CN100564695C - 载体桩的施工方法 - Google Patents
载体桩的施工方法 Download PDFInfo
- Publication number
- CN100564695C CN100564695C CNB2007100507444A CN200710050744A CN100564695C CN 100564695 C CN100564695 C CN 100564695C CN B2007100507444 A CNB2007100507444 A CN B2007100507444A CN 200710050744 A CN200710050744 A CN 200710050744A CN 100564695 C CN100564695 C CN 100564695C
- Authority
- CN
- China
- Prior art keywords
- pile
- ram
- carrier
- construction
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 80
- 239000002689 soil Substances 0.000 claims abstract description 76
- 239000004567 concrete Substances 0.000 claims abstract description 38
- 239000007787 solid Substances 0.000 claims abstract description 15
- 239000000945 filler Substances 0.000 claims abstract description 12
- 239000000463 material Substances 0.000 claims description 12
- 230000035515 penetration Effects 0.000 claims description 7
- 239000004576 sand Substances 0.000 claims description 5
- 238000000034 method Methods 0.000 abstract description 30
- 239000002131 composite material Substances 0.000 abstract description 12
- 239000011150 reinforced concrete Substances 0.000 abstract description 5
- 239000002699 waste material Substances 0.000 abstract description 3
- 239000004575 stone Substances 0.000 abstract description 2
- 238000007789 sealing Methods 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 8
- 238000005056 compaction Methods 0.000 description 6
- 238000011065 in-situ storage Methods 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007100507444A CN100564695C (zh) | 2007-12-11 | 2007-12-11 | 载体桩的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007100507444A CN100564695C (zh) | 2007-12-11 | 2007-12-11 | 载体桩的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101200893A CN101200893A (zh) | 2008-06-18 |
CN100564695C true CN100564695C (zh) | 2009-12-02 |
Family
ID=39516232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2007100507444A Expired - Fee Related CN100564695C (zh) | 2007-12-11 | 2007-12-11 | 载体桩的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100564695C (zh) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444120A (zh) * | 2011-09-23 | 2012-05-09 | 刘献刚 | 全夯式多头扩底灌注桩的施工方法 |
CN103821138B (zh) * | 2012-07-02 | 2016-09-07 | 朱建新 | 复合桩的施工方法 |
CN104404956A (zh) * | 2014-11-20 | 2015-03-11 | 张红 | 一种扩底桩的施工方法 |
CN104846811A (zh) * | 2015-05-20 | 2015-08-19 | 王继忠 | 一种多种工艺流水作业的载体桩的施工方法 |
CN106013042B (zh) * | 2016-06-20 | 2019-01-01 | 叶吉 | 一种软土地基加固方法及加固用的管夯 |
CN107794917A (zh) * | 2016-09-02 | 2018-03-13 | 石午江 | 一种没有大气污染和锤击噪音很小的锤击成孔制桩方法 |
CN112593549B (zh) * | 2020-04-20 | 2022-05-27 | 武汉砼源高新科技有限公司 | 载体桩施工工艺 |
CN112064623A (zh) * | 2020-08-07 | 2020-12-11 | 王继忠 | 一种载体桩的施工方法 |
CN113550306A (zh) * | 2021-07-22 | 2021-10-26 | 江西基业科技集团有限公司 | 土石护壁施工方法 |
CN113481974B (zh) * | 2021-07-30 | 2022-03-22 | 广东康润达建设工程有限公司 | 一种淤泥质土载体桩施工方法 |
CN113914304A (zh) * | 2021-11-19 | 2022-01-11 | 中国水利水电第五工程局有限公司 | 一种cfg桩长螺旋钻孔芯管泵送混合料灌注成桩施工方法 |
CN114182722A (zh) * | 2021-12-23 | 2022-03-15 | 中铁十局集团第七工程有限公司 | 一种用于富水地层载体桩施工方法 |
CN114636582B (zh) * | 2022-03-31 | 2025-02-11 | 中国地质大学(武汉) | 一种模型载体桩的箱体试验装置和试验方法 |
-
2007
- 2007-12-11 CN CNB2007100507444A patent/CN100564695C/zh not_active Expired - Fee Related
Non-Patent Citations (1)
Title |
---|
复合载体夯扩桩在工程中的应用. 朱惠伟等人.施工技术,第36卷第9期. 2007 * |
Also Published As
Publication number | Publication date |
---|---|
CN101200893A (zh) | 2008-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100564695C (zh) | 载体桩的施工方法 | |
CN104074186B (zh) | 一种建筑地基中成孔的护筒装置及其施工方法 | |
CN103184734B (zh) | 一种植入注浆组合桩的施工方法 | |
WO2018210019A1 (zh) | 潜孔冲击旋喷复合桩成桩方法 | |
CN110318393B (zh) | 一种复合桩的施工方法 | |
CN104420486B (zh) | 一种在已有扩展浅基础底部增设钢管桩的方法及结构 | |
KR100762991B1 (ko) | 고강도 몰탈을 충진하는 기성말뚝 매입공법 | |
CN102733378B (zh) | 混凝土桩的施工方法 | |
CN102888834B (zh) | 一种大直径碎石桩的施工方法 | |
CN103821139B (zh) | 一种夯扩载体劲芯多元复合桩及软土地基加固施工方法 | |
CN104294818B (zh) | 混凝土桩的施工方法 | |
CN103074882A (zh) | 用于采用碎石桩加固处理岛状多年冻土地基的施工方法 | |
CN114517472B (zh) | 一种载体桩的施工方法 | |
CN105714773A (zh) | 一种地基处理方法 | |
CN104746505A (zh) | 强夯压密注浆联合处理杂填土地基方法 | |
CN100375820C (zh) | 混凝土桩的施工方法 | |
CN104099925A (zh) | 混凝土桩的施工装置及其施工方法 | |
CN111794216A (zh) | 抗拔载体桩的施工方法 | |
CN104264655A (zh) | 预成孔深层水下夯实法 | |
CN101575852A (zh) | 护壁式扩底沉管灌注桩施工方法 | |
CN102635110B (zh) | 混凝土桩的施工方法 | |
CN107012861A (zh) | 一种散体材料芯膨胀混凝土桩及其施工方法 | |
CN108797578A (zh) | 带分级扩大头的碎石注浆桩及其施工方法 | |
CN100513702C (zh) | 在卵石层、砂层中施工的沉管灌注桩保证桩长的施工方法 | |
CN110485230A (zh) | 一种高水位软土桥头路基的处治结构及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CECEP CONSTRUCTION ENGINEERING DESIGN INSTITUTE CO Free format text: FORMER NAME: ZHONGJI ENGINEERING PROSPECTING DESIGN INST |
|
CP01 | Change in the name or title of a patent holder |
Address after: Hot pepper city street in Chengdu City, Sichuan province 610066 Fuli Building No. 6 Co-patentee after: Wang Huichang Patentee after: China Energy Saving Construction Engineering Design Institute Co Ltd Co-patentee after: Wang Bin Co-patentee after: Gao Shike Co-patentee after: Li Lihua Address before: Hot pepper city street in Chengdu City, Sichuan province 610066 Fuli Building No. 6 Co-patentee before: Wang Huichang Patentee before: Zhongji Engineering Prospecting Design Inst. Co-patentee before: Wang Bin Co-patentee before: Gao Shike Co-patentee before: Li Lihua |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091202 Termination date: 20151211 |
|
EXPY | Termination of patent right or utility model |