CN101348350A CNA2008101509418A CN200810150941A CN101348350A CN 101348350 A CN101348350 A CN 101348350A CN A2008101509418 A CNA2008101509418 A CN A2008101509418A CN 200810150941 A CN200810150941 A CN 200810150941A CN 101348350 A CN101348350 A CN 101348350A
Authority
CN
China
Prior art keywords
rubber powder
waste rubber
asphalt
parts
composite modified
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101509418A
Other languages
Chinese (zh)
Inventor
商博明
周振支
贾晓放
徐培华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI CHAGNDA BOYUAN HIGHWAY MAINTENANCE TECHNOLOGY Co Ltd
Original Assignee
SHANXI CHAGNDA BOYUAN HIGHWAY MAINTENANCE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI CHAGNDA BOYUAN HIGHWAY MAINTENANCE TECHNOLOGY Co Ltd filed Critical SHANXI CHAGNDA BOYUAN HIGHWAY MAINTENANCE TECHNOLOGY Co Ltd
Priority to CNA2008101509418A priority Critical patent/CN101348350A/en
Publication of CN101348350A publication Critical patent/CN101348350A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Compositions Of Macromolecular Compounds (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention provides a waste rubber powder compound modification asphalt. The asphalt consists of the following components in weight portion: 65 to 95 portions of petroleum asphalt, 5 to 35 portions of rubber powder and 1 to 5 portions of sasobit. The preparation method is as follows: according to the weight ratio, the petroleum asphalt is put in an oven and heated to be melted at a temperature of between 120 and 160 DEG C, the liquid asphalt is put in a shearing machine, the sasobit is added in the asphalt and evenly mixed with the asphalt by stirring, and the waste rubber powder is added, the mixture is heated up to a temperature of between 180 and 220 DEG C and subjected to heat preservation and swelling for 5 to 30 minutes and sheared at a temperature of between 180 and 220 DEG C for 10 to 30 minutes, and put in a storage cylinder for swelling development for 30 to 60 minutes, and the waste rubber powder compound modification asphalt is prepared. The waste rubber powder compound modification asphalt of the invention has the advantages of good comprehensive performance, convenient production, easy control, low production cost, energy conservation and little environmental pollution, and can be applied to the pavement and the curing of an asphalt road.

Description

Waste rubber powder composite modified asphalt and preparation method thereof
Technical field
The invention belongs to the material technology field, be specifically related to contain the composite modified asphalt of waste rubber powder and properties-correcting agent.
Background technology
Bituminous material has good pavement performance as a kind of mineral rubber ramming material, and aboundresources, has obtained widespread use on high grade pavement.But because the asphaltene molecule amount is less, wider distribution, its mechanical property is big to temperature sensitivity, and low temperature easily becomes fragile, and high temperature easily trickles, and elasticity and ageing-resistant performance are also relatively poor.On the other hand, along with socioeconomic continuous development, road Traffic Volume is increasing, and axle for vehicle carries more and more heavier, causes occurring on the road surface early diseases such as rut, crack, hole groove, has had a strong impact on the use properties and the comfortable security of driving on road surface.These factors need its performance is improved all to the bituminous demands for higher performance.
Definition according to China's " asphalt highway construction technique normalizing " (JTG F40-2004), modifying asphalt is meant additives (properties-correcting agent) such as admixture rubber, resin, high molecular polymer, rock asphalt, levigated rubber powder or other materials, and the performance that makes pitch or asphalt is improved and the asphaltic binder made.Properties-correcting agent is meant in pitch or asphalt and adds organic or inorganic material natural or synthetic, melting, is dispersed in the pitch, improves or improve the material of bituminous pavement property.According to the difference of properties-correcting agent, modifying asphalt can be divided into: thermoplastic elastomer class modifying asphalt, as the SBS modifying asphalt; The rubber-like modifying asphalt is as the SBR modifying asphalt; The resene modifying asphalt is as the PE modifying asphalt.
In order to alleviate the pressure of the environment and the energy, walk the road of Sustainable development, the seminar at contriver place comes modifying asphalt with waste and scrap as properties-correcting agent, wherein adopts the research of waste old powder-modified asphalt more, and has obtained remarkable progress.According to the definition of the ASTM D6144-97 of American Society Testing and Materials standard, rubber asphalt is that the rubber powder of content more than 15% (on 180 ℃) under the condition of high temperature reacts the modifying asphalt consolidating material that obtains with molten the expanding of pitch.Rubber powder with asphalt high-temperature thorough mixing state under absorb the pitch light component and molten expanding, form the very high gel-film of asphalt content at particle surface simultaneously.The molten back rubber powder volume that expands reaches the nearly 40% of agglutinate, and the rubber powder particle connects by gel-film, forms the system of the very big semi-solid state external phase of viscosity.Waste rubber powder can improve bituminous crack resistance at low-temperature, ageing resistance effectively, can strengthen the cling property of bituminous pavement, and has the function that reduces noise preferably.
Discover that using rubber powder of waste tire has the good effect of improving to the bituminous crack resistance at low-temperature, and high-temperature behavior is improved DeGrain.In order to improve the bituminous over-all properties, the seminar at contriver place is compound with waste rubber powder and other properties-correcting agent, improves the bituminous high temperature performance.Patent publication No. is the patent of invention of CN1313566C, a kind of waste Crumb rubber modified asphalt and preparation method thereof is disclosed, this method is to be under 150~200 ℃ in temperature, mixing waste tire rubber powder, thermoplastic elastomer and the stablizer of different-grain diameter that will be by 60 mesh sieves join in the basic asphalt by a certain percentage, handle through specific equipments such as high-shear or colloidal mills, be prepared into asphaltic products. with good preservation stability, high temperature performance.Although this waste tire rubber and thermoplastic elastomer (SBS or SBR) compound material can improve the bituminous high temperature performance effectively, but also come with some shortcomings: the one, because waste rubber powder and polymkeric substance are under hot conditions, pitch all had very strong viscosifying action, increased the viscosity of modifying asphalt greatly, production, pumping and the transportation of modifying asphalt caused difficulty; The 2nd, because modifying asphalt viscosity is big,, only be 1%~6% so the addition content of waste rubber powder is limited, unfavorable to the low-temperature performance that reduces production costs, alleviates environmental pressure, increase modifying asphalt; The 3rd, the modification temperature height of polymkeric substance SBS or SBR, time are long, have not only quickened the bituminous degree of aging, and have increased production cost.
Patent publication No. is the patent of invention of CN101104739A, discloses a kind of rubber powder modified asphalt and working method thereof, and this method is proportionally mixed matrix pitch, rubber powder, first linking agent, thinner and second linking agent etc., prepares modifying asphalt.This method is by adding thinner, patent CN1313566C waste rubber powder and the excessive problem of polymer composite modified asphalt viscosity have been solved, but because the material of employing solvent oil, furfural extract oil and the contour aromaticity content of vacuum distillate is as thinner, changed the bituminous component, increase bituminous lightweight oil content, damaged the bituminous high-temperature behavior.
Patent publication No. is the preparation method that CN101200597A discloses a kind of solid refuse composite modified asphalt, this method is mainly with waste Crumb rubber and plastic waste composite modified asphalt, not only increase the bituminous high temperature performance, and reduced product cost, alleviated environmental stress.The technical problem underlying that this method exists: the one, under hot conditions, rubber powder and plastics are joined in the pitch, can increase bituminous viscosity greatly, production, pumping, transportation modified bitumen product have difficulties; The 2nd, rubber powder and plastics are junk all, and there is difficulty in quality control; The 3rd, the production temperature height of product, time are long, and ageing of asphalt is serious.
Among the preparation method of disclosed waste rubber powder composite modified asphalt, additive is more in the above-mentioned patent, as thinner, linking agent etc., causes the too complicated of production technique.
Summary of the invention
Technical problem to be solved by this invention is to overcome the shortcoming that above-mentioned waste rubber powder composite modified asphalt exists, provide a kind of over-all properties good, produce convenient, be easy to control, production cost is low, save energy, the little waste rubber powder composite modified asphalt product of environmental pollution.
The technical scheme that solves the problems of the technologies described above employing is to be made by the following weight parts proportion raw material:
65~95 parts in petroleum pitch
5~35 parts of waste rubber powders
1~5 part of Sha Suobide
Above-mentioned petroleum pitch is a kind of in vacuum residuum, straight-run pitch, oxidized bitumen, the mediation pitch, and petroleum pitch is 70~150 25 ℃ penetration degree, 0.1mm; Waste rubber powder is commercially available various waste rubber powder, is produced by the permanently happy reclaimed rubber in Xi'an Products Co., Ltd, and the Sha Suobide English name is Sasobit, is produced by German SCHUMANN company, and Chongqing San Chang material of construction company limited sells on a commission basis.
Preparing raw material preferred weight part proportioning of the present invention is:
70~90 parts in petroleum pitch
10~30 parts of waste rubber powders
2~4 parts of Sha Suobide
Preparing raw material optimum weight part proportioning of the present invention is:
85 parts in petroleum pitch
15 parts of waste rubber powders
3 parts of Sha Suobide
The fineness of the waste rubber powder in proportioning raw materials of the present invention is 20~80 orders.
Waste rubber powder in proportioning raw materials of the present invention is preferably using rubber powder of waste tire.
The main effect of the waste rubber powder in the proportioning of the present invention is by the lightweight oil content in the high temperature swelling absorption petroleum pitch, the waste rubber powder particle volume expands, in petroleum pitch, form the successive elastomerics, help petroleum pitch opposing low temperature convergent force, increase the crack resistance at low-temperature of petroleum pitch.Sha Suobide is the polyolefins macromolecule modifier, and modulus is higher, and fusing point is 115 ℃, and it mainly acts on is the high-temperature behavior that increases the high-temperature modulus of petroleum pitch and improved petroleum pitch, increases the volume of waste rubber powder.
The preparation method of above-mentioned waste rubber powder composite modified asphalt is as follows:
By above-mentioned weight proportion petroleum pitch is put into baking oven internal heating to 120~160 and ℃ make its fusing, liquid bitumen joins in the shears, Sha Suobide joins in the pitch, mix, add waste rubber powder again, continue to be warming up to 180~220 ℃, insulation swelling 5~30 minutes, sheared 10~30 minutes for 180~220 ℃, put into the hold tank swelling and grew 30~60 minutes, be prepared into waste rubber powder composite modified asphalt.
Contain waste rubber powder in the proportioning raw materials of the present invention, the main raw material of waste rubber powder is a junked tire, solved the problem of environmental pollution of junked tire, contain natural rubber, synthetic rubber and minor amounts of additives in the waste rubber powder, use the bituminous pavement of making of the present invention, improve crack resistance at low-temperature, elastic recovery properties and the cling property on road surface, reduced the noise pollution that vehicle travels.Waste rubber powder composite modified asphalt of the present invention have over-all properties good, produce convenient, be easy to that control, production cost are low, advantage such as save energy, environmental pollution are little, can in the making of asphalt roads and maintenance, promote the use of.
Embodiment
The present invention is described in more detail below in conjunction with embodiment, but the invention is not restricted to these embodiment.
Embodiment 1
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
Straight-run pitch 82.53kg
Waste rubber powder 14.56kg
Sha Suobide 2.91kg
Straight-run pitch is 70~150 (in 0.1mm) 25 ℃ penetration degree; The fineness of using rubber powder of waste tire is 60 orders, is produced by the permanently happy reclaimed rubber in Xi'an Products Co., Ltd.The Sha Suobide English name is Sasobit, is produced by German SCHUMANN company, and Chongqing San Chang material of construction company limited sells on a commission basis, and the waste rubber powder of present embodiment also can adopt waste and old footwear rubber powder.
Its preparation method is as follows:
By above-mentioned weight proportion straight-run pitch is put into baking oven internal heating to 120~160 and ℃ make its fusing, liquid bitumen joins in the shears, Sha Suobide joins in the pitch, mix, add waste rubber powder again, continue to be warming up to 200 ℃, insulation swelling 20 minutes, sheared 20 minutes for 200 ℃, put into the hold tank swelling and grew 40 minutes, be prepared into waste rubber powder composite modified asphalt.
In the raw materials used proportioning of present embodiment, the weight part of each component is:
85 parts of straight-run pitches
15 parts of waste rubber powders
3 parts of Sha Suobide
Embodiment 2
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
Straight-run pitch 91.55kg
Waste rubber powder 7.04kg
Sha Suobide 1.41kg
Straight-run pitch is 70~150 (in 0.1mm) 25 ℃ penetration degree; The fineness of junked tire levigated rubber powder is 20 orders, is produced by the permanently happy reclaimed rubber in Xi'an Products Co., Ltd.The Sha Suobide English name is Sasobit, is produced by German SCHUMANN company, and Chongqing San Chang material of construction company limited sells on a commission basis.。
Its preparation method is as follows:
By above-mentioned weight proportion straight-run pitch is put into baking oven internal heating to 120~160 and ℃ make its fusing, liquid bitumen joins in the shears, Sha Suobide joins in the pitch, mix, add waste rubber powder again, continue to be warming up to 180 ℃, insulation swelling 5 minutes, sheared 30 minutes for 180 ℃, put into the hold tank swelling and grew 30 minutes, be prepared into waste rubber powder composite modified asphalt.
In the raw materials used proportioning of present embodiment, the weight part of each component is:
65 parts of straight-run pitches
5 parts of waste rubber powders
1 part of Sha Suobide
Embodiment 3
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
Straight-run pitch 70.37kg
Waste rubber powder 25.93kg
Sha Suobide 3.70kg
Straight-run pitch is 70~150 (in 0.1mm) 25 ℃ penetration degree; The fineness of using rubber powder of waste tire is 80 orders, is produced by the permanently happy reclaimed rubber in Xi'an Products Co., Ltd.The Sha Suobide English name is Sasobit, is produced by German SCHUMANN company, and Chongqing San Chang material of construction company limited sells on a commission basis.
Its preparation method is as follows:
By above-mentioned weight proportion straight-run pitch is put into baking oven internal heating to 120~160 and ℃ make its fusing, liquid bitumen joins in the shears, Sha Suobide joins in the pitch, mix, add waste rubber powder again, continue to be warming up to 220 ℃, insulation swelling 30 minutes, sheared 10 minutes for 220 ℃, put into the hold tank swelling and grew 60 minutes, be prepared into waste rubber powder composite modified asphalt.
In the raw materials used proportioning of present embodiment, the weight part of each component is:
95 parts of straight-run pitches
35 parts of waste rubber powders
5 parts of Sha Suobide
Embodiment 4
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
Straight-run pitch 61.91kg
Waste rubber powder 33.33kg
Sha Suobide 4.76kg
The penetration degree of straight-run pitch, the fineness of using rubber powder of waste tire are identical with embodiment 1.
Its preparation method is identical with embodiment 1.
In the raw materials used proportioning of present embodiment, the weight part of each component is:
65 parts of straight-run pitches
35 parts of waste rubber powders
5 parts of Sha Suobide
Embodiment 5
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
Straight-run pitch 90.48kg
Waste rubber powder 4.76kg
Sha Suobide 4.76kg
The penetration degree of straight-run pitch, the fineness of using rubber powder of waste tire are identical with embodiment 1.
Its preparation method is identical with embodiment 1.
In the raw materials used proportioning of present embodiment, the weight part of each component is:
95 parts of straight-run pitches
5 parts of waste rubber powders
5 parts of Sha Suobide
Embodiment 6
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
Straight-run pitch 72.52kg
Waste rubber powder 26.72kg
Sha Suobide 0.76kg
The penetration degree of straight-run pitch, the fineness of using rubber powder of waste tire are identical with embodiment 1.
Its preparation method is identical with embodiment 1.
In the raw materials used proportioning of present embodiment, the weight part of each component is:
95 parts of straight-run pitches
35 parts of waste rubber powders
1 part of Sha Suobide
Embodiment 7
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
Straight-run pitch 86.66kg
Waste rubber powder 6.67kg
Sha Suobide 6.67kg
The penetration degree of straight-run pitch, the fineness of using rubber powder of waste tire are identical with embodiment 1.
Its preparation method is identical with embodiment 1.
In the raw materials used proportioning of present embodiment, the weight part of each component is:
65 parts of straight-run pitches
5 parts of waste rubber powders
5 parts of Sha Suobide
Embodiment 8
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
Straight-run pitch 64.36kg
Waste rubber powder 34.65kg
Sha Suobide 0.99kg
The penetration degree of straight-run pitch, the fineness of using rubber powder of waste tire are identical with embodiment 1.
Its preparation method is identical with embodiment 1.
In the raw materials used proportioning of present embodiment, the weight part of each component is:
65 parts of straight-run pitches
35 parts of waste rubber powders
1 part of Sha Suobide
Embodiment 9
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
Straight-run pitch 94.06kg
Waste rubber powder 4.95kg
Sha Suobide 0.99kg
The penetration degree of straight-run pitch, the fineness of using rubber powder of waste tire are identical with embodiment 1.
Its preparation method is identical with embodiment 1.
In the raw materials used proportioning of present embodiment, the weight part of each component is:
95 parts of straight-run pitches
5 parts of waste rubber powders
1 part of Sha Suobide
Embodiment 10
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
In above embodiment 1~9, used straight-run pitch is replaced with vacuum residuum, consumption is identical with straight-run pitch, the penetration degree of vacuum residuum is identical with respective embodiments, the consumption of using rubber powder of waste tire and fineness are identical with respective embodiments, and the consumption of Sha Suobide is identical with respective embodiments.
Its preparation method is identical with respective embodiments.
Embodiment 11
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
In above embodiment 1~9, used straight-run pitch is replaced with oxidized bitumen, consumption is identical with straight-run pitch, the penetration degree of oxidized bitumen is identical with respective embodiments, the consumption of using rubber powder of waste tire and fineness are identical with respective embodiments, and the consumption of Sha Suobide is identical with respective embodiments.
Its preparation method is identical with respective embodiments.
Embodiment 12
To produce waste rubber powder composite modified asphalt 100kg is example, and used raw material and proportioning thereof are as follows:
In above embodiment 1~9, used straight-run pitch is with being in harmonious proportion the pitch replacement, consumption is identical with straight-run pitch, the penetration of bitumens that is in harmonious proportion is identical with respective embodiments, the consumption of using rubber powder of waste tire and fineness are identical with respective embodiments, and the consumption of Sha Suobide is identical with respective embodiments.
Its preparation method is identical with respective embodiments.
For determining products material proportioning of the present invention and best preparation method, the contriver has carried out a large amount of research trials, and various test situation are as follows.
Plant and instrument: testing laboratory's high-speed shearing machine, model are SA II-450, and Shanghai Suo Xiang electromechanical equipment Manufacturing Co., Ltd makes; Penetration test device, model are SYD-2801E, and Shanghai Changji Geological Instrument Co., Ltd. produces; Full-automatic bituminous softening-point test device, model is SYD-280G, Shanghai Changji Geological Instrument Co., Ltd. produces; Pitch expansion test device, model are SYD-4508G, and Shanghai Changji Geological Instrument Co., Ltd. produces; Pitch recovery of elasticity determinator, model are HCR-680, and sea, Henan kerr instrument instruments and meters company limited produces; Multi-functional circulation water bath with thermostatic control, model are HWY-10, and Shanghai Changji Geological Instrument Co., Ltd. produces; Cryogenic thermostat water-bath, model are HWY-1, and Shanghai Changji Geological Instrument Co., Ltd. produces; Universal electric furnace, big Yongxing Instr Ltd. of Beijing section produces.
1, material modified performance impact to petroleum pitch
Test method: 75 parts in petroleum pitch, 20 parts of waste rubber powders (WPE), respectively 5 parts of styrene-butadiene-styrene (SBS), new LDPE (film grade) (LPE), Sha Suobide, petroleum pitch adopts No. 90 petroleum pitch in the East Sea, the waste old powder fineness is 60 orders, produced by Sichuan Lv Yuan Science and Technology Ltd., styrene-butadiene-styrene is produced waste rubber powder by Yanshan Petrochemical company and is produced by plastics company limited of Nantong Hang Seng; New LDPE (film grade), trade name are 2426H, and company limited produces by the trade of Shanghai gold, and the Sha Suobide English name is Sasobit, are produced by German SCHUMANN company, and Chongqing San Chang material of construction company limited sells on a commission basis.By preparation method of the present invention, be prepared into waste rubber powder composite modified asphalt respectively, be designated as WR+SBS, WR+WPE, WR+LPE, WR+sasobit respectively.Every index of the waste rubber powder composite modified asphalt by testing the preparation of different proportionings is selected material modified.
Test method is undertaken by the relevant rules of the ministerial standard JTJ 052-2000 of the Ministry of Communications " highway engineering pitch and asphalt testing regulation ".Test-results sees Table 1.
Table 1 different composite material modification bituminous performance
Test subject Petroleum pitch WR+SBS WR+WPE WR+LPE WR+sasobit
Softening temperature (℃) 45.5 64 58 62 69.5
25 ℃ of pins go into (100g, 5s, 0.1mm) 94 72 74 73 70
5 ℃ of ductilities (cm) 6 12 9 10 13
Elastic restoration ratio (%) 25 78 60 63 84
By table 1 as seen, every performance index of several composite modified asphalts all are better than unmodified bituminous performance.Waste rubber powder+sasobit composite modified asphalt softening temperature is the highest, penetration degree is minimum, illustrate that high-temperature behavior is best, waste rubber powder+sasobit composite modified asphalt ductility, elastic restoration ratio maximum, illustrate that low-temperature performance is best, secondly being waste rubber powder+styrene-butadiene-styrene composite modified asphalt, is material modified so the present invention selects waste rubber powder+sasobit.
2, determine best proportioning test of the present invention
In order to determine the best proportioning of the present invention, the contriver is a variable with petroleum pitch, waste rubber powder, Sha Suobide, has designed orthogonal test, and test design sees Table 2.
Table 2 proportioning orthogonal test 1 design table of the present invention
The parameter level Petroleum pitch Waste rubber powder Sha Suobide
Level 1 65 5 1
Level 2 80 20 3
Level 3 95 35 5
Be prepared into different composite modified asphalts by preparation method of the present invention, petroleum pitch adopts No. 90 pitches in the East Sea, and waste rubber powder adopts using rubber powder of waste tire, and fineness is 60 orders.Test method is undertaken by the relevant rules of the ministerial standard JTJ052-2000 of the Ministry of Communications " highway engineering pitch and asphalt testing regulation ", tests softening temperature, penetration degree, ductility and elastic restoration ratio respectively.Test-results sees Table 3.
Table 3 orthogonal test 1 test-results of the present invention
Test Petroleum pitch Waste rubber powder Sha Suobide Softening temperature (℃) 25 ℃ of pins go into (100g, 5s, 0.1mm) 5 ℃ of ductilities (cm) Elastic restoration ratio (%)
1 65 5 1 54.0 83 10 78
2 65 20 3 70.5 75 8 85
3 65 35 5 65.0 72 8 83
4 80 20 3 75.0 66 15 90
5 80 35 5 65.5 69 7 84
6 80 5 1 53.5 80 9 73
7 95 5 5 62.0 68 6 70
8 95 20 1 49.5 70 12 76
9 95 35 3 56.0 74 11 80
By table 3 as seen, test the every better performances of modifying asphalt of 4 correspondences, in order further to determine optimum formula of the present invention, design orthogonal test 2 sees Table 4.Test-results sees Table 5.
Table 4 proportioning orthogonal test 2 design tables of the present invention
The parameter level Petroleum pitch Waste rubber powder Sha Suobide
Level 1 70 10 2
Level 2 85 15 3
Level 3 90 30 4
Table 5 orthogonal test 2 test-results of the present invention
Test Petroleum pitch Waste rubber powder Sha Suobide Softening temperature (℃) 25 ℃ of pins go into (100g, 5s, 0.1mm) 5 ℃ of ductilities (cm) Elastic restoration ratio (%)
1 70 10 2 56.0 80 11 80
2 70 15 3 71.0 77 8 84
3 70 30 4 63.0 75 9 85
4 85 15 3 77.5 68 16 92
5 85 30 4 67.0 67 8 82
6 85 10 2 54.5 78 9 76
7 90 10 4 60.5 66 7 70
8 90 15 2 53.5 72 10 82
9 90 30 3 67.0 74 9 84
As shown in Table 5, under test 4 conditions, promptly the petroleum pitch weight part be 85 parts, waste rubber powder be 15 parts, when Sha Suobide is 3 parts, the every performance of the modifying asphalt of preparation is best.
Can draw from orthogonal test 1 and orthogonal test 2, the weight part proportioning of waste rubber powder composite modified asphalt of the present invention is:
65~95 parts in petroleum pitch
5~35 parts of waste rubber powders
1~5 part of Sha Suobide
Waste rubber powder composite modified asphalt optimum weight part proportioning of the present invention:
85 parts in petroleum pitch
15 parts of waste rubber powders
3 parts of Sha Suobide
In order to verify beneficial effect of the present invention, the contriver has carried out simultaneous test according to the waste rubber powder composite modified asphalt of the embodiment of the invention 1 proportioning preparation and the pavement performance of unmodified petroleum pitch.Various test situation are as follows:
Testing installation: electric oven, model are DGF-4A, are produced by Tianjin Tai Site Instr Ltd.; Mixing apparatus, model are ZJB-20C, by modern mental faculties in quescent slate arrow observation and control technology Research Institute test; The rut test piece shaper, model QCX-4 is by modern mental faculties in quescent slate arrow observation and control technology Research Institute; The wheel tracking test instrument, model QCZ-2 is by modern mental faculties in quescent slate arrow observation and control technology Research Institute; The test specimen cutting facility; CMT5504 micro computer control electronic universal tester, model is CMT5504, is developed by the Shenzhen Sans Material Detection Co., Ltd; The automatic compaction test apparatus of marshal piece, model DZG-3 is developed by Xian Highway Inst.; The Marshall stability test instrument, model AMS-C is developed by Xian Highway Inst..
Test mainly comprises high-temperature stability, low-temperature cracking-resistance and the water stability testing of asphalt, and the thimble test of asphalt adopts wheel tracking test, and the test parameter index is the dynamic stability of asphalt; The low-temperature performance of asphalt adopts low-temperature bending test, and the test parameter index is breaking strain; The water stability testing of asphalt adopts immersion Marshall Test and freeze thawing split test, and the test parameter index is residual stability and retained strength ratio.Test method is undertaken by the relevant rules of the ministerial standard JTJ 052-2000 of the Ministry of Communications " highway engineering pitch and asphalt testing regulation ".Test-results detects the related request of index by the logical ministerial standard JTG F40-2004 of portion " asphalt highway construction technique normalizing " of traffic.Test-results sees Table 6.
Table 6 waste rubber powder composite modified asphalt proof test of the present invention result
By table 6 as seen, dynamic stability, breaking strain, residual stability and the retained strength of the asphalt of waste rubber powder composite modified asphalt of the present invention preparation is than all than the excellent performance of the asphalt of unmodified petroleum pitch preparation, satisfy the related request of the logical ministerial standard JTG F40-2004 of portion " asphalt highway construction technique normalizing " of traffic, illustrate that product of the present invention has good pavement performance.

Claims (7)

1, a kind of waste rubber powder composite modified asphalt is characterized in that it is to be made by the following weight parts proportion raw material:
65~95 parts in petroleum pitch
5~35 parts of waste rubber powders
1~5 part of Sha Suobide
Above-mentioned petroleum pitch is a kind of in vacuum residuum, straight-run pitch, oxidized bitumen, the mediation pitch, and petroleum pitch is 70~150 25 ℃ penetration degree, 0.1mm.
2,, it is characterized in that wherein making by following raw material and weight part proportioning thereof according to the described waste rubber powder composite modified asphalt of claim 1:
70~90 parts in petroleum pitch
10~30 parts of waste rubber powders
2~4 parts of Sha Suobide.
3,, it is characterized in that wherein making by following raw material and weight part proportioning thereof according to the described waste rubber powder composite modified asphalt of claim 1:
85 parts in petroleum pitch
15 parts of waste rubber powders
3 parts of Sha Suobide.
4, according to claim 1 or 2 or 3 described waste rubber powder composite modified asphalts, it is characterized in that: the fineness of said waste rubber powder is 20~80 orders.
5, according to claim 1 or 2 or 3 described waste rubber powder composite modified asphalts, it is characterized in that: said waste rubber powder is a using rubber powder of waste tire.
6, according to the described waste rubber powder composite modified asphalt of claim 4, it is characterized in that: said waste rubber powder is a using rubber powder of waste tire.
7, a kind of preparation method of claim 1 waste rubber powder composite modified asphalt is characterized in that the step of this method is as follows:
By above-mentioned weight proportion petroleum pitch is put into baking oven internal heating to 120~160 and ℃ make its fusing, liquid bitumen joins in the shears, Sha Suobide joins in the pitch, mix, add waste rubber powder again, continue to be warming up to 180~220 ℃, insulation swelling 5~30 minutes, sheared 10~30 minutes for 180~220 ℃, put into the hold tank swelling and grew 30~60 minutes, be prepared into waste rubber powder composite modified asphalt.
CNA2008101509418A 2008-09-12 2008-09-12 Waste rubber powder composite modified asphalt and preparation thereof Pending CN101348350A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101509418A CN101348350A (en) 2008-09-12 2008-09-12 Waste rubber powder composite modified asphalt and preparation thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101509418A CN101348350A (en) 2008-09-12 2008-09-12 Waste rubber powder composite modified asphalt and preparation thereof

Publications (1)

Publication Number Publication Date
CN101348350A true CN101348350A (en) 2009-01-21

Family

ID=40267348

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101509418A Pending CN101348350A (en) 2008-09-12 2008-09-12 Waste rubber powder composite modified asphalt and preparation thereof

Country Status (1)

Country Link
CN (1) CN101348350A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102002246A (en) * 2010-11-26 2011-04-06 重庆交大道路桥技术研究有限公司 Low-viscosity rubber asphalt pavement material and pavement construction method thereof
CN101851426B (en) * 2010-05-13 2012-05-23 重庆中交道桥科技有限公司 High-strength asphalt modifier for cast asphalt concrete and preparation method thereof
CN103468005A (en) * 2013-07-09 2013-12-25 杨林江 Modified low-viscosity rubber asphalt and preparation method thereof
CN106221253A (en) * 2016-08-29 2016-12-14 四川知行路桥集团有限公司 A kind of production technology of waste and old rubber modified asphalt regeneration
CN106497101A (en) * 2016-10-19 2017-03-15 杨人凤 A kind of low-viscosity rubber asphalt
CN106673503A (en) * 2016-12-30 2017-05-17 山东公路技师学院 Composite modified asphalt mixture for steel bridge and preparation method of composite modified asphalt mixture
CN113201226A (en) * 2021-05-25 2021-08-03 山东交通学院 Modified asphalt mixed with waste engine oil residues and waste rubber and preparation method thereof
CN115368746A (en) * 2022-07-13 2022-11-22 广西交建工程检测咨询有限公司 Stable environment-friendly rubber asphalt and preparation method thereof
CN119060553A (en) * 2024-10-30 2024-12-03 南京工业大学 A kind of warm mix modified rubber asphalt and preparation method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101851426B (en) * 2010-05-13 2012-05-23 重庆中交道桥科技有限公司 High-strength asphalt modifier for cast asphalt concrete and preparation method thereof
CN102002246A (en) * 2010-11-26 2011-04-06 重庆交大道路桥技术研究有限公司 Low-viscosity rubber asphalt pavement material and pavement construction method thereof
CN103468005A (en) * 2013-07-09 2013-12-25 杨林江 Modified low-viscosity rubber asphalt and preparation method thereof
CN103468005B (en) * 2013-07-09 2015-09-23 杨林江 A kind of modification low-viscosity rubber asphalt and preparation method thereof
CN106221253A (en) * 2016-08-29 2016-12-14 四川知行路桥集团有限公司 A kind of production technology of waste and old rubber modified asphalt regeneration
CN106497101A (en) * 2016-10-19 2017-03-15 杨人凤 A kind of low-viscosity rubber asphalt
CN106673503A (en) * 2016-12-30 2017-05-17 山东公路技师学院 Composite modified asphalt mixture for steel bridge and preparation method of composite modified asphalt mixture
CN106673503B (en) * 2016-12-30 2018-06-15 长安大学 A kind of Steel Bridge Deck composite modified asphalt mixture and preparation method thereof
CN113201226A (en) * 2021-05-25 2021-08-03 山东交通学院 Modified asphalt mixed with waste engine oil residues and waste rubber and preparation method thereof
CN115368746A (en) * 2022-07-13 2022-11-22 广西交建工程检测咨询有限公司 Stable environment-friendly rubber asphalt and preparation method thereof
CN119060553A (en) * 2024-10-30 2024-12-03 南京工业大学 A kind of warm mix modified rubber asphalt and preparation method thereof

Similar Documents

Publication Publication Date Title
CN101235172B (en) Asphalt pavement rubber plastic composite anti-rut agent and preparation method thereof
CN101348350A (en) Waste rubber powder composite modified asphalt and preparation thereof
CN103819915B (en) A kind of graphene oxide modifying asphalt and preparation method thereof
CN104725883B (en) A kind of high-viscosity high-elasticity asphalt being modified based on rubber particle surface, SMA asphalts and preparation method thereof
CN102786257B (en) Plant-mixed thermally-modified asphalt regenerated mix and preparation method thereof
CN107698199B (en) High-modulus asphalt mixture based on old pavement milling material and preparation method thereof
CN112358223B (en) Warm mix agent, regenerant and preparation method of warm mix recycled asphalt mixture
CN105293996A (en) Warm-mixing recycled asphalt mixture preparation method
CN106242378B (en) Hot in-plant reclaimed asphalt mixture and preparation method thereof
CN103525108A (en) High modulus cold-mixed asphalt as well as preparation method and mixture thereof
CN103468010B (en) A kind of modifying asphalt and preparation method thereof
CN112538274B (en) Low-grade modified asphalt suitable for rigid-flexible composite long-service-life pavement and preparation method thereof
CN105859175A (en) Plant-mixed warm regenerated asphalt mixture of large-proportion RAP material
CN113185847A (en) Environment-friendly economical asphalt composition and application thereof
CN108822563A (en) A kind of Kelamayi pitch dry method modification agent and its application
Zhang et al. Laboratory performance evaluation of a waterborne epoxy-modified asphalt mixture with styrene-butadiene rubber for cold patching applications
CN105948569B (en) A kind of high-modulus modification regeneration asphalt and preparation method and application
CN106032438B (en) Road asphalt modifier and modified road asphalt and its preparation method and asphalt mixture
CN108424661B (en) Composite modified emulsified asphalt with excellent anti-stripping performance and preparation method thereof
CN109320973B (en) Asphalt cement, asphalt mixture and preparation method thereof
CN114656793A (en) PPA (polyphthalamide) -based compounded high-toughness SBS (styrene butadiene styrene) modified asphalt regenerant and preparation method thereof
CN113527899A (en) A kind of pouring modified asphalt and pouring modified asphalt concrete
CN101830669A (en) Method for manufacturing synthetic asphalt for extra heavy traffic
CN101817985A (en) Modified asphalt regeneration agent as well as preparation method and application thereof
Sun et al. Analysis of pavement performance for nano-CaCO3/SBS modified asphalt mixture

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20090121