Summary of the invention
In order to overcome the above-mentioned deficiency that existing common molten iron is used in Electric furnace steel making, the invention provides the application method of a kind of decarburization intensification preprocessed molten iron in Electric furnace steel making, compare with common molten iron electric furnace steelmaking method, shortened tap to tap time, saves energy.
Technical scheme of the present invention is to divide the molten oxygen phase of electric furnace two portions to carry out, be the said hot metal pretreatment device of the present invention with special molten steel decarburization heat riser earlier, molten iron is carried out being blended into electric furnace after decarburization heats up, the steel scrap Intake Quantity reduces in the electric furnace, increased hot metal ratio simultaneously, shortened the time of furnace melting steel scrap, make and to form the molten bath rapidly after having converted molten iron, advance the rifle oxygen blast and improve opportunity, and improved the oxygen rifle and opened blowing temp, can make the electrosmelting bubble level more abundant like this, realize the omnidistance foam operation of electric furnace, thereby shorten the heat, reduce energy consumption of electric furnace, increase production capacity.
Steps in sequence of the present invention is as follows:
1 hot metal pretreatment
A equipment is hot metal pretreatment device body
General molten steel pretreatmenting container body: volume 17m
3Treatment capacity 25t; Treatment time 20-25min; Heat size is than 0.68; Treater height overall 4.5m; Oxygen-blowing gun position 600-800mm; Weight: box hat 20t, build magnesia carbon brick on furnace shell and various magnesia mould material 28t by laying bricks or stones, add up to gross weight 48t.Hot metal pretreatment device body and converter are basic identical, replace with converter or other stove.
Water cooled oxygen lance: length 7500mm adopts three hole de laval oxygen rifle M=1.85, body of a gun diameter of phi 133mm, oxygen flow 2400-2500m
3/ h, oxygen pressure 0.6-0.8Mpa, cooling water flow 〉=38t/h, the Inlet and outlet water temperature difference≤10 ℃.Join in the hot metal pretreatment device body blast-melted.
The b converting process: preprocessed molten iron amount general provision is 25 tons, and omnidistance oxygen-blowing gun position is controlled at 600-800mm; Half a minute is carried rifle to the 1000mm slag splashing before the blow off.Promptly add lime 270-340Kg after the following rifle oxygen blast igniting and (be weight of molten iron 1.08%-1.36%, the lime of hot metal charging weight 1.14%-1.26% according to circumstances, generally add 1.2% lime), the rifle position is controlled at 700-800mm, and oxygen is pressed 0.6-0.7Mpa blowing 5min.Open and blow 6-15min, the rifle position is adjusted into 600-700mm, looks reaction in furnace situation oxygen pressure-controlled at 0.6-0.8Mpa; Add lime 1000-1200Kg (for weight of molten iron 4.0%-4.8%) in three batches, rhombspar 200Kg (being weight of molten iron 0.8%-1.0%) adds rhombspar when first adds lime, add once every 5-6min.Two batches of slag charges add should guarantee that batch slag chargeization good (gentle in voice in the stove, ejecta is not with the iron sparkless, illustrates that promptly the slag fusing is good) is principle opportunity.Open and blow 16-20min, the oxygen pressure-controlled is about 0.6Mpa, and visual fusion slag flowability is added lime 200-300Kg (for weight of molten iron 0.8%-1.2%), rhombspar 100Kg (being weight of molten iron 0.35%-0.45%).Half a minute is carried rifle and carries out slag splashing to 1000mm before the blow off.Blowing promptly stopped oxygen blast in 20 minutes, and thermometric, sampling analysis molten iron composition reach requirement, can go out station.
The main chemical (weight part %) of general molten iron that iron work supplies is
C3.80-4.20 Si0.60-1.00 S≤0.070 P≤0.070
All the other are unavoidable impurities and Fe temperature 〉=1200 ℃.
The Chemical Composition of molten iron after the decarburization hyperthermic treatment (weight part %) is
C2.00-2.50 Si≤0.20 S≤0.050 P≤0.050
All the other are unavoidable impurities and Fe temperature 〉=1600 ℃.
2, be blended into electrosmelting
A electric furnace batching (weight part) is:
Preprocessed molten iron 25 common molten iron 18-25
Medium-sized light material steel scrap 23-28
General 1 part is 1 ton, and the electric furnace Intake Quantity is generally 70 tons.
B Electric furnace steel making batching is packed into earlier after a material basket (23-28 part) steel scrap directly is blended into after the decarburization hyperthermic treatment 25 parts of molten iron, send electric 3-5 minute, is blended into 18 parts of the untreated common molten iron of next jar again.
The c oxygen blast is smelted
Enter the water cooled oxygen lance oxygen blast from fire door, oxygen pressure is controlled at 0.6-0.7Mpa; Oxygen flow is 2400-2500m
3/ h.Smelt after 18-22 minute, temperature reaches 1640 ℃-1680 ℃, get the molten steel sample analysis, when molten steel composition reaches the kind regulation that electric furnace smelts, as after refining LZ50 (railroad industry axletree special-purpose steel) steel grade and reaching requirement, C 〉=0.30%, P≤0.015%, T=1640 ℃-1680 ℃, molten steel can be come out of the stove.
The present invention is when smelting, the preprocessed molten iron that adds preliminary desulfurization dephosphorization, increased the hot metal ratio in the electric furnace, reduce the molten steel inclusion content, increased the physics heat in the electric furnace stove, obviously shortened the time of furnace melting, impel the early stage slagging fast of electric furnace, the condition of having optimized electric furnace dephosphorization in early stage has realized that electric furnace whole process makes foam, has shortened the electrosmelting time significantly, thereby has significantly reduced the consumption of electric energy when smelting.The present invention respectively sees Table 1 at electric furnace smelting method in the contrast of throughput, tap to tap time and the main economic and technical indices in January, 04 to September in February, 05 to May and existing molten iron, table 2 and table 3.
Table 1
During this time | Average monthly output (t) | Operating rate % | Electric furnace average tap to tap time (minute) | Monthly average stove number |
Existing method | 24894.082 | 81.06 | 79 | 445 |
The present invention | 31104.228 | 83.81 | 66 | 551 |
Relatively | 6210.146 | 2.75 | -13 | 106 |
Table 2
During this time | Fettling (minute) | Charging (minute) | Melting (minute) | Tapping (minute) | Altogether (minute) |
Existing method | 5 | 12 | 41 | 21 | 79 |
The present invention | 4 | 22 | 21 | 19 | 66 |
Relatively | -1 | 10 | -20 | -2 | 13 |
Table 3
Project | Unit | The present invention and existing method loss per ton steel are relatively |
Before the transformation | After the transformation | Relatively |
Lime | Kg/t | 90.685 | 87.794 | -2.891 |
Fluorite | Kg/t | 4.405 | 2.81 | -1.595 |
Φ 500mm electrode | Kg/t | 3.536 | 3.132 | -0.404 |
Hot metal ladle refractory brick | Unit/t | 0.605 | 8.93 | 8.325 |
Embodiment
Describe the specific embodiment of the present invention in detail below in conjunction with embodiment, but the specific embodiment of the present invention is not limited to following embodiment.
Embodiment one
1 hot metal pretreatment
With the common molten iron of 24t, temperature is 1320 ℃, and major ingredient (weight %) is
C 3.80-4.20 Si 0.601.00 S≤0.070 P≤0.070
All the other are unavoidable impurities and Fe
Pour the molten long-pending 17m that is into
3The hot metal pretreatment device in, add 300 kilograms in lime, adopt Lavalle, the three holes water cooled oxygen lance of long 7500mm, with the pressure of 0.7Mpa, 2450m
3The flow of/h is blown into oxygen, adds lime 1000-1200 kilogram more in batches, and 200 kilograms of rhombspars, omnidistance cooling water flow are 40t/h, handles 20min, and the temperature of molten iron reaches 1650 ℃, when the composition of molten iron (%) reaches following the requirement by analysis
C 2.00-2.50 Si ≤0.20 S≤0.050 P≤0.050
All the other are unavoidable impurities and Fe, and promptly processing cost is invented said preprocessed molten iron.
2 are blended into electrosmelting
The a batching
The preprocessed molten iron 24t molten iron 22t that is untreated
Medium-sized light material steel scrap 23.7t
B is added to the medium-sized light material steel scrap of 23.7t in the electric furnace, directly adds the preprocessed molten iron of 24t, adds untreated molten iron 22t again, connects power supply and send.
The c oxygen blast is smelted
Entering water cooled oxygen lance from fire door, is 0.6Mpa with air pressure, and flow is 2450m
3Behind/h oxygen blast gas the 15min, thermometric is 1670 ℃, gets the analysis of molten steel sample, and composition reaches the regulation C=0.41% P=0.010% of the LZ50 steel grade of electric furnace refining, and the electric furnace molten steel is come out of the stove.