[go: up one dir, main page]

CN101042750A - Available resource management system and available resource management method - Google Patents

Available resource management system and available resource management method Download PDF

Info

Publication number
CN101042750A
CN101042750A CNA2007100262220A CN200710026222A CN101042750A CN 101042750 A CN101042750 A CN 101042750A CN A2007100262220 A CNA2007100262220 A CN A2007100262220A CN 200710026222 A CN200710026222 A CN 200710026222A CN 101042750 A CN101042750 A CN 101042750A
Authority
CN
China
Prior art keywords
available resource
available
resource
sales
resources
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007100262220A
Other languages
Chinese (zh)
Inventor
李贤�
刘红星
曾茜
董涛
谢利平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Baosteel Southern Trading Co Ltd
Original Assignee
Guangzhou Baosteel Southern Trading Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Baosteel Southern Trading Co Ltd filed Critical Guangzhou Baosteel Southern Trading Co Ltd
Priority to CNA2007100262220A priority Critical patent/CN101042750A/en
Publication of CN101042750A publication Critical patent/CN101042750A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开一种可供资源管理系统,包括:数据库,存储可供资源相关信息;可供资源更新触发单元,若各可供资源采购或销售业务关联环节可供资源变化,则触发进行可供资源即时更新;可供资源更新处理单元,按照各可供资源采购或销售业务关联环节的可供资源变化信息对数据库中存储的可供资源相关信息进行即时更新。另外,本发明还公开一种相应的可供资源管理方法。本发明可以准确即时的展现可供资源明细,可提高企业运营效率,降低企业运营成本。

Figure 200710026222

The invention discloses an available resource management system, which includes: a database storing relevant information on available resources; Resource real-time update: The available resource update processing unit updates the available resource-related information stored in the database in real time according to the available resource change information of each available resource procurement or sales business related links. In addition, the invention also discloses a corresponding available resource management method. The present invention can accurately and instantly display the details of available resources, improve the operating efficiency of the enterprise, and reduce the operating cost of the enterprise.

Figure 200710026222

Description

可供资源管理系统及可供资源管理方法Available resource management system and available resource management method

技术领域technical field

本发明涉及信息处理技术领域,更具体的说,本发明涉及一种可供资源管理系统及可供资源管理方法。The present invention relates to the technical field of information processing, and more specifically, the present invention relates to an available resource management system and an available resource management method.

背景技术Background technique

企业的可供资源是指企业当前可以按照指定的交货时间与交货地点,销售给客户的产品明细。实时、精确地计算出企业可供资源的情况,其应用面广泛,从企业类型上分,可用于生产、分销、批发及零售等企业;从行业上分,可用于家电、汽车、化工、钢铁、房地产、食品、医药、服装及日常消耗品等行业。The available resources of an enterprise refer to the product details that the enterprise can currently sell to customers according to the specified delivery time and delivery location. Real-time and accurate calculation of the resources available to the enterprise. It has a wide range of applications. From the type of enterprise, it can be used in production, distribution, wholesale and retail enterprises; in terms of industry, it can be used in household appliances, automobiles, chemicals, steel, etc. , real estate, food, medicine, clothing and daily consumables and other industries.

目前,可供资源的精确与即时展现是企业经营管理的一个非常核心的问题,这个问题如果没有处理好,会导致一些企业经营上的问题,例如,同一个资源卖给多家用户,造成无法交货,影响企业声誉;或者本来可以销售的资源无法即时进入可供资源清单,从而贻误了商机;以及对资金流、物流和单据流的跟踪非常困难,难以对三者进行核查等。At present, the accurate and real-time display of available resources is a very core issue in business management. If this problem is not handled properly, it will lead to some business problems. For example, the same resource is sold to multiple users, resulting in inability to Delivery affects the reputation of the company; or the resources that could have been sold cannot be immediately entered into the list of available resources, thus delaying business opportunities; and it is very difficult to track capital flow, logistics and document flow, and it is difficult to verify the three.

另一方面,可供资源的精确与即时展现是一个比较复杂的问题,对流线型的产品尤其如此。首先当前库存资源不一定都是可销售的资源,因为还要扣除销售意向锁定的资源、已经销售给用户但还没有及时出库的资源等等;其次,不在当前库存的资源也可以预销售,比如在途的采购资源、在库外的销售退货资源等等。因此可供资源的精确与即时展现涉及到企业的采购合同管理、采购交货管理、采购退货管理、销售合同管理、销售发货管理、销售退货管理等内容,几乎贯穿了企业经营的各个业务环节,由于可供资源信息不准确,可能导致查询性能非常低下,甚至根本没有实用价值,导致企业运营效率低下,且运营成本大大提高。On the other hand, accurate and real-time display of available resources is a more complicated issue, especially for streamlined products. First of all, the current inventory resources are not necessarily all salable resources, because the resources locked in the sales intention, the resources that have been sold to users but have not been released in time, etc. are also deducted; secondly, the resources that are not in the current inventory can also be pre-sold. For example, purchase resources in transit, sales return resources outside the warehouse, and so on. Therefore, the accurate and instant display of available resources involves the enterprise's procurement contract management, procurement delivery management, procurement return management, sales contract management, sales delivery management, sales return management, etc., and runs through almost every business link of the enterprise. , due to inaccurate information on available resources, the query performance may be very low, or even have no practical value at all, resulting in low operating efficiency and greatly increased operating costs.

发明内容Contents of the invention

本发明解决的技术问题是提供一种可供资源管理系统及可供资源管理方法,以精确即时地展现企业可供资源,提高企业运用效率,降低企业运营成本。The technical problem solved by the present invention is to provide an available resource management system and an available resource management method to accurately and instantly display the available resources of an enterprise, improve the utilization efficiency of the enterprise, and reduce the operating cost of the enterprise.

为解决上述问题,本发明的一种可供资源管理系统,包括:In order to solve the above problems, a resource management system of the present invention includes:

数据库,存储可供资源相关信息;A database that stores information about available resources;

可供资源更新触发单元,若各可供资源采购或销售业务关联环节可供资源变化,则触发进行可供资源即时更新;Available resource update trigger unit, if the available resource changes in each available resource procurement or sales business related links, it will trigger the immediate update of available resources;

可供资源更新处理单元,按照各可供资源采购或销售业务关联环节的可供资源变化信息对数据库中存储的可供资源相关信息进行即时更新。The available resource update processing unit updates the available resource-related information stored in the database in real time according to the available resource change information of each available resource purchase or sales related link.

优选地,所述可供资源更新处理单元包括:Preferably, the available resource update processing unit includes:

可供资源确定单元,用于按照各可供资源采购或销售业务关联环节的可供资源变化信息即时确定当前的可供资源信息;The available resource determination unit is used to instantly determine the current available resource information according to the available resource change information of each available resource procurement or sales business related links;

可供资源数据操作单元,按照所述可供资源确定单元确定的当前可供资源信息,即时更新数据库中可供资源相关信息。The available resource data operation unit immediately updates the available resource related information in the database according to the current available resource information determined by the available resource determining unit.

可选地,所述可供资源管理系统还包括:Optionally, the available resource management system further includes:

输入处理单元,用于接收用户可供资源查询请求输入或各可供资源采购或销售业务关联环节的可供资源变化信息输入以及可供资源管理的其他相关信息输入;The input processing unit is used to receive the user's available resource query request input or the available resource change information input of each available resource procurement or sales business related link, as well as other relevant information input for available resource management;

可供资源相关信息查询处理单元,用于响应用户可供资源查询请求,进行可供资源查询处理;An available resource-related information query processing unit, configured to respond to a user's available resource query request and perform available resource query processing;

输出处理单元,用于输出可供资源查询结果以及可供资源管理的其他相关信息;An output processing unit, configured to output resource query results and other relevant information available for resource management;

计时单元,用于指示并记录时间。A timing unit for indicating and recording time.

可选地,所述可供资源管理系统还包括:Optionally, the available resource management system further includes:

可供资源变化信息采集单元,用于采集各可供资源采购或销售业务关联环节的可供资源变化信息;The available resource change information collection unit is used to collect the available resource change information of each available resource procurement or sales related links;

传送单元,用于将所述采集到的可供资源变化信息传送给可供资源更新触发单元。The transmitting unit is configured to transmit the collected available resource change information to the available resource update triggering unit.

可选地,所述可供资源采购业务关联环节包括:Optionally, the business-associated link of the procurement of available resources includes:

可供资源采购合同签订环节、可供资源采购合同变更环节以及可供资源采购合同撤销环节。The link of signing the available resources procurement contract, the link of changing the available resources procurement contract and the cancellation of the available resources procurement contract.

可选地,所述可供资源销售业务关联环节包括:Optionally, the business link of available resource sales includes:

可供资源销售合同签订环节、可供资源销售合同变更环节以及可供资源销售合同撤销环节。The link of signing the available resources sales contract, the link of changing the available resources sales contract, and the link of canceling the available resources sales contract.

相应地,本发明的一种可供资源管理方法,该方法包括:Correspondingly, an available resource management method of the present invention includes:

若各可供资源采购或销售业务关联环节可供资源变化,则触发进行可供资源即时更新;If the available resources of each available resource procurement or sales business link change, it will trigger an immediate update of the available resources;

根据各可供资源采购或销售业务关联环节的可供资源变化信息对数据库中存储的可供资源相关信息进行即时更新。According to the available resource change information of each available resource procurement or sales business related link, the available resource related information stored in the database is updated in real time.

优选地,所述对数据库中存储的可供资源相关信息进行即时更新包括:Preferably, the instant update of the available resource-related information stored in the database includes:

按照各可供资源采购或销售业务关联环节的可供资源变化信息即时确定当前的可供资源信息;Instantly determine the current available resource information according to the available resource change information of each available resource procurement or sales business related links;

根据所述确定的当前可供资源信息,即时更新数据库中可供资源相关信息。According to the determined current available resource information, immediately update the available resource related information in the database.

可选地,所述可供资源采购业务关联环节包括:Optionally, the business-associated link of the procurement of available resources includes:

可供资源采购合同签订环节、可供资源采购合同变更环节以及可供资源采购合同撤销环节;The link of signing the procurement contract of available resources, the link of changing the procurement contract of available resources, and the link of revocation of the procurement contract of available resources;

所述可供资源销售业务关联环节包括:The relevant links of the available resource sales business include:

可供资源销售合同签订环节、可供资源销售合同变更环节以及可供资源销售合同撤销环节。The link of signing the available resources sales contract, the link of changing the available resources sales contract, and the link of canceling the available resources sales contract.

根据本发明的实施例,若各可供资源采购或销售业务关联环节可供资源变化,则触发进行可供资源即时更新;然后根据各可供资源采购或销售业务关联环节的可供资源变化信息对数据库中存储的可供资源相关信息进行即时更新,即从企业的采购开始即跟踪每一个可供资源,一直跟踪到该资源的销售结案为止,在各个可供资源的业务关联环节发生可供资源量的改变时,会触发即时更新该资源的可供信息,由于可供资源计算量已分摊在各个可供资源业务关联环节里,因此可以准确即时的展现可供资源明细,可提高企业运营效率,降低企业运营成本。According to the embodiment of the present invention, if the available resources of each available resource procurement or sales business-related link change, an immediate update of the available resources is triggered; then, according to the available resource change information of each available resource procurement or sales business-related link Instantly update the available resource-related information stored in the database, that is, track each available resource from the beginning of the enterprise's procurement, and track until the sale of the resource is closed. When the amount of resources changes, it will trigger an instant update of the availability information of the resource. Since the calculation amount of available resources has been allocated to each available resource business link, it can accurately and instantly display the details of available resources, which can improve enterprise operations. efficiency and reduce operating costs.

附图说明Description of drawings

图1是本发明可供资源管理系统的第一优选实施例主要组成单元示意图;Fig. 1 is a schematic diagram of the main components of the first preferred embodiment of the available resource management system of the present invention;

图2是本发明可供资源管理系统的第二优选实施例主要组成单元示意图;Fig. 2 is a schematic diagram of the main components of the second preferred embodiment of the available resource management system of the present invention;

图3是本发明可供资源管理系统的第三优选实施例主要组成单元示意图;Fig. 3 is a schematic diagram of the main components of the third preferred embodiment of the available resource management system of the present invention;

图4是本发明可供资源管理方法所涉及的一种采购业务流程图;Fig. 4 is a flow chart of a procurement business involved in the available resource management method of the present invention;

图5是本发明可供资源管理方法所涉及的一种销售业务流程图;Fig. 5 is a sales business flow chart involved in the available resource management method of the present invention;

图6是本发明可供资源管理系统与管理方法所涉及的一种采购明细表示意图;Fig. 6 is a schematic diagram of a procurement schedule involved in the resource management system and management method of the present invention;

图7是本发明可供资源管理系统与管理方法所涉及的一种销售明细表示意图;Fig. 7 is a schematic diagram of a sales schedule involved in the resource management system and management method of the present invention;

图8是本发明可供资源管理系统与管理方法所涉及的一种可供资源明细表示意图;Fig. 8 is a schematic diagram of a list of available resources involved in the available resource management system and management method of the present invention;

图9是本发明可供资源管理系统与管理方法所涉及的一种退货红冲明细表示意图。FIG. 9 is a schematic diagram of a return red punch list related to the available resource management system and management method of the present invention.

具体实施方式Detailed ways

本发明的核心在于当可供资源采购或销售业务关联环节可供资源变化是,触发进行可供资源即时更新;按照各可供资源采购或销售业务关联环节的可供资源变化信息对数据库中存储的可供资源相关信息进行即时更新,其中所述可供资源采购业务关联环节可包括:可供资源采购合同签订环节、可供资源采购合同变更环节以及可供资源采购合同撤销环节;所述可供资源销售业务关联环节包括:可供资源销售合同签订环节、可供资源销售合同变更环节以及可供资源销售合同撤销环节,由于可供资源计算量已分摊在各个可供资源业务关联环节里,因此可以准确即时的展现可供资源明细,下面详细进行说明。The core of the present invention is that when available resource procurement or sales business-related links change, the real-time update of available resources is triggered; The related information of the available resources can be updated in real time, and the related links of the available resources procurement business can include: the signing link of the available resources procurement contract, the modification link of the available resources procurement contract, and the cancellation link of the available resources procurement contract; Links related to the sales of available resources include: the signing of the available resources sales contract, the modification of the available resources sales contract, and the cancellation of the available resources sales contract. Therefore, the details of available resources can be displayed accurately and in real time, which will be described in detail below.

参考图1,该图为本发明可供资源管理系统的第一优选实施例主要组成单元示意图,如图所示,所述可供资源管理系统包括:可供资源触发单元131、可供资源更新处理单元132、和数据库133,下面分别进行说明。Referring to FIG. 1 , this figure is a schematic diagram of the main components of the first preferred embodiment of the available resource management system of the present invention. As shown in the figure, the available resource management system includes: available resource trigger unit 131, available resource update The processing unit 132 and the database 133 will be described separately below.

本实施例中所述可供资源触发单元131,其主要在各可供资源采购或销售业务关联环节可供资源变化,则触发进行可供资源即时更新;The available resource triggering unit 131 in this embodiment is mainly used to trigger the real-time update of the available resources when the available resources change in each link of available resource procurement or sales business related links;

本实施例中所述可供资源更新处理单元132,其主要用于按照各可供资源采购或销售业务关联环节的可供资源变化信息对数据库中存储的可供资源相关信息进行即时更新,具体实现时,根据所述可供资源更新处理单元132的一个优选实施例,按照其实现的逻辑功能划分,所述可供资源更新处理单元132可包括:可供资源确定单元1321和可供资源数据操作单元1322,其中The available resource update processing unit 132 described in this embodiment is mainly used to update the available resource related information stored in the database in real time according to the available resource change information of each available resource procurement or sales business related links, specifically During implementation, according to a preferred embodiment of the available resource update processing unit 132, according to the division of logical functions realized by it, the available resource update processing unit 132 may include: available resource determination unit 1321 and available resource data Operating unit 1322, wherein

可供资源确定单元1321,用于按照各可供资源采购或销售业务关联环节的可供资源变化信息即时确定当前的可供资源信息,具体实现时,所述可供资源确定单元可按照加+、减-、乘*、除/、求和sum等操作计算确定当前的可供资源;The available resource determination unit 1321 is configured to immediately determine the current available resource information according to the available resource change information of each available resource procurement or sales business related link. , Subtract -, multiply *, divide /, sum and other operations calculate and determine the current available resources;

可供资源数据操作单元1322,按照所述可供资源确定单元确定的当前可供资源信息,即时更新数据库中可供资源相关信息,具体实现时,所述可供资源数据操作单元1322可对数据库中可供资源的数据表进行如插入记录insert、更新记录update、删除记录delete等操作,这里不再赘述。The available resource data operation unit 1322, according to the current available resource information determined by the available resource determination unit, immediately updates the available resource related information in the database. In the data tables available for resources, operations such as inserting records, updating records, and deleting records are performed, and will not be repeated here.

本实施例中所述数据库133,本实施例中所述数据库133主要用于存储可供资源相关信息,例如涉及可供资源的各种数据表,如采购明细、销售明细、可供资源明细等的统一存储,具体实现时,可以采用各种形式的数据库,这里不再赘述。The database 133 in this embodiment, the database 133 in this embodiment is mainly used to store information related to available resources, such as various data tables related to available resources, such as purchase details, sales details, available resource details, etc. The unified storage of , in actual implementation, can use various forms of databases, which will not be repeated here.

参考图2,该图是本发明可供资源管理系统的第二优选实施例主要组成单元示意图。Referring to FIG. 2 , this figure is a schematic diagram of the main components of the second preferred embodiment of the resource management system available in the present invention.

本实施例中与第一实施例不同主要在于增加了输入处理单元11、输出处理单元12、可供资源相关信息查询处理单元134和计时单元135,其中The main difference between this embodiment and the first embodiment lies in the addition of an input processing unit 11, an output processing unit 12, an available resource related information query processing unit 134 and a timing unit 135, wherein

所述输入处理单元11主要用于接收用户可供资源查询请求输入或各可供资源采购或销售业务关联环节的可供资源变化信息输入以及可供资源管理的其他相关信息输入,例如用户输入采购合同、确认销售意向、货物收发等可供资源业务关联环节的可供资源变化信息以及用户输入数据检索请求等,具体实现时,所述输入处理单元11可以是键盘或触摸输入设备,这里不再赘述;The input processing unit 11 is mainly used to receive user available resource query request input, available resource change information input of each available resource procurement or sales business related links, and input of other relevant information for available resource management, such as user input purchase The change information of available resource business related links such as contract, confirmation of sales intention, delivery and delivery of goods, and user input data retrieval request, etc., in actual implementation, the input processing unit 11 may be a keyboard or a touch input device, which will not be discussed here. repeat;

另外,所述输出处理单元12主要用于输出可供资源查询结果以及可供资源管理的其他相关信息等,具体实现时,所述外部输出单元12可以采用显示屏或类似的设备,这里不再赘述。In addition, the output processing unit 12 is mainly used to output the query results of the available resources and other relevant information about the management of the available resources, etc. In actual implementation, the external output unit 12 can use a display screen or similar equipment, which will not be repeated here. repeat.

另外,所述可供资源相关信息查询处理单元134主要用于响应用户可供资源查询请求,进行可供资源查询处理;In addition, the available resource-related information query processing unit 134 is mainly used to respond to the user's available resource query request, and perform available resource query processing;

另外,所述计时单元135主要用于指示并记录时间。In addition, the timing unit 135 is mainly used to indicate and record time.

本实施例中所述检索单元134和计时单元135可与可供资源触发单元131、可供资源更新处理单元132和数据库133组成一个后台处理单元13具体进行可供资源更新以及查询等,这里不再赘述。In this embodiment, the retrieval unit 134 and the timing unit 135 can form a background processing unit 13 with the available resource trigger unit 131, the available resource update processing unit 132, and the database 133 to specifically perform available resource update and query, etc., which are not described here. Let me repeat.

参考图3,该图是本发明可供资源管理系统的第三优选实施例组成单元示意图。Referring to FIG. 3 , this figure is a schematic diagram of the constituent units of the third preferred embodiment of the resource management system available in the present invention.

本实施例与前述第一实施例不同在于增加可供资源变化信息采集单元14和传送单元15,其中This embodiment differs from the aforementioned first embodiment in that an available resource change information collection unit 14 and a transmission unit 15 are added, wherein

可供资源变化信息采集单元14,主要用于采集各可供资源采购或销售业务关联环节的可供资源变化信息;Available resource change information collection unit 14 is mainly used to collect available resource change information of each available resource procurement or sales related link;

传送单元15,主要用于将所述采集到的可供资源变化信息传送给可供资源更新触发单元。The transmitting unit 15 is mainly used to transmit the collected available resource change information to the available resource update triggering unit.

即本实施例中对于可供资源变化信息不是通过人工输入的,而是可以采用分布式网络系统形式收集,例如对于各个可供资源业务关联环节可设置对应的客户端(包括可供资源变化信息采集单元和传送单元),各个客户端在其处理的相应业务关联环节将可供资源变化信息上报给可供资源更新触发单元。That is, in this embodiment, the available resource change information is not manually input, but can be collected in the form of a distributed network system. For example, corresponding clients (including available resource change information) can be set for each available resource business link. collection unit and transmission unit), and each client will report the available resource change information to the available resource update trigger unit in the corresponding business link of its processing.

下面按照具体的采购以及销售流程,对本发明可供资源的原理进行详细说明。The principle of resource availability in the present invention will be described in detail below according to specific procurement and sales processes.

参考图4,该图为本发明可供资源管理方法所涉及的一种采购业务流程图,如图示,具体包括以下步骤:Referring to Figure 4, this figure is a procurement business flow chart involved in the available resource management method of the present invention, as shown in the figure, specifically including the following steps:

首先,企业和供应商签订采购合同(步骤21),合同中明确了采购的资源明细和相关条款,具体包括合同号、采购品种、型号、规格、采购量、交货时间、交货地、交货正负公差、退货条件等信息;采购合同签订后,企业的可供资源增加(步骤211),增加的品种、型号、规格和数量与采购合同中的项目相等;此时,由于采购的资源供应商尚未交货,因此该项可供资源显示为期货资源;First, the enterprise and the supplier sign a procurement contract (step 21). The contract specifies the procurement resource details and related terms, including the contract number, procurement variety, model, specification, procurement quantity, delivery time, delivery place, delivery Goods plus or minus tolerance, return conditions and other information; after the purchase contract is signed, the available resources of the enterprise increase (step 211), and the increased variety, model, specification and quantity are equal to the items in the purchase contract; at this time, due to the purchase of resources The supplier has not yet delivered, so this available resource is displayed as a futures resource;

采购合同签订后,有可能出现以下三种情况,如图:①采购合同撤消(步骤22),其有可能是供应商生产方面原因或其它原因导致的采购合同作废;此时与该采购合同相关的可供资源的数量自动清零(步骤221);②供应商按采购合同约定的时间交货(步骤23),企业按实际交货量将采购资源进行入库,库存量增加(步骤231);同时由于交货正负公差可能导致的实际交货量与合同量不一致,该项资源的可供量需按实际交货量进行调整,并且,由于资源已在库,因此可供资源自动由期货资源转为现货资源(步骤232);③采购合同变更(步骤24),由供应商或企业任何一方提出并经双方商谈确认的采购合同变更,有可能包括采购的品种、型号、规格、数量或者交货时间、交货地等信息的变更;变更生效后,企业相对应的可供资源也根据变更后的资源信息进行调整(步骤232);供应商按变更后合同约定的交货时间交货(步骤23);After the procurement contract is signed, the following three situations may occur, as shown in the figure: ①The procurement contract is revoked (step 22), which may be caused by the supplier’s production or other reasons; at this time, it is related to the procurement contract The quantity of available resources is automatically cleared (step 221); ② the supplier delivers the goods according to the time agreed in the purchase contract (step 23), and the enterprise puts the purchased resources into storage according to the actual delivery quantity, and the inventory increases (step 231) ; At the same time, due to the inconsistency between the actual delivery quantity and the contract quantity that may be caused by the plus or minus tolerance of delivery, the available quantity of this resource needs to be adjusted according to the actual delivered quantity, and, since the resource is already in stock, the available resource is automatically transferred from Futures resources are converted into spot resources (step 232); ③ purchase contract change (step 24), the change of the purchase contract proposed by either the supplier or the enterprise and confirmed by both parties may include the variety, model, specification and quantity of the purchase Or changes in information such as delivery time and delivery place; after the change takes effect, the corresponding available resources of the enterprise are also adjusted according to the changed resource information (step 232); the supplier delivers the goods according to the delivery time agreed in the contract after the change Goods (step 23);

供应商按合同约定将采购资源交货后,有可能出现以下两种情况,如图:④货、款和发票均已结算完毕,且供应商和企业双方在规定周期内无异议,采购合同自动结案(步骤25);⑤企业对货物质量存在异议,且满足采购合同退货条件,此时将采购资源作部分退货或全部退货处理(步骤26),并将相应的入库资源进行红冲,库存量减少(步骤261),同时可供资源自动根据退货的品种、规格、型号和数量进行调整(步骤262);退货流程及相应的财务结算完毕后,采购合同结案(步骤25)。After the supplier delivers the procurement resources according to the contract, the following two situations may occur, as shown in the figure: ④ The goods, payments and invoices have been settled, and both the supplier and the enterprise have no objection within the specified period, and the procurement contract is automatically Close the case (step 25); ⑤ The enterprise has objections to the quality of the goods and meets the return conditions of the procurement contract. At this time, the purchased resources will be partially or fully returned (step 26), and the corresponding storage resources will be red-redunded. The amount is reduced (step 261), and the available resources are automatically adjusted according to the variety, specification, model and quantity of the returned goods (step 262); after the return process and corresponding financial settlement are completed, the procurement contract is closed (step 25).

参考图5,该图为本发明可供资源管理方法所涉及的一种销售业务流程图,如图示,具体包括以下步骤:Referring to Fig. 5, this figure is a flow chart of a sales business related to the available resource management method of the present invention. As shown in the figure, it specifically includes the following steps:

首先用户通过企业发布的可供资源信息,查到所需的资源后向企业发出订单,销售意向初步确认(步骤31),销售意向中包括双方交易的资源明细、资源类别(现货或期货)、货款金额和意向锁定时间等信息;企业将用户选定的资源进行意向锁定,此时可供资源中显示的相应品种、型号、规格和数量的资源自动减少(步骤311);First, the user finds the required resources through the available resource information released by the enterprise, and then places an order with the enterprise, and initially confirms the sales intention (step 31). The sales intention includes resource details, resource categories (spot or futures), and Information such as payment amount and intention locking time; the enterprise locks the resources selected by the user in intention, and at this time, the resources of the corresponding varieties, models, specifications and quantities displayed in the available resources are automatically reduced (step 311);

销售意向确认后,有可能出现以下三种情况,如图:(1)销售意向撤消(步骤32),撤销是指用户货款在规定的意向锁定时间结束后未能到帐或者其它原因导致的销售意向作废;此时该意向中锁定的资源自动释放,可供资源自动增加(步骤321);(2)用户货款到帐,销售合同生效(步骤33),合同中明确了销售合同号、资源号、资源类别、品种、型号、规格、销售量、交货时间、交货正负公差、退货条件等信息;(3)销售意向变更(步骤34),由企业或用户中任何一方提出并经双方商谈确认的销售意向变更,有可能包括意向的品种、型号、规格、数量或者交货时间、交货地等信息的变更;变更经双方确认后,企业的可供资源也根据变更后的资源信息进行重新锁定或调整(步骤341);用户的货款到帐后,销售合同生效(步骤33);After the sales intention is confirmed, the following three situations may occur, as shown in the figure: (1) Withdrawal of the sales intention (step 32). The cancellation refers to the failure of the user's payment for the goods to arrive after the specified intention lock time expires or the sales caused by other reasons. The intention is invalidated; at this time, the resources locked in the intention are automatically released, and the available resources are automatically increased (step 321); (2) the user's payment is received, and the sales contract becomes effective (step 33), and the sales contract number and resource number are specified in the contract , resource category, variety, model, specification, sales volume, delivery time, delivery plus or minus tolerance, return conditions and other information; (3) change of sales intention (step 34), proposed by any party of the enterprise or user and approved by both parties The change of sales intention confirmed through negotiation may include changes in the intended variety, model, specification, quantity, or delivery time, delivery place and other information; after the change is confirmed by both parties, the company's available resources will also be based on the changed resource information. Carry out re-locking or adjustment (step 341); after the user's payment for goods arrives, the sales contract becomes effective (step 33);

销售合同生效后,用户凭企业开具的提货单提货,企业的仓储部门按提货单上的资源明细发货(步骤35),并根据实际发货量对相应资源进行出库,库存数量减少(步骤351),同时由于交货正负公差可能导致的实际发货量与销售合同量不完全相等的情况,该项资源的可供量需按实际发货量进行调整(步骤352),如果发货量>合同量,则资源的可供量相应减少,如果发货量<合同量,则资源的可供量相应增加;After the sales contract takes effect, the user picks up the goods with the bill of lading issued by the enterprise, and the warehousing department of the enterprise delivers the goods according to the resource details on the bill of lading (step 35), and the corresponding resources are shipped out according to the actual delivery volume, and the inventory quantity is reduced (step 35). 351), at the same time, due to the fact that the actual delivery volume may not be completely equal to the sales contract volume due to the positive and negative tolerance of delivery, the availability of this resource needs to be adjusted according to the actual delivery volume (step 352), if the delivery If the quantity > the contract quantity, then the available quantity of resources will decrease accordingly; if the quantity shipped < the contract quantity, then the available quantity of resources will increase accordingly;

企业将销售资源发货后,有可能出现以下两种情况:(4)销售合同相关的货、款和发票均已结算完毕,且企业和用户双方在规定周期内无异议,销售合同自动结案(步骤36);(5)用户对货物质量存在异议,且异议满足销售合同退货条件时,企业与用户协商后,按实际情况将销售资源作部分退货或全部退货处理(步骤37),并将相应的出库信息进行红冲,库存量增加(步骤371),同时可供资源也相应增加(步骤372);退货流程及相应的财务结算完毕后,销售合同结案(步骤36)。After the enterprise delivers the sales resources, the following two situations may occur: (4) The goods, payments and invoices related to the sales contract have been settled, and both the enterprise and the user have no objection within the specified period, and the sales contract is automatically closed ( Step 36); (5) When the user has an objection to the quality of the goods, and the objection satisfies the return conditions of the sales contract, after the enterprise negotiates with the user, the sales resource will be partially or completely returned according to the actual situation (step 37), and the corresponding The outbound information of the warehouse is red flushed, the inventory increases (step 371), and the available resources are also correspondingly increased (step 372); after the return process and corresponding financial settlement are completed, the sales contract is closed (step 36).

参考6所示,该图本发明可供资源管理系统与管理方法所涉及的一种采购明细表示意图,包括<1>,<2>,<3>项,如图所示,采购明细表主要包括采购子项号、品种、型号、规格、采购量、交货时间、交货地、交货量、仓储地点、撤销标志、结案标志等信息。其中采购子项号(以下简称资源号)可以采用合同的子项号,也可以是企业自编的带特定含义的采购序列号;交货时间是指合同中约定的供应商交货时间;交货量是指供应商的实际交货量,根据采购合同约定的交货正负公差,有可能与采购量不完全相等;仓储地点是指供应商交货后该货物的存放地点;撤销标志是指各种原因导致的采购合同作废;结案标志是指采购的资源均已入库,所涉及的货款和发票也已结算完毕,且供应商和企业双方在合同规定的周期内无异议,或异议及退货处理流程结束且相应的财务结算完毕后,则该采购合同结案。As shown in reference 6, this figure is a schematic diagram of a procurement schedule involved in the resource management system and management method of the present invention, including items <1>, <2>, and <3>. As shown in the figure, the procurement schedule mainly Including purchase sub-item number, variety, model, specification, purchase quantity, delivery time, delivery place, delivery quantity, storage location, cancellation sign, closing sign and other information. Among them, the procurement sub-item number (hereinafter referred to as the resource number) can be the sub-item number of the contract, or the procurement serial number with specific meaning compiled by the enterprise; the delivery time refers to the delivery time of the supplier agreed in the contract; The quantity of goods refers to the actual delivery quantity of the supplier, which may not be exactly equal to the purchase quantity according to the plus or minus tolerance of the delivery agreed in the purchase contract; the storage location refers to the storage location of the goods after the supplier delivers the goods; the cancellation sign is Refers to the invalidation of the procurement contract due to various reasons; the closure sign means that all the purchased resources have been put into storage, the payment and invoices involved have been settled, and the supplier and the enterprise have no objections within the period specified in the contract, or objections And after the process of returning goods and the corresponding financial settlement is completed, the procurement contract will be closed.

参考7,该图为本发明可供资源管理系统与管理方法所涉及的一种销售明细表示意图,包括<1>,<2>,<3>,<4>项,如图所示,销售明细表主要包括销售子项号、资源号、销售量、资源类别、意向确认时间、发货时间、发货量、销售状态和撤销标志等信息。其中销售子项号可以采用销售合同的子项号,也可以是企业自编的销售序列号;资源类别指期货或现货;意向确认时间指用户挑选可供资源并向企业发出订单的时间;发货时间是指用户实际提货的时间;发货量指实际发货数量,根据销售合同约定的交货正负公差,有可能与销售量不完全相等;销售状态有意向、生效、结案等三种状态,意向指用户的订单确认,选定资源被锁定,生效是指用户的货款到账,销售合同生效,结案指货款支付、发货、开票等同时完毕;意向锁定时间(表中未列出)是指从意向状态到生效状态允许的时间(由企业按实际情况设置,并在用户的销售意向生成后,向用户显示,以便其及时筹集货款。基于商业策略,在资源紧缺时可相应缩短意向锁定时间),撤销是指用户货款在意向锁定时间结束后未能到帐,已选资源被释放,或者其它原因导致的销售意向作废。Referring to 7, this figure is a schematic diagram of a sales schedule involved in the resource management system and management method of the present invention, including items <1>, <2>, <3>, and <4>, as shown in the figure, sales The detailed table mainly includes information such as sales sub-item number, resource number, sales volume, resource category, intention confirmation time, delivery time, delivery volume, sales status, and cancellation flag. The sales sub-item number can be the sub-item number of the sales contract, or the sales serial number compiled by the enterprise itself; the resource category refers to futures or spot goods; the intention confirmation time refers to the time when the user selects available resources and places an order with the enterprise; The delivery time refers to the time when the user actually picks up the goods; the delivery quantity refers to the actual delivery quantity, which may not be exactly equal to the sales quantity according to the plus or minus tolerance of the delivery agreed in the sales contract; the sales status includes three types: intention, effective, and closed Status, intent refers to the user's order confirmation, the selected resource is locked, effective refers to the user's payment to the account, and the sales contract becomes effective, and case closure refers to the completion of payment, delivery, and invoicing at the same time; the intention lock time (not listed in the table ) refers to the time allowed from the intention state to the effective state (set by the enterprise according to the actual situation, and displayed to the user after the user's sales intention is generated, so that they can raise the payment in time. Based on business strategies, it can be shortened accordingly when resources are in short supply Intention lock time), cancellation means that the user's payment fails to arrive after the intention lock time ends, the selected resources are released, or the sales intention is invalidated due to other reasons.

参考图8,该图为本发明可供资源管理系统与管理方法所涉及的一种可供资源明细表示意图,包括<1>,<2>,<3>,<4>,<5>,<6>项。可供资源明细表主要包括资源号、品种、型号、规格、可供量、库存量、资源类别、可供货时间、货物所在地和结案标志等信息,其中可供量是指该资源暂时没有定向下家,可供企业安排销售的货物数量;库存量是指企业当前在库的所有资源的数量,其中包含可供销售的资源、已有销售意向被锁定的资源,或已经开了提单但还没有及时出库的资源等;资源类别指期货或现货,其中期货指暂时未到货的可供资源,现货指当前在库的可供资源;对于期货,可供货时间即该资源的采购交货时间,货物所在地默认为供应商仓库;对于现货,可供货时间默认为当前日期,货物所在地为该资源的仓储地点;结案标志是指该资源相关联的采购合同撤销了或者该资源的可供量为零并且相关联的销售合同全部结案。Referring to FIG. 8 , this figure is a schematic diagram of a list of available resources involved in the available resource management system and management method of the present invention, including <1>, <2>, <3>, <4>, <5>, Item <6>. The list of available resources mainly includes information such as resource number, variety, model, specification, availability, inventory, resource category, availability time, location of the goods, and closing signs, etc. The availability refers to the resource that has no orientation for the time being Next, the quantity of goods that can be arranged for sale by the enterprise; the inventory refers to the quantity of all resources currently in stock by the enterprise, including resources that are available for sale, resources that have already been locked in sales intentions, or have already issued a bill of lading but are not yet available. Resources that have not been released in time; the category of resources refers to futures or spot goods, where futures refers to available resources that have not yet arrived, and spot refers to available resources that are currently in storage; for futures, the availability time refers to the procurement delivery time of the resource. Delivery time, the location of the goods defaults to the supplier's warehouse; for spot goods, the delivery time defaults to the current date, and the location of the goods is the storage location of the resource; The supply is zero and all associated sales contracts are closed.

参考图9,该图为本发明可供资源管理系统与管理方法所涉及的一种退货红冲明细表示意图,其中退货红冲明细表主要包括资源号、红冲代码、红冲量、红冲时间、发货时间等信息,其中红冲代码指红冲入库或红冲出库,如为采购资源退货,则红冲入库,如为销售资源退货,则红冲出库;红冲量指退货数量;红冲时间指退货处理时间。Referring to Fig. 9, this figure is a schematic diagram of a return red charge list involved in the resource management system and management method of the present invention, wherein the return red charge list mainly includes resource number, red charge code, red charge amount, and red charge time , delivery time and other information, among which the red rush code refers to the red rush into the warehouse or the red rush out of the warehouse. If it is a return of purchasing resources, it will be red rush into the warehouse. If it is a return of sales resources, it will be red rush out of the warehouse; Quantity; red rush time refers to the return processing time.

为了进一步说明本发明的工作原理和流程,以下结合图2的可供资源管理系统并以可供资源为钢材产品为例对本发明进行详细阐述。In order to further illustrate the working principle and process of the present invention, the present invention will be described in detail below in conjunction with the available resource management system in FIG. 2 and taking the available resource as steel products as an example.

如图2,本实施例中数据库133中存储着采购明细表order_item、销售明细表sale_item、可供资源明细表res_item和退货红冲明细表hc_item等四张数据表,所述四张数据表的基本结构分别如图6-图9所示。As shown in Fig. 2, four data tables such as purchase list order_item, sales list sale_item, available resource list res_item, and return red punch list hc_item are stored in the database 133 in this embodiment. The structures are shown in Figure 6-Figure 9 respectively.

当有新的采购合同L660101(包括两个子项,L660101A和L660101B)签订时,系统从外部输入装置11中接收采购合同信息,向采购明细表中插入新记录L660101A和L660101B(图6<1>,图表中加粗斜体部分是增加或改动数据,以下同),同时触发后台处理单元的可供资源更新触发单元131,然后调用可供资源数据操作单元1322,向可供资源明细表插入相应的记录(图8<1>),其中,When a new purchase contract L660101 (including two subitems, L660101A and L660101B) is signed, the system receives the purchase contract information from the external input device 11, and inserts new records L660101A and L660101B into the purchase list (Fig. 6<1>, The part in bold and italics in the chart is to add or change data, the same below), trigger the available resource update trigger unit 131 of the background processing unit at the same time, and then call the available resource data operation unit 1322 to insert corresponding records into the available resource list (Figure 8<1>), where,

res_item.资源号=order_item.采购子项号,res_item. resource number = order_item. purchase sub-item number,

res_item.(初始)可供量=order_item.采购量,res_item.(initial) availability = order_item.purchases,

res_item.资源类别=“期货”,res_item.ResourceType = "Futures",

res_item.可供货时间=order_item.交货时间;res_item. Availability time = order_item. Delivery time;

当采购资源L660101A和L660101B到货入库时,系统从外部的输入处理单元装置11中接收入库信息,更新采购明细表中相关联的记录(图8<2>),并触发后台的可供资源更新触发单元131,调用可供资源数据操纵单元1322,对可供资源明细表中相关联资源号的可供量、资源类别和可供货时间等信息进行校正(图8<2>),其中,When the purchased resources L660101A and L660101B arrive in the warehouse, the system receives the warehouse-in information from the external input processing unit device 11, updates the associated records in the procurement list (Fig. 8<2>), and triggers the supply The resource update triggering unit 131 calls the available resource data manipulation unit 1322 to correct information such as available quantity, resource category and available supply time of the associated resource number in the available resource list (Fig. 8<2>), in,

[order_item.交货量]为供应商实际交货量,[order_item.delivery quantity] is the actual delivery quantity of the supplier,

[order_item.仓储地点]为货物入库存放地,[order_item.storage location] is the place where the goods are put into storage,

res_item.库存量=order_item.交货量,res_item.stock quantity=order_item.delivery quantity,

res_item.可供量=res_item.库存量,res_item.availability = res_item.stock,

res_item.资源类别=“现货”,res_item.resource_category = "spot",

[res_item.可供货时间]为当前日期,[res_item.Availability] is the current date,

res_item.货物所在地=order_item.仓储地点;res_item. Location of goods = order_item. Storage location;

货物入库、货款支付和发票结算均已完毕,且双方在规定周期内无异议,采购合同L660101自动结案(图6<3>);The goods storage, payment and invoice settlement have all been completed, and both parties have no objection within the specified period, and the procurement contract L660101 is automatically closed (Figure 6<3>);

如图8<2>,此时显示可供资源有I660100A、I660100B、L660101A和L660101B四项。As shown in Figure 8<2>, the available resources are displayed at this time as I660100A, I660100B, L660101A and L660101B.

当资源号为I660100B和L660101A、重量各100T的资源被签订销售意向时,系统从外部输入处理单元11中接收意向信息,向销售明细表中插入新记录,销售合同子项号分别为25001和25002(图7<1>),其中,When the resources whose resource numbers are I660100B and L660101A and whose weight is 100T each are signed for sales intention, the system receives the intention information from the external input processing unit 11, inserts a new record into the sales list, and the sales contract sub-item numbers are 25001 and 25002 respectively (Figure 7<1>), where,

sale_item.资源类别=res_item.资源类别=“现货”,sale_item.resource_category=res_item.resource_type="spot",

[sale_item.意向确认时间]为当前销售意向确认且选定资源被暂时锁定的时间,[sale_item.Confirmation time of intention] is the time when the current sales intention is confirmed and the selected resource is temporarily locked.

sale_item.销售状态=“意向”;sale_item.SaleStatus="Intention";

同时触发后台的可供资源更新触发单元131,调用可供资源数据操纵单元1322和可供资源确定单元1321,依据销售意向量从可供资源明细表中扣除相应可供量,即时更新可供资源明细表中与资源号I660100B和L660101A相关联的记录(图8<3>),其中,Simultaneously trigger the available resource update trigger unit 131 in the background, call the available resource data manipulation unit 1322 and the available resource determination unit 1321, deduct the corresponding available amount from the available resource list according to the amount of sales intention, and update the available resource immediately The records associated with resource numbers I660100B and L660101A in the detailed table (Figure 8<3>), where,

res_item.可供量=res_item.(原)可供量-sale_item.销售量,res_item.Availability = res_item.(Original) Availability - sale_item.Sales,

在意向锁定时间内,合同子项25002的货款到帐,该销售合同生效;同时用户要求撤消合同子项25001的销售意向,销售明细表即时更新(图7<2>),同时后台可供资源更新触发单元131调用可供资源数据操纵单元1322和可供资源确定单元1321,更新可供资源明细表中与合同25001对应的资源号I660100B相关联的数据(图8<4>),其中,Within the intention lock time, the payment for the contract sub-item 25002 arrives, and the sales contract takes effect; at the same time, the user requests to cancel the sales intention of the contract sub-item 25001, and the sales list is updated immediately (Figure 7<2>), and the background resources are available The update trigger unit 131 invokes the available resource data manipulation unit 1322 and the available resource determination unit 1321 to update the data associated with the resource number I660100B corresponding to the contract 25001 in the available resource list (Fig. 8<4>), wherein,

res_item.可供量=res_item.(原)可供量+sale_item.销售量;res_item. availability = res_item. (original) availability + sale_item. sales;

当销售合同25002发货完毕时,即时更新销售明细表(图7<3>),并触发后台的触发器,将合同25002相关联的资源号L660101A的库存量按照实际发货量进行校正(图8<5>),其中,When the sales contract 25002 is delivered, the sales list is updated immediately (Figure 7<3>), and the background trigger is triggered to correct the inventory of the resource number L660101A associated with the contract 25002 according to the actual delivery volume (Figure 7<3>) 8<5>), where,

res_item.库存量=res_item.(原)库存量-sale_item.发货量,res_item. inventory = res_item. (original) inventory - sale_item. shipments,

由于实际发货量与销售量相等,因此该资源的可供量不需调整;Since the actual shipment quantity is equal to the sales quantity, the availability of this resource does not need to be adjusted;

合同25002发货后,在合同规定周期和退货条件范围内,用户提出退货50T,系统从外部输入装置11中接收退货信息,在退货红冲明细表中插入新记录(图9),同时后台可供资源触发单元131即时调用可供资源数据操纵单元1322和可供资源数据运算单元1321,按照实际退货量更新可供资源明细表中与合同25002对应的资源号I660100B相关联的数据(图8<6>),其中,After delivery of contract 25002, within the period stipulated in the contract and within the scope of return conditions, the user proposes a return of 50T, the system receives the return information from the external input device 11, and inserts a new record into the return red punch list (Figure 9), and at the same time, the background can The resource supply trigger unit 131 immediately calls the available resource data manipulation unit 1322 and the available resource data computing unit 1321, and updates the data associated with the resource number I660100B corresponding to the contract 25002 in the available resource schedule according to the actual returned quantity (Fig. 8< 6>), where,

res_item.库存量=res_item.(原)库存量+hc_item.红冲量,res_item. inventory = res_item. (original) inventory + hc_item. red impulse,

res_item.可供量=res_item.(原)可供量+hc_item.红冲量;res_item. Availability = res_item. (Original) Availability + hc_item. Red Impulse;

当退货流程及相应的财务结算完毕后,销售合同25002结案(图7<4>)。After the return process and the corresponding financial settlement are completed, the sales contract 25002 is closed (Figure 7<4>).

以上实施例只列举了相对简单的情况,仅描述了采购合同-采购入库-采购结案-销售意向-销售生效-销售出库-销售退货-销售结案的情况。而在实际应用中,可能会存在采购合同-销售意向-销售合同-采购入库-销售出库-销售退货-采购退货-采购结案-销售结案等更为复杂的情况,甚至还可能包括合同及意向的撤销、采购量或者销售量发生变更、采购或销售的资源的型号、规格、交货时间或仓储地点发生变化等等情况,对于这些情况,也可以通过类似方式即时触发后台的可供资源触发单元来同步更新相关可供资源的信息。The above embodiment only lists relatively simple situations, and only describes the situation of purchase contract-purchase storage-purchase settlement-sales intention-sales effective-sales delivery-sales return-sales settlement. In practical applications, there may be more complicated situations such as purchase contract-sales intention-sales contract-purchase storage-sales delivery-sales return-purchase return-purchase closing-sales closing, etc., and may even include contracts and Cancellation of intention, changes in purchase volume or sales volume, changes in the model, specification, delivery time, or storage location of purchased or sold resources, etc. For these situations, the available resources in the background can also be triggered instantly in a similar way The trigger unit is used to synchronously update information about available resources.

如果企业或用户想查询可供资源信息,系统可以从外部输入处理单元中接收到查询请求后,调用可供资源相关信息查询处理单元,将可供资源明细表中所有符合条件的数据检索出来,并通过外部输出处理单元将结果显示出来。If an enterprise or a user wants to query available resource information, the system can call the available resource-related information query processing unit after receiving the query request from the external input processing unit to retrieve all qualified data in the available resource list. And display the result through the external output processing unit.

可见,通过这种方式对可供资源明细表进行同步动态维护,在各个可供资源业务关联环节发生可供资源量的改变时,都通过系统后台的可供资源更新触发单元来即时更新该资源的可供量,将计算量分摊在各个业务关联环节里,从而能够实时获取精确的可供资源信息,便于企业直接根据可供资源明细表中未结案的资源来制定销售计划,或提供给用户自助查询并挑选可供资源生成销售意向。It can be seen that in this way, the list of available resources is dynamically maintained synchronously. When the amount of available resources changes in each link of the business-related links of available resources, the resources are updated immediately through the available resource update trigger unit in the system background. The amount of available resources is distributed among various business-related links, so that accurate available resource information can be obtained in real time, and it is convenient for enterprises to directly formulate sales plans based on the unclosed resources in the available resource list, or provide them to users. Self-service query and selection of available resources to generate sales intentions.

需要说明的,上述内容主要针对贸易性企业。对于生产性企业,上述原理同样适用,一方面,生产性企业的各种原料、半成品的可供信息是否即时、准确,关系到生产备料的合理性,严重时可能影响后续生产的顺利进行;另一方面,成品的可供信息,特别是可供量、可供货时间等,如果不能即时准确地展现,同样有可能造成资源重复销售,或造成实际库存积压而占用企业大量资金的情况。It should be noted that the above content is mainly for trading enterprises. For production enterprises, the above principles are also applicable. On the one hand, the availability of information on various raw materials and semi-finished products of production enterprises is timely and accurate, which is related to the rationality of production material preparation, and may affect the smooth progress of subsequent production in serious cases; On the one hand, if the availability information of finished products, especially the availability and availability time, cannot be displayed in real time and accurately, it may also cause repeated sales of resources, or cause a backlog of actual inventory and occupy a large amount of funds of the enterprise.

以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications should also be It is regarded as the protection scope of the present invention.

Claims (9)

1、一种可供资源管理系统,其特征在于,包括:1. An available resource management system, characterized in that it comprises: 数据库,存储可供资源相关信息;A database that stores information about available resources; 可供资源更新触发单元,若各可供资源采购或销售业务关联环节可供资源变化,则触发进行可供资源即时更新;Available resource update trigger unit, if the available resource changes in each available resource procurement or sales business related links, it will trigger the immediate update of available resources; 可供资源更新处理单元,按照各可供资源采购或销售业务关联环节的可供资源变化信息对数据库中存储的可供资源相关信息进行即时更新。The available resource update processing unit updates the available resource-related information stored in the database in real time according to the available resource change information of each available resource purchase or sales related link. 2、根据权利要求1所述的可供资源管理系统,其特征在于,所述可供资源更新处理单元包括:2. The available resource management system according to claim 1, wherein the available resource update processing unit comprises: 可供资源确定单元,用于按照各可供资源采购或销售业务关联环节的可供资源变化信息即时确定当前的可供资源信息;The available resource determination unit is used to instantly determine the current available resource information according to the available resource change information of each available resource procurement or sales business related links; 可供资源数据操作单元,按照所述可供资源确定单元确定的当前可供资源信息,即时更新数据库中可供资源相关信息。The available resource data operation unit immediately updates the available resource related information in the database according to the current available resource information determined by the available resource determining unit. 3、根据权利要求1或2所述的可供资源管理系统,其特征在于,所述可供资源管理系统还包括:3. The available resource management system according to claim 1 or 2, characterized in that the available resource management system further comprises: 输入处理单元,用于接收用户可供资源查询请求输入或各可供资源采购或销售业务关联环节的可供资源变化信息输入以及可供资源管理的其他相关信息输入;The input processing unit is used to receive the user's available resource query request input or the available resource change information input of each available resource procurement or sales business related link, as well as other relevant information input for available resource management; 可供资源相关信息查询处理单元,用于响应用户可供资源查询请求,进行可供资源查询处理;An available resource-related information query processing unit, configured to respond to a user's available resource query request and perform available resource query processing; 输出处理单元,用于输出可供资源查询结果以及可供资源管理的其他相关信息;An output processing unit, configured to output resource query results and other relevant information available for resource management; 计时单元,用于指示并记录时间。A timing unit for indicating and recording time. 4、根据权利要求1或2所述的可供资源管理系统,其特征在于,所述可供资源管理系统还包括:4. The available resource management system according to claim 1 or 2, characterized in that the available resource management system further comprises: 可供资源变化信息采集单元,用于采集各可供资源采购或销售业务关联环节的可供资源变化信息;The available resource change information collection unit is used to collect the available resource change information of each available resource procurement or sales related links; 传送单元,用于将所述采集到的可供资源变化信息传送给可供资源更新触发单元。The transmitting unit is configured to transmit the collected available resource change information to the available resource update triggering unit. 5、根据权利要求1-4任一项所述的可供资源管理系统,其特征在于,所述可供资源采购业务关联环节包括:5. The available resource management system according to any one of claims 1-4, characterized in that, the relevant links of the available resource procurement business include: 可供资源采购合同签订环节、可供资源采购合同变更环节以及可供资源采购合同撤销环节。The link of signing the available resources procurement contract, the link of changing the available resources procurement contract and the cancellation of the available resources procurement contract. 6、根据权利要求5所述的可供资源管理系统,其特征在于,所述可供资源销售业务关联环节包括:6. The available resource management system according to claim 5, characterized in that, the relevant links of the available resource sales business include: 可供资源销售合同签订环节、可供资源销售合同变更环节以及可供资源销售合同撤销环节。The link of signing the available resources sales contract, the link of changing the available resources sales contract, and the link of canceling the available resources sales contract. 7、一种可供资源管理方法,其特征在于,包括:7. A method for resource management, characterized by comprising: 若各可供资源采购或销售业务关联环节可供资源变化,则触发进行可供资源即时更新;If the available resources of each available resource procurement or sales business link change, it will trigger an immediate update of the available resources; 根据各可供资源采购或销售业务关联环节的可供资源变化信息对数据库中存储的可供资源相关信息进行即时更新。According to the available resource change information of each available resource procurement or sales business related link, the available resource related information stored in the database is updated in real time. 8、根据权利要求7所述的可供资源管理方法,其特征在于,所述对数据库中存储的可供资源相关信息进行即时更新包括:8. The method for managing available resources according to claim 7, wherein the instant update of the available resource-related information stored in the database comprises: 按照各可供资源采购或销售业务关联环节的可供资源变化信息即时确定当前的可供资源信息;Instantly determine the current available resource information according to the available resource change information of each available resource procurement or sales business related links; 根据所述确定的当前可供资源信息,即时更新数据库中可供资源相关信息。According to the determined current available resource information, immediately update the available resource related information in the database. 9、根据权利要求7或8所述的可供资源管理方法,其特征在于,所述可供资源采购业务关联环节包括:9. The method for managing available resources according to claim 7 or 8, characterized in that, the relevant links of the procurement of available resources include: 可供资源采购合同签订环节、可供资源采购合同变更环节以及可供资源采购合同撤销环节;The link of signing the procurement contract of available resources, the link of changing the procurement contract of available resources, and the link of revocation of the procurement contract of available resources; 所述可供资源销售业务关联环节包括:The relevant links of the available resource sales business include: 可供资源销售合同签订环节、可供资源销售合同变更环节以及可供资源销售合同撤销环节。The link of signing the available resources sales contract, the link of changing the available resources sales contract, and the link of canceling the available resources sales contract.
CNA2007100262220A 2007-01-05 2007-01-05 Available resource management system and available resource management method Pending CN101042750A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007100262220A CN101042750A (en) 2007-01-05 2007-01-05 Available resource management system and available resource management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007100262220A CN101042750A (en) 2007-01-05 2007-01-05 Available resource management system and available resource management method

Publications (1)

Publication Number Publication Date
CN101042750A true CN101042750A (en) 2007-09-26

Family

ID=38808248

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007100262220A Pending CN101042750A (en) 2007-01-05 2007-01-05 Available resource management system and available resource management method

Country Status (1)

Country Link
CN (1) CN101042750A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103578023A (en) * 2012-07-30 2014-02-12 上海宝信软件股份有限公司 Modeling implementation system based on steel crude fuel purchasing valuation
CN105590178A (en) * 2014-10-21 2016-05-18 阿里巴巴集团控股有限公司 Resource processing method and resource processing device
CN105894306A (en) * 2016-03-30 2016-08-24 乐视控股(北京)有限公司 Monitoring management method and system for promised order time
CN106156975A (en) * 2015-04-23 2016-11-23 阿里巴巴集团控股有限公司 The inventory information processing method and processing device of business object
CN106203894A (en) * 2015-04-30 2016-12-07 阿里巴巴集团控股有限公司 The processing method of the inventory information of merchandise items and system
CN106709774A (en) * 2015-11-12 2017-05-24 阿里巴巴集团控股有限公司 Method and apparatus for processing commodity object transaction information
CN107527171A (en) * 2016-06-22 2017-12-29 阿里巴巴集团控股有限公司 Realize system, method and the dispatch server and processing server of order management and control
CN107749018A (en) * 2011-12-07 2018-03-02 亚马逊技术股份有限公司 Network-accessible point of sale device example
CN112819663A (en) * 2021-01-29 2021-05-18 阅霆信息技术(上海)有限公司 Work copyright inventory management method and system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107749018A (en) * 2011-12-07 2018-03-02 亚马逊技术股份有限公司 Network-accessible point of sale device example
CN107749018B (en) * 2011-12-07 2021-08-17 亚马逊技术股份有限公司 Network accessible point of sale device instances
CN103578023B (en) * 2012-07-30 2016-09-28 上海宝信软件股份有限公司 Modeling based on the buying valuation of iron and steel crude fuel realizes system
CN103578023A (en) * 2012-07-30 2014-02-12 上海宝信软件股份有限公司 Modeling implementation system based on steel crude fuel purchasing valuation
US20170220388A1 (en) * 2014-10-21 2017-08-03 Alibaba Group Holding Limited Resource processing method and device
CN105590178A (en) * 2014-10-21 2016-05-18 阿里巴巴集团控股有限公司 Resource processing method and resource processing device
CN106156975A (en) * 2015-04-23 2016-11-23 阿里巴巴集团控股有限公司 The inventory information processing method and processing device of business object
CN106203894A (en) * 2015-04-30 2016-12-07 阿里巴巴集团控股有限公司 The processing method of the inventory information of merchandise items and system
CN106709774A (en) * 2015-11-12 2017-05-24 阿里巴巴集团控股有限公司 Method and apparatus for processing commodity object transaction information
CN106709774B (en) * 2015-11-12 2020-12-01 菜鸟智能物流控股有限公司 Commodity object transaction information processing method and device
CN105894306A (en) * 2016-03-30 2016-08-24 乐视控股(北京)有限公司 Monitoring management method and system for promised order time
CN107527171A (en) * 2016-06-22 2017-12-29 阿里巴巴集团控股有限公司 Realize system, method and the dispatch server and processing server of order management and control
CN112819663A (en) * 2021-01-29 2021-05-18 阅霆信息技术(上海)有限公司 Work copyright inventory management method and system
CN112819663B (en) * 2021-01-29 2024-06-25 阅霆信息技术(上海)有限公司 Work copyright inventory management method and system

Similar Documents

Publication Publication Date Title
US8190465B2 (en) Make-to-specification process and data model
US7822682B2 (en) System and method for enhancing supply chain transactions
US9767495B2 (en) Different sales and planning product options
CN101346713B (en) Modeling user input and interaction in workflow based applications
US20100161366A1 (en) Product requirement specification in production model
CN110930221B (en) Abnormal order processing method, storage medium and computer equipment
JP6243343B2 (en) Techniques for providing enterprise resource planning functions from email client applications
US10304098B2 (en) Generation and execution of custom requests for quote
CN1221908C (en) Communication method and system between supplier and customer devices
WO1999033016A9 (en) Integrated business-to-business web commerce and business automation system
CN1685308A (en) Real-time aggregation of data within an enterprise planning environment
CN104471602A (en) Invoice and freight statement matching and dispute resolution
US20140095266A1 (en) Supply chain financial orchestration system with custom qualifier parameters
WO2015103222A1 (en) Providing steps for a product return
CN101414369A (en) Management method and system for material encode
CN101042750A (en) Available resource management system and available resource management method
US7711612B1 (en) Replenishment management system and method
Wee et al. Optimising replenishment policy for an integrated production inventory deteriorating model considering green component-value design and remanufacturing
US9224107B2 (en) Managing customizing settings in a business structured interface
CN111507686A (en) Automatic budget system and method for engineering design change
CN1823331A (en) Inline compression of a network communication within an enterprise planning environment
TW589554B (en) A system and method for forecasting and ordering within enterprise
CN1761970A (en) Consignment inventory management and reconciliation system
US7637427B2 (en) Shared financial service systems and methods
Oracle Q: What is ERP?

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20070926