CN101397854A - Enveloping prestressing force fastening type steel tube concrete column and reinforcement method - Google Patents

Enveloping prestressing force fastening type steel tube concrete column and reinforcement method Download PDF

Info

Publication number
CN101397854A
CN101397854A CNA2008103001871A CN200810300187A CN101397854A CN 101397854 A CN101397854 A CN 101397854A CN A2008103001871 A CNA2008103001871 A CN A2008103001871A CN 200810300187 A CN200810300187 A CN 200810300187A CN 101397854 A CN101397854 A CN 101397854A
Authority
CN
China
Prior art keywords
steel
concrete column
reinforced concrete
steel plate
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008103001871A
Other languages
Chinese (zh)
Other versions
CN101397854B (en
Inventor
马克俭
卢亚琴
李华平
覃士杰
董云
魏艳辉
马华
段渝忠
苏丹
覃亮
田子东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd
Guizhou University
Original Assignee
GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd
Guizhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd, Guizhou University filed Critical GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd
Priority to CN2008103001871A priority Critical patent/CN101397854B/en
Publication of CN101397854A publication Critical patent/CN101397854A/en
Application granted granted Critical
Publication of CN101397854B publication Critical patent/CN101397854B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a fastened steel pipe concrete column confined by pre-stress and a reinforcement method thereof. The column is mainly applied to the reinforcement of a monolayer, multilayer or high-rise frame column which exceeds the limit value of the strength, rigidity or axial compression ratio. The basic principle of the invention is as follows: transverse pre-tensioning of a steel plate which is added to the surface of a rectangular or round reinforced concrete column is built up by screwing down a shear high strength bolt and the resultant force thereof acts on the surface of the reinforced concrete column; in accordance with the principle that acting force equals to counter acting force, the surface of the reinforced concrete column generates a counter acting force (positive pressure) towards the inner wall of the steel plate; in such way, friction force, which is corresponding to the positive pressure and is the so-called shear resistant bearing capacity in a project, is generated between the concrete surface and the inner wall of the steel plate, thereby achieving the loaded effect of the current steel pipe concrete column that is manufactured by casting concrete on the prepared steel pipe. Due to the existence of the transverse pre-stress, the mechanical effect of the steel pipe concrete column in the invention is better than the current one.

Description

外包预应力紧固式钢管混凝土柱及加固的方法 Outsourcing Prestressed Fastening Concrete Steel Tube Column and Its Reinforcement Method

技术领域 technical field

本发明涉及一种混凝土柱结构及加固的方法,尤其是一种外包预应力紧固式钢管混凝土柱及加固的方法,属于建筑结构的技术领域。The invention relates to a concrete column structure and a reinforcement method, in particular to an outsourcing prestressed fastening type steel pipe concrete column and a reinforcement method, belonging to the technical field of building structures.

背景技术 Background technique

目前,对于高层建筑的钢管混凝土柱子在制作时,通常先制作钢管,然后往钢管里浇灌混凝土,这种柱子存在的问题是混凝土在高温定形时会发生收缩,使混凝土与钢管存在间隙,难以融为一体。对于现成建筑的加层,为增加柱子的强度、刚度,往往需要对柱子进行加固,目前通常采用在现有的柱子外面包角钢加缀板方式进行加固,这种方法很难保证钢板与原混凝土传递剪力共同工作,而只能考虑钢构架与原混凝土分开承担结构的强度和刚度,其主要原因在于钢板面与混凝土面之间无正压力,即不能传递剪力,无共同工作的基本前提。还有一种就是直接在现有的混凝土柱四周浇注钢筋混凝土,使柱截面增大,若不采用植筋等方法,仍然不能保证两者共同工作,此加固方法俗称“穿棉袄”,不但费工费时,施工难度大,造价也偏高。At present, when making concrete-filled steel pipe columns in high-rise buildings, steel pipes are usually made first, and then concrete is poured into the steel pipes. The problem with this kind of columns is that the concrete will shrink when it is set at high temperature, so that there is a gap between the concrete and the steel pipes, making it difficult to melt. as one. For the addition of floors to existing buildings, in order to increase the strength and rigidity of the columns, it is often necessary to reinforce the columns. At present, it is usually reinforced by wrapping angle steel outside the existing columns and adding panels. This method is difficult to ensure that the steel plate and the original concrete Transmit shear force to work together, but can only consider the strength and stiffness of the steel frame and the original concrete structure separately. The main reason is that there is no positive pressure between the steel plate surface and the concrete surface, that is, the shear force cannot be transmitted, and there is no basic premise for joint work. . Another method is to pour reinforced concrete directly around the existing concrete column to increase the cross section of the column. If no methods such as planting bars are used, the two cannot be guaranteed to work together. Time-consuming, difficult construction, high cost.

发明内容 Contents of the invention

本发明所要解决的技术问题是,提供一种外包预应力紧固式钢管混凝土柱的加固方法,同时提供一种外包预应力紧固式钢管混凝土柱的结构形式。该加固方法及结构可将被加固的混凝土柱与外包钢板通过预应力紧贴为一体,从而共同工作提高混凝土柱的刚度和强度,满足使用需求。The technical problem to be solved by the present invention is to provide a reinforcement method for outsourcing prestressed fastening type concrete-filled steel pipe columns, and at the same time provide a structural form of outsourced prestressed fastening type steel pipe concrete columns. The reinforcement method and structure can make the reinforced concrete column and the outsourcing steel plate close together through prestressing, so as to work together to improve the rigidity and strength of the concrete column and meet the use requirements.

为解决上述技术问题,本发明采用如下技术方案:外包预应力紧固式钢管混凝土柱加固的方法,包括以下步骤:In order to solve the above-mentioned technical problems, the present invention adopts the following technical scheme: the method for reinforcing the outsourcing prestressed fastening type concrete filled steel tube column comprises the following steps:

(1)对原有的钢筋混凝土柱进行检查和修整,将表面打磨、清理平整;(1) Check and repair the original reinforced concrete columns, polish and clean the surface;

(2)在钢筋混凝土柱上钻孔,植入钢筋;植入钢筋的直径为16~25mm,植入深度为160~250mm;(2) Drill holes on the reinforced concrete column and implant steel bars; the diameter of the implanted steel bars is 16-25mm, and the implantation depth is 160-250mm;

(3)在钢筋混凝土柱的表面刷耐高温结构胶,然后在钢筋混凝土柱的表面分段外包已开孔的钢板,钢板孔径大于植筋直径,植筋露出钢板表面20~40mm。(3) Brush high-temperature-resistant structural glue on the surface of the reinforced concrete column, and then cover the surface of the reinforced concrete column with steel plates that have been opened in sections. The hole diameter of the steel plate is larger than the diameter of the planting bar, and the planting bar is exposed to the surface of the steel plate by 20-40mm.

(4)在钢板的螺栓支托架上穿入扭剪型高强螺栓,拧紧高强螺栓,使钢板横向建立预拉力,并利用作用力与反作用力相等原理使高强螺栓与钢板之间产生正压力,从而具有抗剪性能的摩擦力,使钢板紧贴于钢筋混凝土柱表面;(4) Insert torsional shear type high-strength bolts on the bolt support bracket of the steel plate, tighten the high-strength bolts, so that the steel plate can establish a pre-tension force laterally, and use the principle of equal force and reaction force to generate positive pressure between the high-strength bolts and the steel plate, Therefore, it has the friction force of shear resistance, so that the steel plate is close to the surface of the reinforced concrete column;

(5)将钢板的所有接缝采用坡口对焊,使所有钢板连为封闭整体;(5) All the seams of the steel plates are welded by grooves, so that all the steel plates are connected as a closed whole;

(6)分别将植筋头钢筋与钢板围焊焊牢;然后外包高标号并掺防火粉的钢丝网水泥砂浆。(6) Weld and weld the steel bars of the planting bar head and the steel plate firmly; then outsource the steel mesh cement mortar with high grade and mixed with fireproof powder.

外包预应力紧固式钢管混凝土矩形柱。包括矩形的钢筋混凝土柱,在矩形的钢筋混凝土柱每一段的四角外表面包有4块角钢状钢板,在角钢状钢板之间装有与角钢状钢板等高的矩形钢板;在钢筋混凝土柱每一段的每个表面有两条竖直缝,竖直缝之间设有扭剪型高强螺栓支托架,在扭剪型高强螺栓支托架上穿有扭剪型高强螺栓,每一段的角钢状钢板和矩形钢板按钢筋混凝土柱的植筋位置开有孔,并通过该孔挂在矩形钢筋混凝土柱表面,矩形钢板与角钢状钢板之间用扭剪型高强螺栓固定连接为一体。Outsourced prestressed fastening concrete-filled rectangular columns. Including rectangular reinforced concrete columns, there are 4 angle steel-shaped steel plates wrapped around the four corners of each section of the rectangular reinforced concrete columns, and rectangular steel plates with the same height as the angle steel-shaped steel plates are installed between the angle steel-shaped steel plates; each section of the reinforced concrete column There are two vertical seams on each surface, between the vertical seams is a torsional shear type high-strength bolt support bracket, and a torsional shear type high-strength bolt is worn on the torsional shear type high-strength bolt support bracket, and the angle steel shape of each section The steel plate and the rectangular steel plate are provided with holes according to the position of the reinforced concrete column, and are hung on the surface of the rectangular reinforced concrete column through the hole.

所述的角钢状钢板是L形的等肢角钢型截面,矩形钢板为一字型截面。The angle-steel-shaped steel plate is an L-shaped equal-leg angle-steel cross-section, and the rectangular steel plate is a straight cross-section.

在矩形钢板的外表层点焊有钢丝网片,并刷有加防火粉的高标号水泥防火砂浆,其厚度按防火等级确定。The outer layer of the rectangular steel plate is spot-welded with steel wire mesh, and brushed with high-grade cement fireproof mortar with fireproof powder, and its thickness is determined according to the fireproof grade.

外包预应力紧固式钢管混凝土圆柱。包括圆形的钢筋混凝土柱,在圆形的钢筋混凝土柱表面根据柱直径的大小紧贴有4~8块圆弧状截面钢板,圆弧状截面钢板根据柱高分为若干段,在接缝处端部设置有扭剪型高强螺栓支托架,在扭剪型高强螺栓支托架上穿有扭剪型高强螺栓,每一段的圆弧状截面钢板按钢筋混凝土柱的植筋位置开有孔,并通过该孔挂在钢筋混凝土柱表面,圆弧状截面钢板之间通过扭剪型高强螺栓固定连接为一体。Outsourced prestressed fastened steel tube concrete cylinder. Including circular reinforced concrete columns, on the surface of the circular reinforced concrete columns, there are 4 to 8 arc-shaped cross-section steel plates according to the size of the column diameter. The arc-shaped cross-section steel plates are divided into several sections according to the column height. There is a torsional shear type high-strength bolt support bracket at the end, and a torsional shear type high-strength bolt is threaded on the torsional shear type high-strength bolt support bracket. The arc-shaped cross-section steel plate of each section is cut according to the planting position of the reinforced concrete column. hole, and hang on the surface of the reinforced concrete column through the hole, and the arc-shaped cross-section steel plates are fixed and connected as a whole by torsional shear type high-strength bolts.

所述的圆弧状截面钢板是1/4圆弧形或1/8圆弧形截面。The arc-shaped section steel plate is a 1/4 arc-shaped or 1/8 arc-shaped section.

在圆弧状截面钢板的外表层点焊有钢丝网片,并刷有加防火粉的高标号水泥防火砂浆,其厚度按防火等级确定。Steel wire mesh is spot-welded on the outer layer of the arc-shaped steel plate, and it is brushed with high-grade cement fireproof mortar with fireproof powder, and its thickness is determined according to the fireproof level.

与现有技术相比,本发明使用紧固钢板外包在混凝土柱的表面,并采用扭剪型高强度螺栓进行紧固连接,扭剪型高强度螺栓施加预应力的方法为用拧断螺栓梅花头切口处截面来控制预应力数值,这种螺栓施加预应力简单、准确。通过扭剪型高强度螺栓从四周向中间产生挤压力和预紧力,使被加固的混凝土柱表面与外包的紧固钢板紧贴在一起,并产生正压力,通过接触面的抗剪承载力,使两者共同工作,不但加固效果好,施工难度小且省时、省力、造价较低。它的基本原理是使外加于矩形或圆形钢筋混凝土柱表面的紧固钢板,通过扭剪型高强螺栓拧紧后建立横向预拉力,其合力作用于钢筋混凝土柱表面,根据作用力等于反作用力原理,钢筋混凝土柱表面亦对紧固钢板内壁产生反作用力(正压力),从而使混凝土表面与紧固钢板内侧面具有与正压力相应的摩擦力,即工程中的抗剪承载力,达到现行先有钢管再浇注混凝土的钢管混凝土柱的受力效果。由于横向预应力的存在,其力学效果比前者更佳。在外包钢板外侧,利用植筋头和扭剪型高强螺栓支托架作固定点,点焊钢丝网片后,再刷掺有防火粉的耐火砂浆,其厚度按防火等级确定。本发明主要应用于单层、多层与高层框架柱因强度、刚度或轴压比限值超限后的加固补强。Compared with the prior art, the present invention uses fastening steel plates to wrap the surface of the concrete column, and uses high-strength torsional-shear bolts for fastening and connection. The prestressing value is controlled by the section at the head cutout, and the prestressing of this bolt is simple and accurate. The torsional shear type high-strength bolts generate extrusion force and pre-tightening force from the periphery to the middle, so that the surface of the reinforced concrete column and the outer fastening steel plate are closely connected together, and a positive pressure is generated, and the shear load of the contact surface is passed. Force, so that the two work together, not only the reinforcement effect is good, the construction difficulty is small, time-saving, labor-saving, and low cost. Its basic principle is to make the fastening steel plate added to the surface of the rectangular or circular reinforced concrete column, and then establish a transverse pretension force after being tightened by torsional shear type high-strength bolts, and its resultant force acts on the surface of the reinforced concrete column. , the surface of the reinforced concrete column also produces a reaction force (positive pressure) on the inner wall of the fastening steel plate, so that the concrete surface and the inner surface of the fastening steel plate have a friction force corresponding to the positive pressure, that is, the shear bearing capacity in the project, reaching the current advanced Mechanics of CFST columns with recast concrete from steel pipes. Due to the existence of transverse prestress, its mechanical effect is better than the former. On the outer side of the outsourcing steel plate, use the planting head and torsional shear type high-strength bolt bracket as the fixing point. After spot welding the steel wire mesh, brush the refractory mortar mixed with fireproof powder. The thickness is determined according to the fireproof level. The invention is mainly applied to the reinforcement of single-layer, multi-layer and high-rise frame columns after the limit value of strength, stiffness or axial compression ratio exceeds the limit.

附图说明 Description of drawings

图1是本发明外包预应力紧固式钢管混凝土矩形柱的侧面结构示意图;Fig. 1 is the side structure schematic diagram of outsourcing prestressed fastening type concrete filled steel pipe rectangular column of the present invention;

图2是本发明外包预应力紧固式钢管混凝土矩形柱的截面构造示意图;Fig. 2 is the schematic cross-sectional structure schematic diagram of the outsourcing prestressed fastening type concrete filled steel pipe rectangular column of the present invention;

图3是本发明外包预应力紧固式钢管混凝土矩形柱表面作用力(横向预应力)与反作用力(柱对钢板的反作用力)相等形成力的自平衡体系;Fig. 3 is a self-balancing system in which the surface force (transverse prestress) and reaction force (the reaction force of the column to the steel plate) are equal to form a force on the surface of the outsourcing prestressed fastening type concrete filled steel pipe rectangular column of the present invention;

图4是本发明外包预应力紧固式圆形钢管混凝土柱的截面构造示意图;Fig. 4 is a schematic diagram of the cross-sectional structure of the outsourcing prestressed fastening type circular steel pipe concrete column of the present invention;

图5是本发明外包预应力紧固式圆形钢管混凝土柱截面作用力(环向预拉力)与反作用力(柱对钢板径向的反作用力)相等形成力的自平衡体系。Fig. 5 is a self-balancing system in which the section action force (circumferential pretension) and reaction force (the radial reaction force of the column to the steel plate) of the outsourcing prestressed fastening circular steel pipe concrete column section of the present invention are equal to form a force.

具体实施方式 Detailed ways

本发明的实施例1:外包预应力紧固式钢管混凝土矩形柱。如附图1、2所示,首先将矩形的钢筋混凝土柱1外表面进行检查和修整,将表面打磨、清理平整,按设计要求在钢筋混凝土柱1上钻孔、植钢筋;植入的钢筋直径为16~25mm,植入深度为160~250mm,钢筋头露出钢筋混凝土柱1的表面30~40mm,并对植筋位置分别给8块紧固钢板开孔,孔径应大于植筋直径,以利调整钢板位置。8块紧固钢板(钢筋混凝土柱1四角的4块角钢状钢板2和中间的4块矩形钢板3,角钢状钢板2是L形的等肢角钢型截面,矩形钢板3为一字型截面)沿钢筋混凝土柱1的高度方向分若干段,每段1~2m,在每一段的每个表面有两条竖直缝,竖直缝之间设有扭剪型高强螺栓支托架4,在扭剪型高强螺栓支托架4上穿有扭剪型高强螺栓5。分段在钢筋混凝土柱1表面涂刷耐高温结构胶,按植筋位置分别对应挂上8块紧固钢板。将扭剪型高强螺栓支托架4上的扭剪型高强螺栓5拧紧(梅花头剪断即拧紧),使8块紧固钢板横向产生预拉力P(如图3所示),预拉力P的合力P1=2×1.414P=2.828P,由柱四角作用于原钢筋混凝土柱1上,根据作用力等于反作用力原理(如图3所示, P 1 = P 1 ′ ),则

Figure A200810300187D00062
的合力P2=2×2.828P=5.656P反作用于紧固钢板内侧面,亦钢筋混凝土柱1表面与紧固钢板内表面之间产生正压力,这是确保紧固钢板与钢筋混凝土柱1共同工作的剪力(Nv=αRημP)来源,然后将钢板的所有接缝采用坡口对焊,使所有钢板连为封闭整体,分别将植筋头钢筋与钢板围焊焊牢;然后在矩形钢板3的外表层点焊钢丝网片,并刷加防火粉的高标号水泥防火砂浆即可,防火砂浆的厚度按防火等级确定。Embodiment 1 of the present invention: outsourcing prestressed fastening type steel tube concrete rectangular column. As shown in accompanying drawings 1 and 2, at first the outer surface of the rectangular reinforced concrete column 1 is inspected and repaired, the surface is polished, cleaned and leveled, and holes are drilled and steel bars are planted on the reinforced concrete column 1 according to the design requirements; the implanted steel bars The diameter is 16-25mm, the implantation depth is 160-250mm, the steel bar head is exposed to the surface of the reinforced concrete column 1 by 30-40mm, and 8 fastening steel plates are respectively opened for the positions of the planted bars. Adjust the position of the steel plate. 8 fastening steel plates (four angle steel plates 2 at the four corners of the reinforced concrete column 1 and four rectangular steel plates 3 in the middle, the angle steel plates 2 are L-shaped equal-leg angle steel sections, and the rectangular steel plates 3 are straight-shaped cross sections) Along the height direction of the reinforced concrete column 1, it is divided into several sections, each section is 1-2m, and there are two vertical joints on each surface of each section, and torsional shear type high-strength bolt brackets 4 are arranged between the vertical joints. The torsional shear type high strength bolt support bracket 4 is worn with the torsional shear type high strength bolt 5 . Apply high-temperature-resistant structural adhesive to the surface of reinforced concrete column 1 in sections, and hang 8 fastening steel plates corresponding to the positions of the planting bars. Tighten the torsion-shear type high-strength bolts 5 on the torsion-shear type high-strength bolt support bracket 4 (the torx head is cut and tightened), so that the eight fastening steel plates generate a pre-tension force P horizontally (as shown in Figure 3), and the pre-tension force P The resultant force P 1 =2×1.414P=2.828P acts on the original reinforced concrete column 1 from the four corners of the column, according to the principle that the action force is equal to the reaction force (as shown in Figure 3, P 1 = P 1 ′ ),but
Figure A200810300187D00062
The resulting force P 2 =2×2.828P=5.656P reacts on the inner surface of the fastening steel plate, and produces a positive pressure between the surface of the reinforced concrete column 1 and the inner surface of the fastening steel plate, which is to ensure that the fastening steel plate and the reinforced concrete column 1 work together Work shear force (N v = α R ημP) source, and then all the seams of the steel plates are welded by grooves, so that all the steel plates are connected as a closed whole, and the steel bars of the planting head and the steel plates are welded firmly; then The outer layer of the rectangular steel plate 3 is spot-welded with steel wire mesh, and brushed with high-grade cement fireproof mortar with fireproof powder. The thickness of the fireproof mortar is determined according to the fireproof grade.

本发明实施例2:外包预应力紧固式钢管混凝土圆柱。如附图4、5所示,首先将圆形的钢筋混凝土柱1外表面进行检查和修整,将表面打磨、清理平整;按设计要求在钢筋混凝土柱1上钻孔、植钢筋;植入的钢筋直径为16~25mm,植入深度为160~250mm,钢筋头露出钢筋混凝土柱1的表面30~40mm,并对植筋位置分别给4块(D≤800mm)或8块(D>800mm)圆弧状截面钢板6(圆弧状截面的钢板6是1/4圆弧形或1/8圆弧形截面)开孔,孔径应大于植筋直径,以利调整钢板位置。4块或8块圆弧状截面钢板6沿钢筋混凝土柱1的高度方向分若干段,每段1~2m。在钢筋混凝土柱1表面涂耐高温结构胶后,马上分段挂上圆弧状截面钢板6,在扭剪型高强螺栓支托架4上穿有扭剪型高强螺栓5。拧紧扭剪型高强螺栓5,使圆弧状截面钢板6环向产生预拉

Figure A200810300187D0007114712QIETU
,预拉
Figure A200810300187D0007114732QIETU
使圆弧状截面钢板6对钢筋混凝土柱1表面产生预压力,如图5所示,即钢筋混凝土柱1表面与圆弧状截面钢板6之间产生正压应力,从而保证圆弧状截面钢板6与钢筋混凝土柱1表面传递剪应力而共同工作。当扭剪型高强螺栓5达到设计要求的紧固力时,梅花头处被剪断,亦达到紧固产生的横向预拉力,整个圆周长在预拉力作用下对圆形的钢筋混凝土柱1表面产生反作用力,根据作用力等于反作用力原理,则钢筋混凝土柱1表面对圆弧状截面钢板6内侧产生反作用应
Figure A200810300187D0007114810QIETU
,如图5所示,从而形成自平衡结构体系。分段将植筋头钢筋与圆弧状截面钢板6塞焊焊牢,然后将圆弧状截面钢板6的所有接缝采用坡口对焊,使所有圆弧状截面钢板6连为封闭整体,在植筋头和扭剪型高强螺栓支托架4上固定钢丝网片,将掺有防火粉的高标号水泥防火砂浆分层抹上,防火砂浆厚度由结构防火等级确定。Embodiment 2 of the present invention: outsourcing prestressed fastening type steel tube concrete cylinder. As shown in accompanying drawing 4, 5, at first the outer surface of circular reinforced concrete column 1 is checked and repaired, and the surface is polished and cleaned up; drill holes and plant steel bars on reinforced concrete column 1 according to the design requirements; implanted The diameter of the steel bar is 16-25mm, the implantation depth is 160-250mm, the steel bar head is exposed to the surface of the reinforced concrete column 1 by 30-40mm, and 4 pieces (D≤800mm) or 8 pieces (D>800mm) are given for the position of the reinforcement respectively. Arc-shaped cross-section steel plate 6 (the steel plate 6 of arc-shaped cross-section is 1/4 arc-shaped or 1/8 arc-shaped cross-section) is perforated, and the aperture should be greater than the planting bar diameter, in order to adjust the position of the steel plate. 4 or 8 arc-shaped cross-section steel plates 6 are divided into several sections along the height direction of the reinforced concrete column 1, each section is 1-2m. After the surface of the reinforced concrete column 1 is coated with high-temperature-resistant structural glue, the arc-shaped cross-section steel plate 6 is hung up in sections immediately, and the high-strength bolt 5 of the torsional shear type is worn on the support bracket 4 of the high-strength bolt of the torsional shear type. Tighten the high-strength torsional shear bolt 5 to make the arc-shaped cross-section steel plate 6 circumferentially produce pre-tension
Figure A200810300187D0007114712QIETU
, pre-pull
Figure A200810300187D0007114732QIETU
Make the arc-shaped cross-section steel plate 6 generate pre-pressure on the surface of the reinforced concrete column 1, as shown in Figure 5, that is, a positive compressive stress is generated between the surface of the reinforced concrete column 1 and the arc-shaped cross-section steel plate 6, thereby ensuring that the arc-shaped cross-section steel plate 6 and the reinforced concrete column 1 surface to transfer shear stress and work together. When the torsion-shear type high-strength bolt 5 reaches the fastening force required by the design, the plum blossom head is cut off, and the transverse pre-tension force generated by the fastening is also reached. Reaction force, according to the principle that the action force is equal to the reaction force, the surface of the reinforced concrete column 1 reacts to the inner side of the arc-shaped cross-section steel plate 6
Figure A200810300187D0007114810QIETU
, as shown in Figure 5, thus forming a self-balancing structural system. Weld the reinforcing bars of the planting head with the arc-shaped cross-section steel plate 6 in sections, and then weld all the seams of the arc-shaped cross-section steel plate 6 with groove butt welding, so that all the arc-shaped cross-section steel plates 6 are connected as a closed whole, Fix the steel wire mesh sheet on the reinforcement head and the torsional shear type high-strength bolt support bracket 4, and spread the high-grade cement fireproof mortar mixed with fireproof powder layer by layer. The thickness of the fireproof mortar is determined by the fireproof grade of the structure.

Claims (7)

【权利要求1】一种外包预应力紧固式钢管混凝土柱加固的方法,其特征在于,包括以下步骤:[Claim 1] A method for strengthening an outsourced prestressed fastening type concrete filled steel pipe column, characterized in that it comprises the following steps: (1)对原有的钢筋混凝土柱进行检查和修整,将表面打磨、清理平整;(1) Check and repair the original reinforced concrete columns, polish and clean the surface; (2)在钢筋混凝土柱上钻孔,植入钢筋;植入钢筋的直径为16~25mm,植入深度为160~250mm;(2) Drill holes on the reinforced concrete column and implant steel bars; the diameter of the implanted steel bars is 16-25mm, and the implantation depth is 160-250mm; (3)在钢筋混凝土柱的表面刷耐高温结构胶,然后在钢筋混凝土柱的表面分段外包已开孔的钢板,钢板孔径大于植筋直径,植筋露出钢板表面20~40mm;(3) Brush high-temperature-resistant structural glue on the surface of the reinforced concrete column, and then cover the surface of the reinforced concrete column with steel plates that have been opened in sections. The hole diameter of the steel plate is larger than the diameter of the planting bar, and the planting bar is exposed to the surface of the steel plate by 20-40mm; (4)在钢板的螺栓支托架上穿入扭剪型高强螺栓,拧紧扭剪型高强螺栓,使钢板横向建立预拉力,并利用作用力与反作用力相等原理使扭剪型高强螺栓与钢板之间产生正压力,从而具有抗剪性能的摩擦力,使钢板紧贴于钢筋混凝土柱表面;(4) Insert torsion-shear type high-strength bolts on the bolt support bracket of the steel plate, tighten the torsion-shear type high-strength bolts, so that the steel plate can establish a pre-tension force laterally, and use the principle of equal force and reaction force to make the torsion-shear type high-strength bolts and steel plates A positive pressure is generated between them, so that there is a friction force of shear resistance, so that the steel plate is close to the surface of the reinforced concrete column; (5)将钢板的所有接缝采用坡口对焊,使所有钢板连为封闭整体;(5) All the seams of the steel plates are welded by grooves, so that all the steel plates are connected as a closed whole; (6)分别将植筋头钢筋与钢板围焊焊牢;然后外包高标号并掺防火粉的钢丝网水泥砂浆。(6) Weld and weld the steel bars of the planting bar head and the steel plate firmly; then outsource the steel mesh cement mortar with high grade and mixed with fireproof powder. 【权利要求2】一种外包预应力紧固式钢管混凝土矩形柱,包括矩形的钢筋混凝土柱(1),其特征在于:在矩形的钢筋混凝土柱(1)每一段的四角外表面包有4块角钢状钢板(2),在角钢状钢板(2)之间装有与角钢状钢板(2)等高的矩形钢板(3);在钢筋混凝土柱(1)每一段的每个表面有两条竖直缝,竖直缝之间设有扭剪型高强螺栓支托架(4),在扭剪型高强螺栓支托架(4)上穿有扭剪型高强螺栓(5),每一段的角钢状钢板(2)和矩形钢板(3)按钢筋混凝土柱(1)的植筋位置开有孔,并通过该孔挂在矩形钢筋混凝土柱(1)表面,矩形钢板(3)与角钢状钢板(2)之间用扭剪型高强螺栓(5)固定连接为一体。[Claim 2] An outsourcing prestressed fastening concrete-filled steel pipe rectangular column, including a rectangular reinforced concrete column (1), is characterized in that: there are 4 pieces wrapped around the four corners of each section of the rectangular reinforced concrete column (1) Angle-shaped steel plates (2), rectangular steel plates (3) with the same height as the angle-shaped steel plates (2) are installed between the angle-shaped steel plates (2); each surface of each section of the reinforced concrete column (1) has two Vertical seams, torsional shear type high-strength bolt support brackets (4) are arranged between the vertical joints, and torsional shear type high-strength bolts (5) are worn on the torsional shear type high-strength bolt support brackets (4). The angle-steel-shaped steel plate (2) and the rectangular steel plate (3) have holes according to the planting bars of the reinforced concrete column (1), and are hung on the surface of the rectangular reinforced concrete column (1) through the holes, and the rectangular steel plate (3) and the angle-steel-shaped The steel plates (2) are fixed and connected as a whole with torsional shear type high-strength bolts (5). 【权利要求3】根据权利要求2所述的外包预应力紧固式钢管混凝土矩形柱,其特征在于:所述的角钢状钢板(2)为L形的等肢角钢型截面,矩形钢板(3)为一字型截面。[Claim 3] The outsourcing prestressed fastening concrete-filled steel pipe rectangular column according to claim 2 is characterized in that: the angle-steel-shaped steel plate (2) is an L-shaped equal-leg angle-steel section, and the rectangular steel plate (3 ) is a straight section. 【权利要求4】根据权利要求2所述的外包预应力紧固式钢管混凝土矩形柱,其特征在于:在矩形钢板(3)的外表层点焊有钢丝网片,并刷有加防火粉的高标号水泥防火砂浆。[Claim 4] The outsourcing prestressed fastening concrete-filled steel pipe rectangular column according to claim 2 is characterized in that: a steel wire mesh is spot-welded on the outer layer of the rectangular steel plate (3), and it is brushed with fireproof powder. High grade cement fireproof mortar. 【权利要求5】一种外包预应力紧固式钢管混凝土圆柱,包括圆形的钢筋混凝土柱(1),其特征在于:在圆形的钢筋混凝土柱(1)表面根据柱直径的大小紧贴有4~8块圆弧状截面钢板(6),圆弧状截面钢板(6)根据柱高分为若干段,在接缝处端部设置有扭剪型高强螺栓支托架(4),在扭剪型高强螺栓支托架(4)上穿有扭剪型高强螺栓(5),每一段的圆弧状截面钢板(6)按钢筋混凝土柱(1)的植筋位置开有孔,并通过该孔挂在钢筋混凝土柱(1)表面,圆弧状截面钢板(6)之间通过扭剪型高强螺栓(5)固定连接为一体。[Claim 5] An outsourcing prestressed fastening type steel tube concrete cylinder, comprising a circular reinforced concrete column (1), characterized in that: the surface of the circular reinforced concrete column (1) is closely attached to the surface according to the size of the column diameter There are 4 to 8 arc-shaped cross-section steel plates (6), and the arc-shaped cross-section steel plates (6) are divided into several sections according to the height of the column, and torsional shear type high-strength bolt brackets (4) are arranged at the ends of the joints. The torsional shear high-strength bolts (5) are worn on the torsional shear high-strength bolt support bracket (4), and the arc-shaped cross-section steel plate (6) of each section is provided with holes according to the planting bars of the reinforced concrete column (1). And hang on the surface of the reinforced concrete column (1) through the hole, and the arc-shaped cross-section steel plates (6) are fixedly connected as a whole by torsional shear type high-strength bolts (5). 【权利要求6】根据权利要求5所述的外包预应力紧固式钢管混凝土圆柱,其特征在于:所述的圆弧状截面钢板(6)是1/4圆弧形或1/8圆弧形截面。[Claim 6] The outsourcing prestressed fastening concrete-filled steel tube cylinder according to claim 5, characterized in that: the arc-shaped cross-section steel plate (6) is 1/4 arc-shaped or 1/8 arc-shaped shaped section. 【权利要求7】根据权利要求5所述的外包预应力紧固式钢管混凝土圆柱,其特征在于:在圆弧状截面钢板(6)的外表层点焊有钢丝网片,并刷有加防火粉的高标号水泥防火砂浆,其厚度按防火等级确定。[Claim 7] The outsourcing prestressed fastening type concrete filled steel tube cylinder according to claim 5 is characterized in that: a steel wire mesh is spot-welded on the outer layer of the arc-shaped cross-section steel plate (6), and it is brushed with fireproofing The thickness of the high-grade cement fireproof mortar with powder is determined according to the fireproof grade.
CN2008103001871A 2008-01-23 2008-01-23 Enveloping prestressing force fastening type steel tube concrete column and reinforcement method Expired - Fee Related CN101397854B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008103001871A CN101397854B (en) 2008-01-23 2008-01-23 Enveloping prestressing force fastening type steel tube concrete column and reinforcement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008103001871A CN101397854B (en) 2008-01-23 2008-01-23 Enveloping prestressing force fastening type steel tube concrete column and reinforcement method

Publications (2)

Publication Number Publication Date
CN101397854A true CN101397854A (en) 2009-04-01
CN101397854B CN101397854B (en) 2012-01-11

Family

ID=40516674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008103001871A Expired - Fee Related CN101397854B (en) 2008-01-23 2008-01-23 Enveloping prestressing force fastening type steel tube concrete column and reinforcement method

Country Status (1)

Country Link
CN (1) CN101397854B (en)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832035A (en) * 2010-05-15 2010-09-15 朱虹 Construction method for reinforced concrete column
CN101988303A (en) * 2009-08-02 2011-03-23 程义 Concrete structure
CN102155068A (en) * 2011-03-01 2011-08-17 中冶建筑研究总院有限公司 Anchorage device and method for reinforcing silo by using prestressed steel strand
CN101900649B (en) * 2009-12-09 2011-11-16 中国建筑东北设计研究院有限公司 Fastening piece for compressed column test of building structure
CN102268859A (en) * 2011-06-27 2011-12-07 华南理工大学 Method for reinforcing concrete flexural member combining pre-stressing pre-tensioning method and post-tensioning method
CN102635072A (en) * 2012-04-20 2012-08-15 上海颖川加固工程技术有限公司 Steel clamp hoop support system for bridge lift-up
CN102642247A (en) * 2011-02-18 2012-08-22 桑菲斯株式会社 Method of constructing prefabricated steel reinforced concrete (psrc) column using angle steels
CN101748900B (en) * 2009-12-10 2012-11-21 华侨大学 Reinforcement method of reinforced concrete beam column node
CN103215899A (en) * 2013-05-08 2013-07-24 中铁第一勘察设计院集团有限公司 Reinforcement method for pre-stress continuous beam base plate cracks
CN103790391A (en) * 2012-10-30 2014-05-14 贵阳铝镁设计研究院有限公司 Transformation method and structure of built concrete columns
CN104005567A (en) * 2014-05-07 2014-08-27 北京工业大学 Ultra-high-performance concrete reinforced concrete column with fiber reinforced polymers wound around steel pipe
CN104060848A (en) * 2014-07-02 2014-09-24 常州市规划设计院 Reinforced concrete cylinder reinforcing device and reinforcing method
CN104389437A (en) * 2014-11-17 2015-03-04 杭州江润科技有限公司 Construction method for connecting steel pipe concrete column connection structure to reinforced concrete column
CN105484514A (en) * 2015-12-16 2016-04-13 桂林理工大学 Method for strengthening circular reinforced concrete pier column
CN106351464A (en) * 2016-10-21 2017-01-25 湖南工程学院 On-line damage-free reinforcing method for rectangular cross section concrete post by bidirectional prestress angle steel plate
CN107269019A (en) * 2017-07-10 2017-10-20 浙江大学 The device and method of very-high performance fiber concrete prefabricated pipe section hoop constraint reinforced concrete column
CN108756291A (en) * 2018-07-27 2018-11-06 广东华科大建筑技术开发有限公司 A kind of large-tonnage concrete column substitution reinforcement structure and reinforcement means
CN109457993A (en) * 2018-11-16 2019-03-12 中铁二十三局集团第四工程有限公司 A kind of concrete column restoring and fastening method
CN110344373A (en) * 2019-07-29 2019-10-18 中水淮河规划设计研究有限公司 A kind of installation method of plug type rubber dam stainless steel antiwear lining plate
CN111021773A (en) * 2019-12-26 2020-04-17 中北大学 A kind of reinforcement method of concrete frame structure residential building for civil construction
CN112064800A (en) * 2020-09-21 2020-12-11 陕西建科建设特种工程有限公司 Connecting method of net rack sliding support
CN113216677A (en) * 2021-04-08 2021-08-06 河南征信建筑工程有限公司 Simple high-strength structural column reinforcing mechanism and method
CN113567242A (en) * 2021-07-05 2021-10-29 交通运输部公路科学研究所 A method for testing the resistance of reinforced concrete or prestressed concrete beams
CN114278012A (en) * 2021-12-22 2022-04-05 中铁三局集团建筑安装工程有限公司 Large-section concrete column wrapped with stiffened thick plate square tube and construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2701975Y (en) * 2004-07-15 2005-05-25 北京建工一建工程建设有限公司 Diameter variable glass fiber reinforced plastic column template
CN100451276C (en) * 2005-06-30 2009-01-14 贵阳铝镁设计研究院 Method and structure for reinforcing concrete post using angle steel
CN2809064Y (en) * 2005-08-03 2006-08-23 华侨大学 Prestressed steel plate hoop for reinforcement of concrete post with rectangular cross section
CN1978843A (en) * 2005-12-09 2007-06-13 湖南大学 Construction method for reinforcing steel-bar net mortar thin layer
CN100432356C (en) * 2006-05-26 2008-11-12 上海大学 Steel reinforced concrete rectangular column reinforcing method
CN201180376Y (en) * 2008-01-23 2009-01-14 贵州大学 Outsourced prestressed fastening concrete-filled steel pipe concrete rectangular column or column

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101988303A (en) * 2009-08-02 2011-03-23 程义 Concrete structure
CN101900649B (en) * 2009-12-09 2011-11-16 中国建筑东北设计研究院有限公司 Fastening piece for compressed column test of building structure
CN101748900B (en) * 2009-12-10 2012-11-21 华侨大学 Reinforcement method of reinforced concrete beam column node
CN101832035A (en) * 2010-05-15 2010-09-15 朱虹 Construction method for reinforced concrete column
CN102642247A (en) * 2011-02-18 2012-08-22 桑菲斯株式会社 Method of constructing prefabricated steel reinforced concrete (psrc) column using angle steels
CN102155068A (en) * 2011-03-01 2011-08-17 中冶建筑研究总院有限公司 Anchorage device and method for reinforcing silo by using prestressed steel strand
CN102155068B (en) * 2011-03-01 2013-01-02 中冶建筑研究总院有限公司 Anchorage device and method for reinforcing silo by using prestressed steel strand
CN102268859A (en) * 2011-06-27 2011-12-07 华南理工大学 Method for reinforcing concrete flexural member combining pre-stressing pre-tensioning method and post-tensioning method
CN102268859B (en) * 2011-06-27 2013-02-13 华南理工大学 Method for reinforcing concrete flexural member combining pre-stressing pre-tensioning method and post-tensioning method
CN102635072A (en) * 2012-04-20 2012-08-15 上海颖川加固工程技术有限公司 Steel clamp hoop support system for bridge lift-up
CN103790391A (en) * 2012-10-30 2014-05-14 贵阳铝镁设计研究院有限公司 Transformation method and structure of built concrete columns
CN103790391B (en) * 2012-10-30 2017-03-29 贵阳铝镁设计研究院有限公司 The remodeling method and structure of built concrete column
CN103215899A (en) * 2013-05-08 2013-07-24 中铁第一勘察设计院集团有限公司 Reinforcement method for pre-stress continuous beam base plate cracks
CN103215899B (en) * 2013-05-08 2015-09-16 中铁第一勘察设计院集团有限公司 A kind of reinforcement means of prestressed continuous beam Bottom slab breaking
CN104005567A (en) * 2014-05-07 2014-08-27 北京工业大学 Ultra-high-performance concrete reinforced concrete column with fiber reinforced polymers wound around steel pipe
CN104060848A (en) * 2014-07-02 2014-09-24 常州市规划设计院 Reinforced concrete cylinder reinforcing device and reinforcing method
CN104389437A (en) * 2014-11-17 2015-03-04 杭州江润科技有限公司 Construction method for connecting steel pipe concrete column connection structure to reinforced concrete column
CN104389437B (en) * 2014-11-17 2016-06-08 杭州江润科技有限公司 A kind of reinforced column connects the constructional method that steel column connects structure
CN105484514A (en) * 2015-12-16 2016-04-13 桂林理工大学 Method for strengthening circular reinforced concrete pier column
CN106351464B (en) * 2016-10-21 2018-02-23 湖南工程学院 Two dimension prestressing gusset reinforces rectangular section concrete post method without breakage online
CN106351464A (en) * 2016-10-21 2017-01-25 湖南工程学院 On-line damage-free reinforcing method for rectangular cross section concrete post by bidirectional prestress angle steel plate
CN107269019A (en) * 2017-07-10 2017-10-20 浙江大学 The device and method of very-high performance fiber concrete prefabricated pipe section hoop constraint reinforced concrete column
CN108756291A (en) * 2018-07-27 2018-11-06 广东华科大建筑技术开发有限公司 A kind of large-tonnage concrete column substitution reinforcement structure and reinforcement means
CN108756291B (en) * 2018-07-27 2024-04-09 广东华科大建筑技术开发有限公司 Large-tonnage concrete column replacement reinforcement structure and reinforcement method
CN109457993A (en) * 2018-11-16 2019-03-12 中铁二十三局集团第四工程有限公司 A kind of concrete column restoring and fastening method
CN110344373B (en) * 2019-07-29 2024-02-20 中水淮河规划设计研究有限公司 Installation method of stainless steel abrasion-resistant lining plate of plug type rubber dam
CN110344373A (en) * 2019-07-29 2019-10-18 中水淮河规划设计研究有限公司 A kind of installation method of plug type rubber dam stainless steel antiwear lining plate
CN111021773A (en) * 2019-12-26 2020-04-17 中北大学 A kind of reinforcement method of concrete frame structure residential building for civil construction
CN112064800A (en) * 2020-09-21 2020-12-11 陕西建科建设特种工程有限公司 Connecting method of net rack sliding support
CN113216677A (en) * 2021-04-08 2021-08-06 河南征信建筑工程有限公司 Simple high-strength structural column reinforcing mechanism and method
CN113216677B (en) * 2021-04-08 2023-02-10 河南征信建筑工程有限公司 Simple high-strength structural column reinforcing mechanism and method
CN113567242B (en) * 2021-07-05 2022-02-18 交通运输部公路科学研究所 A method for testing the resistance of reinforced concrete or prestressed concrete beams
CN113567242A (en) * 2021-07-05 2021-10-29 交通运输部公路科学研究所 A method for testing the resistance of reinforced concrete or prestressed concrete beams
CN114278012A (en) * 2021-12-22 2022-04-05 中铁三局集团建筑安装工程有限公司 Large-section concrete column wrapped with stiffened thick plate square tube and construction method
CN114278012B (en) * 2021-12-22 2022-12-13 中铁三局集团建筑安装工程有限公司 Large-section concrete column wrapped with stiffened thick plate square tube and construction method

Also Published As

Publication number Publication date
CN101397854B (en) 2012-01-11

Similar Documents

Publication Publication Date Title
CN101397854A (en) Enveloping prestressing force fastening type steel tube concrete column and reinforcement method
CN201180376Y (en) Outsourced prestressed fastening concrete-filled steel pipe concrete rectangular column or column
Li et al. Tensile behaviour of concrete-filled double-skin steel tubular members
CN106400954B (en) A kind of girder steel-Frame Joints of Concrete-Filled Steel Tube based on Damage Coutrol theory
CN110593419B (en) Node structure of assembled type through bolt unequal-altitude beam-square steel tube concrete column and manufacturing method
CN102704698B (en) A kind of full prestressing composite integrated reinforced steel concrete structure
Wang et al. Cyclic behaviour of novel blind bolted joints with different stiffening elements
Ataei et al. Experimental study of flush end plate beam-to-column composite joints with precast slabs and deconstructable bolted shear connectors
KR102075165B1 (en) Concrete filled tubular column and connecting structure of the same and construction method thereof
CN104032839A (en) Connecting structure of frictional type damper assembling type frame joint and constructing method thereof
CN102086677A (en) Prefabricated reinforced concrete beam and connection joint of reinforced concrete column and beam
CN107313540A (en) The anti-buckling assembled combination beam of fire prevention and construction method
Tumialan et al. Field assessment of unreinforced masonry walls strengthened with fiber reinforced polymer laminates
KR101227099B1 (en) Hybrid Column Composed of Centrifugal Concrete Cylinder with Steel Skeleton & Steel Bars
CN111828053A (en) Tunnel support system and construction method of concrete-filled steel tube and shotcrete stiffness composite structure
CN106812229A (en) Combination constraint double steel plate concrete shear force wall and its construction method
CN112267616A (en) Prefabricated steel-encased concrete spliced column and construction process
Vaghani et al. Advanced retrofitting techniques for RC building: a state of an art review
JP5611740B2 (en) Reinforcing method of existing building and stiffener used for the method
CN109610685A (en) Double-steel-plate combined shear wall with externally-wrapped pressure-bearing non-tensioned concrete and embedded damping interlayer
CN200999389Y (en) Joints between CFST Columns and RC Beams
CN204781443U (en) Device for connecting precast shear wall concatenation about being used for
CN103726668B (en) The method of outer subsides Covered with Angles assembling PC framework method ruggedized construction
JP5922993B2 (en) Structure and lining method using multiple fine crack type fiber reinforced cement composites
CN216407050U (en) A reinforcement structure for horizontal joints of assembled concrete towers of wind turbines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120111

Termination date: 20170123