[go: up one dir, main page]

CN1009016B - The device that has the port ramp on landing stage - Google Patents

The device that has the port ramp on landing stage

Info

Publication number
CN1009016B
CN1009016B CN 87104063 CN87104063A CN1009016B CN 1009016 B CN1009016 B CN 1009016B CN 87104063 CN87104063 CN 87104063 CN 87104063 A CN87104063 A CN 87104063A CN 1009016 B CN1009016 B CN 1009016B
Authority
CN
China
Prior art keywords
landing stage
pivot
harbour
slope bridge
respect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CN 87104063
Other languages
Chinese (zh)
Other versions
CN87104063A (en
Inventor
赛伊德·乌勒堡
约兰·约翰森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MACGREGO-NAVIRE INTERNATIONAL AB
Original Assignee
MACGREGO-NAVIRE INTERNATIONAL AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MACGREGO-NAVIRE INTERNATIONAL AB filed Critical MACGREGO-NAVIRE INTERNATIONAL AB
Priority to CN 87104063 priority Critical patent/CN1009016B/en
Publication of CN87104063A publication Critical patent/CN87104063A/en
Publication of CN1009016B publication Critical patent/CN1009016B/en
Expired legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of port ramp (11) with landing stage (15) is as the interface channel between roro container ship (18) and the frequent port and pier (10) that changes of water level.A slope bridge (11a) is being connected respectively on harbour edge and the landing stage around the mode of pivot vertical rotation.Buffer (19) is installed between slope bridge and the landing stage, so that slow down the angle of rotation rate of change between the two, therefore, they are combined, constitute an interconnected rigid element that crosses the car load on landing stage with respect to interruption, constitute the parts that can independently pivot of a SEA LEVEL VARIATION effect that causes with respect to morning and evening tides etc. simultaneously.

Description

The device that has the port ramp on landing stage
The present invention relates to a kind of port ramp with landing stage, it constitutes the interface channel between ferry formula ship and the frequent port and pier that changes of water level, and slope bridge wherein is connected with harbour edge and landing stage respectively in the mode that can vertically pivot.
Loading and unloading roll on roll-off container ship time in the harbour that SEA LEVEL VARIATION (for example morning and evening tides is caused) often takes place utilizes to have the port ramp on landing stage as the interface channel between ship and the harbour usually.This port ramp is known, for example is recorded among the Swedish patent application SE-A 415,583.This have structure to include bigger landing stage earlier, and its main cause is the trim that produces when heavy-duty vehicle crosses the landing stage in order to reduce as far as possible.To the modernized cargo handling of ferry formula ship, the level transhipment of meaning cargo compartment emphatically causes asymmtric load with respect to the buoyancy aid center of gravity to the landing stage.The trim that thereupon causes must reduce, so that reduce the stress on the ramp, vehicle is moved.For this reason, just need large-scale landing stage, its fabricating cost is high, takes up an area of big in harbour facilities.SE-A419,741 disclose a kind of device that reduces landing stage canting power, and this power is to be caused by the load that moves past on it.This device adopts a kind of system that has chain, counterweight and balance weight, so that balance moves past the caused moment in roll of the load on landing stage.The benefit of this device, promptly be subjected to must be by the balance weight of landing stage carrying and the limitation of weight chain for its possibility that reduces the landing stage size.And this structure is very expensive, increase the expense of maintenance.
The objective of the invention is to propose a kind of device that can reduce landing stage size and expense, this landing stage with ferry method handling goods, has extremely excellent trim characteristic for the delivery truck.
According to port ramp of the present invention, it is characterized in that having at least a hydraulic cylinder, be installed between slope bridge and the landing stage in the mode that can pivot, hydraulic cylinder two sap cavities are interconnected by at least one choke valve, and and fluid storage tank connection, so that the angle of rotation rate of change between reduction slope bridge and the landing stage; They are combined, and have constituted a rigid element that interconnects that moves past the car load on landing stage with respect to interruption, have constituted the parts that can independently pivot of the SEA LEVEL VARIATION effect that causes with respect to for example morning and evening tides in long-term.
Buffer preferably includes at least one hydraulic cylinder, and it is installed between slope bridge and the landing stage in the mode that can pivot.
According to another most preferred embodiment of the present invention, interconnect by at least one choke valve between the sap cavity of hydraulic cylinder, and be communicated with fluid storage tank.
Narrate one embodiment of the present of invention with reference to the accompanying drawings, the accompanying drawing drawing is described as follows:
Fig. 1 is the lateral view according to a port ramp of the present invention;
Fig. 2 is the schematic diagram of hydraulic circuit of the present invention;
Fig. 3 and 4 is respectively the scaled down view in two ramps under the different water levels.
In the accompanying drawings, 10 refer to harbour.11 tables are done the carried cargo loading and unloading ramp of usefulness of as a whole expression, and it is secured on the harbour and has a landing stage.Ramp 11 nationality horizontal pivot 12 are connected on the harbour edge, and pivot 12 flexibly is installed on the dock structure by snubber 13.Pivot 12 and snubber 13 are by baffle plate 14 cross-over connections.Port ramp 11 comprises a landing stage 15 and the slope bridge 11a that can vertically rotate installation around pivot, and this slope bridge is supported on harbour 10 and the landing stage 15 substantially equably, and the distance of cross-over connection between the two.This distance equals the length of slope bridge 11a, should make the gradient of slope bridge unlikely too steep during selection, even also must be so under the situation of extreme ebb tide.
Harbour 10 is preferably formed as L shaped angle and is equipped with the mooring gear that supplies landing stage 15 usefulness.
In traditional port ramp, when a loading and unloading truck 17 when ship 18 reaches landing stage 15, the landing stage just often has trim (rotating around its buoyancy aid center of gravity).This Trimming Moment causes difficulty when making ship 18 handling goods.
For avoiding trim, according to the buffer that hydraulic piston cylinder 19 forms are housed on the port ramp 11 of the present invention, the one end is installed on the bridge 11a of slope in the mode that can pivot, the other end is installed on the landing stage 15 with the same manner, piston rod 19 is connected with hydraulic system, and as shown in Figure 2, its connected mode should make between two the sap cavity 19a and 19b of each piston rod, promptly, releasing of a certain amount of hydraulic fluid can be arranged from the side direction opposite side of piston 19c.The adjusting of liquid of releasing should make the floating height and normal SEA LEVEL VARIATION of port ramp 11, and promptly the caused SEA LEVEL VARIATION of morning and evening tides adapts.But, when a loading and unloading truck 17 crosses landing stage 15, the SEA LEVEL VARIATION that is produced is very fast, have only a small amount of hydraulic fluid to flow to another sap cavity from a sap cavity if having time, therefore, slope bridge 11a and landing stage 17 fit in a rigid element, and its rotation is positioned at pivot 12 places at harbour edge.This means that total waterline zone on landing stage will be subjected to the influence of load, therefore the result who uses can make the manufacturing on landing stage 15 have structure littler and cheap earlier than this.
Comprise choke valve 20 in the hydraulic system shown in Figure 2, also has stop valve 21 in addition, can pin or keep apart certain part of system, promptly be used to change certain element, contiguous block 22 is installed in the system, can be used for arbitrary part of for example hand pump connecting system, one way valve 23 and choke valve 20 parallel installations, resistance when avoiding liquid to flow into piston 19c suction side, each piston rod all is connected with common fluid storage tank 24, accommodates hydraulic fluid and a rubber balloon 25 that is communicated with ambient atmosphere in the fluid storage tank 24.Whole hydraulic system generally is in pressure-less state, thereby only plays the piston motion of buffering hydraulic pressure.
Fig. 3 is in two port ramps 11 under the extreme water level situation with Figure 4 shows that, wherein, landing stage 15 remains parallel to the trim of the water surface.Like this,, be convenient to transport the transition of truck between ship and landing stage, need not consider the floating horizon of ship with respect to the landing stage because the transhipment surface on landing stage 15 always is parallel to the water surface under the no-load situation.
Above describe and disclosed embodiment only is an an example of the present invention, its details can change in the scope of additional claims in many ways.For example, buffer 19 can have different project organizations, can in all sorts of ways to be connected on slope bridge and the landing stage, and choke valve 20 can be regulated with different load conditions.

Claims (1)

1, a kind of in the harbour facilities that water level often changes as the port ramp with landing stage of the interface channel between ferry formula ship and the harbour (10), wherein, a slope bridge (11a) is being connected with harbour edge and landing stage (15) respectively around the mode of pivot vertical rotation, it is characterized in that having at least a hydraulic cylinder (19) to be installed between slope bridge (11a) and landing stage (15) in the mode that can pivot, hydraulic cylinder (19) two sap cavity (19a, 19b) can be communicated to fluid storage tank (24) at the one way valve (23) that the direction of hydraulic cylinder (19) is opened by at least one choke valve (20) and at least one, so that slow down the angle of rotation rate of change between slope bridge (11a) and landing stage (15), they are combined, constitute one in a short time and cross the interconnected rigid element of the car load on landing stage (15), the parts that can independently pivot of the SEA LEVEL VARIATION effect that one of formation causes with respect to for example morning and evening tides in long-term with respect to interruption.
CN 87104063 1987-06-03 1987-06-03 The device that has the port ramp on landing stage Expired CN1009016B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 87104063 CN1009016B (en) 1987-06-03 1987-06-03 The device that has the port ramp on landing stage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 87104063 CN1009016B (en) 1987-06-03 1987-06-03 The device that has the port ramp on landing stage

Publications (2)

Publication Number Publication Date
CN87104063A CN87104063A (en) 1988-12-14
CN1009016B true CN1009016B (en) 1990-08-01

Family

ID=4814704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 87104063 Expired CN1009016B (en) 1987-06-03 1987-06-03 The device that has the port ramp on landing stage

Country Status (1)

Country Link
CN (1) CN1009016B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE533362C2 (en) * 2008-06-02 2010-09-07 Tts Ships Equipment Ab Device for shared ship ramp
NL2015438B1 (en) * 2015-04-28 2017-01-18 U-Sea Beheer B V Telescopic access bridge, unit provided therewith, and method there for.
CN104908892A (en) * 2015-06-04 2015-09-16 中国人民解放军镇江船艇学院 Rapid building device for emergency shore connecting channel
CN107794836B (en) * 2016-10-28 2020-01-14 福建省新能海上风电研发中心有限公司 Landing stage is stepped on to offshore platform
CN106688442B (en) * 2016-12-25 2019-02-05 重庆市永川区义三种苗有限责任公司 It can be in picking ladder used in terraced fields
CN107035737B (en) * 2017-06-21 2018-05-04 哈尔滨理工大学 The electro-hydraulic driving load collaborative device of link containing flexible connected and its control method
CN108443248A (en) * 2018-05-08 2018-08-24 哈尔滨理工大学 Electro-hydraulic driving auxiliary device and its control method is adjusted in corner
CN110733912A (en) * 2019-11-14 2020-01-31 大连港口设计研究院有限公司 Jacking type passenger roller bridge driving device
CN112027019A (en) * 2020-07-17 2020-12-04 沪东中华造船(集团)有限公司 Arrangement method of boarding ladder of ship wharf

Also Published As

Publication number Publication date
CN87104063A (en) 1988-12-14

Similar Documents

Publication Publication Date Title
CN1009016B (en) The device that has the port ramp on landing stage
EP0053770A2 (en) Transfer system for use between platforms having relative motion between one another
CN87100953A (en) Water jump course
US5501625A (en) Floating terminal
CN1821016A (en) Full hydraulic driven boarding ladder
CN213112346U (en) Ship wastewater receiving device for river wharf
CN100472075C (en) Boarding bridge ferry plate hydraulic system
CN1152348A (en) Pressure relief valve for pressure equalization between a closed space and the surrounding atmosphere
GB2191458A (en) Semi-submersible crane vessel
AU673363B2 (en) Method for offshore loading of a tanker
EP0245227A2 (en) Device for a port ramp having a pontoon float
CN215515904U (en) Grading shipment system for wharf with large water head
CN108425315A (en) A kind of position compensation extension type is gone on board trestle
JPS62502604A (en) Ship lifting device
CN1675102B (en) Ramp structure of a ship for handling of cargo
CN113212658A (en) Photovoltaic system anchor on water
CN114855694B (en) Dock floating roll-on facility suitable for large tidal range condition and operation method
CN1124943A (en) Tanker provided with swash type bulkheads
CN208053585U (en) A kind of offshore platform
CN111676894B (en) Wharf structure suitable for muddy coast
US4361105A (en) Barge-carrying vessel
CN209535406U (en) Combined drawing anchor adjustable seaplane safely berthing floating wharf
CN106498918A (en) A kind of gravity platform jacking system
CN1067084A (en) Silt partition method in the Hydraulic and Hydro-Power Engineering
CN1051051C (en) Nose jacking-preventing protector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C13 Decision
GR02 Examined patent application
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication