present, it is used internationally to monitor the changes in the concentration of radioactive elements (uranium, radium) decay products (such as radon), chemical elements and their physical fields contained in landslides and other disaster bodies. The physical and chemical fields of geological disaster bodies change, often at the same time The deformation and damage of the disaster body are closely related, and it is ahead of the displacement deformation.
还有监测地质灾害地下水活动、富含特征、水质特征为主的监测方法。如地下水位(或地下水压力)监测、孔隙水压力监测和地下水水质监测等。大部分地质灾害的形成、发展均与灾害体内部或周围的地下水活动关系密切,同时在灾害体生成的过程中,地下水的本身特征也相应发生变化。There are also monitoring methods for monitoring groundwater activities, enrichment characteristics, and water quality characteristics of geological disasters. Such as groundwater level (or groundwater pressure) monitoring, pore water pressure monitoring and groundwater quality monitoring. The formation and development of most geological disasters are closely related to the groundwater activities inside or around the disaster body. At the same time, the characteristics of the groundwater itself change accordingly during the formation of the disaster body.
最后是诱发因素监测,主要包括以监测地质灾害诱发因素为主的监测技术方法:气象监测、地下水动态监测、地震监测、人类工程活动监测等。降雨、地下水活动是地质灾害的主要诱发因素;降雨量大小、时空分布特征是评价区域性地质灾害(特别是崩、滑、流三大地质灾害的判别)的主要判别指标之一;人类工程活动是现代地质灾害的主要诱发因素之一,因此地质灾害诱发因素监测是灾害监测技术的重要组成部分。The last is the monitoring of triggering factors, which mainly includes monitoring techniques and methods focusing on monitoring geological disaster triggering factors: meteorological monitoring, groundwater dynamic monitoring, earthquake monitoring, human engineering activity monitoring, etc. Rainfall and groundwater activities are the main inducing factors of geological disasters; the magnitude of rainfall and the characteristics of temporal and spatial distribution are one of the main discriminant indicators for evaluating regional geological disasters (especially the three major geological disasters of collapse, slip and flow); human engineering activities It is one of the main inducing factors of modern geological disasters, so the monitoring of geological disaster inducing factors is an important part of disaster monitoring technology.
国内在地质灾害监测方面有许多单项或双项监测仪表,它们在预测预报方面的应用上受到一些局限。There are many single-item or dual-item monitoring instruments in domestic geological disaster monitoring, and their application in forecasting and forecasting is subject to some limitations.
地质灾害综合监测装置监测地质灾害形成的主要成因,它既是各个监测模块构成的综合体,还是地质灾害成因分析的一个智能有机体系。监测内容包括变形位移、物理与化学场、诱发因素、地下水活动等。其中变形位移采用非接触式检测,在确保精度的同时强调直观性、简便性和低成本,引入高新技术对灾害体进行多角度的立体监测,是提炼、优化、进步、全新研发、预测预报的综合项目。The geological disaster comprehensive monitoring device monitors the main causes of geological disasters. It is not only a complex composed of various monitoring modules, but also an intelligent organic system for analyzing the causes of geological disasters. The monitoring content includes deformation and displacement, physical and chemical fields, inducing factors, groundwater activities, etc. Among them, the deformation displacement adopts non-contact detection, which emphasizes intuitiveness, simplicity and low cost while ensuring accuracy, and introduces high-tech to carry out multi-angle three-dimensional monitoring of disaster bodies, which is the basis of refinement, optimization, progress, new research and development, and prediction Comprehensive project.
已有地质灾害监测仪器的种类和监测内容Types and monitoring contents of existing geological disaster monitoring instruments
本课题研发的地质灾害监测仪器的种类和监测内容Types and monitoring content of geological disaster monitoring instruments developed in this project
本系统不是上述各种单一监测装置的简单组合,而是在监测原理和技术方法上的提升和集成。由于灾害是一系列内外复杂因素综合作用的结果,因而需要对多参数进行分析才能对灾害进行准确的预报,从而把损失降到最低。This system is not a simple combination of the above-mentioned single monitoring devices, but an improvement and integration of monitoring principles and technical methods. Since disasters are the result of a series of complex internal and external factors, it is necessary to analyze multiple parameters in order to accurately forecast disasters and minimize losses.
地质灾害成因是复杂多变量的综合系统,其中某单个参数处于临界状态并不一定表示灾害即将发生,实践证明要较为正确地预报地质灾害需要多参数同时监测,并还需要清楚常态下各参数及地表演化过程相互关联的作用机理,以及某一参数达到临界值后会加速出现的连锁反映。这些关系是长期研究、总结的结果。因而研发地质灾害的监控系统,满足大面积、长期、实时、无人值守的监测要求,无论对减少极端事件(强地震、强降雨)衍生次生地质灾害的危害,还是揭示地质灾害的成灾机理都具有十分重要的意义。The cause of geological disasters is a complex and multivariate comprehensive system, and a single parameter in a critical state does not necessarily mean that a disaster is about to occur. Practice has proved that to accurately predict geological disasters requires simultaneous monitoring of multiple parameters, and it is also necessary to know the parameters and parameters under normal conditions. The interconnected mechanism of the evolution process of the earth, and the chain reaction that will accelerate after a certain parameter reaches a critical value. These relationships are the result of long-term research and summary. Therefore, the monitoring system for geological disasters is developed to meet the large-area, long-term, real-time, and unattended monitoring requirements, whether it is to reduce the damage of secondary geological disasters derived from extreme events (strong earthquakes, heavy rainfall), or to reveal the occurrence of geological disasters The mechanism is very important.
发明内容Contents of the invention
本发明的目的是提供一种智能型地质灾害综合监测系统,以对地质灾害进行全天候、无人化定时动态监视。The purpose of the present invention is to provide an intelligent comprehensive monitoring system for geological disasters, so as to carry out all-weather, unmanned and timing dynamic monitoring of geological disasters.
本发明的目的是这样实现的:一种智能型地质灾害综合监测系统,包括,灾害体地下深部变形监测单元:采用单多点无线测斜仪并通过钻井或钻孔埋设于斜坡或灾害体上,定时测量并地面无线发射斜坡深部变形信息于系统信息分析控制单元,用于斜坡早期变形破坏方式、深度、范围的监测,是本系统最主要的监测单元之一;The purpose of the present invention is achieved in this way: an intelligent integrated monitoring system for geological disasters, including a deep underground deformation monitoring unit of a disaster body: a single-multipoint wireless inclinometer is used and buried on a slope or a disaster body by drilling or drilling , regularly measure and wirelessly transmit the deep deformation information of the slope to the system information analysis control unit, which is used to monitor the early deformation and damage mode, depth and range of the slope, and is one of the most important monitoring units of the system;
成像与测距灾害检测单元:采用激光扫描器,定时连续扫描得到监测区域内图像,经过移动物体监测、完整性检查、位置和方位监测等一系列图像分析后,客观反映物体不同时间段有无运动及运动状态趋势,发出定量报警;同时还增设多点定点激光测距仪,对选定物体进行精确测距,距离的变动量也发出定量报警;另外上述三种变形、位移信息与数据结合起来综合准确判断被监视的物体是否整体出现位移,分析后再进一步计算位移加速度是否增大,根据整体位移及位移加速度最后作为灾害即将发生预报的关键因素;Imaging and ranging disaster detection unit: use laser scanners to scan regularly and continuously to obtain images in the monitoring area. After a series of image analysis such as moving object monitoring, integrity checking, position and orientation monitoring, etc., it can objectively reflect the presence or absence of objects in different time periods. Quantitative alarms are issued for movement and movement status trends; at the same time, a multi-point fixed-point laser rangefinder is added to perform precise distance measurement on selected objects, and quantitative alarms are also issued for distance changes; in addition, the above three types of deformation and displacement information are combined with data Together, it can be comprehensively and accurately judged whether the monitored object is displaced as a whole, and after the analysis, it is further calculated whether the displacement acceleration has increased. According to the overall displacement and displacement acceleration, it is finally used as a key factor in the prediction of the imminent disaster;
信息分析控制单元:其硬件设备为工业微处理器,配备I/O输入输出模块;其运行的软件分成信号处理运算、分析判断、输出控制、通讯管理、数据储存部分;软件运行参数应依据具体灾害体(或类型)的当地地质条件的差别而不同设置;将灾害预报分成四级:当发现位移,无其它外界因素干扰,处于预备级;开始伴随降雨量出现或地下含水量升高,处于预警级;伴随振动、声纳的出现,处于前期地质灾害预报级;振动、声纳加大,化学气体超常并位移加速提高发出地质灾害预报。反之各种现象逐步消失,降低预报等级;Information analysis control unit: its hardware equipment is an industrial microprocessor, equipped with I/O input and output modules; its operating software is divided into signal processing operations, analysis and judgment, output control, communication management, and data storage; software operating parameters should be based on specific According to the difference of the local geological conditions of the disaster body (or type), the settings are different; the disaster forecast is divided into four levels: when the displacement is found and there is no interference from other external factors, it is at the preparatory level; Early warning level; with the emergence of vibration and sonar, it is at the early geological disaster forecast level; the vibration and sonar increase, the chemical gas is abnormal and the displacement accelerates to issue a geological disaster forecast. On the contrary, various phenomena will gradually disappear and the forecast level will be lowered;
降雨量监测单元:为一个收集雨水的桶体,内设水位计,计算总的24小时的降雨量,分到每个小时的降雨量,记录年、月、日合计降雨量等信息;在底部有电磁阀,每日零点排放存集的雨水,完毕后自动关闭;降雨量、持续强度,作为灾害即将发生预报的次要因素;Rainfall monitoring unit: It is a bucket body that collects rainwater, with a water level gauge inside, calculates the total 24-hour rainfall, divides the rainfall into each hour, and records the annual, monthly, and daily total rainfall and other information; at the bottom There is a solenoid valve to discharge the collected rainwater at zero point every day, and it will automatically close after the end; the rainfall and continuous intensity are the secondary factors for the forecast of the imminent disaster;
风速监测单元:设置单一风速监测仪,当风速达到高限时,对可能出现的滚石、坠落物作出报警;Wind speed monitoring unit: set up a single wind speed monitor, when the wind speed reaches the upper limit, it will give an alarm for possible rolling stones and falling objects;
湿度、温度监测单元:用于监测环境状况,通过热电阻获得当地气候温度,通过陶瓷湿敏传感器获得土壤湿度或含水量参数;Humidity and temperature monitoring unit: used to monitor environmental conditions, obtain local climate temperature through thermal resistance, and obtain soil humidity or water content parameters through ceramic humidity sensor;
振动、声纳监测单元:用于监测岩土断裂、移动所发出的断裂和滑移声波以及连续性的大幅度横向振动,作为灾害即将发生预报的次要因素;Vibration and sonar monitoring unit: used to monitor rock and soil fracture, fracture and slip sound waves emitted by movement, and continuous large-scale lateral vibration, as a secondary factor in the prediction of imminent disasters;
化学气体报警单元:对灾害体附近上空堆积的汞气或氡气特殊气体达到异常浓度时,进行监视报警;作为灾害即将发生预报的次要因素。Chemical gas alarm unit: When the mercury gas or radon gas accumulated in the vicinity of the disaster body reaches an abnormal concentration, it will monitor and alarm; as a secondary factor in the forecast of the imminent disaster.
天线发射单元:保持与远方控制监测指挥中心的联系,传递监测参数及分析数据以及传递扫描得到的监测区图像,供专家远程进一步会诊;Antenna transmitter unit: keep in touch with the remote control monitoring command center, transmit monitoring parameters and analysis data, and transmit scanned images of the monitoring area for further remote consultation by experts;
灾害报警单元:由红、黄两色高光信号灯和一块LED大屏幕构成,多级灾害预报按不同等级直接以红、黄交通信号灯发出光报警,同时在大屏幕上采用文字形式紧急提示,强化报警效果;Disaster alarm unit: It is composed of red and yellow high-gloss signal lights and a large LED screen. Multi-level disaster forecasts are directly issued by red and yellow traffic lights according to different levels. At the same time, emergency prompts in text form are used on the large screen to strengthen the alarm. Effect;
上述所有单元均与信息分析控制单元的工业微处理器连接。All the above units are connected with the industrial microprocessor of the information analysis control unit.
本发明的另一目的是提供一种上述监测系统的多级预报分析方法,旨在以地质灾害体直接变形位移为主要监测预报依据,结合地质灾害的物理、化学场发生变化,进行模型运算分析,就地一体化完成监测、分析、预报功能。Another object of the present invention is to provide a multi-level forecast analysis method for the above-mentioned monitoring system, which aims to use the direct deformation and displacement of the geological disaster body as the main monitoring and forecast basis, and perform model calculation analysis in combination with changes in the physical and chemical fields of the geological disaster , On-site integration to complete monitoring, analysis, forecasting functions.
本发明的另一目的是这样实现的:一种智能型地质灾害综合监测系统的多级预报分析方法,地下深处变形监测单元采用单多点无线测斜仪并通过钻井(钻孔)埋设于斜坡或灾害体上(埋设位置、埋深视灾害体具体情况而定),定时测量并地面无线发射斜坡深部变形信息于系统接收分析单元,用于斜坡早期变形破坏方式、深度、范围的监测;地表成像与测距灾害检测单元采用激光扫描器定时连续扫描得到监测区域内图像,经过移动物体监测、完整性检查、位置和方位监测等一系列图像分析后,客观反映物体不同时间段有无运动及运动状态趋势,发出定量报警,同时还增设多点定点激光测距仪,对选定物体进行精确测距,距离的变动量也发出定量报警;最后将上述三者结合起来综合准确判断被监视的物体是否整体出现位移,分析后再进一步计算位移加速度是否增大,根据整体位移及位移加速度最后作为灾害即将发生预报的关键因素;Another object of the present invention is achieved in this way: a multi-level forecast analysis method of an intelligent geological disaster comprehensive monitoring system, the deformation monitoring unit in the deep underground adopts a single-multipoint wireless inclinometer and is buried in a well (drilling hole) On slopes or disaster bodies (the buried position and depth depend on the specific conditions of the disaster body), regularly measure and wirelessly transmit the deep deformation information of the slope to the system receiving and analyzing unit for monitoring the early deformation and failure mode, depth and range of the slope; The surface imaging and ranging disaster detection unit uses a laser scanner to scan regularly and continuously to obtain images in the monitoring area. After a series of image analysis such as moving object monitoring, integrity inspection, position and orientation monitoring, it can objectively reflect whether the object has moved in different time periods. And movement status trend, quantitative alarm is issued, and a multi-point fixed-point laser range finder is added at the same time to perform precise distance measurement on the selected object, and quantitative alarm is also issued for the distance change; finally, the above three are combined to comprehensively and accurately judge the monitored Whether the overall displacement of the object occurs, and after analysis, further calculate whether the displacement acceleration increases, and finally use the overall displacement and displacement acceleration as the key factors for the prediction of the imminent disaster;
结合地质灾害体的物理、化学场发生变化,如地声监测、放射性元素(氡气、汞气)测量等相对于位移变形具有超前性的参数,进行模型运算分析;Combined with changes in the physical and chemical fields of geological hazards, such as geoacoustic monitoring, measurement of radioactive elements (radon, mercury) and other parameters that are advanced relative to displacement and deformation, model calculation analysis is carried out;
对气象监测、地下水动态监测、地震监测、人类工程活动监测等,地质灾害诱发因素作为预测预报的依据之一;For meteorological monitoring, groundwater dynamic monitoring, earthquake monitoring, human engineering activity monitoring, etc., geological disaster inducing factors are used as one of the basis for forecasting;
软件运行参数应依据当地地质条件的差别而不同设置;将灾害预报分成预备级、预警级、前期预报级、灾害预报四级;The operating parameters of the software should be set differently according to the differences in local geological conditions; the disaster forecast is divided into four levels: preparation level, early warning level, early forecast level, and disaster forecast level;
每套装置自行构成独立的灾害监测预报系统,既利用GPRS通信功能保持与远方控制监测指挥中心的联系,也在本地配置的灾害报警单元上及时显示当前的灾害等级和预防措施,就地一体化地完成监测、分析、预报功能。Each set of devices constitutes an independent disaster monitoring and forecasting system by itself. It not only uses the GPRS communication function to maintain contact with the remote control monitoring command center, but also displays the current disaster level and preventive measures in time on the locally configured disaster alarm unit, which is integrated on the spot. Complete monitoring, analysis, and forecasting functions.
本发明的有益效果是:The beneficial effects of the present invention are:
1、引入高新技术对灾害体进行多参数的立体监测,以地质灾害体直接变形、位移为监测预报的主要依据,结合物理与化学场变化,极端事件诱发因素和地下水活动监测预报为辅助依据,构建地质灾害综合监测装置;1. Introduce high-tech to carry out multi-parameter three-dimensional monitoring of disaster bodies, take the direct deformation and displacement of geological disaster bodies as the main basis for monitoring and forecasting, combine physical and chemical field changes, extreme event triggering factors and groundwater activity monitoring and forecasting as auxiliary basis, Build a comprehensive monitoring device for geological disasters;
2、全新的智能地质灾害综合监测分级预报系统,将地质灾害的预测由偏重于定性分析,全面拓展向综合、多参数定量判断后作出分级预报过渡;2. The brand-new intelligent geological disaster comprehensive monitoring and grading forecast system, which fully expands the prediction of geological disasters from qualitative analysis to comprehensive and multi-parameter quantitative judgment to make a transition to hierarchical forecasting;
3、建立多级极端事件衍生地质灾害预报报警系统,明确表达各种灾害预测出现情况下,分别按等级进行综合防灾减灾处置方法。3. Establish a multi-level extreme event-derived geological disaster forecast and alarm system, clearly expressing the comprehensive disaster prevention and mitigation methods according to the level when various disaster predictions occur.
附图说明Description of drawings
图1地质灾害检测方式示意图;Fig. 1 Schematic diagram of geological disaster detection method;
图2智能型地质灾害综合监测与多级预报系统硬件框图;Fig. 2 Hardware block diagram of intelligent geological disaster comprehensive monitoring and multi-level forecasting system;
图3本发明智能型地质灾害综合监测与多级预报分析方法框图。Fig. 3 is a block diagram of the intelligent geological disaster comprehensive monitoring and multi-level forecast analysis method of the present invention.
具体实施方式Detailed ways
下面结合附图对本发明作进一步的说明:Below in conjunction with accompanying drawing, the present invention will be further described:
图1示出,一种智能型地质灾害综合监测系统监测方式示意图;Fig. 1 shows, a kind of schematic diagram of the monitoring mode of intelligent geological disaster comprehensive monitoring system;
图2示出,一种智能型地质灾害综合监测系统硬件框图,包括,Fig. 2 shows, a kind of intelligent geological disaster comprehensive monitoring system hardware block diagram, comprises,
深部变形监测单元:采用单多点无线测斜仪并通过钻井(钻孔)埋设于斜坡或灾害体上(埋设位置、埋深视灾害体具体情况而定),定时测量并地面无线发射斜坡深部变形信息于系统接收分析单元,用于斜坡早期变形破坏方式、深度、范围的监测;成像与测距灾害检测单元:采用激光扫描器,定时连续扫描得到监测区域内图像,经过移动物体监测、完整性检查、位置和方位监测等一系列图像分析后,客观反映物体不同时间段有无运动及运动状态趋势,发出定量报警;同时还增设多点定点激光测距仪,对选定物体进行精确测距,距离的变动量也发出定量报警;另外三者结合起来综合准确判断被监视的物体是否整体出现变形位移,分析后再进一步计算位移加速度是否增大,根据整体位移及位移加速度最后作为灾害即将发生预报的关键因素;Deep deformation monitoring unit: use a single-multipoint wireless inclinometer and bury it on the slope or disaster body through drilling (boreholes) (the burial position and buried depth depend on the specific conditions of the disaster body), regularly measure and wirelessly transmit the deep part of the slope Deformation information is received and analyzed in the system, which is used to monitor the early deformation and damage mode, depth and range of slopes; imaging and ranging disaster detection unit: adopts laser scanner, regularly and continuously scans to obtain images in the monitoring area, after moving objects are monitored, complete After a series of image analysis such as sex inspection, position and orientation monitoring, etc., objectively reflect whether the object has motion and motion state trend in different time periods, and issue a quantitative alarm; at the same time, a multi-point fixed-point laser range finder is added to accurately measure the selected object. In addition, the combination of the three can comprehensively and accurately judge whether the monitored object has deformation and displacement as a whole, and then further calculate whether the displacement acceleration has increased after analysis. Key factors for occurrence forecasts;
信息分析控制单元:是本装置的重要构建。其硬件设备为工业微处理器,配备I/O输入输出模块;其运行的软件是本项研究需重点开发,并在实际使用过程中经反复运行调试的核心技术。它分成信号处理运算、分析判断、输出控制、通讯管理、数据储存等部分;软件运行参数应依据当地地质条件的差别而不同设置;将灾害预报分成四级:当发现位移,无其它外界因素干扰,处于预备级;开始伴随降雨量出现或地下湿度升高,处于预警级;伴随振动、声纳的出现,处于前期地质灾害预报级;振动、声纳加大,化学气体超常并位移加速提高发出地质灾害预报。反之各种现象逐步消失,降低预报等级;Information analysis control unit: it is an important structure of this device. Its hardware equipment is an industrial microprocessor equipped with I/O input and output modules; its running software is the core technology that needs to be developed in this research and has been repeatedly run and debugged in actual use. It is divided into signal processing operation, analysis and judgment, output control, communication management, data storage and other parts; the software operating parameters should be set differently according to the differences in local geological conditions; the disaster forecast is divided into four levels: when displacement is found, there is no interference from other external factors , at the preparatory level; with the occurrence of rainfall or the increase of underground humidity, it is at the early warning level; with the emergence of vibration and sonar, it is at the early geological disaster forecast level; with the increase of vibration and sonar, the chemical gas is abnormal and the acceleration of displacement increases. Geological Hazard Forecasting. On the contrary, various phenomena will gradually disappear and the forecast level will be lowered;
降雨量监测单元:为一个收集雨水的桶体,内设水位计,计录总的24小时的降雨量,小时降雨量,记录年、月、日合计降雨量等信息;在底部有电磁阀,每日零点排放存集的雨水,完毕后自动关闭;降雨量、持续强度,作为灾害即将发生预报的次要因素;Rainfall monitoring unit: It is a bucket body that collects rainwater, with a water level gauge inside to record the total 24-hour rainfall, hourly rainfall, and record the annual, monthly, and daily total rainfall and other information; there is a solenoid valve at the bottom, The collected rainwater is discharged at zero point every day, and it will be automatically closed after the end; the rainfall and continuous intensity are the secondary factors for the forecast of the imminent disaster;
风速监测单元:设置单一风速监测仪,当风速达到高限时,对可能出现的滚石、坠落物作出报警;Wind speed monitoring unit: set up a single wind speed monitor, when the wind speed reaches the upper limit, it will give an alarm for possible rolling stones and falling objects;
湿度、温度监测单元:用于监测环境状况,通过热电阻获得当地气候温度,通过陶瓷湿敏传感器获得土壤湿度参数;Humidity and temperature monitoring unit: used to monitor environmental conditions, obtain local climate temperature through thermal resistance, and obtain soil humidity parameters through ceramic humidity sensor;
振动、声纳监测单元:用于监测岩土断裂还是移动(包括泥石流),都将发出断裂和滑移声波,敏感的动物都有感知,往往同灾害体的变形破坏联系密切,是另一个重要因素。连续性的大幅度横向振动,可认为是地震或相似于地震(相似主要指人类工程活动),也作为灾害即将发生预报的次要因素;Vibration and sonar monitoring unit: It is used to monitor rock and soil fracture or movement (including debris flow), and will emit fracture and slip sound waves, which are perceived by sensitive animals and are often closely related to the deformation and destruction of disaster bodies. factor. Continuous large-scale lateral vibration can be considered as earthquake or similar to earthquake (similarity mainly refers to human engineering activities), and it is also used as a secondary factor in the prediction of imminent disaster;
化学气体报警单元:对灾害体附近上空堆积的汞气或氡气特殊气体达到异常浓度时,进行监视报警;现象表示裂缝塌陷活动往地壳深处发展,酝酿较大的地质运动,具有超前活跃的特征,作为灾害即将发生预报的次要因素。Chemical gas alarm unit: When the mercury gas or radon gas accumulated in the vicinity of the disaster body reaches an abnormal concentration, it will monitor and alarm; the phenomenon indicates that the crack subsidence activity develops deep in the earth's crust, brewing a large geological movement, and has an advanced active characteristics, as a secondary factor in the forecast of imminent disasters.
天线发射单元:保持与远方控制监测指挥中心的联系,每个装置有唯一的设备命名,它采用事件触发工作模式,即出现参数报警或灾害预报级别变化时不断发送信息,正常情况下每天(24小时)仅自动通讯一次,但可按接收到的指令要求随时再次发送信息。拟利用各大电讯公司已开通的短信信息传递方式(GPRS),用短信息包压缩然后拆分技术,进行双向交流。另外本装置推广后,形成较大范围布局,还可直接通过地理信息系统进行通讯,不仅传递监测参数及分析数据以及传递扫描得到的监测区图像,供专家远程进一步会诊;Antenna transmitter unit: keep in touch with the remote control monitoring command center, each device has a unique device name, it adopts the event-triggered working mode, that is, it continuously sends information when there is a parameter alarm or a change in the disaster forecast level, under normal circumstances (24 hours a day) hour) only automatically communicates once, but can send the message again at any time according to the instructions received. It is planned to use the short message transmission method (GPRS) that has been opened by major telecommunications companies, and use the technology of compressing and splitting short message packets to carry out two-way communication. In addition, after the promotion of this device, a large-scale layout has been formed, and it can also communicate directly through the geographic information system, not only transmitting monitoring parameters and analysis data, but also transmitting scanned images of the monitoring area for further remote consultation by experts;
灾害报警单元:由红、黄两色高光信号灯和一块LED大屏幕构成,多级灾害预报按不同等级直接以红、黄交通信号灯发出光报警,同时在大屏幕上采用文字形式紧急提示,强化报警效果;在居民集中点设置本装置时,改为红色报警闪光信号灯,另增设警报声响。Disaster alarm unit: It is composed of red and yellow high-gloss signal lights and a large LED screen. Multi-level disaster forecasts are directly issued by red and yellow traffic lights according to different levels. At the same time, emergency prompts in text form are used on the large screen to strengthen the alarm. Effect: when this device is installed at a concentrated point of residents, it will be changed to a red alarm flashing signal light, and an alarm sound will be added.
上述所有单元均与信息分析控制单元的工业微处理器连接。All the above units are connected with the industrial microprocessor of the information analysis control unit.
还具有防雷接地单元:相对高点设置本装置时,加装防雷接地装置;电源转化、储存单元:内设置电压转换设备输出不同等级的电压,提供本装置全部所需的电源;还设置少量的可充电式蓄电池,以备急需状况下还能继续工作一段时间;安装、接地单元:为整个柱状物的基础,放置在混凝土基础上,通过地脚螺钉固定,同时引接地导线与混凝土地部钢板连接,与大地相通;防盗报警单元:当有物体靠近本装置0.5米以内时,利用灾害报警单元发出闪烁强光和高频声波,恐吓入侵动物,达到预警的效果。It also has a lightning protection grounding unit: when the device is set at a relatively high point, a lightning protection grounding device is installed; power conversion and storage unit: a voltage conversion device is installed inside to output voltages of different levels to provide all the power required by the device; A small amount of rechargeable battery can continue to work for a period of time in case of urgent need; installation and grounding unit: it is the foundation of the entire column, placed on the concrete foundation, fixed by anchor screws, and at the same time lead the ground wire to the concrete ground The internal steel plate is connected to the ground; anti-theft alarm unit: when there is an object within 0.5 meters of the device, the disaster alarm unit will emit flashing light and high-frequency sound waves to scare the intruding animals and achieve the effect of early warning.
图3示出,一种智能型地质灾害综合监测系统多级预报分析方法,深部变形监测单元,采用单多点无线测斜仪并通过钻井(钻孔)埋设于斜坡或灾害体上(埋设位置、埋深视灾害体具体情况而定),定时测量并地面无线发射斜坡深部变形信息于系统接收分析单元,用于斜坡早期变形破坏方式、深度、范围的监测,发出定量报警,是本系统最主要的监测单元之一;成像与测距灾害检测单元采用激光扫描器定时连续扫描得到监测区域内图像,经过移动物体监测、完整性检查、位置和方位监测等一系列图像分析后,客观反映物体不同时间段有无运动及运动状态趋势,发出定量报警,同时还增设多点定点激光测距仪,对选定物体进行精确测距,距离的变动量也发出定量报警;另外三者结合起来综合准确判断被监视的物体是否整体出现位移,分析后再进一步计算位移加速度是否增大,根据整体位移及位移加速度最后作为灾害即将发生预报的关键因素;Figure 3 shows a multi-level forecast analysis method for an intelligent geological disaster comprehensive monitoring system. The deep deformation monitoring unit adopts a single-multipoint wireless inclinometer and is buried on a slope or a disaster body by drilling (boring) (buried position , buried depth depends on the specific conditions of the disaster body), regularly measure and wirelessly transmit the deep deformation information of the slope to the system receiving and analyzing unit, and use it to monitor the early deformation and damage mode, depth and range of the slope, and issue quantitative alarms. One of the main monitoring units; the imaging and ranging disaster detection unit uses a laser scanner to scan regularly and continuously to obtain images in the monitoring area. After a series of image analysis such as moving object monitoring, integrity inspection, position and orientation monitoring, it can objectively reflect the objects Whether there is movement and movement state trend in different time periods, a quantitative alarm is issued. At the same time, a multi-point fixed-point laser rangefinder is added to measure the distance of the selected object accurately, and a quantitative alarm is also issued for the distance change; the other three are combined to comprehensively Accurately judge whether the overall displacement of the monitored object occurs, and then further calculate whether the displacement acceleration increases after analysis, and finally use the overall displacement and displacement acceleration as the key factor for the prediction of the upcoming disaster;
结合地质灾害体的物理、化学场发生变化,如地声监测、放射性元素(氡气、汞气)测量等相对于位移变形具有超前性的参数,进行模型运算分析;Combined with changes in the physical and chemical fields of geological hazards, such as geoacoustic monitoring, measurement of radioactive elements (radon, mercury) and other parameters that are advanced relative to displacement and deformation, model calculation analysis is carried out;
对气象监测、地下水动态监测、地震监测、人类工程活动监测等,地质灾害诱发因素作为预测预报的依据之一;For meteorological monitoring, groundwater dynamic monitoring, earthquake monitoring, human engineering activity monitoring, etc., geological disaster inducing factors are used as one of the basis for forecasting;
软件运行参数应依据当地地质条件的差别而不同设置;将灾害预报分成预备级、预警级、前期预报级、灾害预报四级;The operating parameters of the software should be set differently according to the differences in local geological conditions; the disaster forecast is divided into four levels: preparation level, early warning level, early forecast level, and disaster forecast level;
每套装置自行构成独立的灾害监测预报系统,既利用GPRS通信功能保持与远方控制监测指挥中心的联系,也在本地配置的灾害报警单元上及时显示当前的灾害等级和预防措施,就地一体化地完成监测、分析、预报功能。Each set of devices constitutes an independent disaster monitoring and forecasting system by itself. It not only uses the GPRS communication function to maintain contact with the remote control monitoring command center, but also displays the current disaster level and preventive measures in time on the locally configured disaster alarm unit, which is integrated on the spot. Complete monitoring, analysis, and forecasting functions.
四级灾害预报为:当发现位移,无其它外界因素干扰,处于预备级;开始伴随降雨量出现或地下含水量升高,处于次级;伴随振动、声纳的出现,处于前期地质灾害预报级;振动、声纳加大,化学气体超常并位移加速提高发出地质灾害预报;反之各种现象逐步消失,降低预报等级;智能地质灾害综合监测分级预报系统,将地质灾害的预测由偏重于定性分析,全面拓展向综合、多参数定量判断后作出分级预报过渡。The four-level disaster forecast is as follows: when displacement is found and there is no interference from other external factors, it is at the preparatory level; when it begins to accompany the occurrence of rainfall or the increase of underground water content, it is at the secondary level; with the emergence of vibration and sonar, it is at the preliminary level of geological disaster forecasting ; Vibration, sonar increase, chemical gas is abnormal and displacement acceleration increases to issue a geological disaster forecast; otherwise, various phenomena gradually disappear, and the forecast level is reduced; the intelligent geological disaster comprehensive monitoring and grading forecast system shifts the geological disaster prediction from focusing on qualitative analysis , comprehensively expand to comprehensive, multi-parameter quantitative judgment and make a transition to graded forecasting.
单多点无线测斜仪定时测量并地面无线发射斜坡深部变形信息于系统接收分析单元,用于斜坡早期变形破坏方式、深度、范围的监测,是本系统最主要的监测单元之一;成像与测距灾害监测单元的成像方式采用激光扫描器配合多点定点非接触式激光测距仪,三者结合起来综合准确判断被监视的物体是否整体出现位移,分析后再进一步计算位移加速度是否增大,根据整体位移及位移加速度最后作为灾害即将发生预报的关键因素。The single-multipoint wireless inclinometer regularly measures and wirelessly transmits the deep deformation information of the slope to the system receiving and analyzing unit, which is used to monitor the early deformation and damage mode, depth and range of the slope. It is one of the most important monitoring units of the system; imaging and The imaging method of the ranging disaster monitoring unit adopts a laser scanner and a multi-point fixed-point non-contact laser rangefinder. The combination of the three can comprehensively and accurately judge whether the monitored object is displaced as a whole, and then further calculate whether the displacement acceleration increases after analysis. , according to the overall displacement and displacement acceleration as the key factors in the prediction of the imminent disaster.
灾害报警单元由红、黄两色高光信号灯和一块LED大屏幕构成;在公路旁设置本装置时,多级灾害预报按不同等级直接以红、黄交通信号灯发出光报警,同时在大屏幕上采用文字形式紧急提示,强化报警效果;在居民集中点设置本装置时,改为红色报警闪光信号灯,并增设警报声响。The disaster alarm unit is composed of red and yellow high-gloss signal lights and a large LED screen; when the device is installed next to the highway, the multi-level disaster forecast will directly issue light alarms with red and yellow traffic lights according to different levels, and at the same time use Emergency reminder in text form to strengthen the alarm effect; when the device is installed at the concentration point of residents, it will be changed to a red alarm flashing signal light and an alarm sound will be added.
本发明智能型地质灾害综合监测系统为一种按需可组合、拆卸的,适合于野外安装的全新开发的常规智能地质灾害综合监测装置,可对山体滑坡或泥石流、洪水等形成的地质灾害进行全天候、无人化实时动态监视及预报分析的高技术仪器。其安装组合完成后为一杆状物,牢固立于需监测地质物体的对面,可监测远距离的灾害体。The intelligent geological disaster comprehensive monitoring system of the present invention is a newly developed conventional intelligent geological disaster comprehensive monitoring device that can be combined and disassembled on demand and is suitable for field installation, and can monitor geological disasters caused by landslides, debris flows, floods, etc It is a high-tech instrument for all-weather, unmanned real-time dynamic monitoring and forecast analysis. After the installation and combination are completed, it becomes a rod-shaped object, which stands firmly on the opposite side of the geological object to be monitored, and can monitor long-distance disaster objects.
本发明多级预报分析方法以地质灾害体直接变形位移为主要监测预报依据,结合地质灾害体的物理、化学场发生变化,如地声监测、放射性元素(氡气、汞气)测量等相对于位移变形具有超前性的参数,进行模型运算分析。对气象监测、地下水动态监测、地震监测、人类工程活动监测等地质灾害诱发因素作为预测预报的依据之一。就地一体化地完成监测、分析、预报功能。The multi-level forecast analysis method of the present invention takes the direct deformation and displacement of the geological disaster body as the main monitoring and forecasting basis, combined with the physical and chemical field changes of the geological disaster body, such as geoacoustic monitoring, radioactive element (radon, mercury gas) measurement, etc. Displacement and deformation have advanced parameters, and model operation analysis is carried out. Meteorological monitoring, groundwater dynamic monitoring, earthquake monitoring, human engineering activity monitoring and other geological disaster-inducing factors are used as one of the basis for prediction and forecasting. Complete the functions of monitoring, analysis and forecast in an integrated manner on the spot.
对灾害体定时连续激光扫描得到监测区域内图像,经过移动物体监测、完整性检查、位置和方位监测等一系列图像分析后,客观反映物体不同时间段有无运动及运动状态趋势的成像分析技术为地质灾害监测开辟了一条新途径。考虑到自然状态下成像技术可能受到多种外界因素的影响,如刮风、动物闯入等,同时还增设多点定点激光测距仪,对选定物体进行精确测距,距离的变动量结合成像变化分析再发出定量报警,不仅有效克服两者各自受到的外界偶发因素的干扰,提高综合报警的可信性;而且监测有面有点相互配合,扩充了监测范围,也提高了预报的准确性。Timed continuous laser scanning of the disaster body to obtain images in the monitoring area, after a series of image analysis such as moving object monitoring, integrity inspection, position and orientation monitoring, it is an imaging analysis technology that objectively reflects whether the object has motion and motion state trends in different time periods It opens up a new way for geological disaster monitoring. Considering that the imaging technology in the natural state may be affected by various external factors, such as wind, animal intrusion, etc., a multi-point fixed-point laser rangefinder is also added to measure the distance of the selected object accurately. Quantitative alarms are issued after imaging change analysis, which not only effectively overcomes the interference of the two external accidental factors respectively, but also improves the credibility of the comprehensive alarm; moreover, the monitoring has some mutual cooperation, which expands the monitoring range and improves the accuracy of the forecast. .
本发明通过智能型地质灾害综合监测系统,为综合监测地质灾害提供一种全新的基础平台,通过不断的完善和更新,可持续寻求综合智能地质灾害监测模式。将本装置安装在地质灾害将要发生的区域,能显著的提高灾害预测的准确性,尤其适用于人员不便到达的高危地区和夜晚、极端气候状况等特殊条件。力求将地质灾害带来的破坏损失降到最低。The present invention provides a brand-new basic platform for comprehensive monitoring of geological disasters through an intelligent geological disaster comprehensive monitoring system, and continuously seeks a comprehensive intelligent geological disaster monitoring mode through continuous improvement and updating. Installing this device in areas where geological disasters are about to occur can significantly improve the accuracy of disaster predictions, and is especially suitable for special conditions such as high-risk areas where people are inconvenient to reach, nights, and extreme weather conditions. Strive to minimize the damage caused by geological disasters.
灾害报警直接前移到现场,由红、黄两色信号灯和一块LED大屏幕构成。多级灾害预报按不同等级直接以红、黄信号灯发出声光报警,同时在大屏幕上采用文字形式紧急提示,强化报警效果。The disaster alarm is directly moved forward to the scene, which consists of red and yellow signal lights and a large LED screen. The multi-level disaster forecast will directly issue sound and light alarms with red and yellow signal lights according to different levels, and at the same time, emergency prompts in text form will be used on the large screen to strengthen the alarm effect.
随着科技的进步,其它特殊需求单元可后续开发叠加,同时某单元设备性能的改进也能较方便地替换。With the advancement of science and technology, other units with special needs can be developed and superimposed, and at the same time, the improvement of the performance of a certain unit can also be replaced more conveniently.
特别适用于长期、定点地需要监测预防地质灾害发生的地方,如极端事件衍生次生地质灾害发生区域内居民生活寄居点、公路边坡、露天矿山采掘边坡、重要的工业生产厂房区、水利水电工程等。It is especially suitable for places where long-term and fixed-point monitoring and prevention of geological disasters are required, such as residential living quarters, road slopes, open-pit mining slopes, important industrial production plant areas, water conservancy areas, etc. Hydropower engineering, etc.
本装置制作时留有一定的可扩展空间。同时,由于装置的可拆卸性,针对不同类型的地质灾害,还可以灵活组合,节省成本。A certain expandable space is left when the device is manufactured. At the same time, due to the detachability of the device, it can be flexibly combined for different types of geological disasters to save costs.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009100581969A CN101477207B (en) | 2009-01-20 | 2009-01-20 | An Intelligent Geological Disaster Comprehensive Monitoring System and Multi-level Forecasting and Analysis Method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009100581969A CN101477207B (en) | 2009-01-20 | 2009-01-20 | An Intelligent Geological Disaster Comprehensive Monitoring System and Multi-level Forecasting and Analysis Method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101477207A CN101477207A (en) | 2009-07-08 |
| CN101477207B true CN101477207B (en) | 2011-04-27 |
Family
ID=40837952
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009100581969A Expired - Fee Related CN101477207B (en) | 2009-01-20 | 2009-01-20 | An Intelligent Geological Disaster Comprehensive Monitoring System and Multi-level Forecasting and Analysis Method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101477207B (en) |
Families Citing this family (61)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102005104B (en) * | 2009-09-02 | 2013-05-01 | 吴立新 | Remote and rapid monitoring and alarming device and method for displacement and gesture of sliding mass |
| KR101004024B1 (en) * | 2009-12-29 | 2010-12-31 | 한국지질자원연구원 | Non-contact rockfall detection method using optical sensor |
| CA2786303C (en) * | 2010-01-19 | 2015-01-06 | Swiss Reinsurance Company Ltd. | Method and system for automated location dependent natural disaster forecast |
| US8391563B2 (en) * | 2010-05-25 | 2013-03-05 | Sony Corporation | Using computer video camera to detect earthquake |
| CN102314747A (en) * | 2010-07-02 | 2012-01-11 | 鸿富锦精密工业(深圳)有限公司 | Disaster monitoring system and monitoring method |
| CN101916504B (en) * | 2010-07-16 | 2012-11-14 | 天津市国土资源和房屋管理局 | Distributed tandem earth-layer fine temperature measurement and wire transmission and acquisition system |
| US8624730B2 (en) * | 2010-11-09 | 2014-01-07 | Landis+Gyr Innovations, Inc. | Systems for detecting, collecting, communicating, and using information about environmental conditions and occurrences |
| CN102122423B (en) * | 2011-01-18 | 2012-09-05 | 中国地质调查局水文地质环境地质调查中心 | Mud-rock flow monitoring, analyzing and early-warning device |
| CN102280007A (en) * | 2011-01-25 | 2011-12-14 | 交通运输部公路科学研究院 | Net type collapse disaster monitoring and prewarning system |
| CN102156294A (en) * | 2011-03-31 | 2011-08-17 | 北京大学深圳研究生院 | Method for monitoring earthquake by utilizing high-rise buildings |
| CN102288985A (en) * | 2011-05-05 | 2011-12-21 | 深圳思量微系统有限公司 | Crustal stress sensing unit structure for imminent earthquake monitoring of earthquake |
| CN102288984A (en) * | 2011-05-05 | 2011-12-21 | 深圳思量微系统有限公司 | Earthquake sound sensing unit structure for imminent earthquake monitoring of earthquake |
| CN102789674B (en) * | 2011-05-17 | 2014-07-02 | 宝鸡市博远信航电子科技有限责任公司 | Geological disaster networking monitoring pre-warning system |
| CN102354434A (en) * | 2011-11-01 | 2012-02-15 | 贵州大学 | Wireless intelligent monitoring and early-warning method and device for slope geological hazard based on acoustic emission |
| CN102419892A (en) * | 2011-11-21 | 2012-04-18 | 航天科工深圳(集团)有限公司 | Geological disaster monitoring system, geological disaster monitoring terminal and monitoring center |
| CN102945131B (en) * | 2012-09-29 | 2016-05-25 | 华为技术有限公司 | A kind of data transmission method and device based on orientation |
| CN103914949B (en) * | 2013-01-08 | 2016-06-15 | 深圳市宏远电子有限公司 | Natural disaster Multi-function Warning System |
| CN105374166A (en) * | 2014-04-27 | 2016-03-02 | 张臣 | Displacement signal analysis part of road slope support engineering collapse early warning system |
| CN104091414A (en) * | 2014-07-25 | 2014-10-08 | 绵阳彬华科技有限公司 | Landslide real-time monitoring device |
| CN104393945A (en) * | 2014-12-17 | 2015-03-04 | 黑龙江真美广播通讯器材有限公司 | Wind-solar complementary warning broadcast machine capable of monitoring temperature and humidity |
| CN104393944A (en) * | 2014-12-17 | 2015-03-04 | 黑龙江真美广播通讯器材有限公司 | Wind-solar hybrid early-warning broadcasting machine |
| CN104506264A (en) * | 2014-12-17 | 2015-04-08 | 黑龙江真美广播通讯器材有限公司 | Early warning broadcasting machine with skipping function |
| CN104700578A (en) * | 2015-03-26 | 2015-06-10 | 小米科技有限责任公司 | Earthquake monitoring method and device |
| CN104714808B (en) * | 2015-04-03 | 2017-09-19 | 北京航空航天大学 | A virtualized management method for data and computing resources in disaster emergency comprehensive research and judgment |
| CN104933829A (en) * | 2015-05-19 | 2015-09-23 | 重庆大学 | Method for constructing geological disaster prediction and early-warning system |
| CN105159318B (en) * | 2015-09-23 | 2018-01-30 | 郑州大学 | Ecological civilization monitoring device and system |
| CN105676266A (en) * | 2015-12-14 | 2016-06-15 | 丁陶生 | Method and system for earthquake forecasting and prediction |
| CN106932842A (en) * | 2015-12-30 | 2017-07-07 | 核工业北京地质研究院 | A kind of rainfall quantitative information method of real-time based on the full spectral method of gamma |
| CN105894742A (en) * | 2016-06-08 | 2016-08-24 | 重庆地质矿产研究院 | Monitoring and early warning method for observing geological disaster warning and prevention area based on real-time rainfall |
| CN106355538A (en) * | 2016-08-26 | 2017-01-25 | 中国地质科学院探矿工艺研究所 | Collapse prevention and control engineering system |
| CN106442115B (en) * | 2016-09-18 | 2024-02-13 | 中国科学院、水利部成都山地灾害与环境研究所 | Ultrasonic experimental device and control system for rock joints under complex stress |
| CN106652358A (en) * | 2016-12-10 | 2017-05-10 | 厦门恺岚方新能源有限公司 | Laser ranging geological disaster three-grade early warning system |
| WO2018119880A1 (en) * | 2016-12-29 | 2018-07-05 | 柳成荫 | Early warning method and device for rainfall induced landslides based on rainfall and soil moisture |
| CN106683349A (en) * | 2017-02-23 | 2017-05-17 | 深圳凯达通光电科技有限公司 | Comprehensive monitoring system for geological disasters |
| CN106990411A (en) * | 2017-05-24 | 2017-07-28 | 东华理工大学 | Contactless side slope falling and landslide hazards long distance intellectual monitoring early warning system |
| CN107218899A (en) * | 2017-06-02 | 2017-09-29 | 北斗卫星导航科技邢台有限公司 | A kind of deformation high-precision intelligent detection method towards subterranean tunnels such as civil air defense works |
| CN107203001A (en) * | 2017-06-19 | 2017-09-26 | 安徽鼎信科技集团有限公司 | Mine Geological Hazard monitoring system based on Internet of Things |
| CN108124353B (en) * | 2017-12-28 | 2019-06-28 | 河南继元智能科技股份有限公司 | A kind of LED light intelligent illuminating system and method |
| CN108682123B (en) * | 2018-06-01 | 2020-11-03 | 深圳安麦思科技有限公司 | Emergency state alarm system |
| CN108986397A (en) * | 2018-06-14 | 2018-12-11 | 江苏德泽智能电气科技有限公司 | Supply network intelligent early-warning device |
| CN109448325B (en) * | 2018-09-29 | 2020-12-25 | 成都理工大学 | Mud-rock flow refined early warning method based on rainfall in one hour and application |
| CN110130421B (en) * | 2019-06-04 | 2020-12-22 | 上海众材工程检测有限公司 | Foundation pit deformation monitoring method and system |
| CN110344883B (en) * | 2019-07-31 | 2021-01-15 | 江苏建筑职业技术学院 | Coal mine safety monitoring system based on Internet of things |
| CN110824576B (en) * | 2019-11-14 | 2021-07-27 | 山东大学 | Imaging device and method for refined detection of shallow cavity-like disaster sources |
| CN111192423A (en) * | 2019-12-16 | 2020-05-22 | 珠海格力电器股份有限公司 | Nursing method, nursing device, electronic device and storage medium |
| CN111220789A (en) * | 2020-01-21 | 2020-06-02 | 山东大学 | System and method for advanced geological prediction using mercury carried by TBM |
| CN111613018A (en) * | 2020-05-20 | 2020-09-01 | 广东电网有限责任公司 | An online monitoring device for slope slip settlement |
| CN111862536A (en) * | 2020-06-26 | 2020-10-30 | 武汉北斗星度科技有限公司 | Automatic monitoring and early warning system for geological disasters |
| CN111784979A (en) * | 2020-07-14 | 2020-10-16 | 云南大学 | Rainfall step type landslide hazard early warning system |
| CN111982004A (en) * | 2020-09-09 | 2020-11-24 | 中国五冶集团有限公司 | High and steep slope geological disaster monitoring and early warning structure and early warning method |
| CN112700623B (en) * | 2020-12-28 | 2024-12-24 | 中国地质调查局南京地质调查中心(华东地质科技创新中心) | Slope instability warning and forecasting system in front of and behind houses |
| CN112885056B (en) * | 2021-01-11 | 2022-05-27 | 湖南联智科技股份有限公司 | Automatic monitoring alarm device for gravity type underground cavity |
| CN114093129B (en) * | 2021-10-15 | 2023-07-21 | 重庆地质矿产研究院 | Intelligent monitoring and early warning method of mine geological environment based on 5G intelligent communication |
| CN114267157B (en) * | 2021-12-17 | 2023-03-14 | 北京科技大学 | Three-level monitoring and early warning method for monitoring sudden engineering geological disasters based on optical remote sensing |
| CN114495430B (en) * | 2021-12-23 | 2023-04-07 | 北京中关村智连安全科学研究院有限公司 | Earth and rockfill dam safety state early warning method and system |
| CN114333257B (en) * | 2021-12-30 | 2023-05-26 | 中国科学院、水利部成都山地灾害与环境研究所 | Landslide deformation rate critical value determination and landslide early warning method |
| CN114882676B (en) * | 2022-07-12 | 2022-11-01 | 云南华尔贝光电技术有限公司 | Intelligent monitoring and early warning method and system based on intelligent pole under multiple scenes |
| CN115854903A (en) * | 2022-11-29 | 2023-03-28 | 山东省公路桥梁建设集团有限公司 | A high and steep slope safety monitoring and early warning method, system and equipment |
| CN115629189B (en) * | 2022-12-07 | 2023-03-10 | 青岛地质工程勘察院(青岛地质勘查开发局) | Automatic monitoring device for geological disasters |
| CN119783993B (en) * | 2025-03-12 | 2025-06-03 | 建平盛德日新矿业有限公司 | A method for monitoring mine geological environment in the process of green mine management |
| CN120673565B (en) * | 2025-08-21 | 2025-11-11 | 汇智智能科技有限公司 | A method and system for processing natural disaster monitoring information |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6662185B1 (en) * | 1999-10-15 | 2003-12-09 | Dekalb Genetics Corporation | Methods and systems for plant performance analysis |
| CN1548987A (en) * | 2003-05-16 | 2004-11-24 | 远传电信股份有限公司 | Geographic disaster monitoring and alarming system applying communication network |
-
2009
- 2009-01-20 CN CN2009100581969A patent/CN101477207B/en not_active Expired - Fee Related
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6662185B1 (en) * | 1999-10-15 | 2003-12-09 | Dekalb Genetics Corporation | Methods and systems for plant performance analysis |
| CN1548987A (en) * | 2003-05-16 | 2004-11-24 | 远传电信股份有限公司 | Geographic disaster monitoring and alarming system applying communication network |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101477207A (en) | 2009-07-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101477207B (en) | An Intelligent Geological Disaster Comprehensive Monitoring System and Multi-level Forecasting and Analysis Method | |
| CN103743441B (en) | The polynary of a kind of side slope safety is coupling in line monitoring system and method | |
| CN102013150B (en) | System for predicting geologic hazard based on rainfall intensity, moisture content of slope soil and deformation | |
| CN103234519B (en) | Land subsidence monitoring and early warning system based on global position system (GPS) and hydrostatic leveling | |
| CN114252128B (en) | An underground pipe gallery water inflow monitoring and early warning system and method | |
| CN201993108U (en) | On-line intelligent monitoring system of tailing pond | |
| Wang et al. | Development and application of a goaf-safety monitoring system using multi-sensor information fusion | |
| CN105957311A (en) | Adaptive expansion slope stability intelligent monitoring early warning system | |
| CN206768889U (en) | An automated deformation monitoring system for subway foundation pits | |
| CN101787897A (en) | System and method for predicting coal and gas outburst risk of mine in real time | |
| CN211181020U (en) | Geological environment governance monitoring system | |
| CN102509433A (en) | Tailing pond numerical simulation and on-line monitoring integral emergency early-warning system | |
| JP2024155698A (en) | A reservoir area landslide deformation monitoring and early warning method based on sliding zone strain evolution | |
| CN208027544U (en) | Landslide Monitoring and Early Warning System | |
| CN106089304A (en) | A kind of based on stratum construction multifunctional electric control early warning communication system | |
| Wang et al. | Panzhihua airport landslide (Oct. 3rd 2009) and an emergency monitoring and warning system based on the internet of things | |
| CN205582211U (en) | Integration disconnection warning automatic monitoring station | |
| CN109596177A (en) | Railway slope Life cycle on-line monitoring system and method | |
| CN118609319A (en) | A cloud platform for intelligent slope monitoring and early warning based on multi-source data fusion | |
| CN120026919B (en) | Intelligent control system for deep well exploitation equipment | |
| CN103046525A (en) | Facility and method for mechanical stability remote intelligent monitoring and three-dimensional early warning of deep foundation pit | |
| Eberhardt et al. | Improving the interpretation of slope monitoring and early warning data through better understanding of complex deep-seated landslide failure mechanisms | |
| CN201142127Y (en) | A landslide monitoring device | |
| CN201680827U (en) | Digging height online monitoring system for coal mine underground fully-mechanized coal face | |
| CN209102148U (en) | Grid displacement testing system based on ten-axis sensor |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110427 Termination date: 20140120 |