CN101122220A - Swelling type screen pipe suspension method and swelling type screen pipe hanger - Google Patents
Swelling type screen pipe suspension method and swelling type screen pipe hanger Download PDFInfo
- Publication number
- CN101122220A CN101122220A CNA2007101220761A CN200710122076A CN101122220A CN 101122220 A CN101122220 A CN 101122220A CN A2007101220761 A CNA2007101220761 A CN A2007101220761A CN 200710122076 A CN200710122076 A CN 200710122076A CN 101122220 A CN101122220 A CN 101122220A
- Authority
- CN
- China
- Prior art keywords
- tube
- sieve tube
- expansion
- sleeve
- sieve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
A circulation sieve tube well completion method is applied in the sieve tube completion of an oil-gas well. The method is characterized as follows: A. a sieve tube well completion string is put down into a well; B. drilling fluid is injected; C. balls are thrown to build the pressure, and an expansion sieve tube suspender is set; D. balls are thrown to build the pressure, and a passage between a drill strings and a sieve tube cluster is got through; E. drilling fluid is injected to wash the interior wall of the sieve tube cluster; F. the sieve tube completion string is got out and the circulation sieve tube well completion work is completed. The effect of the method is that the circulation sieve tube well completion method can realize the well completion by suspending the sieve tube, and break through the traditional practice of sieve tube suspending construction. In the construction course, the drilling fluid can be circulated at any time to reduce the damage to an oil layer to the minimum and promote the oil layer penetration rate recovery value and the recovery rate to the maximum extent when the well is drilled. Compared with a conventional sieve tube well completion method, the well completion by suspending circulation sieve tube can be finished just by putting down the construction string once, which promotes the well completion efficiency and saves the construction cost.
Description
Technical field
Patent of the present invention relates to a kind of oil gas well completion method, the particularly completion method of well screen, and a kind of expansion sieve tube of saying so more specifically hangs completion method and expansion sieve tube hanger.
Background technology
Adopt sieve tube completion can improve the sand control ability of oil gas well, prolong the oil gas well well workover cycle.At present, increasing oil gas field adopts screen casing to hang completion method both at home and abroad.It is the screen casing polyphone to be connected on send into the tubing string lower end that conventional screen casing hangs completion method, and the screen casing string is put into the shaft bottom; Then the screen casing seat is hung over the lower end of internal surface of sleeve pipe; Then, starting releasing device puts the screen casing string aside; On submit into tubing string; Bore down once more, bore the blind plate of opening in the screen casing string, and clean screen casing string inwall; Pull out of hole at last, finish screen casing string suspending construction.Have following deficiency: the screen casing string can not be set up circulation in the process of G.I.H, can't screen casing string and shaft bottom wash cycles only be tripped out and send into tubing string next time Flushing tubular column again, could replace out the mud in the pit shaft, has aggravated oil layer pollution.Need next time drill string in work progress, bore the blind plate of opening in the screen casing string, make and implement screen casing string suspending construction time lengthening, following brill often.
Chinese patent notification number CN2203355Y discloses a kind of screen pipe hanger, and the work progress that screen casing hangs is set forth.Notification number CN2721857Y discloses a kind of completion hanger.Notification number CN2898269Y discloses a kind of multi-functional screen pipe hanger.
Summary of the invention
The purpose of this invention is to provide a kind of expansion sieve tube hanging method, utilize hydraulic pressure to make screen expansion, realize that screen casing hangs completion for power.Before screen casing string seat is hung in work progress, can implement circulating fluid at any time, in construction, reduce the injury that drilling fluid causes oil reservoir, improve the reservoir permeability recovery value to greatest extent, improve oil well output, improve recovery ratio.Finish screen casing suspension completion capable of circulation by in well, being lowered to an operating tool string.Overcome that conventional sieve tube completion method exists can not circulating fluid deficiency, overcoming needs repeatedly lower drill, the deficiency of long construction period in the construction.
Another object of the present invention provides a kind of screen casing hanging tool, and promptly expansion sieve tube hanger realizes that the screen casing of above-mentioned circulating fluid hangs completion method.
Expansion sieve tube hanging method of the present invention is realized by following steps:
A, in well, be lowered to sieve tube completion tubular column
In well bore casing, be lowered to sieve tube completion tubular column, and transfer to the precalculated position.The structure of sieve tube completion tubular column is from bottom to top: the lower end is washpipe packing and float shoe, and washpipe packing is connected the screen casing string with float shoe top.Screen casing string top connects expansion sieve tube hanger, and expansion sieve tube hanger top connects drill string.
B, injection drilling fluid
After sieve tube completion tubular column is transferred to design attitude, in sieve tube completion tubular column, inject drilling fluid, circulation replaces out and stops to annotate drilling fluid between screen casing and the bore hole behind original drilling fluid.Utilize and inject drilling fluid immersion barefoot interval a period of time.Different according to drilling fluid and stratum, soak time length difference is determined the barefoot interval soak time, those skilled in the art can determine.Repeat to inject fresh drilling fluid once more, soak barefoot interval a period of time once more, recover the permeability of reservoir to greatest extent.Pitching builds the pressure at twice then.
C, pitching build the pressure, seat envelope expansion sieve tube hanger
Drop into a bead in sieve tube completion tubular column, bead arrives low sleeve, stops up the low sleeve central passage between expansion sieve tube hanger and the screen casing string; Utilize slush pump in sieve tube completion tubular column, to inject high pressure drilling liquid.Push away the plug that expands on the drilling liquid pressure, seat is hung expansion sieve tube hanger.Determine the pump pressure size according to well depth and hole condition difference, those skilled in the art can determine.
D, pitching build the pressure, and get through the passage between drill string and the screen casing string
Then, drop into a big ball in sieve tube completion tubular column, big ball arrives upper sliding sleeve, packing upper sliding sleeve central passage; Utilize slush pump in sieve tube completion tubular column, to inject high pressure completion liquid.The high pressure completion hydraulic coupling promotes upper sliding sleeve to lower slider, at first cuts off the upper sliding sleeve shear pin, and upper sliding sleeve is fallen on the low sleeve, utilizes completion fluid pressure to cut off the low sleeve shear pin again, makes low sleeve drop down onto washing pipe top, gets through the passage between drill string and the screen casing string.
On carry sieve tube completion tubular column, make expand plug and sealing shroud and screen casing string lose sealing.
E, injection drilling fluid, the inwall of flushing screen casing string
In sieve tube completion tubular column, inject drilling fluid, the inwall of flushing screen casing string.
F, trip out sieve tube completion tubular column
Trip out sieve tube completion tubular column, send into joint, central tube, the plug that expands, tube connector, upper sliding sleeve, low sleeve, washing pipe, sealing shroud, washing pipe box cupling, bead, big ball and the fixed cover of expansion sieve tube hanger are carried to ground, and what stay the down-hole is expansion tube, outer adapter sleeve, screen casing string and washpipe packing and float shoe.Finish sieve tube completion operation capable of circulation.
For realizing purpose of the present invention, employing be expansion sieve tube hanger.Described expansion sieve tube hanger is a kind of hydraulic expansion type screen pipe hanger.The structure of this hydraulic expansion type screen pipe hanger is: comprising: send into joint, central tube, expansion tube, the plug that expands, tube connector, outer adapter sleeve, upper sliding sleeve, low sleeve, washing pipe, sealing shroud, washing pipe box cupling, shear pin, bead, shear pin, big ball and fixed cover.
Sending into joint top has screw thread, hydraulic expansion type screen pipe hanger can be connected the lower end of sending into tubing string.It is characterized in that: send into joint lower end outer wall and be connected with an expansion tube, send into joint lower end inwall and be connected with a central tube, expand plug between central tube and expansion tube, and bloated plug can slide up and down along central tube.Fixed cover is fixedly connected on the central tube.The central tube lower end is connected with tube connector.Be fixed with a upper sliding sleeve by shear pin on the inwall of central tube lower end.Tube connector is fixed with a low sleeve by shear pin.The tube connector lower end is connected with washing pipe.The lower end of washing pipe is fixed with the washing pipe box cupling.The expansion tube lower end connects outer adapter sleeve.Between outer adapter sleeve inwall and the washing pipe outer wall sealing shroud is arranged, between outer adapter sleeve and the sealing shroud sealing ring is arranged, between washing pipe and the sealing shroud sealing ring is arranged.Sealing shroud sets on the interior step of adapter sleeve outside.There is external screw thread the lower end of outer adapter sleeve.The diameter of bead is greater than the center-hole diameter of low sleeve.The diameter of big ball is greater than the center-hole diameter of upper sliding sleeve.
Expansion tube can adopt left side button to be threaded with the connected mode of sending into joint.Expansion tube also can adopt spline to be connected with the connected mode of sending into joint.
The outside of expansion tube has more than one annular protrusion at least.The cross section of annular protrusion is a rectangle, and external edge is identical with the maximum gauge of expansion tube along diameter.
Send between joint and the central tube rubber seal is arranged.Bloated plug has seal with elastometic washer respectively and between central tube and the expansion tube.Between central tube and the tube connector seal with elastometic washer is arranged.Between central tube and the upper sliding sleeve seal with elastometic washer is arranged.Between tube connector and the low sleeve seal with elastometic washer is arranged.Between tube connector and the washing pipe seal with elastometic washer is arranged.Between expansion tube and the outer adapter sleeve seal with elastometic washer is arranged.
The shear pin hole that has two symmetries on the outer wall of upper sliding sleeve at least has a upper-side hole at least between the seat envelope plane of upper sliding sleeve and the centre bore, has a side opening between the outer wall of upper sliding sleeve and the centre bore at least.
The shear pin hole that has two symmetries on the outer wall of low sleeve at least has a side opening at least on the outer wall of low sleeve.
The invention has the beneficial effects as follows: utilize sieve tube completion method capable of circulation, can realize that screen casing hangs completion.The present invention utilizes hydraulic pressure to make screen expansion for power, realizes that screen casing hangs completion.This hanging method has been broken screen casing suspending construction traditional method, and a kind of brand-new screen casing hanging method is provided.At work progress circulating fluid at any time, the injury that during drilling well oil reservoir is caused is reduced to minimum, improves the reservoir permeability recovery value to greatest extent, improves recovery ratio; Compare with the sieve tube completion method of routine, only can finish screen casing suspension completion capable of circulation, improve completion efficiency, save operating expenses by in well, being lowered to an operating tool string.
Description of drawings
Fig. 1 is the sieve tube completion tubular column structural representation that the present invention's sieve tube completion method capable of circulation adopts.
Fig. 2 is the hydraulic expansion type screen pipe hanger schematic diagram when dropping into bead.
Fig. 3 is the hydraulic expansion type screen pipe hanger schematic diagram when having high input ball.
Fig. 4 carries the sieve tube completion tubular column schematic diagram on being.
Fig. 5 proposes the sieve tube completion tubular column schematic diagram.
Fig. 6 is the structural profile schematic diagram of upper sliding sleeve.
Fig. 7 is the structural profile schematic diagram of low sleeve.
Among the figure, 1. send into joint, 2. central tube, 3. expansion tube, plug 4. expands, 5. tube connector, 6. outer adapter sleeve, 7. upper sliding sleeve, 8. low sleeve, 9. washing pipe, 10. sealing shroud, 11. washing pipe box cuplings, steps in 12., 13. side openings, 14. shear pin, 15. beads, 16. side openings, 17. shear pins, 18. upper-side hole, 19. big balls, 20. fixed covers, 21. annular protrusions, 22. sleeve pipe, 23. drill strings, 24. screen casing strings, 25. washpipe packings and float shoe.
The specific embodiment
Embodiment 1: work progress:
A, in well, be lowered to sieve tube completion tubular column
Consult accompanying drawing 1.In well bore casing, be lowered to sieve tube completion tubular column, and transfer to the precalculated position.The structure of sieve tube completion tubular column is from bottom to top: the lower end is washpipe packing and float shoe 25, and washpipe packing is connected screen casing string 24 with float shoe 25 tops.Screen casing string 24 tops connect expansion sieve tube hanger, and expansion sieve tube hanger top connects drill string 23.
B, injection drilling fluid
After sieve tube completion tubular column is transferred to design attitude, in sieve tube completion tubular column, inject drilling fluid, circulation replaces out and stops to annotate drilling fluid between screen casing and the bore hole behind original drilling fluid.Utilize and injected drilling fluid immersion barefoot interval 5 hours.Repeat to inject fresh drilling fluid once more, soaked barefoot interval once more 5 hours.Recover the permeability of reservoir by the immersion of injecting drilling fluid.Pitching builds the pressure at twice then.
C, pitching build the pressure, seat envelope expansion sieve tube hanger
Consult Fig. 2.In sieve tube completion tubular column, drop into a bead 15,55 millimeters of diameters, bead 15 arrives low sleeve 8, stops up low sleeve 8 central passage between expansion sieve tube hanger and the screen casing string 24; Utilize slush pump in sieve tube completion tubular column, to inject high pressure drilling liquid.The pressure of high pressure drilling liquid is 12MPa.Push away the plug 4 that expands on the drilling liquid pressure and move upward, with expansion tube 3 whole distendings, seat is hung expansion sieve tube hanger, termination of pumping then.
D, pitching build the pressure, and get through the passage between drill string and the screen casing string
Consult Fig. 3.In sieve tube completion tubular column, drop into a big ball 19,80 millimeters of diameters, big ball 19 arrives upper sliding sleeve 7, packing upper sliding sleeve 7 central passage; Utilize slush pump in sieve tube completion tubular column, to inject high pressure completion liquid.The pressure of high pressure drilling liquid is 13MPa.The high pressure completion hydraulic coupling promotes upper sliding sleeve 7 to lower slider, at first cut off the shear pin 17 of upper sliding sleeve 7, upper sliding sleeve 7 is fallen on the low sleeve 8, utilize completion fluid pressure to cut off the shear pin 14 of low sleeve 8 again, make low sleeve 8 drop down onto washing pipe 9 tops, get through the passage between drill string 23 and the screen casing string 24.Termination of pumping.
Consult Fig. 4.On carry 2.5 meters of sieve tube completion tubular columns, making expand plug 4 and sealing shroud 10 lose sealing with screen casing string 24.
E, injection drilling fluid, the inwall of flushing screen casing string
Inject drilling fluid in sieve tube completion tubular column, the time is 2 hours, the inwall of flushing screen casing string 24.
F, trip out sieve tube completion tubular column
Consult Fig. 5.On carry and trip out sieve tube completion tubular column, with expansion sieve tube hanger send into joint 1, central tube 2, the plug 4 that expands, tube connector 5, upper sliding sleeve 7, low sleeve 8, washing pipe 9, sealing shroud 10, washing pipe box cupling 11, bead 15, big ball 19 and fixed cover 20 be carried to ground.What stay the down-hole is expansion tube 3, outer adapter sleeve 6, screen casing string 24 and washpipe packing and float shoe 25.Finish sieve tube completion operation capable of circulation.
Hydraulic expansion type screen pipe hanger embodiment
Consult accompanying drawing 1.With a specification is 9
5/
8The hydraulic expansion type screen pipe hanger of " 7 " is an example, is specifically described.
Sending into joint 1 maximum outside diameter is 210 millimeters.Central tube 2 length are 1355 millimeters, and internal diameter is 82 millimeters, and external diameter is 120 millimeters.Expansion tube 3 length are 1400 millimeters.There is twice annular protrusion 21 in the outside of expansion tube 3.The cross section of annular protrusion 21 is trapezoidal, and thickness is 5 millimeters.The diameter on annular protrusion 21 external edge edges is identical with the maximum gauge of expansion tube 3.
Sending into joint 1 top has screw thread, can make hydraulic expansion type screen pipe hanger be connected the lower end of sending into tubing string, and hydraulic expansion type screen pipe hanger is sent into the position that the down-hole hangs.Send into joint 1 lower end outer wall and be connected with expansion tube 3.Expansion tube 3 is that spline is connected with the connected mode of sending into joint 1.Send into joint 1 lower end inwall and connect a central tube 2.Send between joint 1 and the central tube 2 rubber seal is arranged.
The thickness of bloated plug 4 is 300 millimeters, and maximum outside diameter is 192 millimeters, and there is the conical surface at its axial two ends.The plug 4 that expands is enclosed within on the central tube 2, and the plug 4 that expands can slide on central tube 2.The plug 4 that expands has seal with elastometic washer respectively and between central tube 2 and the expansion tube 3.Fixed cover 20 is fixedly connected on the central tube 2, can stop the plug 4 of expanding with respect to central tube 2 relatively to lower slider.
Be fixed with upper sliding sleeve 7 by shear pin 17 on the central tube 2 lower end inwalls.Between central tube 2 and the upper sliding sleeve 7 seal with elastometic washer is arranged.The diameter of bore of upper sliding sleeve 7 is 60 millimeters.The effect of upper sliding sleeve 7: the inner passage of tubing string to the screen casing string sent in bead 15 blocking-up of input, and upper sliding sleeve 7 is got through the inner passage that is blocked with big ball 19.Consult Fig. 6.There are two upper-side holes 18 in the shear pin hole that two symmetries are arranged on the outer wall of upper sliding sleeve 7 between the seat envelope plane of upper sliding sleeve 7 and the centre bore.The effect of upper-side hole 18 is: when big ball 19 under the effect of pressure liquid, after upper sliding sleeve 7 glides and promotes low sleeve and glide, get through the inner passage of sending into tubing string and screen casing string.Two side openings 16 are arranged between the outer wall of upper sliding sleeve 7 and the centre bore.The effect of side opening 16 is: in the process that upper sliding sleeve 7 glides, shutoff a part of former injection liquid, side opening 16 is pressure relief vents.
The outside, lower end of washing pipe 9 is fixed with washing pipe box cupling 11.
Between outer adapter sleeve 6 inwalls and washing pipe 9 outer walls sealing shroud 10 is arranged.The effect of sealing shroud 10 is: the annular space between outer adapter sleeve 6 and the washing pipe 9 is sealed.Between outer adapter sleeve 6 and the sealing shroud 10 sealing ring is arranged, between washing pipe 9 and the sealing shroud 10 sealing ring is arranged.Sealing shroud 10 sets on the interior step 12 of adapter sleeve 6 outside.There is external screw thread the lower end of outer adapter sleeve 6.During construction, outer adapter sleeve 6 lower ends can connect screen casing, so that screen casing is suspended on the casing wall of down-hole.
The diameter of bead 15 is greater than the center-hole diameter of low sleeve 8.The diameter of bead 15 is 55 millimeters.
The diameter of big ball 19 is greater than the center-hole diameter of upper sliding sleeve 7.The diameter of big ball 19 is 80 millimeters.
Claims (8)
1. expansion sieve tube hanging method is characterized in that:
A, in well, be lowered to sieve tube completion tubular column
In well bore casing, be lowered to sieve tube completion tubular column, and transfer to the precalculated position, the structure of sieve tube completion tubular column is from bottom to top: the lower end is washpipe packing and float shoe (25), washpipe packing is connected screen casing string (24) with float shoe (25) top, screen casing string (24) top connects expansion sieve tube hanger, and expansion sieve tube hanger top connects drill string (23);
B, injection drilling fluid
After sieve tube completion tubular column is transferred to design attitude, in sieve tube completion tubular column, inject drilling fluid, circulation replaces out and stops to annotate drilling fluid between screen casing and the bore hole behind original drilling fluid, utilize and inject drilling fluid immersion barefoot interval a period of time, different according to drilling fluid and stratum, soak time length difference, determine the barefoot interval soak time, those skilled in the art can determine, repeat to inject fresh drilling fluid once more, soak barefoot interval a period of time once more, recover the permeability of reservoir to greatest extent, pitching builds the pressure at twice then;
C, pitching build the pressure, seat envelope expansion sieve tube hanger
Drop into a bead (15) in sieve tube completion tubular column, bead (15) arrives low sleeve (8), stops up low sleeve (8) central passage between expansion sieve tube hanger and the screen casing string (24); Utilize slush pump to inject high pressure drilling liquid in sieve tube completion tubular column, push away the plug (4) that expands on the drilling liquid pressure, seat is hung expansion sieve tube hanger, determines the pump pressure size according to well depth and hole condition difference, and those skilled in the art can determine;
D, pitching build the pressure, and get through the passage between drill string and the screen casing string
Then, drop into a big ball (19) in sieve tube completion tubular column, big ball (19) arrives upper sliding sleeve (7), packing upper sliding sleeve (7) central passage; Utilize slush pump in sieve tube completion tubular column, to inject high pressure completion liquid, the high pressure completion hydraulic coupling promotes upper sliding sleeve (7) to lower slider, at first cut off the shear pin (17) of upper sliding sleeve (7), upper sliding sleeve (7) is fallen on the low sleeve (8), utilize completion fluid pressure to cut off the shear pin of low sleeve (8) (14) again, make low sleeve (8) drop down onto washing pipe (9) top, get through the passage between drill string (23) and the screen casing string (24);
On carry sieve tube completion tubular column, making expand plug (4) and sealing shroud (10) and screen casing string (24) lose sealing;
E, injection drilling fluid, the inwall of flushing screen casing string
In sieve tube completion tubular column, inject drilling fluid, the inwall of flushing screen casing string (24);
F, trip out sieve tube completion tubular column
Trip out sieve tube completion tubular column, send into joint (1), central tube (2), bloated plug (4), tube connector (5), upper sliding sleeve (7), low sleeve (8), washing pipe (9), sealing shroud (10), washing pipe box cupling (11), bead (15), big ball (19) and the fixed cover (20) of expansion sieve tube hanger are carried to ground, what stay the down-hole is expansion tube (3), outer adapter sleeve (6), screen casing string (24) and washpipe packing and float shoe (25), finishes sieve tube completion operation capable of circulation.
2. expansion sieve tube hanging method as claimed in claim 1, the structure of employed hydraulic expansion type screen pipe hanger, comprise: send into joint (1), central tube (2), expansion tube (3), expand and fill in (4), tube connector (5), outer adapter sleeve (6), upper sliding sleeve (7), low sleeve (8), washing pipe (9), sealing shroud (10), washing pipe box cupling (11), shear pin (14), bead (15), shear pin (17), big ball (19) and fixed cover (20)
Send into joint (1) top screw thread is arranged, it is characterized in that: send into joint (1) lower end outer wall and be connected with an expansion tube (3), send into joint (1) lower end inwall and be connected with a central tube (2), expand plug (4) between central tube (2) and expansion tube (3), and the plug (4) that expands can slide up and down along central tube (2), fixed cover (20) is fixedly connected on the central tube (2), central tube (2) lower end is connected with tube connector (5), be fixed with a upper sliding sleeve (7) by shear pin (17) on the inwall of central tube (2) lower end, tube connector (5) is fixed with a low sleeve (8) by shear pin (14), tube connector (5) lower end is connected with washing pipe (9), the lower end of washing pipe (9) is fixed with washing pipe box cupling (11), expansion tube (3) lower end connects outer adapter sleeve (6), between outer adapter sleeve (6) inwall and washing pipe (9) outer wall sealing shroud (10) is arranged, between outer adapter sleeve (6) and the sealing shroud (10) sealing ring is arranged, between washing pipe (9) and the sealing shroud (10) sealing ring is arranged, sealing shroud (10) sets on the interior step (12) of adapter sleeve (6) outside, there is external screw thread the lower end of outer adapter sleeve (6), the diameter of bead (15) is greater than the center-hole diameter of low sleeve (8), and the diameter of big ball (19) is greater than the center-hole diameter of upper sliding sleeve (7).
3. hydraulic expansion type screen pipe hanger according to claim 2 is characterized in that: expansion tube (3) is that spline is connected with the connected mode of sending into joint (1).
4. hydraulic expansion type screen pipe hanger according to claim 2 is characterized in that: expansion tube (3) is that left side button is threaded with the connected mode of sending into joint (1).
5. according to claim 3 or 4 described hydraulic expansion type screen pipe hangers, it is characterized in that: the outside of expansion tube (3) has more than one annular protrusion (21) at least, the cross section of annular protrusion (21) is a rectangle, and external edge is identical with the maximum gauge of expansion tube (3) along diameter.
6. according to claim 3 or 4 described hydraulic expansion type screen pipe hangers, it is characterized in that: sending between joint (1) and the central tube (2) has rubber seal, the plug (4) that expands has seal with elastometic washer respectively and between central tube (2) and the expansion tube (3), between central tube (2) and the tube connector (5) seal with elastometic washer is arranged, between central tube (2) and the upper sliding sleeve (7) seal with elastometic washer is arranged, between tube connector (5) and the low sleeve (8) seal with elastometic washer is arranged, between tube connector (5) and the washing pipe (9) seal with elastometic washer is arranged, between expansion tube (3) and the outer adapter sleeve (6) seal with elastometic washer is arranged.
7. according to claim 3 or 4 described hydraulic expansion type screen pipe hangers, it is characterized in that: the shear pin hole that has two symmetries on the outer wall of upper sliding sleeve (7) at least, have a upper-side hole (18) at least between the seat envelope plane of upper sliding sleeve (7) and the centre bore, have a side opening (16) between the outer wall of upper sliding sleeve (7) and the centre bore at least.
8. according to claim 3 or 4 described hydraulic expansion type screen pipe hangers, it is characterized in that: have the shear pin hole of two symmetries on the outer wall of low sleeve (8) at least, have a side opening (13) on the outer wall of low sleeve (8) at least.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007101220761A CN100538003C (en) | 2007-09-21 | 2007-09-21 | The expansion sieve tube hanging method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007101220761A CN100538003C (en) | 2007-09-21 | 2007-09-21 | The expansion sieve tube hanging method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101122220A true CN101122220A (en) | 2008-02-13 |
CN100538003C CN100538003C (en) | 2009-09-09 |
Family
ID=39084701
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2007101220761A Active CN100538003C (en) | 2007-09-21 | 2007-09-21 | The expansion sieve tube hanging method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100538003C (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102979472A (en) * | 2012-12-06 | 2013-03-20 | 中国石油集团西部钻探工程有限公司 | Expansion hanger |
CN103790533A (en) * | 2014-01-03 | 2014-05-14 | 中国石油天然气股份有限公司 | Expansion type liner hanger capable of cementing well |
CN107420044A (en) * | 2017-04-27 | 2017-12-01 | 江楠 | Sleeve pipe reentries completion method |
CN109386247A (en) * | 2018-11-27 | 2019-02-26 | 中国石油天然气股份有限公司 | Expansion pipe patch back-inserting and separate-mining tool and using method |
CN110500065A (en) * | 2019-09-20 | 2019-11-26 | 德州众凯石油科技有限公司 | The screen construction of oil/gas well floatability tripping in |
CN111425174A (en) * | 2019-01-09 | 2020-07-17 | 中国石油天然气股份有限公司 | Thermal concentric layered electric ignition process pipe column |
CN114016977A (en) * | 2021-10-29 | 2022-02-08 | 德州众凯石油科技有限公司 | Well control type suspension sieve tube and well completion process |
CN115012831A (en) * | 2022-06-20 | 2022-09-06 | 中国石油大学(北京) | Natural gas hydrate exploitation drilling tool with borehole support sieve tube |
CN115324536A (en) * | 2022-10-11 | 2022-11-11 | 山东普瑞思德石油技术有限公司 | Screen pipe string for bidirectional conversion between filling operation and blockage removing operation and using method |
-
2007
- 2007-09-21 CN CNB2007101220761A patent/CN100538003C/en active Active
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102979472A (en) * | 2012-12-06 | 2013-03-20 | 中国石油集团西部钻探工程有限公司 | Expansion hanger |
CN102979472B (en) * | 2012-12-06 | 2015-06-17 | 中国石油集团西部钻探工程有限公司 | Expansion hanger |
CN103790533A (en) * | 2014-01-03 | 2014-05-14 | 中国石油天然气股份有限公司 | Expansion type liner hanger capable of cementing well |
CN103790533B (en) * | 2014-01-03 | 2016-08-17 | 中国石油天然气股份有限公司 | Expansion type liner hanger capable of cementing well |
CN107420044A (en) * | 2017-04-27 | 2017-12-01 | 江楠 | Sleeve pipe reentries completion method |
CN107420044B (en) * | 2017-04-27 | 2018-11-27 | 江楠 | Casing reentries completion method |
CN109386247A (en) * | 2018-11-27 | 2019-02-26 | 中国石油天然气股份有限公司 | Expansion pipe patch back-inserting and separate-mining tool and using method |
CN111425174A (en) * | 2019-01-09 | 2020-07-17 | 中国石油天然气股份有限公司 | Thermal concentric layered electric ignition process pipe column |
CN111425174B (en) * | 2019-01-09 | 2022-02-01 | 中国石油天然气股份有限公司 | Thermal concentric layered electric ignition process pipe column |
CN110500065A (en) * | 2019-09-20 | 2019-11-26 | 德州众凯石油科技有限公司 | The screen construction of oil/gas well floatability tripping in |
CN110500065B (en) * | 2019-09-20 | 2024-03-08 | 德州众凯石油科技有限公司 | Screen pipe structure capable of being floated and lowered into oil-gas well |
CN114016977A (en) * | 2021-10-29 | 2022-02-08 | 德州众凯石油科技有限公司 | Well control type suspension sieve tube and well completion process |
CN114016977B (en) * | 2021-10-29 | 2024-06-11 | 德州众凯石油科技有限公司 | Well control type hanging screen pipe and well completion process |
CN115012831A (en) * | 2022-06-20 | 2022-09-06 | 中国石油大学(北京) | Natural gas hydrate exploitation drilling tool with borehole support sieve tube |
CN115324536A (en) * | 2022-10-11 | 2022-11-11 | 山东普瑞思德石油技术有限公司 | Screen pipe string for bidirectional conversion between filling operation and blockage removing operation and using method |
CN115324536B (en) * | 2022-10-11 | 2022-12-27 | 山东普瑞思德石油技术有限公司 | Screen pipe string for bidirectional conversion between filling operation and blockage removing operation and using method |
Also Published As
Publication number | Publication date |
---|---|
CN100538003C (en) | 2009-09-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100538003C (en) | The expansion sieve tube hanging method | |
CN103726869B (en) | Soft and broken seam gas pumping hole pipe-following drilling method | |
CN101435318A (en) | Non-drill cementing well method and pipe column | |
CN107762444B (en) | Integrated tubular column for well cementation and sand prevention and use method | |
CN105986795B (en) | Coal bed gas horizontal well coal bed transformation method | |
CN109611061B (en) | Method for floating and running sieve tube | |
CN110439524A (en) | The refracturing remodeling method of oil/gas well | |
CN101864924A (en) | Drilling fixed-point plugging method | |
CN102434192A (en) | Device and method for enhancing coal seam fracturing effect | |
CN101173601B (en) | Rotatable hydraulic expanding type tail pipe hanger | |
CN202381036U (en) | Suspension type squeezing bridge plug | |
CN203420698U (en) | Open hole horizontal well completion fracturing integrated pipe column | |
CN201110143Y (en) | Fluid pressure tailpiece hanger | |
CN103362488B (en) | Sand blasting device allowing fracturing sliding sleeve to be fished | |
CN103790529A (en) | Coalbed methane drainage extraction and backwashing device and method | |
CN101403281A (en) | Tail pipe well drilling and well completion technique | |
CN204941345U (en) | A kind of radial well transfer with packing function | |
CN107642329A (en) | A kind of process of the U-shaped docking geothermal well casings pipeline sealing operation of mid-deep strata | |
CN101260791B (en) | Raising-out type ball seat | |
CN116816308A (en) | Oil-free pipe paraffin removal lifting device for small-bore shale oil well | |
CN106801589A (en) | High temperature resistant big orifice hydraulic booster expanding suspension instrument and method | |
CN201106427Y (en) | Rotatable hydraulic machinery double-acting intumescence type tailpiece hanger | |
CN110700777B (en) | System and method for flushing coal ash in coal-bed gas well by using nitrogen foam flushing fluid | |
CN201280903Y (en) | Oil gas well tail tube suspension controller | |
CN205577845U (en) | Float pipe tool that traps from crushing -type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |