CN101298765A - 一种新的独柱结构及其安装方法 - Google Patents
一种新的独柱结构及其安装方法 Download PDFInfo
- Publication number
- CN101298765A CN101298765A CNA2007101414930A CN200710141493A CN101298765A CN 101298765 A CN101298765 A CN 101298765A CN A2007101414930 A CNA2007101414930 A CN A2007101414930A CN 200710141493 A CN200710141493 A CN 200710141493A CN 101298765 A CN101298765 A CN 101298765A
- Authority
- CN
- China
- Prior art keywords
- pile
- suction
- new single
- pillar structure
- single pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007101414930A CN101298765B (zh) | 2007-08-27 | 2007-08-27 | 一种新的独柱结构及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007101414930A CN101298765B (zh) | 2007-08-27 | 2007-08-27 | 一种新的独柱结构及其安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101298765A true CN101298765A (zh) | 2008-11-05 |
CN101298765B CN101298765B (zh) | 2010-04-21 |
Family
ID=40078700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2007101414930A Expired - Fee Related CN101298765B (zh) | 2007-08-27 | 2007-08-27 | 一种新的独柱结构及其安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101298765B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101879932B (zh) * | 2009-05-08 | 2013-03-06 | 中国海洋石油总公司 | 大型深水导管架的钢桩接长及装船的方法 |
CN103270239A (zh) * | 2010-10-19 | 2013-08-28 | 霍顿-维森深水公司 | 用于钻探和/或开采的海上塔 |
CN103911978A (zh) * | 2014-03-24 | 2014-07-09 | 广州中国科学院工业技术研究院 | 一种海上预制式平台及其安装方法 |
CN104805817A (zh) * | 2015-01-12 | 2015-07-29 | 烟台中集来福士海洋工程有限公司 | 自升式海洋平台及其潜水泵塔 |
CN107090844A (zh) * | 2017-05-19 | 2017-08-25 | 中交第三航务工程局有限公司 | 海上风电多桩承台复合基础及施工方法 |
CN110541418A (zh) * | 2019-10-17 | 2019-12-06 | 中国石油大学(华东) | 一种自锁嵌套式深水钻井表层导管及其安装方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1016199B (zh) * | 1989-06-03 | 1992-04-08 | 渤海石油公司工程设计公司 | 海底施工用基础导流下沉工艺及其专用基础装置 |
GB2341409B (en) * | 1998-09-08 | 2000-11-01 | John Stephen Baross | Mechanical pipeline span prop with suction anchor foundation |
CN1317160C (zh) * | 2002-02-26 | 2007-05-23 | 天津市海王星海上工程技术有限公司 | 自安装式吸力锚或桩 |
-
2007
- 2007-08-27 CN CN2007101414930A patent/CN101298765B/zh not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101879932B (zh) * | 2009-05-08 | 2013-03-06 | 中国海洋石油总公司 | 大型深水导管架的钢桩接长及装船的方法 |
CN103270239A (zh) * | 2010-10-19 | 2013-08-28 | 霍顿-维森深水公司 | 用于钻探和/或开采的海上塔 |
CN103270239B (zh) * | 2010-10-19 | 2018-01-02 | 霍顿-维森深水公司 | 用于布置和安装海上塔的方法 |
CN103911978A (zh) * | 2014-03-24 | 2014-07-09 | 广州中国科学院工业技术研究院 | 一种海上预制式平台及其安装方法 |
CN103911978B (zh) * | 2014-03-24 | 2016-08-17 | 广州中国科学院工业技术研究院 | 一种海上预制式平台及其安装方法 |
CN104805817A (zh) * | 2015-01-12 | 2015-07-29 | 烟台中集来福士海洋工程有限公司 | 自升式海洋平台及其潜水泵塔 |
CN107090844A (zh) * | 2017-05-19 | 2017-08-25 | 中交第三航务工程局有限公司 | 海上风电多桩承台复合基础及施工方法 |
CN110541418A (zh) * | 2019-10-17 | 2019-12-06 | 中国石油大学(华东) | 一种自锁嵌套式深水钻井表层导管及其安装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101298765B (zh) | 2010-04-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107542101B (zh) | 一种海上四浮筒-浮箱组合式基础结构的施工方法 | |
CN101298765B (zh) | 一种新的独柱结构及其安装方法 | |
CN107630461B (zh) | 一种组合式海上四浮筒浮箱基础结构及其施工方法 | |
CN107653895B (zh) | 一种组合式海上六浮筒浮箱基础结构及其施工方法 | |
CN102383431B (zh) | 中掘预应力离心管桩沉桩装置及其沉桩法 | |
CN111456075A (zh) | 一种桩筒复合桁架式海上风机基础及其施工工艺 | |
CN107806108A (zh) | 一种组合式海上三浮筒浮箱基础结构及其施工方法 | |
CN101255701A (zh) | 一种海上混合式基础 | |
CN113417311A (zh) | 一种海上风电多筒导管架基础施工方法 | |
CN103015455B (zh) | 桥梁桩桶组合基础及其施工方法 | |
CN115233679B (zh) | 一种结构强度高的水下导向架 | |
CN105401577A (zh) | 适用于自升降平台的吸力式桩靴及安装方法 | |
CN113404081A (zh) | 一种利用高频振动装置辅助下沉的吸力桶基础结构及其施工方法 | |
CN109306706B (zh) | 一种主副桶海床贯入装置及其施工方法 | |
CN107630462A (zh) | 一种海上六浮筒‑浮箱组合式基础结构及其施工方法 | |
CN110258571A (zh) | 一种灌注桩沉管压灌施工方法 | |
CN207987950U (zh) | 一种组合式海上四浮筒浮箱基础结构 | |
CN200971492Y (zh) | 一种吸力桩式海底钻井基盘 | |
CN103572770B (zh) | 一种桩箱水工结构物及其建造方法 | |
CN201347191Y (zh) | 一种吸力桩式海底钻井新基盘 | |
CN216739729U (zh) | 一种适用于淤泥作业的自升式平台吸力桩靴装置 | |
CN103031853A (zh) | 海底储油系统 | |
CN202176267U (zh) | 一种新的吸力桩式海底钻井基盘 | |
CN201883448U (zh) | 一种海上混合式基础 | |
CN103556972A (zh) | 一种自安装式海底钻井基盘及其安装方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Novel single pillar structure and mounting method thereof Effective date of registration: 20130724 Granted publication date: 20100421 Pledgee: Bank of Shanghai Limited by Share Ltd. Tianjin branch Pledgor: Tianjin Neptune Offshore Engineering Development Co.,Ltd.|WUDI HAIZHONG FLEXIBLE PIPE MANUFACTURING CO.,LTD. Registration number: 2013990000500 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
C56 | Change in the name or address of the patentee |
Owner name: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD. Free format text: FORMER NAME: HAIWANGXING OCEAN ENGINEERING TECHNOLOGY CO., LTD, TIANJIN CITY |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 300384 Tianjin City, Nankai District Huayuan Industrial Park Road No. 1 Industrial Park E block 6 layer Patentee after: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co.,Ltd. Address before: 300384 Tianjin City, Nankai District Huayuan Industrial Park Road No. 1 Industrial Park E block 6 layer Patentee before: Tianjin Neptune Offshore Engineering Development Co.,Ltd. |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20141119 Granted publication date: 20100421 Pledgee: Bank of Shanghai Limited by Share Ltd. Tianjin branch Pledgor: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co.,Ltd.|WUDI HAIZHONG FLEXIBLE PIPE MANUFACTURING CO.,LTD. Registration number: 2013990000500 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Novel single pillar structure and mounting method thereof Effective date of registration: 20141120 Granted publication date: 20100421 Pledgee: Bank of Shanghai Limited by Share Ltd. Tianjin branch Pledgor: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co.,Ltd. Registration number: 2014990000973 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
PM01 | Change of the registration of the contract for pledge of patent right |
Change date: 20141119 Registration number: 2013990000500 Pledgor after: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co.,Ltd. Pledgor after: WUDI HAIZHONG FLEXIBLE PIPE MANUFACTURING CO.,LTD. Pledgor before: Tianjin Neptune Offshore Engineering Development Co.,Ltd. Pledgor before: WUDI HAIZHONG FLEXIBLE PIPE MANUFACTURING CO.,LTD. |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20160108 Granted publication date: 20100421 Pledgee: Bank of Shanghai Limited by Share Ltd. Tianjin branch Pledgor: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co.,Ltd. Registration number: 2014990000973 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Novel single pillar structure and mounting method thereof Effective date of registration: 20160125 Granted publication date: 20100421 Pledgee: Bank of Shanghai Limited by Share Ltd. Tianjin branch Pledgor: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co.,Ltd. Registration number: 2016120000003 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20170527 Granted publication date: 20100421 Pledgee: Bank of Shanghai Limited by Share Ltd. Tianjin branch Pledgor: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co.,Ltd. Registration number: 2016120000003 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100421 |
|
CF01 | Termination of patent right due to non-payment of annual fee |