[go: up one dir, main page]

CH625290A5 - Track of a suspended railway with cable support - Google Patents

Track of a suspended railway with cable support Download PDF

Info

Publication number
CH625290A5
CH625290A5 CH1377877A CH1377877A CH625290A5 CH 625290 A5 CH625290 A5 CH 625290A5 CH 1377877 A CH1377877 A CH 1377877A CH 1377877 A CH1377877 A CH 1377877A CH 625290 A5 CH625290 A5 CH 625290A5
Authority
CH
Switzerland
Prior art keywords
cables
pretensioning
roadway
beams
carriageway
Prior art date
Application number
CH1377877A
Other languages
German (de)
Inventor
Rudolf Baltensperger
Hans Beat Pfister
Original Assignee
Rudolf Baltensperger
Hans Beat Pfister
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rudolf Baltensperger, Hans Beat Pfister filed Critical Rudolf Baltensperger
Priority to CH1377877A priority Critical patent/CH625290A5/en
Priority to BR7801525A priority patent/BR7801525A/en
Publication of CH625290A5 publication Critical patent/CH625290A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/22Tracks for railways with the vehicle suspended from rigid supporting rails
    • E01B25/24Supporting rails; Auxiliary balancing rails; Supports or connections for rails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The track consists of two rectangular tubes (1) which are interconnected at regular intervals by distance pieces (2). It is rigidified by pretensioned cables (5) arranged under the track. The cables are guided in a polygonal manner; at given points, they are fastened to the track with clamps (6) and between these points they are held at a spacing from the track underside by means of cable supports (8). The track thus rigidified is as a result inter alia more resistant to lateral bending out. This is important in suspended railways if side wind strikes the cabin. <IMAGE>

Description

       

  
 

**WARNUNG** Anfang DESC Feld konnte Ende CLMS uberlappen **.

 



   PATENTANSPRÜCHE
1. Fahrbahn einer Schienenhängebahn-Anlage mit Seiltragwerk, dadurch gekennzeichnet, dass die Schiene zwei in Abstand voneinander angeordnete Fahrbahnbalken (1) umfasst, die durch Distanzstücke (2) in festem Abstand voneinander gehalten sind, und dass unter den Fahrbahnbalken entlang deren ganzen Länge Vorspannseile oder Vorspannstäbe (5) angeordnet sind, die mit den Fahrbahnbalken verbunden sind.



   2. Fahrbahn nach Anspruch 1, dadurch gekennzeichnet, dass die unter den Fahrbahnbalken angeordneten Vorspannseile oder Vorspannstäbe polygonal geführt sind.



   3. Fahrbahn nach Anspruch 2, dadurch gekennzeichnet, dass die Vorspannseile oder Vorspannstäbe im Bereich der Aufhängestellen (2', 3), wo die   Aufhängeseile    mit der Fahrbahn verbunden sind, möglichst nahe an die Fahrbahn herangeführt sind, während zwischen diesen Stellen Distanzhalter (8) angeordnet sind, welche für einen grösseren Abstand der Vorspannseile oder -stäbe zwischen diesen und der Fahrbahn sorgen.



   4. Fahrbahn nach Anspruch 3, dadurch gekennzeichnet, dass die Fahrbahnbalken (1) ohne Dilatationsstösse ausgebildet sind, und dass die Vorspannseile oder -stäbe (5) an den Aufhängestellen jeweils fest mit den Fahrbahnbalken verbunden sind.



   5. Fahrbahn nach Anspruch 3, dadurch gekennzeichnet, dass die Fahrbahnbalken in Abschnitte unterteilt sind, die je für sich mittels Seilen oder Stäben (5) vorgespannt und durch biege- und torsionssteife Dilatationsstösse miteinander verbunden sind.



   6. Fahrbahn nach Anspruch 1, dadurch gekennzeichnet, dass die Vorspannseile aussenliegende Profildrähte aufweisen, deren Gesamtquerschnitt mindestens   60%    des totalen wirksamen Seilquerschnitts ausmacht.



   Bei Luftseilbahnen bekannter Art hängt und fährt das Fahrzeug auf einem Seil. Dadurch ist die Fahrgeschwindigkeit begrenzt und die Anlage ist sehr seitenwindempfindlich. Es treten Pendelbewegungen auf. Bei stärkerem Seitenwind muss der Betrieb eingestellt werden.



   Die Erfindung will eine Fahrbahn für eine Schienenhängebahn schaffen, die zwar an einem Seiltragwerk aufgehängt ist, aber erheblich steifer ist, als ein Seil, daher höhere Fahrgeschwindigkeiten zulässt und weniger seitenwindempfindlich ist.



   Die erfindungsgemässe Fahrbahn zeichnet sich dadurch aus, dass die Schiene zwei in Abstand voneinander angeordnete Fahrbahnbalken umfasst, die durch Distanzstücke in festem Abstand voneinander gehalten sind, und dass unter den Fahrbahnbalken entlang deren ganzen Länge Vorspannseile oder Vorspannstäbe angeordnet sind, die mit den Fahrbahnbalken verbunden sind.



   Es ist von Vorteil, wenn die unter den Fahrbahnbalken angeordneten Vorspannseile oder Vorspannstäbe polygonal geführt sind. Die unter der Fahrbahn angeordneten Vorspannseile oder Vorspannstäbe geben der Fahrbahn als Ganzes eine grössere Steifigkeit. Eine polygonale Führung dieser Seile verringert die Durchbiegung der Fahrbahnbalken bei der Belastung durch die Räder des unterhalb des Balkens hängenden Fahrzeuges, da ein Teil der Last auf die Vorspannseile oder -stäbe übertragen wird. Man kann die Aufhängung an den Tragseilen so ausbilden, dass die Fahrbahn zwischen zwei Masten jeweils einen negativen Durchgang aufweist, der bei Belastung durch das Fahrzeuggewicht in eine mindestens annähernd gerade Strecke übergeht.

  Zusammenfassend lässt sich sagen, dass die Vorspannseile oder -stäbe der Fahrbahn eine grössere Steifigkeit geben, die sowohl eine grössere Fahrgeschwindigkeit zulässt, als auch die Empfindlichkeit gegen   Seitenwandeinilüsse    herabsetzt.



   In der Zeichnung ist ein Ausführungsbeispiel dargestellt:
Fig. 1 und 2 zeigen einen Teil der Fahrbahn zwischen zwei Aufhängestellen;
Fig. 3 einen Teil der Fahrbahn in perspektivischer Darstellung und
Fig. 4 eine Aufhängestelle in Ansicht quer zur Fahrbahn.



   Die Fahrbahn F umfasst zwei Balken 1, die als Vierkantrohr ausgebildet sind. Die Rohre sind in regelmässigen Abständen durch Distanzhalter 2 miteinander verbunden und in Abstand voneinander gehalten. Bei den Distanzhaltern 2' sind an der Innenseite der Fahrbahnbalken 1 Ösen 3 angeschweisst, an denen   Aufhängeorgane    4 für Hängeseile angreifen, die die Verbindung zu den (nicht dargestellten) Tragseilen herstellen.



   Unter der Fahrbahn befinden sich sechs Vorspannseile 5, die bei den Distanzhaltern 2', also dort, wo auch die Hängeseile angreifen, festgeklemmt sind. Dazu dienen die Klemmblöcke 6, die mittels Schraubbolzen 7 jeweils zwei Seile klemmend halten. Bei den dazwischenliegenden Distanzhaltern 2 sind Seilstützen 8 angeordnet, die für eine polygonale Führung der Vorspannseile sorgen.



   Bei der dargestellten Anordnung sind keine Dilatationsfugen vorgesehen. Bei relativ mildem Klima ist dies möglich. Die Fahrbahnbalken sind dann je nach Temperatur zusätzlichem Zug oder Druckspannungen unterworfen. Bei extremen Temperaturunterschieden empfiehlt es sich, Dilatationsstösse in den Fahrbahnbalken einzubauen. Der Fahrbahnbalken wird dazu in längere Abschnitte unterteilt, die je für sich vorgespannt sind und mittels biege- und torsionssteifen Dilatations Verbindungselementen miteinander gekuppelt sind. Die Vor   spannteile    oder -stäbe dürfen dann bei den Stellen 6 nicht mehr fest angeklemmt sein und müssen stattdessen verschiebbar gehalten werden. Dazu empfiehlt es sich, an diesen Stellen Gleitfolien zu verwenden.

 

   Vorzugsweise werden für die Vorspannseile Seile mit aussenliegenden Profildrähten verwendet, deren Gesamtquerschnitt mindestens 60% des totalen wirksamen Seilquerschnittes ausmacht. Solche Seile sind der Kontrolle besser zugänglich. 



  
 

** WARNING ** beginning of DESC field could overlap end of CLMS **.

 



   PATENT CLAIMS
1.Lane of a monorail system with cable support structure, characterized in that the rail comprises two spaced-apart track beams (1), which are kept at a fixed distance from one another by spacers (2), and that pretensioning cables are located underneath the track beams along their entire length or prestressing rods (5) are arranged, which are connected to the road beams.



   2. Roadway according to claim 1, characterized in that the pretensioning cables or pretensioning rods arranged under the roadway beams are guided polygonally.



   3. The carriageway according to claim 2, characterized in that the prestressing cables or prestressing rods are brought as close as possible to the carriageway in the region of the suspension points (2 ', 3) where the suspension cables are connected to the carriageway, while spacers (8 ) are arranged, which ensure a greater distance between the pretensioning cables or rods between them and the road.



   4. The carriageway according to claim 3, characterized in that the carriageway beams (1) are designed without dilatation surges, and that the pretensioning cables or rods (5) are each firmly connected to the carriageway beams at the suspension points.



   5. The carriageway according to claim 3, characterized in that the carriageway beams are divided into sections which are each prestressed for themselves by means of ropes or bars (5) and are connected to one another by bending and torsionally rigid dilatation joints.



   6. Roadway according to claim 1, characterized in that the pretensioning cables have external profile wires, the total cross section of which makes up at least 60% of the total effective cable cross section.



   In the case of aerial cableways of a known type, the vehicle hangs and runs on a rope. This limits the driving speed and the system is very sensitive to cross winds. Pendulum movements occur. Operation must be stopped in the event of strong cross winds.



   The invention seeks to create a track for a monorail that is suspended from a cable support structure, but is considerably stiffer than a cable, therefore allows higher travel speeds and is less sensitive to cross winds.



   The roadway according to the invention is characterized in that the rail comprises two roadway bars arranged at a distance from one another, which are kept at a fixed distance from one another by spacers, and that tensioning cables or tensioning bars are arranged under the roadway bars along their entire length, which are connected to the roadway bars .



   It is advantageous if the pretensioning cables or pretensioning rods arranged under the road beams are guided polygonally. The pretensioning ropes or pretensioning rods under the road give the roadway as a whole greater rigidity. A polygonal guidance of these ropes reduces the deflection of the road beams when loaded by the wheels of the vehicle hanging underneath the beam, since part of the load is transferred to the pretensioning cables or rods. The suspension on the suspension cables can be designed in such a way that the carriageway between two masts each has a negative passage, which merges into an at least approximately straight section when loaded by the vehicle weight.

  In summary, it can be said that the pretensioning cables or rods give the roadway greater rigidity, which both allows a higher driving speed and reduces sensitivity to side wall interference.



   An exemplary embodiment is shown in the drawing:
1 and 2 show part of the roadway between two suspension points;
Fig. 3 shows a part of the road in perspective and
Fig. 4 shows a suspension point in a view transverse to the carriageway.



   The roadway F comprises two beams 1, which are designed as a square tube. The tubes are connected to one another at regular intervals by spacers 2 and are kept at a distance from one another. In the case of the spacers 2 ', eyelets 3 are welded to the inside of the carriageway beams 1, on which suspension elements 4 for suspension cables act, which establish the connection to the (not shown) suspension cables.



   There are six pretensioning ropes 5 under the carriageway, which are clamped to the spacers 2 ', that is to say where the hanging ropes also act. For this purpose, the clamping blocks 6, which hold two cables each by means of screw bolts 7. In the intermediate spacers 2, cable supports 8 are arranged, which ensure polygonal guidance of the pretensioning cables.



   No dilation joints are provided in the arrangement shown. This is possible in a relatively mild climate. Depending on the temperature, the road beams are then subjected to additional tension or compressive stress. In the event of extreme temperature differences, it is advisable to install dilation surges in the road beam. For this purpose, the road beam is divided into longer sections, each of which is prestressed and coupled to one another by means of flexural and torsionally rigid dilatation connecting elements. The pre-tensioning parts or rods must then no longer be firmly clamped at positions 6 and must instead be kept displaceable. It is advisable to use slide films at these points.

 

   Ropes with external profile wires are preferably used for the pretensioning ropes, the total cross-section of which accounts for at least 60% of the total effective rope cross-section. Such ropes are more accessible for inspection.


    

Claims (6)

PATENTANSPRÜCHE 1. Fahrbahn einer Schienenhängebahn-Anlage mit Seiltragwerk, dadurch gekennzeichnet, dass die Schiene zwei in Abstand voneinander angeordnete Fahrbahnbalken (1) umfasst, die durch Distanzstücke (2) in festem Abstand voneinander gehalten sind, und dass unter den Fahrbahnbalken entlang deren ganzen Länge Vorspannseile oder Vorspannstäbe (5) angeordnet sind, die mit den Fahrbahnbalken verbunden sind.  PATENT CLAIMS 1. Track of a monorail system with a cable support structure, characterized in that the rail comprises two spaced-apart track beams (1), which are kept at a fixed distance from one another by spacers (2), and that pretensioning cables are underneath the track beams along their entire length or prestressing rods (5) are arranged, which are connected to the road beams. 2. Fahrbahn nach Anspruch 1, dadurch gekennzeichnet, dass die unter den Fahrbahnbalken angeordneten Vorspannseile oder Vorspannstäbe polygonal geführt sind.  2. Roadway according to claim 1, characterized in that the pretensioning cables or pretensioning rods arranged under the roadway beams are guided polygonally. 3. Fahrbahn nach Anspruch 2, dadurch gekennzeichnet, dass die Vorspannseile oder Vorspannstäbe im Bereich der Aufhängestellen (2', 3), wo die Aufhängeseile mit der Fahrbahn verbunden sind, möglichst nahe an die Fahrbahn herangeführt sind, während zwischen diesen Stellen Distanzhalter (8) angeordnet sind, welche für einen grösseren Abstand der Vorspannseile oder -stäbe zwischen diesen und der Fahrbahn sorgen.  3. The carriageway according to claim 2, characterized in that the prestressing cables or prestressing rods are brought as close as possible to the carriageway in the region of the suspension points (2 ', 3), where the suspension cables are connected to the carriageway, while spacers (8 ) are arranged, which ensure a greater distance between the pretensioning cables or rods between them and the road. 4. Fahrbahn nach Anspruch 3, dadurch gekennzeichnet, dass die Fahrbahnbalken (1) ohne Dilatationsstösse ausgebildet sind, und dass die Vorspannseile oder -stäbe (5) an den Aufhängestellen jeweils fest mit den Fahrbahnbalken verbunden sind.  4. The carriageway according to claim 3, characterized in that the carriageway beams (1) are designed without dilation impacts, and that the pretensioning cables or rods (5) are each firmly connected to the carriageway beams at the suspension points. 5. Fahrbahn nach Anspruch 3, dadurch gekennzeichnet, dass die Fahrbahnbalken in Abschnitte unterteilt sind, die je für sich mittels Seilen oder Stäben (5) vorgespannt und durch biege- und torsionssteife Dilatationsstösse miteinander verbunden sind.  5. The carriageway according to claim 3, characterized in that the carriageway beams are divided into sections which are each prestressed for themselves by means of ropes or bars (5) and are connected to one another by bending and torsionally rigid dilatation joints. 6. Fahrbahn nach Anspruch 1, dadurch gekennzeichnet, dass die Vorspannseile aussenliegende Profildrähte aufweisen, deren Gesamtquerschnitt mindestens 60% des totalen wirksamen Seilquerschnitts ausmacht.  6. Roadway according to claim 1, characterized in that the pretensioning cables have external profile wires, the total cross section of which makes up at least 60% of the total effective cable cross section. Bei Luftseilbahnen bekannter Art hängt und fährt das Fahrzeug auf einem Seil. Dadurch ist die Fahrgeschwindigkeit begrenzt und die Anlage ist sehr seitenwindempfindlich. Es treten Pendelbewegungen auf. Bei stärkerem Seitenwind muss der Betrieb eingestellt werden.  In cable cars of known type, the vehicle hangs and runs on a rope. This limits the driving speed and the system is very sensitive to cross winds. Pendulum movements occur. Operation must be stopped in the event of strong cross winds. Die Erfindung will eine Fahrbahn für eine Schienenhängebahn schaffen, die zwar an einem Seiltragwerk aufgehängt ist, aber erheblich steifer ist, als ein Seil, daher höhere Fahrgeschwindigkeiten zulässt und weniger seitenwindempfindlich ist.  The invention seeks to create a track for a monorail that is suspended from a cable structure, but is considerably stiffer than a cable, therefore allows higher speeds and is less sensitive to cross winds. Die erfindungsgemässe Fahrbahn zeichnet sich dadurch aus, dass die Schiene zwei in Abstand voneinander angeordnete Fahrbahnbalken umfasst, die durch Distanzstücke in festem Abstand voneinander gehalten sind, und dass unter den Fahrbahnbalken entlang deren ganzen Länge Vorspannseile oder Vorspannstäbe angeordnet sind, die mit den Fahrbahnbalken verbunden sind.  The roadway according to the invention is characterized in that the rail comprises two roadway bars arranged at a distance from one another, which are kept at a fixed distance from one another by spacers, and that tensioning cables or tensioning bars are arranged under the roadway bars along their entire length, which are connected to the roadway bars . Es ist von Vorteil, wenn die unter den Fahrbahnbalken angeordneten Vorspannseile oder Vorspannstäbe polygonal geführt sind. Die unter der Fahrbahn angeordneten Vorspannseile oder Vorspannstäbe geben der Fahrbahn als Ganzes eine grössere Steifigkeit. Eine polygonale Führung dieser Seile verringert die Durchbiegung der Fahrbahnbalken bei der Belastung durch die Räder des unterhalb des Balkens hängenden Fahrzeuges, da ein Teil der Last auf die Vorspannseile oder -stäbe übertragen wird. Man kann die Aufhängung an den Tragseilen so ausbilden, dass die Fahrbahn zwischen zwei Masten jeweils einen negativen Durchgang aufweist, der bei Belastung durch das Fahrzeuggewicht in eine mindestens annähernd gerade Strecke übergeht.  It is advantageous if the pretensioning cables or pretensioning rods arranged under the road beams are guided polygonally. The pretensioning ropes or pretensioning rods under the road give the roadway as a whole greater rigidity. A polygonal guidance of these ropes reduces the deflection of the road beams when loaded by the wheels of the vehicle hanging underneath the beam, since part of the load is transferred to the pretensioning cables or bars. The suspension on the suspension cables can be designed in such a way that the roadway between two masts has a negative passage, which changes into an at least approximately straight line when loaded by the vehicle weight. Zusammenfassend lässt sich sagen, dass die Vorspannseile oder -stäbe der Fahrbahn eine grössere Steifigkeit geben, die sowohl eine grössere Fahrgeschwindigkeit zulässt, als auch die Empfindlichkeit gegen Seitenwandeinilüsse herabsetzt. In summary, it can be said that the pretensioning ropes or rods give the roadway greater rigidity, which both allows a higher driving speed and also reduces sensitivity to side wall interference. In der Zeichnung ist ein Ausführungsbeispiel dargestellt: Fig. 1 und 2 zeigen einen Teil der Fahrbahn zwischen zwei Aufhängestellen; Fig. 3 einen Teil der Fahrbahn in perspektivischer Darstellung und Fig. 4 eine Aufhängestelle in Ansicht quer zur Fahrbahn.  An exemplary embodiment is shown in the drawing: 1 and 2 show part of the roadway between two suspension points; Fig. 3 shows a part of the road in perspective and Fig. 4 shows a suspension point in a view transverse to the carriageway. Die Fahrbahn F umfasst zwei Balken 1, die als Vierkantrohr ausgebildet sind. Die Rohre sind in regelmässigen Abständen durch Distanzhalter 2 miteinander verbunden und in Abstand voneinander gehalten. Bei den Distanzhaltern 2' sind an der Innenseite der Fahrbahnbalken 1 Ösen 3 angeschweisst, an denen Aufhängeorgane 4 für Hängeseile angreifen, die die Verbindung zu den (nicht dargestellten) Tragseilen herstellen.  The roadway F comprises two beams 1, which are designed as a square tube. The tubes are connected to one another at regular intervals by spacers 2 and are kept at a distance from one another. In the case of the spacers 2 ', eyelets 3 are welded to the inside of the carriageway beams 1, on which suspension elements 4 for hanging cables act which establish the connection to the (not shown) suspension cables. Unter der Fahrbahn befinden sich sechs Vorspannseile 5, die bei den Distanzhaltern 2', also dort, wo auch die Hängeseile angreifen, festgeklemmt sind. Dazu dienen die Klemmblöcke 6, die mittels Schraubbolzen 7 jeweils zwei Seile klemmend halten. Bei den dazwischenliegenden Distanzhaltern 2 sind Seilstützen 8 angeordnet, die für eine polygonale Führung der Vorspannseile sorgen.  There are six pretensioning ropes 5 under the carriageway, which are clamped to the spacers 2 ', that is to say where the hanging ropes also act. For this purpose, the clamping blocks 6, which hold two cables each by means of screw bolts 7. In the intermediate spacers 2, cable supports 8 are arranged, which ensure polygonal guidance of the pretensioning cables. Bei der dargestellten Anordnung sind keine Dilatationsfugen vorgesehen. Bei relativ mildem Klima ist dies möglich. Die Fahrbahnbalken sind dann je nach Temperatur zusätzlichem Zug oder Druckspannungen unterworfen. Bei extremen Temperaturunterschieden empfiehlt es sich, Dilatationsstösse in den Fahrbahnbalken einzubauen. Der Fahrbahnbalken wird dazu in längere Abschnitte unterteilt, die je für sich vorgespannt sind und mittels biege- und torsionssteifen Dilatations Verbindungselementen miteinander gekuppelt sind. Die Vor spannteile oder -stäbe dürfen dann bei den Stellen 6 nicht mehr fest angeklemmt sein und müssen stattdessen verschiebbar gehalten werden. Dazu empfiehlt es sich, an diesen Stellen Gleitfolien zu verwenden.  No dilation joints are provided in the arrangement shown. This is possible in a relatively mild climate. Depending on the temperature, the road beams are then subjected to additional tension or compressive stress. In the event of extreme temperature differences, it is advisable to install dilation surges in the road beam. For this purpose, the road beam is divided into longer sections, each of which is prestressed and is connected to one another by means of bending and torsionally rigid dilation connecting elements. The pre-tensioning parts or rods must then no longer be firmly clamped at positions 6 and must instead be kept displaceable. It is advisable to use slide films at these points.   Vorzugsweise werden für die Vorspannseile Seile mit aussenliegenden Profildrähten verwendet, deren Gesamtquerschnitt mindestens 60% des totalen wirksamen Seilquerschnittes ausmacht. Solche Seile sind der Kontrolle besser zugänglich. **WARNUNG** Ende CLMS Feld konnte Anfang DESC uberlappen**.  Ropes with external profile wires, the total cross section of which makes up at least 60% of the total effective cable cross section, are preferably used for the pretensioning ropes. Such ropes are more accessible for inspection. ** WARNING ** End of CLMS field could overlap beginning of DESC **.
CH1377877A 1977-11-11 1977-11-11 Track of a suspended railway with cable support CH625290A5 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CH1377877A CH625290A5 (en) 1977-11-11 1977-11-11 Track of a suspended railway with cable support
BR7801525A BR7801525A (en) 1977-11-11 1978-03-14 TRACK FOR A SUSPENDED RAIL TRAIN WITH CABLE HOLDER

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH1377877A CH625290A5 (en) 1977-11-11 1977-11-11 Track of a suspended railway with cable support

Publications (1)

Publication Number Publication Date
CH625290A5 true CH625290A5 (en) 1981-09-15

Family

ID=4395234

Family Applications (1)

Application Number Title Priority Date Filing Date
CH1377877A CH625290A5 (en) 1977-11-11 1977-11-11 Track of a suspended railway with cable support

Country Status (2)

Country Link
BR (1) BR7801525A (en)
CH (1) CH625290A5 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1036720A3 (en) * 1999-03-15 2001-08-01 High Technology Investments B.V. Transport installation for vehicles pulled by a rope
CN105568784A (en) * 2015-11-10 2016-05-11 北京交通大学 Support system for suspension type monorail traffic track beam
CN112553981A (en) * 2020-09-07 2021-03-26 同济大学 Long-line cable force control system and method for cable rail structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1036720A3 (en) * 1999-03-15 2001-08-01 High Technology Investments B.V. Transport installation for vehicles pulled by a rope
CN105568784A (en) * 2015-11-10 2016-05-11 北京交通大学 Support system for suspension type monorail traffic track beam
CN105568784B (en) * 2015-11-10 2024-04-09 北京交通大学 Support system for suspended type monorail traffic track beam
CN112553981A (en) * 2020-09-07 2021-03-26 同济大学 Long-line cable force control system and method for cable rail structure
CN112553981B (en) * 2020-09-07 2022-04-15 同济大学 A long-line cable force control system and method used in a cable-rail structure

Also Published As

Publication number Publication date
BR7801525A (en) 1979-05-29

Similar Documents

Publication Publication Date Title
CH648623A5 (en) METHOD FOR THE PRODUCTION OF A CABLE ROPE OR TOW BELT BRIDGE.
DE1806381C3 (en) Self-supporting running track for monorails
DE10212090B4 (en) Track for an electromagnetic high-speed train
DE1930991A1 (en) Self-supporting track for hanging railways
DE2338926A1 (en) STRUCTURE OF A HIGH SPEED RAILWAY
CH625290A5 (en) Track of a suspended railway with cable support
EP0643169B1 (en) Joint arrangement for rails tied on a support structure
DE2443770C2 (en) Railway bridge with continuously welded tracks
DE2258657C2 (en) Carrier element for the production of equipment carriers
DE3207340A1 (en) INCLINED CABLE BRIDGE
CH601560A5 (en) High speed suspension railway track
AT409746B (en) PLANE FOR TRANSPORTING PERSONS
DE949063C (en) Coupling for swimming bridge support
CH386467A (en) Tongue switch for monorail railways
CH601561A5 (en) High speed suspension railway track
DE936988C (en) Inspection vehicles for bridges, especially arched bridges
DE2009663A1 (en) Bridge girders
DE1658624C3 (en) Crossing structure for two traffic routes that cross each other at an acute angle and the process for its construction
DE570661C (en) Supporting structure for the carriageway of high-speed trains with very high speeds
DE1106047B (en) Track for overhead cranes
DE756552C (en) Chain contact line with maximum spans for electric railways
DE876252C (en) Access ramp for road scooters
CH433425A (en) Suspended elevated railway
AT153266B (en) Contact line arrangement of electric railways.
DE2251475A1 (en) PROCESS AND BASE FOR THE PRODUCTION OF A STRUCTURAL STRUCTURE, IN PARTICULAR A BRIDGE MADE OF STRENGTHENED CONCRETE

Legal Events

Date Code Title Description
PL Patent ceased