[go: up one dir, main page]

CN101368439B - Self-leveling movable aerial floor and its installation method - Google Patents

Self-leveling movable aerial floor and its installation method Download PDF

Info

Publication number
CN101368439B
CN101368439B CN2008101393958A CN200810139395A CN101368439B CN 101368439 B CN101368439 B CN 101368439B CN 2008101393958 A CN2008101393958 A CN 2008101393958A CN 200810139395 A CN200810139395 A CN 200810139395A CN 101368439 B CN101368439 B CN 101368439B
Authority
CN
China
Prior art keywords
floor
floorboard
flooring base
self
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101393958A
Other languages
Chinese (zh)
Other versions
CN101368439A (en
Inventor
王全良
刘清宝
李建海
战晓静
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINAN DWELLING HOUSE INDUSTRIALIZATION DEVELOPMENT CENTER
Original Assignee
JINAN DWELLING HOUSE INDUSTRIALIZATION DEVELOPMENT CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINAN DWELLING HOUSE INDUSTRIALIZATION DEVELOPMENT CENTER filed Critical JINAN DWELLING HOUSE INDUSTRIALIZATION DEVELOPMENT CENTER
Priority to CN2008101393958A priority Critical patent/CN101368439B/en
Publication of CN101368439A publication Critical patent/CN101368439A/en
Application granted granted Critical
Publication of CN101368439B publication Critical patent/CN101368439B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

The invention provides a self-leveling moveable raised floorboard and an installation method for the self-leveling moveable raised floorboard. The self-leveling moveable raised floorboard comprises afloorboard base layer and a floorboard bracket which is adjustable in height and installed below the floorboard base layer. The floorboard bracket is composed of a nut fixed at the bottom of the floorboard base layer through a self-tapping screw, a threaded rod matched with the nut, and a cushioning mat installed at the bottom of the threaded rod. The installation method for the self-leveling moveable raised floorboard includes the following steps: 1)cleaning up the surface of the concrete floorboard; 2) installing the floorboard base layer; 3) installing bonding buckles; 4) fabricating a floorboard surface layer; and 5)installing the floorboard surface layer. The self- leveling moveable raised floorboard can be installed at the surface of cast-in-place reinforced concrete without levelingand ensures the overall levelness of the floor. Drainage pipes, heavy/low current conduit pipes, heating pipes and natural gas pipelines can be laid under the raised floorboard. The self-leveling moveable raised floorboard realizes commercialization and factory production and saves material, improves quality and reduces cost.

Description

The movable aerial floor of self-leveling and mounting method thereof
(1) technical field
The present invention relates to building material technical field, particularly the movable aerial floor of self-leveling and mounting method thereof.
(2) background technology
Along with the development of Building Trade in China, floor decorative material is various in style, and the art floor is because of its good springiness, and coefficient of thermal conductivity is little, anti-wear performance is good, does not play dirt, and is not aging, easy cleaning has certain insulation, sound insulation effect and has the comfortable advantage of step sense, adopts in a large number in the flooring is decorated.
Existing solid wood or composite floor board are laid way: deck is handled, the brush plain concrete together, 40 thick pea gravel concretens are with smashing with smearing, dry cement sand troweling (can lay section of tubing) is spread on the surface, 20 thick concrete leveling layers, lay rough ground or aluminium alloy joist, lay solid wood or compoiste wood floor surface layer.Above-mentioned floor has the following disadvantages:
1. sound isolation of floor poor performance, upward serious interference downstairs;
2. increase every square metre of deck load more than 200 kilograms, increase cost;
3. operation is various, prolongs the engineering time, can not arbitrarily dismantle after the floor completes;
4. pipe laying can't be changed in concrete pavement, and maintenance is complicated, and expends great amount of manpower, financial resources;
5. the site environment wet trade causes secondary pollution to metope, increases unnecessary operation;
(3) summary of the invention
One of the object of the invention provided a kind of cost low, be easy to change, contain adjustable for height floor stand, surface line need not pre-buried self-leveling movable aerial floor
Another object of the present invention has provided the mounting method of above-mentioned self-leveling movable aerial floor, this method simple installation, efficient height.
The present invention realizes by following measure: a kind of movable aerial floor of self-leveling, comprise flooring base and some adjustable for height floor stand that is installed in described flooring base below, described floor stand comprises by self-tapping screw and is fixed on nut, the screw rod that cooperates with it of described flooring base bottom and the damping foot pad of described screw rod bottom is installed.
Movable aerial floor of the present invention is bonded with floor covering on the wherein said flooring base.
Movable aerial floor of the present invention, wherein said flooring base side and bottom surface all are enclosed with fire-proof sound insulation silk floss.
Movable aerial floor of the present invention, wherein said screw tip are provided with can be for the groove of screwdriver contact.
A kind of mounting method of above-mentioned movable aerial floor is characterized in that: may further comprise the steps:
1) surface of cleaning concrete floor face;
2) flooring base is installed:
(1) by standard size Manufacture of Floor basic unit;
(2) on flooring base, get through the hole, nut is installed in the through hole, and be fixed on the flooring base bottom, in factory, after the installation, be transported to the erecting bed with self-tapping screw with appropriate intervals;
(3) with level gauge with the line drawing of designed holder outage degree on wall, guarantee whole room inner control line on same horizontal plane, the height allowable error be ± 3mm;
(4) screw rod is installed on the flooring base of nut, is placed on the cast-in-place coagulation face, adjust screw rod, carry out the height fine setting with screwdriver, levelling, allowable error is ± 1mm;
(5) other flooring base in the room is installed successively, flooring base is answered marshalling, surface cleaning, seam is even, side face is straight, when room-sized did not meet the design modulus, its insufficient section was pieced together benefit according to real size with flooring base cutting back at the scene, is equipped with corresponding screw rod and nut; Do not interspace between flooring base and the metope;
3) thread gluing is installed: thread gluing is bonded on the flooring base with environment-friendly adhesive;
4) floor covering is made: manufacture craft and ground board size by present wood flooring or composite floor board are made floor covering, and are stained with stick in the floor covering bottom with environment-friendly adhesive;
5) floor covering is installed: the bonding of floor covering by thread gluing and stick is installed on the flooring base.
Beneficial effect of the present invention:
1, can utilize the adjustability of raised flooring, need not levelling on the cast-in-situ steel reinforced concrete surface can install, and guarantees the integral level degree on ground;
2, water supply and sewerage pipeline, strong and weak electricity pipeline, hot duct, natural gas line can be laid under raised flooring, make the room neat and artistic.Wherein lay down on the floor of drainage pipe, has realized co-layer draining, and piping shaft can be arranged at public part, reduces indoor influence.
3, together, floor production realization portion productization reduce working procedure, are convenient to assembling with each unit construction on floor; Realized batch production production, economical with materials improves the quality, and reduces cost;
4, installation is oversimplified, and the change and the expansion of disposing for later equipment provide bigger flexibility; As can be the air duct of setting up new-customs-family's formula central air conditioning and install the space is provided, changing for water power heating coil road provides the space, is convenient to maintenance maintenance.
(4) description of drawings
Fig. 1: the floor map of movable aerial floor;
Fig. 2: the installation generalized section of movable aerial floor;
Fig. 3: double-screw bolt enlarged diagram;
Fig. 4: nut schematic perspective view;
Fig. 5: movable aerial floor connection diagram;
Fig. 6: movable aerial floor and body of wall connection diagram;
Fig. 7: the floor map of floor covering;
1, flooring base, 2, screw rod, 3, nut, 4, cast-in-situ concrete face, 5, fire-proof sound insulation silk floss, 6, self-tapping screw, 7, thread gluing, 8, floor covering, 9, metope, 10, rubber sheet gasket, 11, stick, 12 grooves.
(5) specific embodiment
Below in conjunction with the drawings and specific embodiments the present invention is described in further details.A kind of movable aerial floor of self-leveling shown in Fig. 2 .3.4, comprise flooring base 1 and some adjustable for height floor stand that is installed in described flooring base 1 below, described floor stand comprises by self-tapping screw 6 and is fixed on the nut 3 of described flooring base 1 bottom, the screw rod 2 that cooperates with it and the damping foot pad 10 of described screw rod 2 bottoms is installed.
Be bonded with floor covering 8 as described in shown in Fig. 1 .2 on the flooring base 1.
Described as shown in Figure 3 screw rod 2 tops are provided with can be for the groove 12 of screwdriver contact.
Flooring base 1 side and bottom surface all are enclosed with fire-proof sound insulation silk floss 5 as described in shown in Fig. 1 .2.5.6.
Shown in Fig. 1 .2.6.7 a kind of as described in the mounting method of movable aerial floor, may further comprise the steps:
1) surface of cleaning concrete surface;
2) flooring base 1 is installed:
(1) by standard size Manufacture of Floor basic unit 1, recommended standard is of a size of: 600*600,600*1200,600*1800;
(2) being not more than 600 millimeters gets through the hole at interval on flooring base 1, nut 3 is installed in the through hole, and is fixed on flooring base 1 bottom with self-tapping screw 6, after the installation, is transported to the erecting bed in factory;
(2) with level gauge with the line drawing of designed holder outage degree on wall, guarantee whole room inner control line on same horizontal plane, the height allowable error be ± 3mm;
(3) screw rod 2 is equipped with on the flooring base 1 of flange nut 3, is placed on the cast-in-place coagulation face 4, adjust screw rod 2, carry out height and finely tune with screwdriver, levelling, allowable error is ± 1mm;
(4) other flooring base 1 in the room is installed successively, flooring base 1 is answered marshalling, surface cleaning, seam is even, side face is straight, when room-sized does not meet the design modulus, its insufficient section is pieced together benefit according to real size with flooring base 1 cutting back at the scene, is equipped with corresponding screw rod 2 and flange nut 3; Do not interspace between flooring base 1 and the metope;
3) thread gluing is installed: thread gluing 11 is bonded on the flooring base 1 with environment-friendly adhesive;
4) floor covering is made; Manufacture craft and ground board size by existing wood flooring or composite floor board are made floor covering (8), need not to make tenon, groove, are stained with stick 7 in floor covering 8 bottoms with environment-friendly adhesive, all factory normalization production;
5) floor covering is installed: the floor covering material is wooden floor or composite floor board, and floor covering is installed on the flooring base by the bonding of stick 7 with thread gluing 11.
During manufacturing shown in Fig. 3 .4 the adjustable for height floor stand of Manufacture of Floor at first: it comprises nut 3, screw rod 2, can be by specialized factory's standardized production, it is M8 that the flange nut specification is made in screw rod 2, nut suggestion, screw rod 2 suggestion length are 22cm.
Press Manufacture of Floor basic unit as shown in Figure 1 then: making material, color, size can be determined as required, carry out factory normalization production.It is 22mm that thickness is adopted in suggestion, be of a size of the sandwich slab of 600 * 600mm, 600 * 1200mm, 600 * 1800mm, four jiaos on floor, spacing are got through the hole less than 600mm, and bore hole size is as the criterion with the flange nut that floor stand can be installed, and flooring base is wrapped up in fire-proof sound insulation silk floss 5 three bread.
Press Manufacture of Floor surface layer as shown in Figure 7 at last: the floor covering bottom is stained with stick with environment-friendly adhesive, all factory normalization productions.Floor covering, stick making material, color, size can be determined as required, carry out factory normalization production.

Claims (3)

1. the mounting method of a movable aerial floor, described movable aerial floor comprises flooring base (1) and some adjustable for height floor stand that is installed in described flooring base (1) below, described floor stand comprises by self-tapping screw (6) and is fixed on the nut (3) of described flooring base (1) bottom, the screw rod (2) that cooperates with it and is installed in damping foot pad (10) bottom the described screw rod (2), be bonded with floor covering (8) on the described flooring base (1), it is characterized in that may further comprise the steps:
1) surface of cleaning concrete floor face;
2) flooring base is installed:
(1) by standard size Manufacture of Floor basic unit (1);
(2) upward get through the hole at flooring base (1), nut (3) is installed in the through hole, and be fixed on flooring base (1) bottom, in factory, after the installation, be transported to the erecting bed with self-tapping screw (6) with appropriate intervals;
(3) with level gauge with the line drawing of designed holder outage degree on wall, guarantee whole room inner control line on same horizontal plane, the height allowable error be ± 3mm;
(4) screw rod (2) is installed on the flooring base (1) of nut (3), is placed on the cast-in-situ concrete face, adjust screw rod (2), carry out the height fine setting with screwdriver, levelling, allowable error is ± 1mm;
(5) other flooring base (1) in the room is installed successively, flooring base (1) is answered marshalling, surface cleaning, seam is even, side face is straight, when room-sized does not meet the design modulus, its insufficient section is pieced together benefit according to real size with flooring base (1) cutting back at the scene, is equipped with corresponding screw rod (2) and nut (3); Do not interspace between flooring base (1) and the metope;
3) thread gluing (11) is installed: thread gluing (11) is bonded on the flooring base (1) with environment-friendly adhesive;
4) floor covering is made: manufacture craft and ground board size by present wood flooring or composite floor board are made floor covering (8), and upward are stained with stick (7) with environment-friendly adhesive at floor covering (8);
5) floor covering is installed: floor covering (8) is installed on the flooring base by the bonding of thread gluing (11) with stick (7).
2. according to the mounting method of the described movable aerial floor of claim 1, it is characterized in that: described flooring base (1) side and bottom surface all are enclosed with fire-proof sound insulation silk floss (5).
3. according to the mounting method of claim 1 or 2 described movable aerial floors, it is characterized in that: described screw rod (2) top is provided with can be for the groove of screwdriver contact.
CN2008101393958A 2008-09-05 2008-09-05 Self-leveling movable aerial floor and its installation method Expired - Fee Related CN101368439B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101393958A CN101368439B (en) 2008-09-05 2008-09-05 Self-leveling movable aerial floor and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101393958A CN101368439B (en) 2008-09-05 2008-09-05 Self-leveling movable aerial floor and its installation method

Publications (2)

Publication Number Publication Date
CN101368439A CN101368439A (en) 2009-02-18
CN101368439B true CN101368439B (en) 2010-06-02

Family

ID=40412428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101393958A Expired - Fee Related CN101368439B (en) 2008-09-05 2008-09-05 Self-leveling movable aerial floor and its installation method

Country Status (1)

Country Link
CN (1) CN101368439B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032925B (en) * 2014-06-30 2016-07-06 龙信建设集团有限公司 CSI house wall ground Stilt layer construction method
CN105113734A (en) * 2015-09-22 2015-12-02 黄坤坤 Construction method for CSI residential wall and ground empty spaces
CN106812284B (en) * 2016-07-29 2022-09-13 上海市建筑装饰工程集团有限公司 Stone terrace overhead preassembling structure
CN108316606A (en) * 2017-12-30 2018-07-24 浙江亚厦装饰股份有限公司 A kind of ground overhead system and its installation method
CN108104417A (en) * 2017-12-30 2018-06-01 浙江亚厦装饰股份有限公司 Base's leveling component and leveling method
CN109235829A (en) * 2018-11-16 2019-01-18 五冶集团上海有限公司 The installation method of overhead movable block-shaped floor and its application
CN111622453A (en) * 2020-03-03 2020-09-04 朗诗集团股份有限公司 Floor surface layer structure of underground air supply and installation method thereof
CN111550008A (en) * 2020-04-23 2020-08-18 上海市建筑装饰工程集团有限公司 Keel-free high-adaptability raised floor structure and construction method
CN115030441A (en) * 2022-06-21 2022-09-09 浙江亚厦装饰股份有限公司 Clamping type overhead leveling structure and mounting method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1213034A (en) * 1997-09-30 1999-04-07 有限会社泰成电机工业 Structural component carriage, double floor component and construction method of double floor using the same
CN2908658Y (en) * 2006-05-19 2007-06-06 程林鹏 Floor board keel device of sound-proofing
CN201007069Y (en) * 2007-02-01 2008-01-16 傅晓乐 Infrared electric heating overhead heating floor board and its combined floor
CN201258575Y (en) * 2008-09-05 2009-06-17 济南市住宅产业化发展中心 Self-leveling moveable overhead floor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1213034A (en) * 1997-09-30 1999-04-07 有限会社泰成电机工业 Structural component carriage, double floor component and construction method of double floor using the same
CN2908658Y (en) * 2006-05-19 2007-06-06 程林鹏 Floor board keel device of sound-proofing
CN201007069Y (en) * 2007-02-01 2008-01-16 傅晓乐 Infrared electric heating overhead heating floor board and its combined floor
CN201258575Y (en) * 2008-09-05 2009-06-17 济南市住宅产业化发展中心 Self-leveling moveable overhead floor

Also Published As

Publication number Publication date
CN101368439A (en) 2009-02-18

Similar Documents

Publication Publication Date Title
CN101368439B (en) Self-leveling movable aerial floor and its installation method
CN201258575Y (en) Self-leveling moveable overhead floor
CN109707133B (en) Assembled individual floor ground sound insulation and heat preservation system and implementation method thereof
CN212836496U (en) Height-adjustable floor support structure
CN110409756B (en) Low-cost floor thermal insulation and sound insulation system and installation method thereof
CN209145326U (en) A prefabricated ground structure for the renovation of an old city bungalow
CN113789933A (en) Ground installation method for overhead building
CN101509312A (en) False floor tile and floor system composed of same
CN205296694U (en) Underfloor heating system is maked somebody a mere figurehead to SI system dry -type
CN112878622A (en) Fabricated overhead heat-insulating and sound-insulating brick system and construction method
CN115807519B (en) Detachable assembled ground installation adjusting system and assembling method thereof
CN210767670U (en) Floor heat preservation sound insulation structure with backup pad
CN214575361U (en) Assembled overhead heat-insulating and sound-insulating brick system
CN218911877U (en) Assembled groove type partition wall structure adapting to pipeline separation
CN212613529U (en) Floor surface layer structure of underground air supply
CN212613528U (en) Floor surface layer structure of underground air supply
CN110607890A (en) Built-in height-adjustable foot cup structure for concrete overhead ground
CN216920996U (en) Assembly type wall body structure based on pipeline separation
CN114319776A (en) Assembly type building floor structure system
CN212836500U (en) Novel bearing leveling plate
CN212957429U (en) Multifunctional integrated assembly type ground system
CN212295472U (en) Assembled built on stilts ground
CN114000676A (en) Built-in wall and ground structure system of prefabricated building
CN211548572U (en) Built-in height-adjustable foot cup structure for concrete overhead ground
CN210530252U (en) Low-cost building ground heat preservation sound insulation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100602

Termination date: 20170905

CF01 Termination of patent right due to non-payment of annual fee