Arrangement for reactive power control in alternating current networks.

Info

Publication number
CH227675A
CH227675A CH227675DA CH227675A CH 227675 A CH227675 A CH 227675A CH 227675D A CH227675D A CH 227675DA CH 227675 A CH227675 A CH 227675A
Authority
CH
Switzerland
Prior art keywords
group
arrangement according
controller
dependent
regulators
Prior art date
Application number
Other languages
German (de)
Inventor
Haftung Licentia Beschraenkter
Original Assignee
Licentia Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Licentia Gmbh filed Critical Licentia Gmbh
Publication of CH227675A publication Critical patent/CH227675A/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • H02J3/1821Arrangements for adjusting, eliminating or compensating reactive power in networks using shunt compensators
    • H02J3/1828Arrangements for adjusting, eliminating or compensating reactive power in networks using shunt compensators with stepwise control, the possibility of switching in or out the entire compensating arrangement not being considered as stepwise control
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

  

  Anordnung zur     Blindleistungsregelung    in Wechselstromnetzen.    In Wechselstromnetzen werden die ruhen  den oder umlaufenden Phasenschieber ent  weder nach rein tariflichen Gesichtspunkten  oder nach Gesichtspunkten höchster Ent  lastung der     Stromerzeugungs-        und        Übertra-          gungsmittel,    niedrigster Übertragungsver  luste, bester     Spannungsstützung    und so wei  ter eingesetzt. Diesen Aufgaben. ist die For  derung nach grösster Wirtschaftlichkeit über  geordnet, das heisst die Anlagekosten bezie  hungsweise der     Gesamtkompensations-Blind-          leistungsbedarf    soll so gering wie möglich  gehalten werden.  



  Handelt es sich um nicht sehr ausge  dehnte Netze, so wird man     mittels    eines  Zentralreglers den     Gesamtblindleistungsbe-          darf        ausregeln.    Man kann hierdurch die  tariflichen Verpflichtungen erfüllen und  ausserdem mit minimaler     Kondensatorleistung     auskommen. Es muss aber dann auf die ge  gebenenfalls ausserdem vorliegenden Auf  gaben einer Entlastung der Zuleitungen zu    den Verteilergruppen, einer Spannungsstüt  zung der Netzausläufer und so weiter zum  Teil verzichtet werden, weil die von dem  Zentralregler vorzunehmende     Zuschaltung     der Kondensatoren in starrer oder von Hand  jeweils vorher festzusetzender Reihenfolge  durchgeführt werden muss.

   Unangenehm sind  ausserdem die erforderlichen     Steuerleitungen     zwischen dem Zentralregler und den in den  Stationen einzusetzenden Kondensatoren.  



  Diese Schwierigkeiten können nach der  Erfindung dadurch     vermieden    werden, dass  allen oder einzelnen Stationen     beziehungs=     weise     Netzteilen    je eine     Gruppenregelein-          richtung    zugeordnet     wird,    die abhängig von  dem     Blindenergiefluss    in     derjenigen.    oder den  jenigen ankommenden, nicht als Ausgleich  leitungen dienenden Leitungen gesteuert  wird, über die die Haupteinspeisung bezie  hungsweise     Haupteinspeisungen,    der betref  fenden Stationen beziehungsweise der be  treffenden Netzteile erfolgen.

        Die Erfindung soll an Hand der in der  Zeichnung veranschaulichten Ausführungs  beispiele erläutert werden.  



       Fig.    1 zeigt die Anwendung der Erfin  dung bei einem Strahlennetz mit Aus  gleichsleitungen. In den Stationen<I>A, B, C</I>  sind danach parallel arbeitende Gruppen  regeleinrichtungen     a,    b, c vorgesehen. Diese  sind mit ihren     Stromwicklungen    an die  Stromwandler     a1,    b,,     c,.    angeschlossen, mit  ihren     Spannungswicklungen    an die     Span-          nungswandler        a2,        b2,        c,.    Die Stromwandler  liegen primärseitig in den Speiseleitungen  auf der Niederspannungsseite der Umspan  ner     a3,

          b3,        c3,    die Spannungswandler an den       Verbrauchersammelsehienen,    an denen neben  den eigentlichen Verbrauchern     a4,        b4,        c4,    zum  Beispiel Motoren, auch die Kondensatoren     a.-"          b5,        c,    für die     Blindleistungsregelung    ange  ordnet sind.

   Damit wird zum Beispiel in dem  Betriebsfall, in dem die Station A mit Spit  zenlast arbeitet, erreicht, dass der Kompen  sationsbedarf dieser Station, deren Konden  satoren bereits sämtlich eingeschaltet sind,  durch die in der Station B und C zur Ver  fügung stehenden Kondensatoren     mitgedeckt     wird, obwohl die beiden letztgenannten Sta  tionen keinerlei induktive Belastung -auf  weisen.  



  In noch weit wirksamerer Form ermög  licht diese Heranziehung der Kondensatoren  unbelasteter Stationen zur Deckung des  Spitzenbedarfes an Blindleistung, zum Bei  spiel einer dritten Station, die in     Fig.    2     ver-          anschäulichte    Anordnung, bei denen die im  wesentlichen hintereinander arbeitenden Grup  penregler     a,   <I>b</I> und c der Stationen<I>A, B</I>       bezw.    C an die     oberspannungsseitigen    Zulei  tungen zu diesen Stationen derart angeschlos  sen sind, dass die in den Stationen verbrauch  ten- und durchgehenden Leistungen erfasst  weiden.

   In diesem Falle regelt der Gruppen  regler c gleichsam gleichzeitig als Zentral  regler den Gesamtbedarf des mit Ausgleichs  leitungen arbeitenden Strahlennetzes.  



       Fig.    3, 4 und 5 zeigen die Anwendung  der Erfindung bei einem Maschennetz     bezw.          Ringnetz    in schematischer Darstellung. Die    Anordnung nach     Fig.    3 entspricht dabei  ihrer Wirkung nach etwa. derjenigen nach       Fig.    1.     Fig.    6 zeigt für mehrseitig gespeiste  Netze mit Ausgleichsleitungen den Anschluss  der Gruppenregler an die     Hauptspeisestrom-          wa,ndler    mittels     Summenstromwandler,    wo  durch die in die betreffenden Stationen von,  den beiden     Ilauptspeisestellen    gelieferte  Blindleistung erfasst wird.  



       Fig.    7 zeigt ein weiteres Ausführungsbei  spiel der Erfindung, das besonders für Strah  lennetze grossen Ausmasses geeignet ist. Bei  dieser Ausführungsmöglichkeit ist ausser den  den Unterstationen<B><I>A,</I></B> B und C zugeordne  ten Gruppenreglern<I>a, b</I>     bezw.        c,    die auf den  vorgeschriebenen     Blindleistungs-        und,/oder     Spannungswert regeln, ein Zentralregler d  vorgesehen, der nicht nur den Bedarf der  nicht geregelten kleinen Unterstationen F  und     h',    sondern auch den     Spitzenbedarf    der  mit Gruppenreglern versehenen Unterstatio  nen A,

   B und C auf den     vorgeschriebenen          Blindleistungswert        ausregelt.     



  Da bei dieser Ausführungsmöglichkeit  die Kondensatoren in einer schwach belaste  ten Station durch den zugehörigen Gruppen  regler nur in geringem Masse eingeschaltet  werden, während sie in andern parallel lie  genden Stationen. die Spitzenbelastungen  aufweisen, dringend benötigt werden, ist es       zweckmässig,    in allen Strahlennetzen die     Kon-          densa.torleistimg    der einzelnen     auszuregeln-    ;  den parallelen Unterstationen höchstens für  den Normalbedarf, niemals jedoch für den  Spitzenbedarf dieser Stationen vorzusehen,  während der Spitzenbedarf von dem Zentral  regler gedeckt wird.  



  - Es wurde nun erkannt, dass in solchen  Netzen, bei denen die Gruppenregler unter  einander parallel arbeiten, also in     vermasch-          ten    Netzen beziehungsweise in Netzen mit  Ausgleichsleitungen, die     Einschalt-    und/oder  Laufzeiten der einzelnen Regler gestaffelt  sein müssen, um gestaffelte Gesamtlaufzeiten  zu erhalten und damit ein Gegeneinander  regeln der Regler, das Pendelerscheinungen  verursachen     könnte,    zu vermeiden. Arbeiten i  bei einer strahlenförmigen Netzspeisung meh-           rere    Gruppenregler     hintereinander,    so muss  aus den gleichen Gründen der jeweils vor  geschaltete Gruppenregler langsamer anspre  chen als der nachgeordnete.

   Es ist also auch  bei stichförmig betriebenen, mit Gruppenreg  lern versehenen Unterstationen eine Zeitstaf  felung derart vorzusehen, dass der vom Zen  tralregler am weitesten entfernte Gruppen  regler am schnellsten und der     Zentralregler     am langsamsten arbeitet.  



  Auf Grund dieser Überlegung     wird        also     bei der Anordnung nach     Fig.    1 die Zeitstaf  felung zweckmässig derart getroffen, dass der  von der Übergabestelle am weitesten ent  fernte Gruppenregler     a    am schnellsten, der  Gruppenregler c, der der     Einspeisestelle    am  nächsten liegenden Station C dagegen am  langsamsten regelt. Bei der Anordnung nach       Fig.    2 ist eine     entsprechende    Zeitstaffelung  der einzelnen Regler vorgesehen.  



  Die Gruppenregler a, b und c der An  ordnung nach     Fig.    3 sind in ihren Regelzei  ten nach den oben angegebenen Grundsätzen  so gestaffelt, dass der Regler b am schnell  sten, der Regler a weniger schnell und der  Regler c am langsamsten     ausregelt.    Für die  Regler der Anordnung nach     Fig.    4 gilt be  züglich der Staffelung ihrer Regelzeiten das  gleiche wie für die Regler der Anordnung  nach     Fig.    3.  



  In dem Netzsystem nach     Fig.    5 wird der  Gruppenregler a am schnellsten, der als Zen  tralregler wirkende Regler<I>d</I> der Station<I>D</I>  am langsamsten regeln. Die Regelzeit     des     Reglers c der Station C liegt entsprechend  seiner     mittleren    Entfernung zwischen beiden  Regelzeiten.  



  Die Regler des Systems nach     Fig.    6 sind  in folgender Weise gestaffelt:<I>d, c, b, e, a, f.</I>  ,g und     1a,    wobei     def    Regler<I>d</I> die kleinste und       h    die grösste Einschaltzeit     und/oder    Laufzeit  aufweist. Gegebenenfalls kann auch die  Regelzeit des Reglers a gleich derjenigen des  Reglers<I>f</I> und die Regelzeit des Reglers     h     gleich derjenigen des Reglers.     g    gewählt  werden.  



  Bei der. Anordnung nach     Fig.    7 muss der  Zentralregler d verzögert gegenüber den    Gruppenreglern     a.,    b und c- der '     eiÜzellren     Lastgruppen ansprechen, so     dass-er        erst        dann     eingreift, wenn die in den     Unterstafioneä    "A;  B und C aufgetretenen     Laständerungen     durch die ihnen zugeordneten Gruppenregler  mit Sicherheit bereits     äusgeregelt    sind.

     Die für die Staffelung der Regelzeiten  oben angegebenen Gesichtspunkte- gelten für  einseitig und insbesondere auch für . mehr  seitig gespeiste Netze, wie sie in     Fig.    8       (Sternnetz)    und in     Fig.    9     (vermaschtes          Polygonnetz)    dargestellt sind. Da bei der  artigen Netzgebilden die erfindungsgemäss  vorgesehenen Regler     vorzugsweise    parallel  arbeiten, müssen die Gruppenregler     mitgegen-          einander    gestaffelten     Einsehalt-    und/oder  Laufzeiten arbeiten.

   Diese können je nach  der Art des Netzgebildes     strom-,    Spannungs  oder lastabhängig, ortsabhängig,     impedanz-          abhängig    oder dergleichen sein, das heisst, die  von der     Übergabestelle,    beziehungsweise vom       energierichtungsmässig    vorgeordneten Netz  punkt am weitesten entfernten Regler müs  sen in der Regel am     schnellsten    ansprechen.

    Bei dem Netzgebilde nach     Fig.    8 sind die       Regelzeiten    -der Regler a, .b, c und- -d in der       genannten    Reihenfolge gegeneinander .ge  staffelt, das heisst-es arbeitet der Regler     a     am langsamsten, der Regler d dagegen am  schnellsten. In     entsprechender    Weise sind  die Regelzeiten -der Regler a, b und c<B>-</B>des  in     Fig.    9 schematisch     dargestellten-    Netzes.,  und zwar in der genannten Reihenfolge,  gegeneinander gestaffelt.  



  Arbeiten in einem Netz die Regler hin  tereinander, so wird die Staffelung derart  vorgenommen, dass die Einschalk-. und/oder  Laufzeiten der Gruppenregler kleiner, sind  als diejenigen der     energierichtungsmässig    vor  geordneten Regler.  



  In ein- oder mehrseitig gespeisten     Netzen     ist eine lastabhängige Staffelung zweck  mässig, die nach ähnlichen     Gesichtspunkten     erfolgt, welche bei der selektiven     gurzschluss-          abschaltung    von     Strahlennetzen,        Ringnetzen,     Sternnetzen,     Polygonnetzen,    Maschennetzen  und deren Abarten"     berücksiähügt    werden       müssen;

      denn im     vörliegenden    Falle handelt      es sich um ein selektives     Arbeiten,    der Grup  penregler, welches durch den vor- oder neben  geordneten Gruppenregler im Normalfall  nicht     behindert    werden     darf.    Der parallel  liegende     bezw.    vorgeschaltete Regler soll  vielmehr erst dann ansprechen, wenn der be  trachtete Regler keine Kondensatoren mehr  zuzuschalten vermag.  



  Die Zeitstaffelung der Gruppenregler ist  in einfachster Weise bei den als Relais arbei  tenden     Überverbräuchszählern    mit nachge  schalteter     Noekenschaltwelle,    den sogenann  ten     Blindleistungsbegrenzern,    durchführbar,  bei denen die Staffelung der Laufzeit durch  Veränderung des     Übersetzungsverhältnisses     der     Schneckenradkupplung    zwischen dem       Zählertriebsystem    und der Nockenwelle er  reicht werden kann, und bei denen die Staf  felung der Einschaltzeit durch Beeinflussung  der     magnetischen    Anlaufsperre (Verzögerung       bezw.    Erschwerung des Anlaufes),

   zum Bei  spiel durch Verringerung des Abstandes zwi  schen     Hufeisenmagnet    und auf der Welle       sitzendem        Eisenstern    hervorgerufen werden  kann. Durch die Veränderung der magne  tischen Bremsung kann ausserdem die     Ge-          samtregelzeit,    das heisst die Einschaltzeit ein  schliesslich Laufzeit beeinflusst werden. Diese  als Zähler     arbeitenden        Blindleistungsbegren-          zer    sind ferner lastabhängig, das heisst sie  laufen um so schneller, je grösser die zu über  wachende, in der Netzstation anfallende  Blindlast ist.  



  Es ist daher zweckmässig, dem Regler c  der     Anordnungen,    zum Beispiel nach     Fig.    1,  2, 3, 4 und 6, dem Regler b in     Fig.    1 und  dem Regler c der Anordnung nach     Fig.    4,  also den Reglern solcher Stationen, wo zu  nächst die grösste Blindlast zu     erwarten    ist,  jedoch erfindungsgemäss langsamster Lauf  verlangt wird, ein sehr grosses Übersetzungs  verhältnis der     Schneckenradkupplung    sowie  gegebenenfalls auch. eine scharfe magnetische  Bremsung zu geben.  



  Durch eine systematisch durchgeführte  Zeitstaffelung kann ein gleichzeitiges An  sprechen mehrerer Regler und damit ein         Gegeneinanderregeln    und unnötiges Pendeln  der Regler bei     Blindlaständerungen,    die in  einer oder mehreren parallel oder hinterein  ander arbeitenden Stationen auftreten kön  nen, vermieden werden. Ausserdem wird er  reicht, dass zuerst die zum Beispiel von der  Übergabestelle am weitesten entfernt liegen  den Stationen Zeit genug haben. um die     in     ihrer Station aufgetretenen     Blindlastände-          rungen        auszuregeln.     



  Die     vorgeschilderten    Zeitstaffelungen las  sen sich natürlich auch bei andern für die       Blindleistungsregelung    in Betracht kommen  den Reglern, wie zum Beispiel     cos        gg-Reglern,     Spannungsreglern, Stromreglern usw., durch  Zuhilfenahme von Zeitrelais, mechanischen  Übersetzungen, magnetischen Bremsungen  und dergleichen erreichen.  



  Die Erfindung ist natürlich nicht auf  die beschriebenen Ausführungsbeispiele be  schränkt. Sie ist vielmehr für sämtliche  Netze ohne und mit Ausgleichsleitungen,  zum Beispiel für Strahlennetze,     Ringnetze,          Polygonnetze,    Maschennetze und deren Ab  arten anwendbar. Sie kann mit besonderem  Vorteil in solchen Netzen Anwendung fin  den, in denen Kondensatoren aus tariflichen  Gründen mit Rücksicht auf die Spannungs  regelung oder Netzentlastung oder derglei  chen benötigt werden, man jedoch mit Rück  sicht auf ein     Minimum    an Anlagekosten mit  möglichst geringer     Gesamtkondensatorleistung     für den Netzverband auskommen muss.



  Arrangement for reactive power control in alternating current networks. In AC grids, the stationary or rotating phase shifters are used either according to purely tariff aspects or according to aspects of maximum relief for the power generation and transmission means, lowest transmission losses, best voltage support and so on. These tasks. The requirement for the greatest economic efficiency is paramount, i.e. the system costs or the total compensation reactive power requirement should be kept as low as possible.



  If the networks are not very extensive, the total reactive power requirement will be regulated by means of a central controller. In this way, you can meet the tariff obligations and also get by with minimal capacitor output. In some cases, however, the additional tasks of relieving the supply lines to the distribution groups, voltage support for the network outlets and so on have to be dispensed with, because the connection of the capacitors to be carried out by the central controller must be fixed either rigidly or manually Sequence must be carried out.

   The control lines required between the central controller and the capacitors to be used in the stations are also uncomfortable.



  According to the invention, these difficulties can be avoided in that a group control device is assigned to all or individual stations or network parts, which is dependent on the reactive energy flow in that device. or the incoming lines, which do not serve as compensation lines, are controlled via which the main feed or main feeds of the relevant stations or the relevant network components take place.

        The invention will be explained with reference to the execution examples illustrated in the drawing.



       Fig. 1 shows the application of the inven tion in a radiation network with equalization lines. In the stations <I> A, B, C </I>, groups of control devices a, b, c working in parallel are then provided. These are connected with their current windings to the current transformers a1, b ,, c ,. connected, with their voltage windings to the voltage converters a2, b2, c ,. The current transformers are located on the primary side in the supply lines on the low-voltage side of the transformer a3,

          b3, c3, the voltage converters on the consumer collectors, on which in addition to the actual consumers a4, b4, c4, for example motors, the capacitors a.- "b5, c, are arranged for reactive power control.

   This ensures, for example, in the case of operation in which station A is working with peak load, that the compensation requirements of this station, whose capacitors are all already switched on, is also covered by the capacitors available in stations B and C. , although the last two stations mentioned do not have any inductive load.



  In a far more effective form, this use of the capacitors of unloaded stations to cover the peak demand for reactive power, for example a third station, enables the arrangement illustrated in FIG. 2, in which the group controllers a, <I, working essentially one behind the other > b </I> and c of stations <I> A, B </I> and C are connected to the high-voltage supply lines to these stations in such a way that the power consumed and continuous in the stations is recorded.

   In this case, the group controller c, as it were, at the same time as the central controller regulates the total requirements of the radiation network that works with compensating lines.



       3, 4 and 5 show the application of the invention in a mesh network BEZW. Ring network in a schematic representation. The arrangement according to FIG. 3 corresponds approximately to its effect. those according to FIG. 1. FIG. 6 shows the connection of the group controller to the main feed current converter by means of summation current converters for multi-sided fed networks with compensating lines, where the reactive power supplied to the relevant stations by the two main feed points is recorded.



       Fig. 7 shows another Ausführungsbei game of the invention, which is particularly suitable for Strah lennetz large extent. With this implementation option, in addition to the group controllers <I> a, b </I> and / or the substations <B> <I> A, </I> </B> B and C, c, which regulate to the prescribed reactive power and / or voltage value, a central controller d is provided that not only meets the requirements of the unregulated small substations F and h ', but also the peak demand of the substations A, which are equipped with group controllers,

   B and C adjusts to the prescribed reactive power value.



  Since in this embodiment, the capacitors in a weakly loaded th station are only switched on to a small extent by the associated group controller, while they are in other parallel lying stations. which show peak loads, are urgently needed, it is advisable to regulate the condensa-tor power of the individual in all radiation networks; the parallel substations should be provided for normal demand at most, but never for the peak demand of these stations, while the peak demand is covered by the central controller.



  - It has now been recognized that in those networks in which the group controllers work in parallel with each other, i.e. in meshed networks or in networks with compensating lines, the switch-on and / or running times of the individual controllers must be staggered in order to have staggered overall running times and thus prevent the controllers from regulating against each other that could cause oscillation. If several group controllers work one after the other with a radial mains supply, the upstream group controller must respond more slowly than the downstream one for the same reasons.

   In the case of substations that are operated in staggered fashion and equipped with group controllers, a time graduation must be provided so that the group controller furthest away from the central controller works fastest and the central controller works the slowest.



  Based on this consideration, in the arrangement according to FIG. 1, the timing is expediently made such that the group controller a furthest away from the transfer point controls the fastest, the group controller c, the station C closest to the feed point, controls the slowest . In the arrangement according to FIG. 2, a corresponding time graduation of the individual controllers is provided.



  The group controllers a, b and c of the arrangement according to FIG. 3 are staggered in their control times according to the principles given above so that controller b is the fastest, controller a is less fast and controller c is the slowest. For the controller of the arrangement according to FIG. 4, the same applies to the staggering of their control times as for the controller of the arrangement according to FIG. 3.



  In the network system according to FIG. 5, the group controller a will control the fastest, the controller <I> d </I> of the station <I> D </I> acting as a central controller will control the slowest. The control time of controller c of station C lies between the two control times according to its mean distance.



  The controllers of the system according to FIG. 6 are staggered in the following way: <I> d, c, b, e, a, f. </I>, g and 1a, where def controller <I> d </I> die The smallest and h the largest switch-on time and / or running time. If necessary, the control time of controller a can be the same as that of controller <I> f </I> and the control time of controller h can be the same as that of the controller. g can be selected.



  In the. Arrangement according to FIG. 7, the central controller d must respond with a delay compared to the group controllers a., B and c- the single load groups, so that it only intervenes when the load changes that have occurred in the sub-stations A; B and C are caused by them assigned group controllers are already noisy.

     The considerations given above for the staggering of the regular times apply to one-sided and in particular also to. networks fed from more than one side, as shown in FIG. 8 (star network) and in FIG. 9 (meshed polygon network). Since the regulators provided according to the invention preferably work in parallel with this type of network structure, the group regulators must work with staggered maintenance and / or running times.

   Depending on the type of network structure, these can be current, voltage or load-dependent, location-dependent, impedance-dependent or the like, i.e. the controllers furthest away from the transfer point or from the upstream network point in terms of energy direction must generally respond the fastest .

    In the network structure according to FIG. 8, the control times -the controllers a, .b, c and -d are staggered against one another in the order mentioned, that is, the controller a works the slowest, the controller d, on the other hand, the fastest. In a corresponding manner, the control times of the regulators a, b and c of the network shown schematically in FIG. 9 are staggered with respect to one another, specifically in the order mentioned.



  If the regulators work one after the other in a network, the grading is carried out in such a way that the switch-on. and / or the runtimes of the group controllers are shorter than those of the controllers arranged upstream in terms of energy direction.



  In networks fed on one or more sides, a load-dependent graduation is advisable, which takes place according to similar criteria, which must be taken into account in the selective short-circuit disconnection of radial networks, ring networks, star networks, polygon networks, mesh networks and their variants;

      because in the present case it is a matter of selective work, the group controller, which normally must not be hindered by the upstream or adjacent group controller. The parallel respectively. Rather, upstream controller should only respond when the controller under consideration is no longer able to connect capacitors.



  The time grading of the group controllers can be carried out in the simplest way with the overconsumption counters working as relays with downstream Noek switching shaft, the so-called reactive power limiters, in which the grading of the running time can be achieved by changing the gear ratio of the worm gear coupling between the meter drive system and the camshaft. and where the graduation of the switch-on time by influencing the magnetic start-up lock (delay or more difficult start-up),

   For example, by reducing the distance between the horseshoe magnet and the iron star sitting on the shaft, this can be caused. By changing the magnetic braking, the overall control time, i.e. the switch-on time including the running time, can also be influenced. These reactive power limiters, which work as counters, are also load-dependent, which means that they run faster, the greater the reactive load that is to be monitored and occurring in the network station.



  It is therefore expedient to connect the controller c of the arrangements, for example according to FIGS. 1, 2, 3, 4 and 6, the controller b in FIG. 1 and the controller c of the arrangement according to FIG. 4, i.e. the controllers of such stations, where at first the greatest reactive load is to be expected, but according to the invention the slowest run is required, a very high transmission ratio of the worm gear coupling and possibly also. to give a sharp magnetic brake.



  Through a systematically implemented time graduation, a simultaneous addressing of several controllers and thus counter-regulation and unnecessary oscillation of the controllers in case of reactive load changes that can occur in one or more stations working in parallel or one behind the other can be avoided. It is also sufficient that the stations that are furthest away from the transfer point, for example, have enough time first. in order to regulate the reactive load changes that have occurred in your station.



  The above-mentioned time graduations can of course also be achieved with other regulators for reactive power regulation, such as cos gg regulators, voltage regulators, current regulators, etc., by using time relays, mechanical transmissions, magnetic braking and the like.



  The invention is of course not limited to the exemplary embodiments described. Rather, it can be used for all networks with and without compensation lines, for example for radial networks, ring networks, polygon networks, mesh networks and their types. It can be used with particular advantage in those networks in which capacitors are required for tariff reasons with regard to voltage regulation or network relief or the like, but with the lowest possible total capacitor output for the network with a minimum of system costs got to.

 

Claims (1)

PATENTANSPRUCH: Anordnung zur Blindleistungsregelung in ein- oder mehrseitig gespeisten Wechsel stromnetzen mittels regelbarer Phasenschie ber, dadurch gekennzeichnet, da.ss allen oder einzelnen Stationen oder Netzteilen des Wechselstromnetzes je eine Gruppenregelein- richtung zugeordnet ist, die abhängig von dem Blindenergiefluss in derjenigen oder den jenigen ankommenden, nicht als Ausgleichs leitung dienenden Leitungen gesteuert wird, über die die Haupteinspeisung beziehungs weise Haupteinspeisungen der betreffenden Stationen beziehungsweise Netzteile erfolgen. UNTERANSPRüCHE 1. PATENT CLAIM: Arrangement for reactive power control in single- or multi-sided fed AC networks by means of controllable phase shifters, characterized in that a group control device is assigned to all or individual stations or network parts of the AC network, which depending on the reactive energy flow in one or the others incoming lines that do not serve as compensating lines are controlled, via which the main feed or main feeds of the relevant stations or power supply units take place. SUBCLAIMS 1. Anordnung nach Patentanspruch, da durch gekennzeichnet, dass ausser den Grup penreglern mindestens ein Zentralregler vor gesehen ist, der in einem den Gruppenreglern energierichtungsmässig vorgeordneten 1\Tetz- punkt angeordnet ist. 2. Anordnung nach Patentanspruch, da durch gekennzeichnet, dass die Gesamtlauf zeiten der parallel oder hintereinander arbei tenden Gruppenregler gegeneinander gestaf felt sind. 3. Anordnung nach Unteranspruch 1, da durch gekennzeichnet, dass die Gesamtlauf zeiten des oder der Zentralregler und der Gruppenregler gegeneinander gestaffelt sind. 4. Arrangement according to patent claim, characterized in that, in addition to the group regulators, at least one central regulator is provided, which is arranged in a point upstream of the group regulators in terms of energy direction. 2. Arrangement according to claim, characterized in that the total running times of the group controllers working in parallel or one behind the other are stacked against each other. 3. Arrangement according to dependent claim 1, characterized in that the total running times of the central controller or controllers and the group controller are staggered against each other. 4th Anordnung nach Unteranspruch 1, da durch gekennzeichnet, dass die Gesamtlauf zeiten der von energierichtungsmässig vorge ordneten Netzpunkten entfernter angeordne ten Gruppenregler kleiner sind als diejenigen der näher angeordneten Gruppenregler. 5. Anordnung nach Unteranspruch 1, mit hintereinander arbeitenden Gruppenreglern, dadurch gekennzeichnet, dass die Gesamtlauf zeiten der Gruppenregler kleiner sind als die jenigen der energierichtungsmässig vorgeord neten Gruppenregler. 6. Arrangement according to dependent claim 1, characterized in that the total running times of the group regulators arranged more distant from the energy-directional pre-arranged network points are shorter than those of the group regulators arranged closer. 5. Arrangement according to dependent claim 1, with group regulators working one behind the other, characterized in that the total running times of the group regulators are smaller than those of the group regulators in terms of energy direction. 6th Anordnung nach Unteranspruch 1, reit parallel arbeitenden, von einem energierich- tungsmässig vorgeordneten Netzpunkt an nähernd gleich weit entfernten Gruppenreg lern, dadurch gekennzeichnet, dass die Ge samtlaufzeiten der parallel arbeitenden Gruppenregler gestaffelt sind. 7. Anordnung nach Unteranspruch 1, da durch gekennzeichnet, dass die Grösse der Gesamtlaufzeiten der parallel arbeitenden Gruppenregler von der Grösse der am Reg- lereinbauort verbrauchten und durchgehen den Leistungen abhängt. 3. Arrangement according to dependent claim 1, group regulators operating in parallel, from an energy direction upstream network point to approximately the same distance, characterized in that the total runtimes of the group regulators operating in parallel are staggered. 7. Arrangement according to dependent claim 1, characterized in that the size of the total runtimes of the group controllers working in parallel depends on the size of the services consumed at the controller installation site. 3. Anordnung nach Unteranspruch 1, da durch gekennzeichnet, dass die Grösse der Gesamtlaufzeiten der parallel arbeitenden Gruppenregler von der Grösse der Spannung am Reglereinbauort abhängt. 9. Anordnung nach Unteranspruch 1, da durch gekennzeichnet, da-ss die Grösse der Ge samtlaufzeiten der Gruppenregler derart impedanzabhängig ist, dass die genannten Grössen der Gruppenregler bei kleinerer Impedanz grösser sind als bei höherer Impe danz. 10. Anordnung nach Patentanspruch, da durch gekennzeichnet, dass als Reglerrelais je eine Nockenschaltwelle antreibende Zäh lertriebsysteme verwendet werden. 11. Arrangement according to dependent claim 1, characterized in that the size of the total running times of the group regulators operating in parallel depends on the size of the voltage at the location of the regulator installation. 9. Arrangement according to dependent claim 1, characterized in that the size of the total running times of the group controller is impedance-dependent in such a way that the said sizes of the group controller are greater at a lower impedance than at a higher impedance. 10. The arrangement according to claim, characterized in that a cam switching shaft driving counter drive systems are used as the controller relay. 11. Anordnung nach I?nteranspruch 10, dadurch gekennzeichnet, dass die Staffelung der Laufzeiten der Reglerrelais durch ent sprechende Wahl des übersetzungsverhält- nisses der Schneckenradkupplung zwischen dem Zählertriebsystem und der zugeordneten Nockenwelle erreicht ist. 12. Anordnung nach Unteranspruch 10, dadurch gekennzeichnet, dass die Staffelung der Einschaltzeiten des Reglerrelais durch eine entsprechende Beeinflussung der magne tischen Anlaufsperre der Reglerrelais er reicht ist. 13. Arrangement according to claim 10, characterized in that the staggering of the running times of the controller relays is achieved by appropriate selection of the transmission ratio of the worm gear coupling between the counter drive system and the associated camshaft. 12. The arrangement according to dependent claim 10, characterized in that the graduation of the switch-on times of the regulator relay by a corresponding influencing of the magnetic start lock of the regulator relay it is enough. 13th Anordnung nach Unteranspruch 10, dadurch gekennzeichnet, dass die Staffelung der Gesamtregelzeiten der Reglerrelais durch entsprechende Wahl der magnetischen Brem sung erreicht ist. Arrangement according to dependent claim 10, characterized in that the grading of the total control times of the controller relays is achieved by appropriate selection of the magnetic brake.
CH227675D 1941-07-04 1942-05-29 Arrangement for reactive power control in alternating current networks. CH227675A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE227675X 1941-07-04

Publications (1)

Publication Number Publication Date
CH227675A true CH227675A (en) 1943-06-30

Family

ID=5866765

Family Applications (1)

Application Number Title Priority Date Filing Date
CH227675D CH227675A (en) 1941-07-04 1942-05-29 Arrangement for reactive power control in alternating current networks.

Country Status (1)

Country Link
CH (1) CH227675A (en)

Similar Documents

Publication Publication Date Title
DE10059018C2 (en) Wind turbine or wind farm consisting of a large number of wind turbines
EP2984725B1 (en) Wind turbine having extended voltage range
DE3225285A1 (en) METHOD FOR OPERATING A HIGH VOLTAGE DC TRANSFER SYSTEM WITH ANY MANY TRANSFORMER STATIONS
EP3413422B1 (en) Local network station with variable low voltage outputs
DE2747136C2 (en) Control procedure for an HVDC close coupling
DE2419663C3 (en) Device for coordinating and switching the energy requirements of several electrical consumers that work independently of one another
CH227675A (en) Arrangement for reactive power control in alternating current networks.
DE2316341A1 (en) PROCESS FOR CONTINUOUSLY DISTRIBUTING ELECTRIC ENERGY
EP3297115B1 (en) Assembly with an energy storage device and energy converter for absorbing electrical energy from a power network and discharge of electrical energy to the power network
DE966924C (en) Arrangement for reactive power control in single or multi-sided AC networks
DE740043C (en) Device for central reactive power control in alternating current networks
DE943963C (en) Process for reactive power control in line networks
EP3125401B1 (en) Wind turbine with voltage-controlled internal requirements power supply
DEA0008029MA (en)
DE632944C (en) Arrangement to improve the operation of converters
DE645293C (en) Control of power distribution, power flows and speed (frequency) in single or multi-phase AC networks or network connections
WO2018114714A1 (en) Longitudinal voltage regulator
DE742515C (en) Frequency control in a three-phase network fed by a self-controlled inverter
DE569692C (en) Control device for power and heat systems
DE3013060A1 (en) Ice formation prevention system for power transmission lines - using wattless current due to voltage increase to heat lines
DE657588C (en) Method and device for regulating several frequency converters consisting of a synchronous generator and a synchronous motor or asynchronous motor without a rear machine
DE676752C (en) Regulation of power distribution, power flows and frequency (speed) in single or multi-phase AC networks or network connections
DE938081C (en) Device for monitoring or regulating reactive power or voltage in single or multi-sided AC line networks
DE1941047C (en) Composite device for two power grids