Process for the production of a concrete ceiling with hollow and solid beams.

Info

Publication number
CH184814A
CH184814A CH184814DA CH184814A CH 184814 A CH184814 A CH 184814A CH 184814D A CH184814D A CH 184814DA CH 184814 A CH184814 A CH 184814A
Authority
CH
Switzerland
Prior art keywords
hollow
concrete
girders
beams
producing
Prior art date
Application number
Other languages
German (de)
Inventor
Modrow Ludwig
Original Assignee
Modrow Ludwig
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Modrow Ludwig filed Critical Modrow Ludwig
Publication of CH184814A publication Critical patent/CH184814A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/04Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
    • E04B5/043Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement having elongated hollow cores
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/04Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
    • E04B5/06Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement with beams placed against one another optionally with pointing-mortar

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Description

  

  Verfahren zur Herstellung einer Betondecke mit hohlen und massiven Trägern.    Vorliegende Erfindung bezieht sich auf  ein Verfahren zur     Herstellung    einer Beton  decke mit hohlen und massiven Trägern.  



  Das Verfahren besteht darin, dass man  hohle Träger aus Beton, welche die volle  Höhe der herzustellenden Decke besitzen, und  auf zwei einander gegenüberliegenden Längs  seiten einen Fussflansch aufweisen, mit letz  teren unmittelbar aneinander fügt, in die  über den Flanschen gebildeten Hohlräume       Armierungseisen    einlegt und diese Hohl  räume, unter Verwendung der hohlen Träger  als Schalung, mit Beton ausfüllt, wodurch  die massiven Träger entstehen.  



  An Hand der Zeichnung ist ein Aus  führungsbeispiel eines Verfahrens gemäss der  Erfindung beschrieben, welches zur Herstel  lung einer Decke dient, deren Spannweite  grösser ist als die Länge der hohlen Träger.  In der Zeichnung zeigt:       Fig.    1 ein Teilstück der fertigen Decke,  im Querschnitt;       Fig.    2 die Seitenansicht zweier hohlen  Träger;         Fig.    3 die Draufsicht auf vier hohle  Träger;       Fig.    4 die Seitenansicht des Endes eines  hohlen Trägers;       Fig.    5 die Stirnansicht eines hohlen  Trägers.  



  Zur Herstellung der dargestellten Beton  decke werden Hohlträger 1 verwendet, deren  Höhe der Höhe der herzustellenden Decke,  und deren Länge etwa der Hälfte der .Spann  weite der herzustellenden Decke entspricht.  Diese Hohlträger besitzen auf beiden Längs  seiten je einen Fussflansch 7, im Innern einen       Hohlraum    8, welcher an den Enden des Trä  gers durch Stirnwände 9 abgeschlossen ist,  sowie     eine        Armierung    4, welche aus einer  Stirnseite herausreicht.

   Die Hohlträger wer  den     einerendes    auf die festen Auflagen 10  und     anderends    auf provisorische     Stützen    11  abgestützt, und so in zwei Reihen anein  andergefügt, dass sie in jeder Reihe mit den  Fussflanschen 7 unmittelbar aneinander  stossen     (Fig.    1 und 3). Die aus den Stirn  seiten der hohlen Träger einer Trägerreihe      herausragenden     Eisen    4 werden in die Zwi  schenräume zwischen den     Hohlträgern    der  gegenüber liegenden Trägerreihe eingefügt.

    In diesen Raum werden noch die     Armierungs-          eisen    3     (Fig.    1, 2 und 3) und die Verstär  kungseisen 6     (Fig.    2) eingelegt, worauf,  sowohl der     zwischen    den Längsseiten, als  auch der zwischen den     Stirnseiten    der hohlen  Träger vorhandene     Zwischenraum    mit Beton  ausgefüllt wird, welcher Beton zwischen den  hohlen Träger armierte, massive Träger er  zeugt. Die hohlen Träger dienen bei diesem       Betonierungsprozess    als Schalung.

   Die     Ar-          mierungseisen    der hohlen Träger gehen durch  Eisenplatten 5     (Fig.    5 hindurch, welche     in     den hohlen Träger einbetoniert sind. Diese  Platten nehmen die Komponenten der Zug  kräfte der     Armierungseisen    auf und verhin  dern ein Abbröckeln des Betons an den Kan  ten der hohlen Träger.  



  Zur Herstellung des Zugteiles der hohlen  Träger kann Leichtbeton, und zur Herstel  lung des Druckteiles der gleichen Träger  hingegen     kann    Normalbeton verwendet wer  den.



  Process for the production of a concrete ceiling with hollow and solid beams. The present invention relates to a method for producing a concrete ceiling with hollow and solid beams.



  The method consists in that hollow concrete girders, which have the full height of the ceiling to be produced, and have a foot flange on two opposite longitudinal sides, join directly to one another with the latter, insert reinforcing iron into the cavities formed over the flanges and these Hollow spaces, using the hollow girders as formwork, filled with concrete, creating the massive girders.



  With reference to the drawing, an exemplary embodiment of a method according to the invention is described, which is used to manufacture a ceiling whose span is greater than the length of the hollow beam. The drawing shows: FIG. 1 a section of the finished ceiling, in cross section; Fig. 2 is a side view of two hollow supports; 3 shows the plan view of four hollow supports; Figure 4 is a side view of the end of a hollow beam; Fig. 5 is an end view of a hollow carrier.



  To produce the concrete ceiling shown, hollow beams 1 are used, the height of which corresponds to the height of the ceiling to be produced, and the length of which corresponds to about half of the .Span width of the ceiling to be produced. These hollow beams have on both longitudinal sides a foot flange 7, inside a cavity 8, which is closed at the ends of the Trä gers by end walls 9, and a reinforcement 4, which extends out from one end face.

   The hollow beams are supported on the fixed supports 10 and the other ends on provisional supports 11, and are joined in two rows so that they abut directly with the foot flanges 7 in each row (Fig. 1 and 3). The protruding from the front sides of the hollow beams of a row of iron 4 are inserted into the inter mediate spaces between the hollow beams of the opposite row of beams.

    Reinforcing irons 3 (FIGS. 1, 2 and 3) and reinforcing irons 6 (FIG. 2) are placed in this space, whereupon the space between the long sides and between the front sides of the hollow beams is filled with concrete, which concrete reinforced between the hollow beams, massive beams he testifies. The hollow girders serve as formwork during this concreting process.

   The reinforcing bars of the hollow girders go through iron plates 5 (Fig. 5, which are concreted into the hollow girder. These plates absorb the components of the tensile forces of the reinforcing bars and prevent the concrete from crumbling at the edges of the hollow girders .



  To produce the tensile part of the hollow beam, lightweight concrete can be used, and normal concrete can be used to produce the pressure part of the same beam.

 

Claims (1)

PATENTANSPRUCH Verfahren zur Herstellung einer Beton decke, dadurch gekennzeichnet, dass man hohle Träger aus Beton, welche die volle Höhe der herzustellenden Decke besitzen und an zwei einander gegenüber liegenden Längs seiten einen Fussflansch aufweisen, mit letz teren unmittelbar aneinandergefügt, in die über den Manschen gebildeten Hohlräume Armierungseisen einlegt und diese Hohl- räume dann, unter Verwendung der hohlen Träger als Schalung, mit Beton ausfüllt, wodurch zwischen den hohlen Trägern ar mierte massive Träger erzeugt werden. PATENT CLAIM A method for producing a concrete ceiling, characterized in that hollow concrete beams, which have the full height of the ceiling to be produced and have a foot flange on two opposite longitudinal sides, are joined directly to one another with the latter, in which the sleeves are formed Reinforcing iron is inserted into cavities and these cavities are then filled with concrete using the hollow girders as formwork, as a result of which solid reinforced girders are created between the hollow girders. UNTERANSPRüCHE: 1. Verfahren zur Herstellung einer Beton decke nach Patentanspruch, mit zwei Rei hen von stirnseitig einander gegenüber liegenden armierten, hohlen Trägern, da durch gekennzeichnet, dass die Armie- rungseisen dieser Träger die an den .Stirn seiten der letzteren herausragen, in die Zwischenräume zwischen den hohlen Trä gern der gegenüber liegenden Trägerreihe eingeführt, und dort bei der Ausbetonie rung dieser Räume einbetoniert werden. 2. SUBClaims: 1. A method for producing a concrete ceiling according to claim, with two rows of frontally opposite reinforced, hollow beams, characterized in that the reinforcing irons of these beams protrude into the .Stirn sides of the latter Interstices between the hollow Trä like the opposite row of girders introduced, and there these rooms are concreted in during the concreting. 2. Verfahren zur Herstellung einer Beton decke nach Patentanspruch und Unter anspruch 1, dadurch gekennzeichnet, dass bei der Herstellung jedes hohlen Trägers an der Austrittstelle der Armierung aus dem Träger ein Eisen in den Träger ein betoniert wird, durch welches die Armie- rungseisen hindurchgehen, und welches die Komponenten der Zugkräfte aufnimmt und verhindert, dass der Beton des hohlen Trägers an den Austrittstellen der Ar- mierung abgesprengt wird. 3. Method for producing a concrete ceiling according to claim and sub-claim 1, characterized in that during the production of each hollow beam at the point where the reinforcement emerges from the beam, an iron is concreted into the beam through which the reinforcing irons pass and which absorbs the components of the tensile forces and prevents the concrete of the hollow girder from being blown off at the points where the reinforcement emerges. 3. Verfahren zur Herstellung einer Beton decke nach Patentanspruch und Unter ansprüchen 1 und 2, dadurch gekennzeich net, dass zur Herstellung des Zugteiles der hohlen Träger Leichtbeton, während zur Herstellung des Druckteiles dieser Träger normaler Beton verwendet wird. A method for producing a concrete ceiling according to claim and sub-claims 1 and 2, characterized in that lightweight concrete is used to produce the tensile part of the hollow support, while normal concrete is used to produce the pressure part.
CH184814D 1935-06-27 1935-06-27 Process for the production of a concrete ceiling with hollow and solid beams. CH184814A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH184814T 1935-06-27

Publications (1)

Publication Number Publication Date
CH184814A true CH184814A (en) 1936-06-30

Family

ID=4433239

Family Applications (1)

Application Number Title Priority Date Filing Date
CH184814D CH184814A (en) 1935-06-27 1935-06-27 Process for the production of a concrete ceiling with hollow and solid beams.

Country Status (1)

Country Link
CH (1) CH184814A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE907580C (en) * 1950-05-05 1954-03-25 Belge De Construction D Habita Process for producing hollow ceilings and hollow elements used for their production
DE953911C (en) * 1948-10-02 1956-12-06 Gustav Reese Reinforced concrete hollow stone ceiling with hollow stones widened like a flange on the long sides

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE953911C (en) * 1948-10-02 1956-12-06 Gustav Reese Reinforced concrete hollow stone ceiling with hollow stones widened like a flange on the long sides
DE907580C (en) * 1950-05-05 1954-03-25 Belge De Construction D Habita Process for producing hollow ceilings and hollow elements used for their production

Similar Documents

Publication Publication Date Title
CH184814A (en) Process for the production of a concrete ceiling with hollow and solid beams.
EP0143101B1 (en) Reinforcement for reinforced concrete constructions
EP0267146B1 (en) Reinforcing cage
AT304827B (en) Process for the production of a concrete shell structure
CH335834A (en) Process for the production of walls and wall produced by the process
CH330032A (en) Shoring for a formwork for the production of building parts, in particular of ceilings in reinforced concrete construction
DE2406852A1 (en) PROCESS FOR THE PRODUCTION OF BUILDINGS WITH ROCK CONCRETE WALLS AND REINFORCED CONCRETE SOLID SLABS
DE965660C (en) Reinforced concrete ceiling beams
DE809100C (en) Reinforced concrete skeleton structure
EP2175079B1 (en) Method for forming a rigid corner reinforcement for reinforced concrete construction, reinforcement element and rigid corner reinforcement
DE3933392A1 (en) Self-supporting expandable constructional plate - has three=dimensional lattice work structure between bottom portion and strip
DE638584C (en) A wall consisting of two wall shells reinforced by a wire mesh or reinforcement layers of any kind, as well as a method and device for producing the same
DE531909C (en) Reinforcement of wire brick fabrics and similar openwork plaster supports
DE601651C (en) Load-bearing wall made of a weatherproof outer shell, an insulating inner shell and a concrete filling
DE536873C (en) Process for the production of trough-shaped reinforced concrete beams for reinforced concrete hollow ceilings
DE541725C (en) Light, load-bearing structure
AT80718B (en) Process for the production of reinforced concrete ceilings. Process for the production of reinforced concrete ceilings.
CH697250B1 (en) Cavity wall reinforcement cage.
AT225889B (en) Process for the creation of a reinforced concrete structure and structure created according to this process
DE807546C (en) Ceiling hollow stone
AT158233B (en) Process for the production of a supporting frame for formwork walls of reinforced concrete masts, in particular for electrical overhead lines.
AT285121B (en) METHOD OF MANUFACTURING SPACE BOXES
DE878323C (en) Device for forming reinforced concrete beams or the like, in particular of trapezoidal cross-section
DE1106946B (en) Process for the production of cavities in concrete components, especially in floor slabs, as well as tubular cages for carrying out the process
AT205719B (en) Process for the production of filling concrete masonry and connecting element for carrying out the process