CN100341075C - 一种提高核电站安注系统整体可靠性的方法 - Google Patents
一种提高核电站安注系统整体可靠性的方法 Download PDFInfo
- Publication number
- CN100341075C CN100341075C CNB2004100772662A CN200410077266A CN100341075C CN 100341075 C CN100341075 C CN 100341075C CN B2004100772662 A CNB2004100772662 A CN B2004100772662A CN 200410077266 A CN200410077266 A CN 200410077266A CN 100341075 C CN100341075 C CN 100341075C
- Authority
- CN
- China
- Prior art keywords
- boron
- injection system
- nuclear power
- water
- safety injection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Structure Of Emergency Protection For Nuclear Reactors (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2004100772662A CN100341075C (zh) | 2004-12-03 | 2004-12-03 | 一种提高核电站安注系统整体可靠性的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2004100772662A CN100341075C (zh) | 2004-12-03 | 2004-12-03 | 一种提高核电站安注系统整体可靠性的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1783353A CN1783353A (zh) | 2006-06-07 |
CN100341075C true CN100341075C (zh) | 2007-10-03 |
Family
ID=36773370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2004100772662A Expired - Fee Related CN100341075C (zh) | 2004-12-03 | 2004-12-03 | 一种提高核电站安注系统整体可靠性的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100341075C (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5364424B2 (ja) * | 2009-04-14 | 2013-12-11 | 三菱重工業株式会社 | 原子炉 |
CN101840738B (zh) * | 2009-06-24 | 2012-06-27 | 中广核工程有限公司 | 一种核电站核岛厂房的安注罐安装方法 |
FR2983336B1 (fr) * | 2011-11-30 | 2014-01-31 | Areva Np | Ensemble et procede d'injection d'eau d'un element absorbeur de neutrons pour le refroidissement d'un coeur d'un reacteur nucleaire en situation de crise. |
CN103426484A (zh) * | 2012-05-25 | 2013-12-04 | 国家核电技术有限公司 | 一种防止反应堆堆内熔融物熔损压力容器的方法以及用于实施这种方法的系统 |
CN102881340B (zh) * | 2012-09-27 | 2015-09-23 | 中国核电工程有限公司 | 一种能动与非能动相结合的应急停堆系统及方法 |
CN108679355B (zh) * | 2018-06-06 | 2021-04-23 | 广东核电合营有限公司 | 一种疏通核电站硼水管路的方法及装置 |
CN109473185B (zh) * | 2018-11-13 | 2022-07-29 | 中国核动力研究设计院 | 一种自动化学停堆系统的测试装置及其测试方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1049743A (zh) * | 1989-08-24 | 1991-03-06 | 核工业部第一研究设计院第二研究所 | 双道中子泄漏补偿吸收测量水中硼浓度的装置 |
US5180543A (en) * | 1989-06-26 | 1993-01-19 | Westinghouse Electric Corp. | Passive safety injection system using borated water |
CN1227658A (zh) * | 1996-10-21 | 1999-09-01 | 西门子公司 | 用来测定硼浓度的测量装置 |
-
2004
- 2004-12-03 CN CNB2004100772662A patent/CN100341075C/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5180543A (en) * | 1989-06-26 | 1993-01-19 | Westinghouse Electric Corp. | Passive safety injection system using borated water |
CN1049743A (zh) * | 1989-08-24 | 1991-03-06 | 核工业部第一研究设计院第二研究所 | 双道中子泄漏补偿吸收测量水中硼浓度的装置 |
CN1227658A (zh) * | 1996-10-21 | 1999-09-01 | 西门子公司 | 用来测定硼浓度的测量装置 |
Also Published As
Publication number | Publication date |
---|---|
CN1783353A (zh) | 2006-06-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101719386B (zh) | 先进压水堆核电站中完全非能动停堆安全冷却装置及其运行程序 | |
Yang et al. | Simulation and analysis on 10-in. cold leg small break LOCA for AP1000 | |
US20110158371A1 (en) | Pressurized water reactor plant | |
CN100341075C (zh) | 一种提高核电站安注系统整体可靠性的方法 | |
Jin et al. | System code evaluation of near-term accident tolerant claddings during pressurized water reactor station blackout accidents | |
Wang et al. | Analyses of liquid entrainment through ADS-4 in AP1000 during a typical small break LOCA transient | |
MacDonald et al. | Feasibility study of supercritical light water cooled reactors for electric power production | |
Komu et al. | A Finnish District Heating Reactor: Thermal-Hydraulic Design and Transient Analyses | |
Li et al. | Numerical study on improved design of passive residual heat removal system for China pressurizer reactor | |
Ishiwatari et al. | LOCA analysis of super LWR | |
Wenxiang et al. | NHR-200 nuclear energy system and its possible applications | |
Bi et al. | Severe accident analysis induced by secondary pipeline break in a small modular PWR | |
Kim et al. | Safety analysis of SMART | |
D'Auria et al. | Applications of SYS TH codes to nuclear reactor design and accident analysis | |
Li et al. | Influence of active and passive equipment for advanced pressurized water reactor on thermal hydraulic and source term behavior in severe accidents | |
Kang et al. | Preliminary Analysis about SBO-induced severe accident at CANDU-6 using M-CAISER code | |
Sun et al. | RELAP5 Foresight Thermal‐Hydraulic Analysis of Hypothesis Passive Safety Injection System under LOCA for an Existing NPP in China | |
Wang et al. | A preliminary probabilistic safety assessment for ITER | |
Kuznetsov et al. | NPP with VK-300 boiling water reactor for power and district heating grids | |
Murao et al. | A Concept of Passive Safety, Pressurized Water Reactor System with Inherent Matching Nature of Core Heat Generation and Heat Removal | |
Mikityuk et al. | RBEC-M lead-bismuth cooled fast reactor: optimization of conceptual decisions | |
Takeda et al. | ROSA/LSTF experiment on a PWR station blackout transient with accident management measures and RELAP5 analyses | |
Susyadi et al. | Numerical Study on Condensation in Immersed Containment System of Advanced SMR During Uncontrolled Depressurization | |
Dazhong et al. | Research and development of nuclear heating reactors in China | |
Pančiak et al. | Investigating Load Follow Operation for a Typical Nuclear Power Plant using Multi-Physics Analysis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20060607 Assignee: LING'AO NUCLEAR POWER Co.,Ltd. Assignor: DAYABAY NUCLEAR POWER OPERATIONS AND MANAGEMENT Co.,Ltd. Contract record no.: 2010440000223 Denomination of invention: Method for improving integrated reliability of nuclear power station safety injection system Granted publication date: 20071003 License type: Exclusive License Record date: 20100308 |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20071003 Termination date: 20211203 |
|
CF01 | Termination of patent right due to non-payment of annual fee |