CN101368439B - Self-leveling movable aerial floor and its installation method - Google Patents
Self-leveling movable aerial floor and its installation method Download PDFInfo
- Publication number
- CN101368439B CN101368439B CN2008101393958A CN200810139395A CN101368439B CN 101368439 B CN101368439 B CN 101368439B CN 2008101393958 A CN2008101393958 A CN 2008101393958A CN 200810139395 A CN200810139395 A CN 200810139395A CN 101368439 B CN101368439 B CN 101368439B
- Authority
- CN
- China
- Prior art keywords
- floor
- floorboard
- flooring base
- self
- leveling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000009434 installation Methods 0.000 title claims abstract description 9
- 238000004519 manufacturing process Methods 0.000 claims abstract description 18
- 239000004567 concrete Substances 0.000 claims abstract description 9
- 238000004140 cleaning Methods 0.000 claims abstract description 8
- 238000010079 rubber tapping Methods 0.000 claims abstract description 8
- 238000009408 flooring Methods 0.000 claims description 53
- 238000004026 adhesive bonding Methods 0.000 claims description 10
- 239000000853 adhesive Substances 0.000 claims description 7
- 230000001070 adhesive effect Effects 0.000 claims description 7
- 238000009413 insulation Methods 0.000 claims description 7
- 239000002023 wood Substances 0.000 claims description 6
- 241000628997 Flos Species 0.000 claims description 5
- 239000002131 composite material Substances 0.000 claims description 5
- 230000008901 benefit Effects 0.000 claims description 4
- 238000005520 cutting process Methods 0.000 claims description 3
- 238000013016 damping Methods 0.000 claims description 3
- 238000011065 in-situ storage Methods 0.000 claims description 3
- 239000010410 layer Substances 0.000 abstract description 6
- 239000000463 material Substances 0.000 abstract description 6
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 abstract description 4
- 239000002344 surface layer Substances 0.000 abstract description 4
- 238000010438 heat treatment Methods 0.000 abstract description 2
- 239000003345 natural gas Substances 0.000 abstract description 2
- 239000011150 reinforced concrete Substances 0.000 abstract description 2
- 238000010606 normalization Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 235000008429 bread Nutrition 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Floor Finish (AREA)
Abstract
The invention provides a self-leveling moveable raised floorboard and an installation method for the self-leveling moveable raised floorboard. The self-leveling moveable raised floorboard comprises afloorboard base layer and a floorboard bracket which is adjustable in height and installed below the floorboard base layer. The floorboard bracket is composed of a nut fixed at the bottom of the floorboard base layer through a self-tapping screw, a threaded rod matched with the nut, and a cushioning mat installed at the bottom of the threaded rod. The installation method for the self-leveling moveable raised floorboard includes the following steps: 1)cleaning up the surface of the concrete floorboard; 2) installing the floorboard base layer; 3) installing bonding buckles; 4) fabricating a floorboard surface layer; and 5)installing the floorboard surface layer. The self- leveling moveable raised floorboard can be installed at the surface of cast-in-place reinforced concrete without levelingand ensures the overall levelness of the floor. Drainage pipes, heavy/low current conduit pipes, heating pipes and natural gas pipelines can be laid under the raised floorboard. The self-leveling moveable raised floorboard realizes commercialization and factory production and saves material, improves quality and reduces cost.
Description
(1) technical field
The present invention relates to building material technical field, particularly the movable aerial floor of self-leveling and mounting method thereof.
(2) background technology
Along with the development of Building Trade in China, floor decorative material is various in style, and the art floor is because of its good springiness, and coefficient of thermal conductivity is little, anti-wear performance is good, does not play dirt, and is not aging, easy cleaning has certain insulation, sound insulation effect and has the comfortable advantage of step sense, adopts in a large number in the flooring is decorated.
Existing solid wood or composite floor board are laid way: deck is handled, the brush plain concrete together, 40 thick pea gravel concretens are with smashing with smearing, dry cement sand troweling (can lay section of tubing) is spread on the surface, 20 thick concrete leveling layers, lay rough ground or aluminium alloy joist, lay solid wood or compoiste wood floor surface layer.Above-mentioned floor has the following disadvantages:
1. sound isolation of floor poor performance, upward serious interference downstairs;
2. increase every square metre of deck load more than 200 kilograms, increase cost;
3. operation is various, prolongs the engineering time, can not arbitrarily dismantle after the floor completes;
4. pipe laying can't be changed in concrete pavement, and maintenance is complicated, and expends great amount of manpower, financial resources;
5. the site environment wet trade causes secondary pollution to metope, increases unnecessary operation;
(3) summary of the invention
One of the object of the invention provided a kind of cost low, be easy to change, contain adjustable for height floor stand, surface line need not pre-buried self-leveling movable aerial floor
Another object of the present invention has provided the mounting method of above-mentioned self-leveling movable aerial floor, this method simple installation, efficient height.
The present invention realizes by following measure: a kind of movable aerial floor of self-leveling, comprise flooring base and some adjustable for height floor stand that is installed in described flooring base below, described floor stand comprises by self-tapping screw and is fixed on nut, the screw rod that cooperates with it of described flooring base bottom and the damping foot pad of described screw rod bottom is installed.
Movable aerial floor of the present invention is bonded with floor covering on the wherein said flooring base.
Movable aerial floor of the present invention, wherein said flooring base side and bottom surface all are enclosed with fire-proof sound insulation silk floss.
Movable aerial floor of the present invention, wherein said screw tip are provided with can be for the groove of screwdriver contact.
A kind of mounting method of above-mentioned movable aerial floor is characterized in that: may further comprise the steps:
1) surface of cleaning concrete floor face;
2) flooring base is installed:
(1) by standard size Manufacture of Floor basic unit;
(2) on flooring base, get through the hole, nut is installed in the through hole, and be fixed on the flooring base bottom, in factory, after the installation, be transported to the erecting bed with self-tapping screw with appropriate intervals;
(3) with level gauge with the line drawing of designed holder outage degree on wall, guarantee whole room inner control line on same horizontal plane, the height allowable error be ± 3mm;
(4) screw rod is installed on the flooring base of nut, is placed on the cast-in-place coagulation face, adjust screw rod, carry out the height fine setting with screwdriver, levelling, allowable error is ± 1mm;
(5) other flooring base in the room is installed successively, flooring base is answered marshalling, surface cleaning, seam is even, side face is straight, when room-sized did not meet the design modulus, its insufficient section was pieced together benefit according to real size with flooring base cutting back at the scene, is equipped with corresponding screw rod and nut; Do not interspace between flooring base and the metope;
3) thread gluing is installed: thread gluing is bonded on the flooring base with environment-friendly adhesive;
4) floor covering is made: manufacture craft and ground board size by present wood flooring or composite floor board are made floor covering, and are stained with stick in the floor covering bottom with environment-friendly adhesive;
5) floor covering is installed: the bonding of floor covering by thread gluing and stick is installed on the flooring base.
Beneficial effect of the present invention:
1, can utilize the adjustability of raised flooring, need not levelling on the cast-in-situ steel reinforced concrete surface can install, and guarantees the integral level degree on ground;
2, water supply and sewerage pipeline, strong and weak electricity pipeline, hot duct, natural gas line can be laid under raised flooring, make the room neat and artistic.Wherein lay down on the floor of drainage pipe, has realized co-layer draining, and piping shaft can be arranged at public part, reduces indoor influence.
3, together, floor production realization portion productization reduce working procedure, are convenient to assembling with each unit construction on floor; Realized batch production production, economical with materials improves the quality, and reduces cost;
4, installation is oversimplified, and the change and the expansion of disposing for later equipment provide bigger flexibility; As can be the air duct of setting up new-customs-family's formula central air conditioning and install the space is provided, changing for water power heating coil road provides the space, is convenient to maintenance maintenance.
(4) description of drawings
Fig. 1: the floor map of movable aerial floor;
Fig. 2: the installation generalized section of movable aerial floor;
Fig. 3: double-screw bolt enlarged diagram;
Fig. 4: nut schematic perspective view;
Fig. 5: movable aerial floor connection diagram;
Fig. 6: movable aerial floor and body of wall connection diagram;
Fig. 7: the floor map of floor covering;
1, flooring base, 2, screw rod, 3, nut, 4, cast-in-situ concrete face, 5, fire-proof sound insulation silk floss, 6, self-tapping screw, 7, thread gluing, 8, floor covering, 9, metope, 10, rubber sheet gasket, 11, stick, 12 grooves.
(5) specific embodiment
Below in conjunction with the drawings and specific embodiments the present invention is described in further details.A kind of movable aerial floor of self-leveling shown in Fig. 2 .3.4, comprise flooring base 1 and some adjustable for height floor stand that is installed in described flooring base 1 below, described floor stand comprises by self-tapping screw 6 and is fixed on the nut 3 of described flooring base 1 bottom, the screw rod 2 that cooperates with it and the damping foot pad 10 of described screw rod 2 bottoms is installed.
Be bonded with floor covering 8 as described in shown in Fig. 1 .2 on the flooring base 1.
Described as shown in Figure 3 screw rod 2 tops are provided with can be for the groove 12 of screwdriver contact.
Shown in Fig. 1 .2.6.7 a kind of as described in the mounting method of movable aerial floor, may further comprise the steps:
1) surface of cleaning concrete surface;
2) flooring base 1 is installed:
(1) by standard size Manufacture of Floor basic unit 1, recommended standard is of a size of: 600*600,600*1200,600*1800;
(2) being not more than 600 millimeters gets through the hole at interval on flooring base 1, nut 3 is installed in the through hole, and is fixed on flooring base 1 bottom with self-tapping screw 6, after the installation, is transported to the erecting bed in factory;
(2) with level gauge with the line drawing of designed holder outage degree on wall, guarantee whole room inner control line on same horizontal plane, the height allowable error be ± 3mm;
(3) screw rod 2 is equipped with on the flooring base 1 of flange nut 3, is placed on the cast-in-place coagulation face 4, adjust screw rod 2, carry out height and finely tune with screwdriver, levelling, allowable error is ± 1mm;
(4) other flooring base 1 in the room is installed successively, flooring base 1 is answered marshalling, surface cleaning, seam is even, side face is straight, when room-sized does not meet the design modulus, its insufficient section is pieced together benefit according to real size with flooring base 1 cutting back at the scene, is equipped with corresponding screw rod 2 and flange nut 3; Do not interspace between flooring base 1 and the metope;
3) thread gluing is installed: thread gluing 11 is bonded on the flooring base 1 with environment-friendly adhesive;
4) floor covering is made; Manufacture craft and ground board size by existing wood flooring or composite floor board are made floor covering (8), need not to make tenon, groove, are stained with stick 7 in floor covering 8 bottoms with environment-friendly adhesive, all factory normalization production;
5) floor covering is installed: the floor covering material is wooden floor or composite floor board, and floor covering is installed on the flooring base by the bonding of stick 7 with thread gluing 11.
During manufacturing shown in Fig. 3 .4 the adjustable for height floor stand of Manufacture of Floor at first: it comprises nut 3, screw rod 2, can be by specialized factory's standardized production, it is M8 that the flange nut specification is made in screw rod 2, nut suggestion, screw rod 2 suggestion length are 22cm.
Press Manufacture of Floor basic unit as shown in Figure 1 then: making material, color, size can be determined as required, carry out factory normalization production.It is 22mm that thickness is adopted in suggestion, be of a size of the sandwich slab of 600 * 600mm, 600 * 1200mm, 600 * 1800mm, four jiaos on floor, spacing are got through the hole less than 600mm, and bore hole size is as the criterion with the flange nut that floor stand can be installed, and flooring base is wrapped up in fire-proof sound insulation silk floss 5 three bread.
Press Manufacture of Floor surface layer as shown in Figure 7 at last: the floor covering bottom is stained with stick with environment-friendly adhesive, all factory normalization productions.Floor covering, stick making material, color, size can be determined as required, carry out factory normalization production.
Claims (3)
1. the mounting method of a movable aerial floor, described movable aerial floor comprises flooring base (1) and some adjustable for height floor stand that is installed in described flooring base (1) below, described floor stand comprises by self-tapping screw (6) and is fixed on the nut (3) of described flooring base (1) bottom, the screw rod (2) that cooperates with it and is installed in damping foot pad (10) bottom the described screw rod (2), be bonded with floor covering (8) on the described flooring base (1), it is characterized in that may further comprise the steps:
1) surface of cleaning concrete floor face;
2) flooring base is installed:
(1) by standard size Manufacture of Floor basic unit (1);
(2) upward get through the hole at flooring base (1), nut (3) is installed in the through hole, and be fixed on flooring base (1) bottom, in factory, after the installation, be transported to the erecting bed with self-tapping screw (6) with appropriate intervals;
(3) with level gauge with the line drawing of designed holder outage degree on wall, guarantee whole room inner control line on same horizontal plane, the height allowable error be ± 3mm;
(4) screw rod (2) is installed on the flooring base (1) of nut (3), is placed on the cast-in-situ concrete face, adjust screw rod (2), carry out the height fine setting with screwdriver, levelling, allowable error is ± 1mm;
(5) other flooring base (1) in the room is installed successively, flooring base (1) is answered marshalling, surface cleaning, seam is even, side face is straight, when room-sized does not meet the design modulus, its insufficient section is pieced together benefit according to real size with flooring base (1) cutting back at the scene, is equipped with corresponding screw rod (2) and nut (3); Do not interspace between flooring base (1) and the metope;
3) thread gluing (11) is installed: thread gluing (11) is bonded on the flooring base (1) with environment-friendly adhesive;
4) floor covering is made: manufacture craft and ground board size by present wood flooring or composite floor board are made floor covering (8), and upward are stained with stick (7) with environment-friendly adhesive at floor covering (8);
5) floor covering is installed: floor covering (8) is installed on the flooring base by the bonding of thread gluing (11) with stick (7).
2. according to the mounting method of the described movable aerial floor of claim 1, it is characterized in that: described flooring base (1) side and bottom surface all are enclosed with fire-proof sound insulation silk floss (5).
3. according to the mounting method of claim 1 or 2 described movable aerial floors, it is characterized in that: described screw rod (2) top is provided with can be for the groove of screwdriver contact.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101393958A CN101368439B (en) | 2008-09-05 | 2008-09-05 | Self-leveling movable aerial floor and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101393958A CN101368439B (en) | 2008-09-05 | 2008-09-05 | Self-leveling movable aerial floor and its installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101368439A CN101368439A (en) | 2009-02-18 |
CN101368439B true CN101368439B (en) | 2010-06-02 |
Family
ID=40412428
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101393958A Expired - Fee Related CN101368439B (en) | 2008-09-05 | 2008-09-05 | Self-leveling movable aerial floor and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101368439B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032925B (en) * | 2014-06-30 | 2016-07-06 | 龙信建设集团有限公司 | CSI house wall ground Stilt layer construction method |
CN105113734A (en) * | 2015-09-22 | 2015-12-02 | 黄坤坤 | Construction method for CSI residential wall and ground empty spaces |
CN106812284B (en) * | 2016-07-29 | 2022-09-13 | 上海市建筑装饰工程集团有限公司 | Stone terrace overhead preassembling structure |
CN108316606A (en) * | 2017-12-30 | 2018-07-24 | 浙江亚厦装饰股份有限公司 | A kind of ground overhead system and its installation method |
CN108104417A (en) * | 2017-12-30 | 2018-06-01 | 浙江亚厦装饰股份有限公司 | Base's leveling component and leveling method |
CN109235829A (en) * | 2018-11-16 | 2019-01-18 | 五冶集团上海有限公司 | The installation method of overhead movable block-shaped floor and its application |
CN111622453A (en) * | 2020-03-03 | 2020-09-04 | 朗诗集团股份有限公司 | Floor surface layer structure of underground air supply and installation method thereof |
CN111550008A (en) * | 2020-04-23 | 2020-08-18 | 上海市建筑装饰工程集团有限公司 | Keel-free high-adaptability raised floor structure and construction method |
CN115030441A (en) * | 2022-06-21 | 2022-09-09 | 浙江亚厦装饰股份有限公司 | Clamping type overhead leveling structure and mounting method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1213034A (en) * | 1997-09-30 | 1999-04-07 | 有限会社泰成电机工业 | Structural component carriage, double floor component and construction method of double floor using the same |
CN2908658Y (en) * | 2006-05-19 | 2007-06-06 | 程林鹏 | Floor board keel device of sound-proofing |
CN201007069Y (en) * | 2007-02-01 | 2008-01-16 | 傅晓乐 | Infrared electric heating overhead heating floor board and its combined floor |
CN201258575Y (en) * | 2008-09-05 | 2009-06-17 | 济南市住宅产业化发展中心 | Self-leveling moveable overhead floor |
-
2008
- 2008-09-05 CN CN2008101393958A patent/CN101368439B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1213034A (en) * | 1997-09-30 | 1999-04-07 | 有限会社泰成电机工业 | Structural component carriage, double floor component and construction method of double floor using the same |
CN2908658Y (en) * | 2006-05-19 | 2007-06-06 | 程林鹏 | Floor board keel device of sound-proofing |
CN201007069Y (en) * | 2007-02-01 | 2008-01-16 | 傅晓乐 | Infrared electric heating overhead heating floor board and its combined floor |
CN201258575Y (en) * | 2008-09-05 | 2009-06-17 | 济南市住宅产业化发展中心 | Self-leveling moveable overhead floor |
Also Published As
Publication number | Publication date |
---|---|
CN101368439A (en) | 2009-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101368439B (en) | Self-leveling movable aerial floor and its installation method | |
CN201258575Y (en) | Self-leveling moveable overhead floor | |
CN109707133B (en) | Assembled individual floor ground sound insulation and heat preservation system and implementation method thereof | |
CN212836496U (en) | Height-adjustable floor support structure | |
CN110409756B (en) | Low-cost floor thermal insulation and sound insulation system and installation method thereof | |
CN209145326U (en) | A prefabricated ground structure for the renovation of an old city bungalow | |
CN113789933A (en) | Ground installation method for overhead building | |
CN101509312A (en) | False floor tile and floor system composed of same | |
CN205296694U (en) | Underfloor heating system is maked somebody a mere figurehead to SI system dry -type | |
CN112878622A (en) | Fabricated overhead heat-insulating and sound-insulating brick system and construction method | |
CN115807519B (en) | Detachable assembled ground installation adjusting system and assembling method thereof | |
CN210767670U (en) | Floor heat preservation sound insulation structure with backup pad | |
CN214575361U (en) | Assembled overhead heat-insulating and sound-insulating brick system | |
CN218911877U (en) | Assembled groove type partition wall structure adapting to pipeline separation | |
CN212613529U (en) | Floor surface layer structure of underground air supply | |
CN212613528U (en) | Floor surface layer structure of underground air supply | |
CN110607890A (en) | Built-in height-adjustable foot cup structure for concrete overhead ground | |
CN216920996U (en) | Assembly type wall body structure based on pipeline separation | |
CN114319776A (en) | Assembly type building floor structure system | |
CN212836500U (en) | Novel bearing leveling plate | |
CN212957429U (en) | Multifunctional integrated assembly type ground system | |
CN212295472U (en) | Assembled built on stilts ground | |
CN114000676A (en) | Built-in wall and ground structure system of prefabricated building | |
CN211548572U (en) | Built-in height-adjustable foot cup structure for concrete overhead ground | |
CN210530252U (en) | Low-cost building ground heat preservation sound insulation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100602 Termination date: 20170905 |
|