[go: up one dir, main page]

CN100426732C - Display method for all link service flow statistics on network - Google Patents

Display method for all link service flow statistics on network Download PDF

Info

Publication number
CN100426732C
CN100426732C CNB021459584A CN02145958A CN100426732C CN 100426732 C CN100426732 C CN 100426732C CN B021459584 A CNB021459584 A CN B021459584A CN 02145958 A CN02145958 A CN 02145958A CN 100426732 C CN100426732 C CN 100426732C
Authority
CN
China
Prior art keywords
link
service
network
network topology
links
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNB021459584A
Other languages
Chinese (zh)
Other versions
CN1492625A (en
Inventor
付裕
张远
施广宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CNB021459584A priority Critical patent/CN100426732C/en
Publication of CN1492625A publication Critical patent/CN1492625A/en
Application granted granted Critical
Publication of CN100426732C publication Critical patent/CN100426732C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The present invention relates to a display method for counting all link service flow on a network, which has the technical scheme that the using situation of link counting service resources between two arbitrary nodal points is displayed on a network topological diagram composed of network net element nodal points and links mutually connected to the network net element nodal points. The present invention comprises: a link pattern is divided into two parts connected with each other, wherein the first part is represented by a first color, and the second part is represented by a second color; the proportion of the length of a link pattern represented by the first color to the total length of the link pattern is a ratio of occupied service resources on the links to total service resources of the links; the proportion of the length of a link pattern represented by the second color to the total length of the link pattern is a ratio of idle service resources on the links to the total service resources of the links. The method can display a bidirectional service resource using situation or two single-direction service resource using situations on one link, and the present invention is suitable for network topological diagrams with large scales, complex networks and large service flow counting data and is intuitionistic and brief.

Description

网络上所有链路业务流量统计的显示方法 Method for displaying service flow statistics of all links on the network

技术领域 technical field

本发明涉及一种网络管理技术,更确切地说是涉及一种对网络上所有链路业务流量(或者业务资源使用)统计进行显示的方法,通过在网络拓扑图中直观显示全部网络链路的业务流量,或者业务资源的使用情况,以便于对业务资源使用进行分类、检索或进行其他活动,The present invention relates to a network management technology, more specifically to a method for displaying the statistics of all link service flows (or service resource usage) on the network. Business traffic, or the usage of business resources, in order to classify, retrieve or perform other activities on the use of business resources,

背景技术 Background technique

在业务传送网络中,包括但不限于:异步传输模式(ATM)、IP、同步数字系列(SDH)和波分复用(DWDM)网络,一般都要求在网管上以动态或者静态方式显示网络上各个链路的业务流量,或者业务资源的使用情况,从而使网管操作者能够直观了解整个网络的业务配置分布情况和网络资源的负载情况,从而满足网络业务增加、业务调整、以及网络扩容的要求。In the service transmission network, including but not limited to: Asynchronous Transfer Mode (ATM), IP, Synchronous Digital Hierarchy (SDH) and Wavelength Division Multiplexing (DWDM) networks, it is generally required to display the information on the network dynamically or statically on the network management system. The service flow of each link, or the use of service resources, so that the network management operator can intuitively understand the service configuration distribution of the entire network and the load of network resources, so as to meet the requirements of network service increase, service adjustment, and network expansion .

目前的做法是:在由网络网元节点及相互连接链路(数据传送通路)组成的网络拓扑图上,将计算统计出的各链路上业务资源已经占用的百分率数字,直接显示在网络拓扑图该相应的链路上。如图1中所示,网络网元节点NE1、NE2、NE 3、NE4、NE5、NE6,网络网元节点间相互连接链路上标出两节点间的业务资源已经占用的百分率数据,如图中所示的20%、92%、65%、80%、33%和50%。图中显示的百分率数据是两个网络网元节点间链路双向业务资源已经占用的百分率数据,也可以是用两个数据分别表示两个方向的单向业务资源已经占用的百分率。The current practice is: on the network topology diagram composed of network element nodes and interconnecting links (data transmission paths), the calculated statistics of the percentage of business resources already occupied by each link are directly displayed on the network topology Figure on the corresponding link. As shown in Figure 1, the network element nodes NE1, NE2, NE3, NE4, NE5, and NE6, and the interconnection links between the network element nodes indicate the percentage data of the service resources already occupied between the two nodes, as shown in the figure 20%, 92%, 65%, 80%, 33%, and 50% are shown in . The percentage data shown in the figure is the percentage data of the already occupied bidirectional service resource of the link between the two network element nodes, or two data can be used to represent the percentage already occupied of the unidirectional service resource of the two directions respectively.

这种网络链路资源使用情况的显示方式,在网络比较简单、网络网元节点和链路数目都比较少的情况下是可以接受的。但是,当网络规模比较大,组网比较复杂,两个网元节点之间存在多条链路,或者拓扑图中链路的显示长度较短时,则将所有的数据显示在整个网络拓扑图中就会非常凌乱,操作者根本无法准确地浏览并判断出相应网络链路上的业务流量情况。This way of displaying the usage of network link resources is acceptable when the network is relatively simple and the number of network element nodes and links is relatively small. However, when the network scale is relatively large, the networking is relatively complex, there are multiple links between two network element nodes, or the link display length in the topology diagram is short, all data will be displayed in the entire network topology diagram It will be very messy, and the operator cannot accurately browse and judge the service flow on the corresponding network link.

如果要求在拓扑图中同时显示链路的单向资源使用情况,需要显示的数据则更多,更显得杂乱无章,无法辩识清楚。而在实际应用中,在网络拓扑图的一条链路上一般需要显示两个单向的资源使用数据(在链路上方向恰好相反)。比如在图1中NE4到NE5之间的链路上,从NE4到NE5的单向业务就只占用NE4到NE5的链路业务资源,从NE 5到NE4的单向业务就只占用NE5到NE4的链路业务资源。一般情况下这两个数据不同,所以都需要显示,但是按照以上的数据显示方法,会引起网络拓扑图上显示的数据较多,并且受面积限制造成各数据间不易区分。If it is required to simultaneously display the unidirectional resource usage of links in the topology diagram, more data needs to be displayed, which is even more chaotic and difficult to identify clearly. However, in practical applications, two unidirectional resource usage data generally need to be displayed on a link in the network topology diagram (directions are just opposite on the link). For example, on the link between NE4 and NE5 in Figure 1, the unidirectional service from NE4 to NE5 only occupies the link service resources from NE4 to NE5, and the unidirectional service from NE5 to NE4 only occupies the resources from NE5 to NE4. link service resources. Generally, these two data are different, so they both need to be displayed, but according to the above data display method, there will be more data displayed on the network topology map, and it is difficult to distinguish between the data due to the area limitation.

发明内容 Contents of the invention

本发明的目的是设计一种网络上所有链路业务流量统计的显示方法,用于解决在网络拓扑图上链路资源使用情况的显示问题,使在大规模和复杂网络,以及大业务流量统计数据的网络拓扑图上,也能够直观显示网络上所有链路(传送通路)的业务流量,或者业务资源的使用情况。The purpose of the present invention is to design a display method for all link service flow statistics on the network, which is used to solve the display problem of link resource usage on the network topology map, so that large-scale and complex networks, and large-scale service flow statistics On the network topology map of the data, the service flow of all links (transmission paths) on the network or the usage of service resources can also be visually displayed.

实现本发明目的的技术方案是这样的:一种网络上所有链路业务流量统计的显示方法,在由网络网元节点及其相互连接的链路构成的网络拓扑图上,显示两网络网元节点间链路上所统计的业务资源使用情况,其特征在于包括:The technical solution for realizing the object of the present invention is as follows: a method for displaying service flow statistics of all links on the network, on a network topology diagram composed of network element nodes and their interconnected links, two network elements are displayed The usage of service resources counted on the links between nodes is characterized by including:

将链路图形划分为两个相连接的第一部分和第二部分;计算两部分链路图形界面划分点在网络拓扑图上的坐标,为((x2-x1)×r+x1,(y2-y1)×r+y1),其中(x1,y1)和(x2,y2)是链路图形两个端点在网络拓扑图上的坐标,r是统计的链路业务流量占用总的业务资源率;显示所述第一部分的链路图形和显示所述第二部分的链路图形,该第一部分链路图形的长度占链路图形总长度的比例,是该链路上已经占用的业务资源与该链路总业务资源的比值,和该第二部分链路图形的长度占链路图形总长度的比例,是该链路上空闲业务资源与该链路总业务资源的比值。Divide the link graph into two connected first and second parts; calculate the coordinates of the division point of the two-part link graphic interface on the network topology map, which is ((x2-x1)×r+x1, (y2- y1)×r+y1), wherein (x1, y1) and (x2, y2) are the coordinates of the two endpoints of the link graph on the network topology map, and r is the total service resource rate occupied by the link service flow of statistics; Displaying the link graphics of the first part and the link graphics of the second part, the ratio of the length of the first part of the link graphics to the total length of the link graphics is the ratio of the service resources already occupied on the link to the The ratio of the total service resources of the link and the ratio of the length of the second part of the link graph to the total length of the link graph are the ratios of the idle service resources on the link to the total service resources of the link.

还包括两部分链路图形界面划分点在网络拓扑图上的坐标为((x2+a-x1+a)×r1+x1+a,(y2+a-y1+a)×r1+y1+a),其中(x1+a,y1+a)和(x2+a,y2+a)是位于链路图形两个端点在网络拓扑图上的坐标(x1,y1)和(x2,y2)附近的两个端点在网络拓扑图上的坐标,r1是统计的链路一个方向的单业务流量占用总的业务资源率;和还包括,两部分链路图形界面划分点在网络拓扑图上的坐标为((x2-a-x1-a)×r2+x1-a,(y2-a-y1-a)×r2+y1-a),其中(x1-a,y1-a)和(x2-a,y2-a)是位于链路图形两个端点在网络拓扑图上的坐标(x1,y1)和(x2,y2)附近的另两个端点在网络拓扑图上的坐标,r2是统计的链路另一个方向的单业务流量占用总的业务资源率,a为网络拓扑图中用于描绘链路图形的宽度。It also includes the coordinates of the two-part link graphical interface division point on the network topology map as ((x2+a-x1+a)×r1+x1+a, (y2+a-y1+a)×r1+y1+a ), where (x1+a, y1+a) and (x2+a, y2+a) are located near the coordinates (x1, y1) and (x2, y2) of the two endpoints of the link graph on the network topology map The coordinates of the two endpoints on the network topology map, r1 is the total service resource rate occupied by the single-service traffic in one direction of the statistical link; ((x2-a-x1-a)×r2+x1-a, (y2-a-y1-a)×r2+y1-a), where (x1-a, y1-a) and (x2-a, y2-a) is the coordinates of the other two endpoints near the coordinates (x1, y1) and (x2, y2) of the two endpoints of the link graph on the network topology diagram, and r2 is the statistical link The single service flow in the other direction occupies the total service resource rate, and a is the width used to describe the link graph in the network topology diagram.

本发明显示网络业务资源的使用情况基于网管上的现有网络拓扑图,根据网络拓扑图中链路显示的特点,以不同颜色图形的方式直接在网络拓扑图的链路基础上直观显示相应链路的业务资源使用情况。The present invention displays the use of network service resources based on the existing network topology diagram on the network management system, and according to the characteristics of link display in the network topology diagram, directly displays the corresponding links directly on the basis of the links in the network topology diagram in the form of different color graphics. Service resource usage of the road.

网管中,网络拓扑图上的链路本来就存在,本发明的方法以原链路显示为基础,以不同颜色的图形显示链路资源的使用情况,不需要额外附加符号或者文字,显示直观、简洁。In the network management, the links on the network topology map already exist. The method of the present invention is based on the display of the original links, and displays the use of link resources in graphics of different colors without additional symbols or texts. The display is intuitive and concise.

如在传送业务规划设计系统中,采用本发明技术显示所统计的网络链路业务资源使用情况,可增加界面数据浏览的直观性和友好性;For example, in the transmission service planning and design system, the technology of the present invention is used to display the statistics of the usage of network link service resources, which can increase the intuition and friendliness of interface data browsing;

在网络拓扑图上,通过设置链路图形的颜色,直观、简洁地显示并说明了全网络所有链路资源的使用情况,操作者可一目了然,提高了系统的可操作性和友好性。On the network topology map, by setting the color of the link graphics, the usage of all link resources in the entire network is intuitively and concisely displayed and explained, so that the operator can understand at a glance, which improves the operability and friendliness of the system.

附图说明 Description of drawings

图1是网络链路双向业务资源使用的数据显示方式示意图;FIG. 1 is a schematic diagram of a data display mode used by bidirectional service resources of a network link;

图2是网络链路双向业务资源使用的图形显示方式示意图1;FIG. 2 is a schematic diagram 1 of a graphic display mode for use of network link bidirectional service resources;

图3是网络链路单向业务资源使用的图形显示方式示意图2。FIG. 3 is a schematic diagram 2 of a graphic display mode of network link unidirectional service resource usage.

具体实施方式 Detailed ways

参见图2,图中示出在网管的网络拓扑图上,采用本发明的方法显示任一条链路上的业务资源使用情况,包括单向和双向资源使用情况的显示。Referring to FIG. 2 , it shows that on the network topology diagram of the network management system, the method of the present invention is used to display the usage of service resources on any link, including the display of unidirectional and bidirectional resource usage.

在网络拓扑图上的每一条链路上,以第一颜色(如红色,以实线线段表示,以下同),的链路图形表示本链路上业务资源被使用的情况,以第二颜色(如绿色,以空心线段表示,以下同)的链路图形表示本链路上业务资源空闲的情况。根据链路的长度,链路图形上涂为第一颜色(如红色)部分所占的比例,正好是该链路上已经占用的业务资源与该链路总业务资源的比值;同样,链路图形上涂为第二颜色(如绿色)部分所占比例,正好是该链路上空闲业务资源与该链路总业务资源的比值。On each link on the network topology map, the link graph in the first color (such as red, represented by a solid line segment, the same below), indicates the use of service resources on this link, and the second color (such as green, represented by a hollow line segment, the same below) the link graph indicates the situation that the service resources on this link are idle. According to the length of the link, the proportion of the part painted in the first color (such as red) on the link graph is exactly the ratio of the service resources already occupied on the link to the total service resources of the link; The proportion of the part painted in the second color (such as green) on the graph is just the ratio of the idle service resources on the link to the total service resources of the link.

实现相应显示效果的技术方案是:在网络拓扑图的图形界面上,一般是用连接两端节点的一定宽度的直线所形成的图形来表示链路,所以链路的两个设为A1,A2的端点,在图形界面上的坐标可分别设为A1(x1,y1)和A2(x2,y2),该链路的业务流量占用总的业务资源率已由网管计算统计出来,设为r。为了得到链路流量资源占用的直观显示效果,需要在界面上分两次重新画出该链路,计算其两种颜色图形的中间划分点M的坐标:M((x2-x1)×r+x1,(y2-y1)×r+y1),然后就可用第一颜色(如红色)画从A1到M点的链路图形,再用第二颜色(如绿色)画从M到A2点的链路图形。这样链路上业务流量占用业务资源的比例就在该链路上直接并直观地显示出来了。The technical solution to achieve the corresponding display effect is: on the graphical interface of the network topology map, the link is generally represented by a graph formed by a straight line of a certain width connecting the nodes at both ends, so the two links are set to A1 and A2 The coordinates of the endpoints on the graphical interface can be set to A1 (x1, y1) and A2 (x2, y2) respectively, and the total service resource rate occupied by the service traffic of this link has been calculated and counted by the network management, which is set to r. In order to obtain an intuitive display effect of link traffic resource occupation, it is necessary to redraw the link twice on the interface, and calculate the coordinates of the middle division point M of the two color graphics: M((x2-x1)×r+ x1, (y2-y1)×r+y1), then you can use the first color (such as red) to draw the link from A1 to point M, and then use the second color (such as green) to draw the link from M to A2 Link graphics. In this way, the proportion of service resources occupied by service traffic on the link is directly and visually displayed on the link.

对于链路双向业务资源的显示,就在两个节点间的一条链路图形上用两种颜色显示其双向业务的业务资源被使用情况与业务资源空闲情况。如图中节点NE3、NE4、NE5、NE6、NE7、NE8之间的链路及节点NE9、NE10、NE11、NE12、NE13、NE14之间的链路。For the display of link bidirectional service resources, use two colors to display the usage status and idle status of the bidirectional service service resources on a link graph between two nodes. In the figure, the links between nodes NE3, NE4, NE5, NE6, NE7, and NE8 and the links between nodes NE9, NE10, NE11, NE12, NE13, and NE14 are shown.

对于链路单向业务资源的显示,就在两个节点间的两条链路上各以两种颜色图形分别显示链路上两个方向的业务资源被使用情况与业务资源空闲情况,如图中,节点NE1至节点NE2间的链路,节点NE2至节点NE2-1间的链路,节点NE2至节点NE2-2间的链路,节点NE1至节点NE1-1间的链路,节点NE1至节点NE1-2间的链路。采用本发明的方法进行显示后,可表示出链路资源的四种使用情况:甲节点至乙节点方向的业务资源被使用情况、业务资源空闲情况,和乙节点至甲节点方向的业务资源被使用情况、业务资源空闲情况。For the display of unidirectional service resources on a link, the usage and idleness of service resources in two directions on the link are displayed on the two links between two nodes in two colors, respectively, as shown in the figure Among them, the link between node NE1 and node NE2, the link between node NE2 and node NE2-1, the link between node NE2 and node NE2-2, the link between node NE1 and node NE1-1, the link between node NE1 Links to nodes NE1-2. After displaying by the method of the present invention, four usage situations of link resources can be shown: usage of business resources in the direction from node A to node B, idleness of business resources, and usage of business resources in the direction from node B to node A. Usage status, business resource idle status.

参见图3,图中示出的全部为链路单向业务资源的显示。在网络拓扑图上的每条链路上,进一步地表示出从源网元节点到宿网元节点间链路的单向业务资源显示方法,用第一颜色(如红色)部分表示业务资源被使用情况,并靠近源网元节点端,用第二颜色(如绿色)部分表示业务资源空闲情况,并靠近宿网元节点端。Referring to FIG. 3 , all shown in the figure are the display of link unidirectional service resources. On each link on the network topology diagram, the one-way service resource display method of the link from the source network element node to the sink network element node is further shown, and the first color (such as red) part indicates that the service resource is The usage status is close to the source network element node end, and the second color (such as green) part indicates the service resource idle condition, and is close to the sink network element node end.

相应显示效果的实现方案:在网络拓扑图的图形界面上,链路上的单向业务资源占用率显示的实现与双向业务大致相同,但是由于需要显示两条,相应处理的不同之处是:设一条链路的端点为A1,A2,在图形界面上的相应坐标分别设为A1(x1,y1)和A2(x2,y2),假设先画表示A1到A2单向业务资源使用情况的线段,则该线段不能覆盖原来的链路,设置的该线段在A1,A2附近处,其源宿点的坐标分别为(x1+a,y1+a)和(x2+a,y2+a),a是网络拓扑图中标绘链路的线段宽度,可相对于原来链路的宽度取值,建议为原来链路宽度值的一半,然后依据这两个新的坐标值和A1到A2间业务资源占用率如r1,利用图2说明中所述的方法计算并画出A1到A2业务资源使用及业务资源空闲的图形直线表示。对于A2到A1间单向业务资源使用情况的线段,线段在A1和A2处源宿点的坐标分别为(x1-a,y1-a)和(x2-a,y2-a),再依据A2到A1的业务资源占用率如r2,利用图2说明中所述的方法计算并画出A2到A1业务资源使用的图形直线表示。不用修改原网络拓扑图,在原双向业务资源使用情况的链路上,就可区分显示出两个单向业务流量占用业务资源的比例。The realization scheme of the corresponding display effect: on the graphical interface of the network topology map, the realization of the resource occupancy rate display of the one-way service on the link is roughly the same as that of the two-way service, but because two of them need to be displayed, the difference in the corresponding processing is: Let the endpoints of a link be A1 and A2, and the corresponding coordinates on the graphical interface are respectively set to A1 (x1, y1) and A2 (x2, y2), assuming that the line segment representing the usage of one-way business resources from A1 to A2 is first drawn , then the line segment cannot cover the original link. The line segment is set near A1 and A2, and the coordinates of the source and sink points are (x1+a, y1+a) and (x2+a, y2+a) respectively. a is the line segment width of the plotted link in the network topology diagram, which can be taken relative to the original link width. It is recommended to be half of the original link width value, and then based on these two new coordinate values and the business resources between A1 and A2 The occupancy rate is r1, calculated by using the method described in the description of Figure 2 and drawing a straight line representation of service resource usage and service resource idling from A1 to A2. For the line segment of the one-way service resource usage between A2 and A1, the coordinates of the source and sink points of the line segment at A1 and A2 are (x1-a, y1-a) and (x2-a, y2-a) respectively, and then according to A2 The service resource occupancy rate to A1 is r2, calculated by using the method described in the description of Figure 2 and drawing a straight line representation of service resource usage from A2 to A1. Without modifying the original network topology diagram, on the link of the original two-way service resource utilization, the proportion of service resources occupied by two unidirectional service flows can be distinguished and displayed.

本发明的方法,在现有网管的网络拓扑图上,通过设置链路的颜色并与资源使用情况及空闲情况联系,直观、简洁地显示并说明了全网络所有链路资源的使用与空闲情况,操作者一目了然,提高了系统的可操作性及友好性。The method of the present invention intuitively and succinctly displays and explains the usage and idle status of all link resources in the entire network by setting the color of the link and contacting the resource usage status and idle status on the network topology diagram of the existing network management , the operator is clear at a glance, which improves the operability and friendliness of the system.

Claims (2)

1. 一种网络上所有链路业务流量统计的显示方法,在由网络网元节点及其相互连接的链路构成的网络拓扑图上,显示两网络网元节点间链路上所统计的业务资源使用情况,其特征在于包括:1. A method for displaying service flow statistics of all links on the network, on a network topology diagram composed of network element nodes and their interconnected links, displaying the statistics of services on the links between the two network element nodes Resource usage, characterized by including: 将链路图形划分为两个相连接的第一部分和第二部分;计算两部分链路图形界面划分点在网络拓扑图上的坐标,为((x2-x1)×r+x1,(y2-y1)×r+y1),其中(x1,y1)和(x2,y2)是链路图形两个端点在网络拓扑图上的坐标,r是统计的链路业务流量占用总的业务资源率;显示所述第一部分的链路图形和显示所述第二部分的链路图形,该第一部分链路图形的长度占链路图形总长度的比例,是该链路上已经占用的业务资源与该链路总业务资源的比值,和该第二部分链路图形的长度占链路图形总长度的比例,是该链路上空闲业务资源与该链路总业务资源的比值。Divide the link graph into two connected first and second parts; calculate the coordinates of the division point of the two-part link graphic interface on the network topology map, which is ((x2-x1)×r+x1, (y2- y1)×r+y1), wherein (x1, y1) and (x2, y2) are the coordinates of the two endpoints of the link graph on the network topology map, and r is the total service resource rate occupied by the link service flow of statistics; Displaying the link graphics of the first part and the link graphics of the second part, the ratio of the length of the first part of the link graphics to the total length of the link graphics is the ratio of the service resources already occupied on the link to the The ratio of the total service resources of the link and the ratio of the length of the second part of the link graph to the total length of the link graph are the ratios of the idle service resources on the link to the total service resources of the link. 2. 根据权利要求1所述的一种网络上所有链路业务流量统计的显示方法,其特征在于:还包括两部分链路图形界面划分点在网络拓扑图上的坐标为((x2+a-x1+a)×r1+x1+a,(y2+a-y1+a)×r1+y1+a),其中(x1+a,y1+a)和(x2+a,y2+a)是位于链路图形两个端点在网络拓扑图上的坐标(x1,y1)和(x2,y2)附近的两个端点在网络拓扑图上的坐标,r1是统计的链路一个方向的单业务流量占用总的业务资源率;和还包括,两部分链路图形界面划分点在网络拓扑图上的坐标为((x2-a-x1-a)×r2+x1-a,(y2-a-y1-a)×r2+y1-a),其中(x1-a,y1-a)和(x2-a,y2-a)是位于链路图形两个端点在网络拓扑图上的坐标(x 1,y1)和(x2,y2)附近的另两个端点在网络拓扑图上的坐标,r2是统计的链路另一个方向的单业务流量占用总的业务资源率,a为网络拓扑图中用于描绘链路图形的宽度。2. the display method of all link service flow statistics on a kind of network according to claim 1, it is characterized in that: also comprise the coordinates of two part link graphic interface division points on the network topology map as ((x2+a -x1+a)×r1+x1+a, (y2+a-y1+a)×r1+y1+a), where (x1+a, y1+a) and (x2+a, y2+a) are The coordinates of the two endpoints located near the coordinates (x1, y1) and (x2, y2) of the two endpoints of the link graph on the network topology diagram on the network topology diagram, r1 is the statistical single-service traffic in one direction of the link Occupy the total business resource rate; and also include, the coordinates of the two-part link graphic interface division point on the network topology map are ((x2-a-x1-a)×r2+x1-a, (y2-a-y1 -a)×r2+y1-a), where (x1-a, y1-a) and (x2-a, y2-a) are the coordinates (x 1, y1) and (x2, y2) near the coordinates of the other two endpoints on the network topology map, r2 is the total service resource rate occupied by the single-service traffic in the other direction of the link, and a is used in the network topology map Draws the width of the link graphic.
CNB021459584A 2002-10-25 2002-10-25 Display method for all link service flow statistics on network Expired - Lifetime CN100426732C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021459584A CN100426732C (en) 2002-10-25 2002-10-25 Display method for all link service flow statistics on network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021459584A CN100426732C (en) 2002-10-25 2002-10-25 Display method for all link service flow statistics on network

Publications (2)

Publication Number Publication Date
CN1492625A CN1492625A (en) 2004-04-28
CN100426732C true CN100426732C (en) 2008-10-15

Family

ID=34232564

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021459584A Expired - Lifetime CN100426732C (en) 2002-10-25 2002-10-25 Display method for all link service flow statistics on network

Country Status (1)

Country Link
CN (1) CN100426732C (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100337432C (en) * 2004-06-29 2007-09-12 杭州华三通信技术有限公司 Data flow statistic method and device
CN100365996C (en) * 2005-08-06 2008-01-30 华为技术有限公司 The method of counting the business flow based on IPv6
CN101631047B (en) * 2009-07-20 2012-01-11 南京联创科技集团股份有限公司 Network topology structure showing method based on plane mode
CN101739260A (en) * 2010-01-11 2010-06-16 北京数码大方科技有限公司 Method and device for displaying node information
CN102510546B (en) * 2011-11-11 2014-12-03 华为技术有限公司 Wavelength division multiplexing network resource and service display processing method and device adopting same
CN104125596B (en) * 2014-07-07 2018-07-27 北京奇虎科技有限公司 A kind of data flow statistic method and device
CN105515813B (en) * 2014-10-15 2020-08-04 南京中兴软件有限责任公司 Method and device for visualizing flow in SDN network
CN105808591B (en) * 2014-12-30 2019-06-07 阿里巴巴集团控股有限公司 A kind of flow methods of exhibiting and device
CN104660693A (en) * 2015-02-06 2015-05-27 北京京东尚科信息技术有限公司 Method and device for graphically displaying node state information
CN108632100B (en) * 2015-08-24 2020-11-17 上海天旦网络科技发展有限公司 Method and system for discovering and presenting network application access information
CN108540302B (en) * 2017-03-03 2020-08-04 腾讯科技(深圳)有限公司 Big data processing method and equipment
CN107238775B (en) * 2017-05-24 2019-06-18 中国电子科技集团公司第四十一研究所 A Color Identification Method of Pathway Status
CN110505439A (en) * 2018-05-18 2019-11-26 杭州海康威视数字技术股份有限公司 Video traffic the Visual Implementation method, apparatus, electronic equipment and storage medium
CN109600436B (en) * 2018-12-10 2021-06-29 浪潮电子信息产业股份有限公司 A kind of distributed iscsi service realization method, system and related device
US11290348B1 (en) * 2019-03-28 2022-03-29 Juniper Networks, Inc. Interactive user interfaces for displaying features of an optimized network plan
CN111538501B (en) * 2020-07-10 2020-10-27 北京东方通科技股份有限公司 Artificial intelligence-based multivariate heterogeneous network data visualization method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0715473A (en) * 1992-12-16 1995-01-17 Internatl Business Mach Corp <Ibm> Method and system for requiring resource in packet switching network
US5412654A (en) * 1994-01-10 1995-05-02 International Business Machines Corporation Highly dynamic destination-sequenced destination vector routing for mobile computers
CN1148300A (en) * 1995-08-31 1997-04-23 摩托罗拉公司 Systems and methods for supporting connection-oriented traffic in networks with varying topologies
CN1191433A (en) * 1998-01-12 1998-08-26 高会萌 Distributed wide-band interconnection network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0715473A (en) * 1992-12-16 1995-01-17 Internatl Business Mach Corp <Ibm> Method and system for requiring resource in packet switching network
US5412654A (en) * 1994-01-10 1995-05-02 International Business Machines Corporation Highly dynamic destination-sequenced destination vector routing for mobile computers
CN1148300A (en) * 1995-08-31 1997-04-23 摩托罗拉公司 Systems and methods for supporting connection-oriented traffic in networks with varying topologies
CN1191433A (en) * 1998-01-12 1998-08-26 高会萌 Distributed wide-band interconnection network

Also Published As

Publication number Publication date
CN1492625A (en) 2004-04-28

Similar Documents

Publication Publication Date Title
CN100426732C (en) Display method for all link service flow statistics on network
US10700958B2 (en) Network management system with traffic engineering for a software defined network
US7855978B2 (en) Method of displaying nodes and links
CN103746852B (en) Service routing configuration method and network management equipment
KR101676587B1 (en) Method and apparatus for determining network topology structure
CN100586079C (en) A Data Link Layer Oriented Network Topology Discovery Method
CN102882722B (en) PTN (packet transport network) /IPRAN (internet protocol radio access network) end-to-end business data quick creation method
US20080091803A1 (en) Method for managing a virtual private network
US5521909A (en) Frame relay management system
CN101916320A (en) Method for graphically representing network topological objects and network topological object relationships in network planning
CN1282199A (en) Display of network information
CN107070724A (en) A kind of power telecom network teleservice communications status monitoring method
US8589536B2 (en) Network monitoring system
CN1321508C (en) open shortest path first monitor
CN103209125B (en) A kind of transmission method of label information and equipment
US20120030572A1 (en) Network visualization system
CN103368764B (en) The implementation method and Network Management System of a kind of virtual network
WO2005022823A1 (en) A method for achieving a path with protection entity in the intelligent optical network
CN101640824B (en) Frame device for establishing end-to-end business and use method thereof
CN112087321B (en) TAPI layered topology design method, medium, device and service creation method
CN102571490A (en) End-to-end quality monitoring method based on strategy mode
CN101051992B (en) Method for calculating customer layer service route in multilayer network
JP2005524368A (en) A system and method for generating network graphs from a node perspective.
CN108989201B (en) End-to-end path configuration method for SNCP tangent ring service
CN107343229A (en) A kind of method of POTN service management

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20081015

CX01 Expiry of patent term