CN101083020A - Method for establishing star landing seeker ground simulation testing field - Google Patents
Method for establishing star landing seeker ground simulation testing field Download PDFInfo
- Publication number
- CN101083020A CN101083020A CN 200710043512 CN200710043512A CN101083020A CN 101083020 A CN101083020 A CN 101083020A CN 200710043512 CN200710043512 CN 200710043512 CN 200710043512 A CN200710043512 A CN 200710043512A CN 101083020 A CN101083020 A CN 101083020A
- Authority
- CN
- China
- Prior art keywords
- area
- detector
- test
- establishing
- site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Geophysics And Detection Of Objects (AREA)
Abstract
The invention discloses a building method of ground simulating testing field of star landing detector, which is characterized by the following: selecting address of the testing field; designing and building the remote operating information; testing the outdoor experiment of the detector and synthetic ability reference of project; providing communication chain and entire 360 deg horizon line environment for remote operation of moon cruise detector; supplying full-natural light for main navigation of the detector; pre-burying the detective goal for moon measuring radar with different depths; realizing remote control of star landing detector; testing the sand and dust -proof ability of cruise detector and adapting ability under high and low temperature and dry environment; solving the problem of bad reliability for the star landing detector.
Description
Technical field
The present invention relates to the survey of deep space technology, specifically a kind of method for building up of star landing seeker ground simulation testing field.
Background technology
The simulation test of relevant space environment mainly is at mars exploration in recent years, the Johnson Space Center (JSC) that is positioned at Dezhou Houston has set up moon landforms testing field (Lunar TopographicSimulation area), be used to train the cosmonaut and test lunar rover, 220 kilometers the long-time analog operation test that Nomad robot in 1997 carries out in the northern Ah tower Karma Atacama desert of Chile is the most comprehensively l-G simulation test that carries out in the recent period.Domestic Harbin Institute of Technology has set up lunar surface outdoor test field in the Wudalianchi, Changbai Mountain, mainly be to utilize the volcanic debris of local soil to form simulation lunar surface soil.Because the Changbai Mountain landform belongs to the high mountain landforms, can't provide 360 ° of complete local horizon environment for panorama camera, in addition, this area belongs to virgin forest, and weather is moistening, required rocky dirt and high low temperature dry environment in the time of can't providing environmental test.
Summary of the invention
The method for building up that a kind of star landing seeker ground simulation testing field of providing at the deficiencies in the prior art is provided, it is by having realized the simulation of testing field landform, landforms to the desert area transformation, for the distant service test of inspection tour prober for moon surface provides clean communication link and 360 ° of complete local horizon environment, and for the detector independent navigation provide full natural light illumination and various different depths be the moon sight radar pre-buried the detection of a target, establish magnetic north for navigator fix, realized the test of the remote distant operation of star landing seeker.
The technical scheme that realizes the object of the invention is: a kind of method for building up of star landing seeker ground simulation testing field, characteristics comprise the following steps:
1, the addressing of simulation test field: satisfy 360 ° of required local horizon of panorama camera, the electromagnetic wave space of required cleaning is verified in straighforward operation, the illumination of the required full natural light of detector independent navigation, the climatic environment of the ground of soft complexity and high and low temperature, drying, rocky dirt.
2, the foundation of simulation test field: with the square levelling of the land of 100m * 100m, and be divided into four zones, each region area is about 50m * 50m, builds loose face of land obstacle detouring, the stability with the basic landforms characteristic of moonscape, the test site of getting over hole and integration test different content respectively.
The foundation of 3, straighforward operation information: ADSL agreement broadband or portable satellite antenna and cable modem UNICOM internet that the distant end at testing field utilizes telecommunications company to provide.
Described obstacle detouring test site is the sand dune of piling up certain slope in the zone, forms the slope of different angle, and artificially adds various stones on the sand dune, forms various obstacle.
Described stability test district is provided with in the zone from 0 °~30 °, serves as at interval the slope to be set with per 5 °, and is more than the sloping wide 5m, long more than 30m.
Described Yue Keng test site is that the degree of depth/diameter ratio in simulation hole in the zone is 0.1~0.3, and brim height/diameter ratio is 0.01~0.03.
Described integrated testing area is a complex topography of setting up crater, crescent moon hole, groove, independent stone in the zone.
The present invention simulates the integrated environment condition of lunar surface test and the survey of deep space testing field set up, it has carried out comprehensive outdoor test to the star landing inspection prober, considered the integration capability of making an inspection tour device and engineering support, for the distant service test of inspection tour prober for moon surface provides clean communication link and 360 ° of complete local horizon environment, and for the detector independent navigation provide full natural light illumination and various different depths be the moon sight radar pre-buried the detection of a target, for navigator fix is established magnetic north, realized the test of the remote distant operation of star landing seeker, tested the anti-dust ability of inspection prober and the adaptive faculty under the high low temperature dry environment, successfully solved the problem of star landing inspection prober in ground simulation test result poor reliability.
Embodiment
The concrete enforcement of the present invention follows these steps to carry out:
1, the addressing of simulation test field: satisfy 360 ° of required local horizon of panorama camera, the electromagnetic wave space of required cleaning is verified in straighforward operation, the illumination of the required full natural light of detector independent navigation, the climatic environment of the ground of soft complexity and high and low temperature, drying, rocky dirt.
2, the foundation of simulation test field: with the square levelling of the land of 100m * 100m, and be divided into four zones, each region area is about 50m * 50m, builds loose face of land obstacle detouring, the stability with the basic landforms characteristic of moonscape, the test site of getting over hole and integration test different content respectively.
The foundation of 3, straighforward operation information: ADSL agreement broadband or portable satellite antenna and cable modem UNICOM internet that the distant end at testing field utilizes telecommunications company to provide.
Embodiment
1, the addressing of simulation test field
The test site of selecting is positioned at the fourth-largest desert-Southeastern Marginal Tengger Desert of China, Ningxia is domestic, near with the Gansu intersection, have and satisfy 360 ° of required local horizon of panorama camera, the electromagnetic wave space of required cleaning is verified in straighforward operation, the illumination of the required full natural light of detector independent navigation, the climatic environment of the ground of soft complexity and high and low temperature, drying, rocky dirt.
2, the foundation of simulation test field
Testing field landforms design is a simulation moon special geology structure, for example Biao Mian Duo Keng hole, soft and thick dust and many rocks and rugged topography and geomorphology possess the condition that inspection prober is comprehensively examined and verified the control ability of identification capability, moving line, measurement and the capability for correcting of landform and barrier, motion, dangerous dodging ability, remote tele-operation ability, long-time continuous locomotor activity etc. when menology moves.The test site is the square region of 100m * 100m, after preliminary leveling, be divided into four zones, each region area is about 50m * 50m, build the face of land obstacle detouring that becomes to loosen, stability, the test site of different contents such as hole and integration test more respectively, the condition that possesses the basic pattern of simulation lunar surface, in this zone, can further test every performance of principle prototype, and the examination natural conditions change (illumination, temperature etc.), can support simultaneously the fault that principle prototype occurs is accurately located, analyzed and detects to the principle prototype Effect on Performance.Transforming the construction of interior four test sites, district carries out according to following requirement:
(1) obstacle detouring test site
In this zone, according to acquired lunar surface landform information, pile up the sand dune of certain slope, form the slope of different angle, according to the regularity of distribution of lunar surface stone, the various stones of artificial interpolation form various obstacle on the sand dune simultaneously, with test inspection tour prober for moon surface environment identification, path planning and the ability of keeping away barrier and obstacle detouring.
(2) stability test district
The moon upslope gradient is between 0 °~25 °, and the gradient is bigger, and it is fewer to distribute.25 ° of gradients account for 1%, 5 ° of gradient and surpass 5%, and most of gradients are less than 20 °, and are comparatively approaching with the windward slope on natural sand dune.So be provided with artificially from 0 °~30 °, serve as at interval the slope to be set with per 5 °, more than the sloping wide 5m, long more than 30m.With the stability of examining inspection tour prober for moon surface to walk on the slope.
(3) Yue Keng test site
The zap pit of simulation menology diameter 2m~10m, the processing of terrestrial materials and stability test district are similar, and the degree of depth/diameter ratio in simulation hole is 0.1~0.3, and brim height/diameter ratio is 0.01~0.03.
(4) integrated testing area
Set up complex topography, contain the pattern that lunar surface can occur substantially, as crater, crescent moon hole, groove, independent stone etc., with the Autonomous Control and the handling capacity of integrated survey inspection tour prober for moon surface.
The foundation of 3, straighforward operation information
Utilize near the communication line in outfield, the existing fixation phone line of prolongation is distant end to the testing field, the ADSL agreement broadband UNICOM internet that distant end provides by Tie Tong.
Can make distant end computer expert cross prosperous promise satellite and directly link institute's Intranet by use portable satellite antenna and cable modem at the testing field simultaneously.
According to the demand of inspection prober scientific exploration, buried the dark rock detection of a target underground from 0~0.3m on the scenely, density is 1/20m
2
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200710043512 CN101083020A (en) | 2007-07-05 | 2007-07-05 | Method for establishing star landing seeker ground simulation testing field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200710043512 CN101083020A (en) | 2007-07-05 | 2007-07-05 | Method for establishing star landing seeker ground simulation testing field |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101083020A true CN101083020A (en) | 2007-12-05 |
Family
ID=38912568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200710043512 Pending CN101083020A (en) | 2007-07-05 | 2007-07-05 | Method for establishing star landing seeker ground simulation testing field |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101083020A (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101866178A (en) * | 2010-06-18 | 2010-10-20 | 中国航天科技集团公司第五研究院第五一三研究所 | Spacecraft equipment ground testing system and method |
CN101630146B (en) * | 2009-07-30 | 2011-04-13 | 上海交通大学 | Simulation control system for remote tele-operation of lunar rover |
CN102564784A (en) * | 2011-12-20 | 2012-07-11 | 北京卫星环境工程研究所 | Ground walking test system of lunar surface inspection device |
CN102589910A (en) * | 2011-12-20 | 2012-07-18 | 北京卫星环境工程研究所 | Lunar soil and lunar appearance simulation system for ground walking test of lunar surface rover and construction method of lunar soil and lunar appearance simulation system |
CN103439694A (en) * | 2013-08-29 | 2013-12-11 | 中国科学院国家天文台 | Method for verifying detection depth and resolution ratio of ground penetrating radar on lunar subsurface |
CN103803101A (en) * | 2013-12-19 | 2014-05-21 | 中国北方车辆研究所 | Motion control method of planet vehicle and determining method of width of mobile system of planet vehicle |
CN103869820A (en) * | 2014-03-18 | 2014-06-18 | 北京控制工程研究所 | Ground navigation planning control method of rover |
CN103884520A (en) * | 2014-01-14 | 2014-06-25 | 北京控制工程研究所 | Method for manufacturing lunar surface topography simulator |
CN103921955A (en) * | 2014-03-28 | 2014-07-16 | 北京空间飞行器总体设计部 | Patroller pit digging and attitude adjusting method for moon probe projects |
CN104729558A (en) * | 2015-03-05 | 2015-06-24 | 北京空间机电研究所 | Method for simulating surface characters of moon |
CN104821127A (en) * | 2015-05-19 | 2015-08-05 | 北京控制工程研究所 | Indoor soft landing lunar surface terrain simulation method |
CN110411695A (en) * | 2019-08-21 | 2019-11-05 | 南京林业大学 | A test device and test method for simulating the impact of a probe on an inclined lunar surface |
CN111459047A (en) * | 2020-03-04 | 2020-07-28 | 北京空间飞行器总体设计部 | A Lunar Rover Motion Control Decision Support System |
CN112213132A (en) * | 2020-09-23 | 2021-01-12 | 同济大学 | A Martian ground simulation field for the test of the walking ability of the Mars rover |
CN113247317A (en) * | 2021-04-20 | 2021-08-13 | 北京空间机电研究所 | Method for simulating surface morphology of Mars in earth environment |
CN114495677A (en) * | 2021-12-20 | 2022-05-13 | 北京空间机电研究所 | A kind of simulated Martian soil preparation method and test bed construction method |
-
2007
- 2007-07-05 CN CN 200710043512 patent/CN101083020A/en active Pending
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101630146B (en) * | 2009-07-30 | 2011-04-13 | 上海交通大学 | Simulation control system for remote tele-operation of lunar rover |
CN101866178B (en) * | 2010-06-18 | 2011-10-05 | 中国航天科技集团公司第五研究院第五一三研究所 | Spacecraft equipment ground testing system and method |
CN101866178A (en) * | 2010-06-18 | 2010-10-20 | 中国航天科技集团公司第五研究院第五一三研究所 | Spacecraft equipment ground testing system and method |
CN102564784B (en) * | 2011-12-20 | 2015-04-08 | 北京卫星环境工程研究所 | Ground walking test system of lunar surface inspection device |
CN102564784A (en) * | 2011-12-20 | 2012-07-11 | 北京卫星环境工程研究所 | Ground walking test system of lunar surface inspection device |
CN102589910A (en) * | 2011-12-20 | 2012-07-18 | 北京卫星环境工程研究所 | Lunar soil and lunar appearance simulation system for ground walking test of lunar surface rover and construction method of lunar soil and lunar appearance simulation system |
CN103439694A (en) * | 2013-08-29 | 2013-12-11 | 中国科学院国家天文台 | Method for verifying detection depth and resolution ratio of ground penetrating radar on lunar subsurface |
CN103439694B (en) * | 2013-08-29 | 2015-06-10 | 中国科学院国家天文台 | Method for verifying detection depth and resolution ratio of ground penetrating radar on lunar subsurface |
CN103803101A (en) * | 2013-12-19 | 2014-05-21 | 中国北方车辆研究所 | Motion control method of planet vehicle and determining method of width of mobile system of planet vehicle |
CN103803101B (en) * | 2013-12-19 | 2016-03-16 | 中国北方车辆研究所 | The defining method of celestial body car motion control method and celestial body car mobile system width |
CN103884520A (en) * | 2014-01-14 | 2014-06-25 | 北京控制工程研究所 | Method for manufacturing lunar surface topography simulator |
CN103869820A (en) * | 2014-03-18 | 2014-06-18 | 北京控制工程研究所 | Ground navigation planning control method of rover |
CN103869820B (en) * | 2014-03-18 | 2015-10-21 | 北京控制工程研究所 | A kind of rover ground navigation planning control method |
CN103921955A (en) * | 2014-03-28 | 2014-07-16 | 北京空间飞行器总体设计部 | Patroller pit digging and attitude adjusting method for moon probe projects |
CN104729558A (en) * | 2015-03-05 | 2015-06-24 | 北京空间机电研究所 | Method for simulating surface characters of moon |
CN104729558B (en) * | 2015-03-05 | 2017-05-10 | 北京空间机电研究所 | Method for simulating surface characters of moon |
CN104821127A (en) * | 2015-05-19 | 2015-08-05 | 北京控制工程研究所 | Indoor soft landing lunar surface terrain simulation method |
CN110411695A (en) * | 2019-08-21 | 2019-11-05 | 南京林业大学 | A test device and test method for simulating the impact of a probe on an inclined lunar surface |
CN110411695B (en) * | 2019-08-21 | 2024-03-08 | 南京林业大学 | Test device and test method for simulating impact of detector on inclined lunar surface |
CN111459047A (en) * | 2020-03-04 | 2020-07-28 | 北京空间飞行器总体设计部 | A Lunar Rover Motion Control Decision Support System |
CN111459047B (en) * | 2020-03-04 | 2021-04-06 | 北京空间飞行器总体设计部 | A Lunar Rover Motion Control Decision Support System |
CN112213132A (en) * | 2020-09-23 | 2021-01-12 | 同济大学 | A Martian ground simulation field for the test of the walking ability of the Mars rover |
CN112213132B (en) * | 2020-09-23 | 2021-12-07 | 同济大学 | Mars ground simulation field for testing walking ability of Mars patrol instrument |
CN113247317A (en) * | 2021-04-20 | 2021-08-13 | 北京空间机电研究所 | Method for simulating surface morphology of Mars in earth environment |
CN114495677A (en) * | 2021-12-20 | 2022-05-13 | 北京空间机电研究所 | A kind of simulated Martian soil preparation method and test bed construction method |
CN114495677B (en) * | 2021-12-20 | 2024-05-14 | 北京空间机电研究所 | A method for preparing simulated Martian soil and a method for constructing a test bed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101083020A (en) | Method for establishing star landing seeker ground simulation testing field | |
Boike et al. | A 20-year record (1998–2017) of permafrost, active layer and meteorological conditions at a high Arctic permafrost research site (Bayelva, Spitsbergen) | |
Mateos et al. | The combined use of PSInSAR and UAV photogrammetry techniques for the analysis of the kinematics of a coastal landslide affecting an urban area (SE Spain) | |
CN114353876A (en) | A method for health monitoring of loess highway slopes | |
Tapete et al. | Localising deformation along the elevation of linear structures: An experiment with space-borne InSAR and RTK GPS on the Roman Aqueducts in Rome, Italy | |
CN103913146B (en) | The continuous operational monitoring station of GNSS | |
Govil et al. | Deformation monitoring of Surakachhar underground coal mines of Korba, India using SAR interferometry | |
Silvestro et al. | Interpretation of the complex dune morphology on Mars: Dune activity, modelling and a terrestrial analogue | |
Molinari et al. | Swiss-AlpArray temporary broadband seismic stations deployment and noise characterization | |
Clemente et al. | Rockfall hazard mitigation in coastal environments using dune protection: a nature-based solution case on Barinatxe beach (Basque Coast, northern Spain) | |
CN115988445A (en) | Slope staged combined monitoring method based on wireless transmission | |
Jones et al. | Geomorphological investigation, for engineering purposes, of blowing sand and dust hazard | |
Harrap et al. | An overview of LIDAR: collection to application | |
López-Fernández et al. | Instability mechanisms and evolution of a rocky cliff on the Atlantic coast of Spain | |
Rodriguez et al. | Cost-effective landslide monitoring GPS system: characteristics, implementation and results | |
Gumilar et al. | Landslide monitoring using terrestrial laser scanner and robotic total station in Rancabali, West Java (Indonesia) | |
Sharma et al. | Urban infrastructure monitoring with a spatially adaptive multi-looking InSAR technique | |
Faizal et al. | Small dam planning as a water sources alternative in Sekaran Village, Bojonegoro Regency, Indonesia | |
Olugbenga et al. | Underground water distribution system in Gwagwalada Area Council Abuja, Nigeria, using resistivity geophysical method | |
Gao et al. | Evolution of Secondary Periglacial Environment Induced by Thawing Permafrost near China–Russia Crude Oil Pipeline Based on Airborne LiDAR, Geophysics, and Field Observation | |
Zebker et al. | Advanced space-based InSAR risk analysis of planned and existing transportation infrastructure. | |
Leisner et al. | Applications of UAV-SfM Remote Sensing in Monitoring Morphodynamic Processes in Sedimentary Cliffs of Pacheco Beach, Northeast Brazil | |
Kienenberger et al. | Field analog studies of the distribution of windblown sediments at Amboy Crater, California, with application to Mars | |
Blišťan et al. | Monitoring of selected geohazards by using unmanned aerial systems (UAS) | |
Abate et al. | LIDAR in extreme environment: Surveying in Antarctica |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20071205 |