[go: up one dir, main page]

CH190808A - Method and device for the production of reinforced concrete poles. - Google Patents

Method and device for the production of reinforced concrete poles.

Info

Publication number
CH190808A
CH190808A CH190808DA CH190808A CH 190808 A CH190808 A CH 190808A CH 190808D A CH190808D A CH 190808DA CH 190808 A CH190808 A CH 190808A
Authority
CH
Switzerland
Prior art keywords
box parts
molding box
molding
parts
reinforcement
Prior art date
Application number
Other languages
German (de)
Inventor
Ingg A G Ghira
Original Assignee
Ingg A & G Ghira
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ingg A & G Ghira filed Critical Ingg A & G Ghira
Publication of CH190808A publication Critical patent/CH190808A/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

  

  Verfahren und Einrichtung zur Herstellung von     Eisenbetonmasten.       Die Erfindung betrifft ein Verfahren  und eine Einrichtung zur Herstellung von       Eisenhetonmasten    am Standort und in der       endgültigen    Lage, insbesondere von Gitter  masten für elektrische Leitungen.

   Das Ver  fahren besteht darin, dass zuerst aus den  äussern Teilen der eisernen     Formkästen    für  die Ständer     und.    Strebendes Mastes ein     Bau-          gerüst    gebildet wird und dass von unten be  ginnend die innern     Formkastenteile    an die  äussern angelegt und mit diesen verbunden  werden, ferner dass nach Einlegen von     Be-          wehrungen    die     Formkästen    mit Beton ausge  füllt werden.

   Die     Einrichtung    gemäss der  Erfindung zur Durchführung des Verfahrens       besitzt    äussere     Formkastenteile    für die Stän  der, die unter     sich    durch     Verschlülsse    ver  bunden sind.

   Die äussern     Formkastenteile     benachbarter     Ständer    sind     miteinander    durch  ebenfalls mit Verschlüssen     angeschlossene     Querversteifungen - verbunden, während     idie     innern und die äussern     Formkästenteile    mit         Flanschen        aufeinanderliegen.       Im     folgenden    werden anhand der Zeich  nung einige     Ausführungsbeispiele    der Erfin  dung     erläutert.     



       Fig.    1 der Zeichnung ist     eine        Ansicht,des     Gerüstes eines     Gittermastes;          Fig.    2 ist ein     Horizontalschnitt    nach  Linie     B-B    der     Fig.    1;       Fig.    3 zeigt als     Einzelheit,die        getrennten          Formkastenelemente    in     perspektivischer    An  sicht;

         FLg.    4 zeigt im Grundriss dieselben Ele  mente     zusammengesetzt;          Fig.    5 und 5b     zeigen    Einzelheiten eines       Knotenpunktes    in dem sich     Formkastenele-          mente    für Ständer und     Streben    treffen;

         Fig.    6 zeigt     einen    Formkasten für     Dia-          gonalverstrebungen    im     Querschnitt;          Fig.    7 und 8     zeigen    die Form für eine       Konsole    und     Iden        Halter    für eine Sprosse;

         Fig.    9, 10 und 11 zeigen in     Perspektive,     Grundriss und Aufriss eine     Einrichtung    um  die vertikalen     Armierungseisen    der Ständer      des Mastes im     richtigen    Abstand von den       Formkastenwänden    zu halten.  



  Bei der Erstellung     eines        Gittermastes     zum Beispiel für elektrische     Hochspannungs-          leitungen    werden zunächst die Fundament  gruben für die Ständer ausgehoben und in  jeder wird eine     Eisenbetonplatte    P herge  stellt, welche     als        Basis    für     die    Aufrichtung  des     Arbeitsgerüstes    dient, das gleichzeitig die       Formkästen    für die     Betonmischung    bildet.  Dieses Gerüst umfasst Ständer,     Diagonalver-          strebungen    und horizontale Glieder.

   Die  Ständer A des     Gerüstes    sind als     @Vinkel-          bleche        ausgebildet.    Jeder der vier Gerüst  ständer A     (Fig.    1)     besteht    aus     Abschnitten,     die von     einem    Knotenpunkt zum andern  durchgehen und die durch     Scharniere        (Fig.     3 und 5) verbunden sind.  



  Die Formkästen für die     Diagonalv        erstre-          bungen    C bestehen aus Profileisen     a        (Fig.    6).  Diese Profileisen a sind mit Teilen     r    der  Ständer zusammengeschweisst und diese Teile  <I>r</I> werden an den Ständemeilen<I>A</I> mit     Ver-          sahlüssen.l    und     Keilen    2! befestigt     (Fig.5)

  .    Die  horizontalen     Eisen    b dienen nur als Gerüst  versteifung und zur Auflage der     Bühnen    3  für die Ausführung .der Arbeiten und wer  den an die .Ständer     mit        Stift-    und Schlitz  verschlüssen     v    angebracht, die in     Fig.        äh     dargestellt     sind.     



  Die weitere Ausführung geht     folgender-          ma.ssen    vor sich: Nachdem,     wie    in     Fig.    2  angedeutet, die äussern     Winkelbleche    A durch       die        Profileisen    b     bezw.    durch geschlossene       diagonale        Formkastenteile        a    zu einem fer  tigen     Baugerüst    verbunden sind,

   werden zu  nächst die     Armierungseisen    4 in üblicher  Weise in den Ständern     angebracht    und nach  Einschalung der     Plinthen    5     (Fig.    1) wird  mit dem Einstampfen des Betons     begonnen.     



  Nach Herstellung der     Plinthen    werden  von unten beginnend     nacheinander    die ein  zelnen     Ständerabschnitte    durch     Anbringung     der innern Winkelbleche 6; die wegen der  Einfüllung und des     Feststampfens    des Be  tons nicht zu hoch sein dürfen,     fertiggestellt.     Die äussern Winkelbleche A, die zum Gerüst  gehören, und die     innern    Winkelbleche 6 der    Formkästen besitzen nicht das gleiche Profil.  Jene     sind    mit Zapfen 7 versehen und die  Winkelbleche 6 haben entsprechende Pass  löcher B. Die Verbindung der beiden Teile.

    die mit Flanschen     aufeinanderliegen,    ge  schieht mittels Bindedraht 9, der     durch,    wei  tere in beiden Teilen vorgesehene Löcher 8'  durchgezogen wird     (Fig.        3.).    Umständliche  und     kostspielige        Schraubenverbindungen        sind     somit     vermieden.     



  Die Formkästen für die     Eisenbetondia-          gonalen    C zur Verbindung der Ständer, wel  che mittels der Teile r und der Verschlüsse 1  an die Ständer A .des     Gerüstes    angeschlossen  werden,     bestehen        aus    einem     äussern    Kasten  teil a, der beim Aufbau als     Gerüstteil    dient,  und einem     innern        Kastenteil    a',     der    durch  Bindeverschlüsse an .den Teil a     angeschlossen     ,den     Foimka-sten    v     ervollständigt,

      nachdem die       R,undeisenarmierung        angebracht    worden     ist.     Beide     Formka:stenteile    haben abgeschrägte       Seitenwände    zur     Erleichterung        des        Abmon-          tierens.    Falls der     Masst    Konsolen besitzt,  werden die Formkästen für diese in dersel  ben Weise hergestellt     (Fig.    7).  



  Um den Hast     besteigbar    zu machen, kann  man vordem Feststampfen     Eisensprossen    in  der in     Fig.    8     angedeuteten    Weise anbringen  und diese bleiben so im Beton befestigt.  



  Die     Formkästen    16 für Konsolen können       etwa    wie in     Fig.    7 gezeigt     angeordnet    sein.  Die .Stützen 17 für die Steigsprossen können       zum    Beispiel durch     Vorreiber    an dem Form  kastenständer     befestigt    werden. Der be  quemen     Ausschalung        halber    werden auch  die Seitenflächen     dieser        Formkastenteile    ab  geschrägt.  



  Um die     Armierungseisen        im    Formkasten  am     richtigen    Platz zu halten wird eine in  den     Fig.    9, 10 und 11 gezeigte Einrichtung  verwendet, die aus kleinen Blechstreifen 19  besteht, die im Winkel abgebogen und an die       Rundeisenbügel    2.0 mit     Eisendraht    festgebun  den sind. Diese Blechstreifen     sind    vorne zu  gespitzt, damit keine Eisenflächen an die  Aussenseite des     Mastes    zu liegen kommen.  



       Natürlich    werden je nach der Art und  Form der zu     errichtenden        Maste    die gleich-      zeitig als     Gerüstteile        verwendeten        eisernen          Formkastenteile    verschiedene Gestalt an  nehmen.



  Method and device for the manufacture of reinforced concrete poles. The invention relates to a method and a device for the production of Eisenhetonmasten on site and in the final position, in particular of lattice masts for electrical lines.

   The process consists in that first from the outer parts of the iron molding boxes for the stand and. A building scaffold is formed on the striving mast and that the inner molding box parts are placed against the outside and connected to them, starting from below, and that the molding boxes are filled with concrete after reinforcement has been inserted.

   The device according to the invention for carrying out the method has outer molding box parts for the stand which are connected to each other by closures.

   The outer molding box parts of adjacent uprights are connected to one another by cross stiffeners, which are also connected with fasteners, while the inner and outer molding box parts lie on top of one another with flanges. In the following some exemplary embodiments of the invention are explained with reference to the drawing.



       Fig. 1 of the drawings is a view of the framework of a lattice tower; Fig. 2 is a horizontal section on line B-B of Fig. 1; Fig. 3 shows in detail, the separate molding box elements in perspective to view;

         FLg. 4 shows the same elements assembled in plan; 5 and 5b show details of a node in which molding box elements for uprights and struts meet;

         6 shows a molding box for diagonal struts in cross section; Figures 7 and 8 show the shape for a bracket and holder for a rung;

         9, 10 and 11 show in perspective, plan and elevation a device for keeping the vertical reinforcing bars of the posts of the mast at the correct distance from the molding box walls.



  When constructing a lattice mast, for example for high-voltage electrical lines, the foundation pits for the stands are first dug and a reinforced concrete slab P is made in each one, which serves as the basis for erecting the work scaffolding, which also forms the molding boxes for the concrete mix. This framework includes uprights, diagonal struts and horizontal members.

   The uprights A of the scaffolding are designed as @ angled sheets. Each of the four scaffold stands A (Fig. 1) consists of sections that go through from one node to the other and which are connected by hinges (Fig. 3 and 5).



  The molding boxes for the diagonal struts C consist of profile iron a (Fig. 6). These profile bars a are welded together with parts r of the stand and these parts <I> r </I> are attached to the stand miles <I> A </I> with locking nuts. 1 and wedges 2! attached (Fig. 5)

  . The horizontal iron b serve only as a framework stiffening and to support the stages 3 for the execution .the work and who attached to the .Stand with pin and slot closures v, which are shown in Fig. Äh.



  The further execution proceeds as follows: After, as indicated in FIG. 2, the outer angle plates A through the profile iron b or. are connected by closed diagonal molding box parts a to form a finished scaffolding,

   the reinforcement bars 4 are attached to the uprights in the usual way and after the plinths 5 (Fig. 1) have been shuttered, the concrete is started to be tamped.



  After making the plinths starting from the bottom one after the other, the individual stand sections by attaching the inner angle plates 6; which must not be too high due to the filling and the tamping of the concrete, completed. The outer angle plates A, which belong to the framework, and the inner angle plates 6 of the molding boxes do not have the same profile. Those are provided with pins 7 and the angle plates 6 have corresponding pass holes B. The connection of the two parts.

    which lie on top of each other with flanges, ge happens by means of binding wire 9, which is pulled through, white tere holes 8 'provided in both parts (Fig. 3.). Cumbersome and expensive screw connections are thus avoided.



  The molding boxes for the reinforced concrete diagonals C for connecting the uprights, which are connected to the uprights A of the scaffolding by means of the parts r and the locks 1, consist of an outer box part a, which serves as a scaffolding part during construction, and a inner box part a ', which is connected to part a by binding closures and completes the foam box,

      after the R, iron reinforcement has been attached. Both mold parts have beveled side walls to facilitate assembly. If the dimensions have consoles, the molding boxes are produced for them in the same way (Fig. 7).



  In order to make the haste mountable, iron rungs can be attached in the manner indicated in FIG. 8 before tamping down and these remain fixed in the concrete.



  The molding boxes 16 for consoles can be arranged approximately as shown in FIG. The supports 17 for the climbing rungs can be attached to the box stand, for example, by sash fasteners. For the sake of convenient formwork, the side surfaces of these molding box parts are also beveled.



  In order to keep the reinforcement bars in the right place in the molding box, a device shown in FIGS. 9, 10 and 11 is used, which consists of small sheet metal strips 19 which are bent at an angle and fastened to the iron bar 2.0 with iron wire. These metal strips are too pointed at the front so that no iron surfaces come to rest on the outside of the mast.



       Of course, depending on the type and shape of the masts to be erected, the iron molding box parts used as scaffolding parts will take on different shapes.

 

Claims (1)

PATENTANSPRüCHE I. Verfahren zur Herstellung von Eisen- betonmasten am Standort und in der end gültigen Lage., insbesondere von Gitter- ma.sten für elektrische Leitungen, da durch gekennzeichnet, PATENT CLAIMS I. Process for the production of reinforced concrete poles on site and in the final position, in particular of lattice poles for electrical lines, as characterized by .dass zuerst aus den äussern Teilen der eisernen Formkästen für die Ständer und Streben des Mastes ein Baugerüst gebildet wird und dass von unten beginnend die innern. Formkasten- teile an die äussern angelegt -und mit die sen verbunden werden, ferner :dass nach Einlegen von Bewehrungen die Form kästen mit Beton ausgefüllt werden. .that a scaffolding is first formed from the outer parts of the iron molding boxes for the posts and struts of the mast and that the inner ones, starting from below. Mold box parts are placed on the outside and connected to them, furthermore: that after inserting reinforcement, the molding boxes are filled with concrete. 1I. Einrichtung zur Ausführung,des Verfah rens nach Patentanspruch I, dadurch ge kennzeichnet, dass die äussern Form- kastenteile für die Ständer unter sich durch Verschlüsse verbunden sind und dass die äussern Formkastenteile benach barter Ständer durch ebenfalls mit Ver schlüssen angeschlossene Quersteifungen miteinander verbunden sind, 1I. Device for carrying out the method according to patent claim I, characterized in that the outer molding box parts for the stands are connected to one another by closures and that the outer molding box parts of adjacent stands are connected to one another by transverse stiffeners also connected with closures, während die innern und die äussern Formkastenteile mit Flanschen aufeinanderliegen. UNTERANSPRüCHE 1. Verfahren nach Patentanspruch I, da .durch gekennzeichnet, dass zur Einhal tung .des richtigen Abstandes der Armie- rungseisen von der Formwand gebogene Blechstreifen verwendet werden, die vorne zugespitzt und mit den Armie- rungsbügeln durch Eisendraht verbunden werden. 2. while the inner and outer molding box parts lie on top of one another with flanges. SUBClaims 1. Method according to patent claim I, characterized in that bent sheet metal strips are used to maintain the correct distance between the reinforcement bars and the mold wall, which are pointed at the front and connected to the reinforcement stirrups by iron wire. 2. Einrichtung nach Patentanspruch II, da durch gekennzeichnet, dass zur Erleich terung des Ausschalens die Formkasten teile abgeschrägte Wände besitzen. 3. Device according to claim II, characterized in that the molding box parts have beveled walls to facilitate stripping. 3. Einrichtung nach Patentanspruch II, da durch gekennzeichnet, dass die Form- kastenteile für Konsolen und zum Hal ten von Steigsprossen von aussen an -die mit Aussparungen versehenen Form- ka.stenteile der Ständer angeschlossen werden können. Device according to patent claim II, characterized in that the molding box parts for consoles and for holding climbing rungs can be connected from the outside to the molding box parts of the uprights provided with recesses.
CH190808D 1935-03-23 1936-03-23 Method and device for the production of reinforced concrete poles. CH190808A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
IT190808X 1935-03-23

Publications (1)

Publication Number Publication Date
CH190808A true CH190808A (en) 1937-05-15

Family

ID=11154372

Family Applications (1)

Application Number Title Priority Date Filing Date
CH190808D CH190808A (en) 1935-03-23 1936-03-23 Method and device for the production of reinforced concrete poles.

Country Status (1)

Country Link
CH (1) CH190808A (en)

Similar Documents

Publication Publication Date Title
DE69302390T2 (en) FRAME FOR A BUILDING
DE3140287A1 (en) Device for producing concrete walls of storey height
DE212023000095U1 (en) System for supporting a multifunctional cap and construction method therefor
DE2123351A1 (en) Steel beam ceiling construction
DE202022102656U1 (en) Support structure for constructing the platform canopy
DE2117711A1 (en) Foundation stand that can be placed on the ground
DE3036539A1 (en) Prefabricated brick wall element for the full assembly of houses
CH190808A (en) Method and device for the production of reinforced concrete poles.
AT411079B (en) METHOD FOR THE CONSTRUCTION OF A CONSTRUCTION WITH A CONCRETE WALL CONTAINED IN A CIRCUMFERENCE
DE1634302A1 (en) Prefabricated construction element made of reinforced concrete for the production of earth supports or retaining walls and a method for producing such earth supports or retaining walls
AT150932B (en) Method and device for the production of reinforced concrete masts or reinforced concrete lattice masts.
DE2645910A1 (en) FORMWORK AND PROCEDURES FOR ERECTING FUNNEL OR CONE-SHAPED CONCRETE BUILDINGS
DE212021000476U1 (en) External suspension frame for building an in-situ cast air corridor of a high-rise structure
DE4239057C2 (en) Process and prefabricated module for the production of structures and buildings
AT507841B1 (en) SWIMMING POOLS
DE2636168C2 (en) Buildings made from load-bearing prefabricated components
DE7603410U1 (en) PREFABRICATED BUILDING SKELETON
DE2912131C2 (en) garage
EP0715039A1 (en) Shuttering element
DE673652C (en) Process for the production of reinforced concrete lattice masts
DE2658410A1 (en) Rapidly assembled temporary stable - comprises wall panels and roof sheets on structure of tubular posts and trusses
DE1434466A1 (en) Method for erecting tall concrete structures, e.g. of high-rise residential buildings
DE888161C (en) Tubular scaffolding made from individual frames made beforehand
DE1221422B (en) Method for erecting walls from posts and wall elements inserted between them, and then erected wall and posts for the wall
AT408004B (en) Prefabricated-concrete-wall shuttering-element system