一种空间塔柱斜拉开启桥 Download PDFInfo
- Publication number
- CN101298753A CN101298753A CNA2008100119532A CN200810011953A CN101298753A CN 101298753 A CN101298753 A CN 101298753A CN A2008100119532 A CNA2008100119532 A CN A2008100119532A CN 200810011953 A CN200810011953 A CN 200810011953A CN 101298753 A CN101298753 A CN 101298753A
- Authority
- CN
- China
- Prior art keywords
- bridge
- cable
- tower
- space
- stayed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 abstract description 12
- 229910000831 Steel Inorganic materials 0.000 abstract description 11
- 239000010959 steel Substances 0.000 abstract description 11
- 238000000034 method Methods 0.000 abstract description 10
- 238000010586 diagram Methods 0.000 description 2
- 230000009194 climbing Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明属于建筑工程技术领域,特别涉及到桥梁工程中的大跨度开启桥的设计。其特征是:主塔为空间四塔柱结构,顺桥向和横桥向均为倒Y型;采用斜拉桥体系结构,空间双索面。施工过程中,首先施工斜拉桥基础,再施工下塔柱,之后在下塔柱平台上安装转动装置和滑道,再进行斜拉桥上塔柱施工,同时在工厂加工钢箱梁,分段运到桥位,之后安装斜拉索,分段拼装钢箱梁,至合龙段,最后施工桥面铺装等桥面附属设施。本发明的效果和益处是:造型新颖别致,特别是采用空间四塔柱结构,能保持桥梁在转动过程中的稳定性;采用斜拉桥体系结构,可以做成大跨径开启桥,并且提高使用过程中的行车平稳性。
Description
技术领域
本发明属于建筑工程技术领域,涉及到桥梁工程中的桥梁的设计,特别涉及到大跨度开启桥的设计。
背景技术
目前,开启桥的开启方式包括直升式,水平转动开启式,竖向转动开启式和伸缩开启式。在开启桥设计中有以下三种桥型:
一种是钢桁架开启桥,是最常见的开启桥桥型。现在已建成最大跨径的钢桁架开启桥是横跨苏伊士运河的埃及EL FERDAN大桥,主跨340m,单侧开启跨径170m,为水平转动开启方式。但是随着跨度的增加,单纯的桁架结构工程造价增加迅速,根部杆件的轴力过大容易出现失稳而导致全桥倒塌。
另一种是梁桥方案。 目前已建成的此类开启桥最大跨径达到55.8m,直升开启跨径55.8m,位于巴西GUIABA河上,为直升式开启桥。由于为梁式结构,跨度受到限制,所以用的很少。
还有一种是漂浮拱桥方案。目前此类桥型只有一例,是日本的梦舞大桥,主跨280m,开启跨径410m,为水平转动开启式。对于此类桥型,受水位影响较大,桥面标高会发生变化,不利于快速行车。
发明内容
本发明的目的是提供一种大跨度开启桥设计方案,解决开启桥跨度受到限制的问题,并能保证开启过程中的稳定性和使用过程中的行车平稳性。
本发明技术方案是,平转式斜拉开启桥,主塔为空间四塔柱结构,顺桥向和横桥向均为倒Y型。采用斜拉桥体系结构,空间双索面,拉索集中锚固于主塔上端。边跨尾索区范围内主梁设有压重,用以保证平转后结构的平衡。整个结构通过转轴,在圆形滑道上进行旋转。
具体步骤是:
1.施工准备工作;
2.斜拉桥基础,根据不同的地质条件,选择不同的基础型式;
3.下塔柱施工,可以采用爬模施工方法;
4.在下塔柱平台上安装转动装置;
5.斜拉桥上塔柱施工;
6.同时在工厂加工钢箱梁,分段运到桥位;
7.拼装根部钢箱梁段,并施加配重;
8.安装斜拉索,分段拼装钢箱梁,至合龙段;
9.施工桥面铺装等桥面附属设施。
本发明的效果益处是造型新颖别致,特别是采用空间四塔柱结构,能保持桥梁在转动过程中的稳定性;采用斜拉桥体系结构,可以做成大跨径开启桥,并且提高使用过程中的行车平稳性。
附图说明
图1是斜拉开启桥立面示意图。
图2是斜拉开启桥桥塔示意图。
图中:1上塔柱,2主梁,3支座,4转轴,5滑道,6下塔柱,7承台,8基础,9斜拉索,10引桥,11过渡墩,12压重。
具体实施方式
以下结合技术方案和附图,详细叙述本发明的最佳实施例:
基础和下塔柱施工完毕,安装转轴和滑道,再施工上塔柱。安装斜拉索和主梁至合龙,调整全桥索力。
首先施工斜拉桥基础,再施工下塔柱,之后在下塔柱平台上安装转动装置和滑道,再进行斜拉桥上塔柱施工,同时在工厂加工钢箱梁,分段运到桥位,之后安装斜拉索,分段拼装钢箱梁,至合龙段,最后施工桥面铺装等桥面附属设施。
塔柱:塔为空间四塔柱结构,顺桥向和横桥向均为倒Y型,采用实心截面。
主梁截面:采用钢箱梁截面。
材料特性:墩、基础采用C30混凝土;桥塔采用C50混凝土;主梁采用Q345q钢;斜拉索采用挤包护层扭绞型拉索,标准抗拉强度1670Mpa。
荷载等级:公路一I级。
Claims (1)
1.一种空间塔柱斜拉开启桥,其特征是:主塔为空间四塔柱结构,顺桥向和横桥向均为倒Y型;采用斜拉桥体系结构,空间双索面,拉索集中锚固于主塔上端;边跨尾索区范围内主梁设有压重;整个结构通过圆形滑道进行旋转。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100119532A CN101298753A (zh) | 2008-06-19 | 2008-06-19 | 一种空间塔柱斜拉开启桥 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100119532A CN101298753A (zh) | 2008-06-19 | 2008-06-19 | 一种空间塔柱斜拉开启桥 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101298753A true CN101298753A (zh) | 2008-11-05 |
Family
ID=40078687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008100119532A Pending CN101298753A (zh) | 2008-06-19 | 2008-06-19 | 一种空间塔柱斜拉开启桥 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101298753A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493364A (zh) * | 2011-12-23 | 2012-06-13 | 中铁大桥局股份有限公司 | 大跨度钢梁悬臂施工中的压重方法 |
CN102644241A (zh) * | 2012-04-05 | 2012-08-22 | 广东省长大公路工程有限公司 | 斜拉桥的空间曲面索塔 |
CN103603263A (zh) * | 2013-11-25 | 2014-02-26 | 中铁第一勘察设计院集团有限公司 | 铁路预应力混凝土槽型梁部分斜拉桥 |
CN104562932A (zh) * | 2015-01-06 | 2015-04-29 | 大连理工大学 | 一种埋入式钢锚箱 |
CN106012797A (zh) * | 2016-07-25 | 2016-10-12 | 同济大学 | 一种全地锚式独塔双跨斜拉桥结构及其施工方法 |
CN114717929A (zh) * | 2022-03-11 | 2022-07-08 | 中冶建筑研究总院有限公司 | 一种cfrp板带支承的开合桥 |
-
2008
- 2008-06-19 CN CNA2008100119532A patent/CN101298753A/zh active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493364A (zh) * | 2011-12-23 | 2012-06-13 | 中铁大桥局股份有限公司 | 大跨度钢梁悬臂施工中的压重方法 |
CN102493364B (zh) * | 2011-12-23 | 2014-01-15 | 中铁大桥局股份有限公司 | 大跨度钢梁悬臂施工中的压重方法 |
CN102644241A (zh) * | 2012-04-05 | 2012-08-22 | 广东省长大公路工程有限公司 | 斜拉桥的空间曲面索塔 |
CN102644241B (zh) * | 2012-04-05 | 2014-07-30 | 广东省长大公路工程有限公司 | 斜拉桥的空间曲面索塔 |
CN103603263A (zh) * | 2013-11-25 | 2014-02-26 | 中铁第一勘察设计院集团有限公司 | 铁路预应力混凝土槽型梁部分斜拉桥 |
CN104562932A (zh) * | 2015-01-06 | 2015-04-29 | 大连理工大学 | 一种埋入式钢锚箱 |
CN104562932B (zh) * | 2015-01-06 | 2016-04-13 | 大连理工大学 | 一种埋入式钢锚箱 |
CN106012797A (zh) * | 2016-07-25 | 2016-10-12 | 同济大学 | 一种全地锚式独塔双跨斜拉桥结构及其施工方法 |
CN114717929A (zh) * | 2022-03-11 | 2022-07-08 | 中冶建筑研究总院有限公司 | 一种cfrp板带支承的开合桥 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206109970U (zh) | 适用于中强震区的预制装配式桥墩 | |
CN100567644C (zh) | 一种桁式索拱桥结构及施工方法 | |
CN108374347A (zh) | 一种高速铁路大跨度提篮拱桥钢拱肋扣挂系统施工方法 | |
CN103290784B (zh) | 拱梁结合桥吊装施工方法 | |
CN201047060Y (zh) | 一种桁式索拱桥结构 | |
CN112342917A (zh) | 一种大跨度系杆拱桥先梁顶推后拱提升的组合施工工法 | |
CN101298753A (zh) | 一种空间塔柱斜拉开启桥 | |
JP2010501743A (ja) | 橋の折曲げ工法 | |
CN106939553A (zh) | 一种钢桥面和钢箱拱肋安装方法 | |
CN110424246A (zh) | 一种大跨径系杆拱桥引桥顶升系统及顶升施工方法 | |
Mato et al. | Viaduct over River Ulla: an outstanding composite (steel and concrete) high-speed railway viaduct | |
Pipinato | Case study: the Russky bridge | |
Veie et al. | Steien Network Arch Bridge | |
Sanders et al. | Design and Construction of Mersey Gateway Bridge, UK | |
CN207727406U (zh) | 一种斜拉桥 | |
Xiang et al. | Making technological breakthrough and becoming a world power in bridge technology | |
Climie et al. | Construction of the Queensferry Crossing and approach roads in Scotland (part 1). | |
CN206693070U (zh) | 拱梁组合式连续刚构桥上弦行走式挂篮施工装置 | |
Bao-chun | Long span arch bridges in China | |
Romberg et al. | Queensferry Crossing, UK: towers, piers and abutments–design and construction | |
Dai et al. | Sanchaji bridge: three-span self-anchored suspension bridge, China | |
Vonganan | The second Mekong international bridge, Thailand | |
Lau et al. | Prestressed concrete application in bridges in the Hong Kong Airport Core Programme projects | |
Ellis et al. | New concrete arch bridge at Victoria Avenue, Lincoln, Canada | |
Sun et al. | Asymmetric Construction Technology of Partially Cable-Stayed Bridge with Single Tower and Single Cable Plane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20081105 |