Scaffolding on a structure and method for its manufacture.

Info

Publication number
CH183614A
CH183614A CH183614DA CH183614A CH 183614 A CH183614 A CH 183614A CH 183614D A CH183614D A CH 183614DA CH 183614 A CH183614 A CH 183614A
Authority
CH
Switzerland
Prior art keywords
support
scaffolding
building
support members
attached
Prior art date
Application number
Other languages
German (de)
Inventor
Kern Conrad
Original Assignee
Kern Conrad
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kern Conrad filed Critical Kern Conrad
Publication of CH183614A publication Critical patent/CH183614A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

  

  Baugerüst an einem Bauwerk und Verfahren zu dessen Herstellung.    Vorliegende Erfindung betrifft ein Bau  gerüst an einem Bauwerk, sowie ein Verfah  ren zur Herstellung     tles    Baugerüstes an einem  Betonbauwerk. Das Baugerüst weist eine an  Stützgliedern befestigte Stützlehne auf.

   Er  findungsgemäss sind nun die genannten Stütz  glieder mittels der Stützlehne und mittels  mit .der Stützlehne zusammenwirkenden  Klemmteilen, welche an den Stützgliedern  angebracht sind, starr miteinander verspannt  und dadurch in der Längsrichtung des Bau  werkes gesichert, wobei     einerends    an den  Stützgliedern     bezw.    an der Stützlehne an  greifende,     andernends    durch das Bauwerk ge  tragene     Haltestangen    zur .Sicherung der  Stützglieder in Richtung senkrecht zum Bau  werk vorgesehen sind, das Ganze derart, dass  die Haltestangen als Träger für einen Zwi  schenboden dienen können.  



  Das Verfahren zur Herstellung ,des Bau  gerüetes an einem Betonbauwerk     besteht,dar-          in,    dass man im Beton des Baues untere,     drei-          eckförmige    Träger für einen untern Rüst-         bretterboden    verankert und auf diesen Trä  gern Stützglieder anordnet,

   diese durch eine  an ihnen     befestigte    Stützlehne in der Längs  richtung des Bauwerkes und durch am Bau  werk verankerte     Haltestangen    in     Richtung     senkrecht zum Bauwerk     sichert    und auf die  Stützglieder obere Träger für einen     obern          Rüstbretterboden    abstützt.  



  Auf beiliegender     Zeichnung    ist ein Aus  führungsbeispiel .des     Baugerüstes    dargestellt,   und zwar zeigen       Fig.    1 .das Baugerüst mit in einer Beton  mauer verankerten     Rüstbretterträgern,          Fig.    2 einen     Längsschnitt    durch einen in  die Mauer einbetonierten Dübel mit Kupp  lungsstück zum Anschrauben eines     Rüst-          bretterträgers    in grösserem Massstab,       Fig.    3 einen     Querschnitt    nach Linie       III        III    in     Fig.    2,

         Fig.    4 einen Schnitt nach     Linie        IV-IV     in     Fig.    1,       Fig.    5 einen     Schnitt    nach Linie     V-V    in       Fig.    1,           Fig.    6 eine Teilansicht der Stützlehne an  einer Stelle, wo sie in Längsrichtung und  senkrecht zur Mauer gesichert ist, und       Fig.    7 einen     Schnitt    nach Linie     VII-VII     in     Fig.    6.  



  In der     Betonmauer    1 sind Dübel 2 ein  betoniert. Die Dübel besitzen von ihren  Aussenenden her zugängliche Gewinde 6. Am  rechten Ende jedes Dübels 2 ist je ein     drei-          eckförmiger        Rüstbretterträger    3 mit Hilfe  eines     Kupplungsstückes    4 und einer Bolzen  schraube 5 befestigt. Diese Träger weisen  einen     obern    Schenkel 10, einen Stützschenkel       3a    und einen Versteifungsschenkel 3u auf.

    Zur Verankerung der Träger 3 könnte man  aber auch ein Kupplungsstück 4 verwen  den, das eine mit Gewinde versehene Ver  längerung aufweist, die in den Dübel ein  geschraubt wird, so dass in diesem Falle eine  besondere Schraube 5 nicht nötig ist. Am  linken Ende jedes Dübels 2 ist gemäss     Fig.    2  ein abnehmbarer konischer Distanzring 7 an  gebracht.  



  Das Kupplungsstück 4 besitzt am linken  Ende einen konischen Ansatz B. Da jeder       Gerüstträger    eine beträchtliche Last zu tra  gen hat, wird durch die Ansätze 8 eine Ent  lastung der die     Kupplungsstücke    4 mit den  Dübeln 2 verbindenden Schrauben 5 in ver  tikaler Richtung erzielt. Das Kupplungsstück  4 weist am Aussenende zwei einander gegen  überliegende     segmentförmige    Backen 9 auf.  Die obere Seite 10 des .den     Rüstbretterträger     bildenden     Dreieckes    besteht aus einem Flach  eisen, auf dessen Innenende eine Hülse 11 be  festigt ist.

   Die     Hülse    11 weist an ihrem In  nenende zwei     segmentförmige    Vorsprünge 12  auf, welche mit .den Backen 9 zusammen  wirken. Backen 9 und Vorsprünge 12 sind  derart ausgebildet und angeordnet, dass bei  horizontaler Lage des     Rüstbretterträgers    das  die Vorsprünge 12 tragende Hülsenende in  das Kupplungsstück 4 eingeführt werden  kann, worauf durch Verdrehung des     Rüst-          bretterträgers        um    90   die Vorsprünge 12  hinter die Backen 9 greifen. Auf den Dübeln  2 ist eine Umfangsverdickung, bestehend  beispielsweise aus     einem    aufgeschweissten    Draht 2a angebracht.

   Die Verdickung ge  währleistet eine zuverlässige Verankerung  der Dübel in der Mauer.  



  An dem Aussenende der     Rüstbretterträger     sind vertikale Zapfen 13 befestigt     und    auf  diese Stützrohre 14 aufgesetzt, welche mit  tels Tragstücken 15 eine Stützlehne 16 tra  gen. Diese Stützrohre sind senkrecht, sowie  parallel zur Mauer gesichert. Die Sicherung  der Stützrohre parallel zur Mauer erfolgt  durch die Stützlehne und durch auf den Roh  ren 14     verkeilbare    Klemmorgane, welche die  Lehne gegen die Tragstücke     festpressen    und  dadurch die Stützlehne mit den Stützrohren  zu einer starren Einheit     verbinden,    während  die Sicherung senkrecht zur Mauer durch       1Taltestangen    20, welche am     Mauerwerk    ver  ankert sind, erfolgt.

   In das obere Ende der  Rohre 14 ist eine aus dem Rohr heraus  ragender Führungszapfen 18 eingeschoben.  



  Das in     Fig.    1 dargestellte Baugerüst wird       zweckmässigerweise    folgendermassen erstellt:  Nach Aufbau des Bauwerkes bis     etwas     oberhalb der dargestellten untern Rüstbretter  träger und     Anbringung    dieser letzteren in  der beschriebenen Weise wird der     Rüstbret-          terboden    hergestellt, die Stützrohre 14 auf  gesetzt, die Stützlehne 16 angebracht und  mittels den Klemmorganen 15, 17 auf den  Stützrohren 14 festgeklemmt, die Schalwände  weiter oben angebracht und in bekannter  Weise mit Spannschrauben in     Verbindung     mit Dübeln und abnehmbaren,

       konischen     Distanzringen verschraubt und die Mauer  weiter betoniert. Darauf wird, im     untern     Teil bis etwas über den     Punkt    M, die.Scha  lung entfernt und die zur     Verspannung    der  Verschalung an der Stelle M verwendeten,  keine Verdickung aufweisenden Dübel nebst  konischen Distanzringen werden heraus  geschlagen.  



  Durch     in    die frei gewordenen Löcher ein  gesetzte Schrauben 19 werden an der Mauer  Haltestangen 20 verankert, welche mit ihrem  hakenförmig ausgebildeten Aussenende 21 die  Stützlehne 16 und damit die Stützrohre 14  parallel zur Mauer sichern. Die Haltestangen  <B>20</B> dienen in der Folge als Träger für     einen         weiteren Bretterboden, von welchem aus  höher eingeschalt und betoniert     wird.     



  Auf jedes Rohr 14 wird mittels des aus  diesem herausragenden, als Führung dienen  den Zapfenende 18 ein weiteres Stützrohr  stück 22 aufgesetzt, auf dessen oberes Ende  eine     verschraubbare    Einstellmuffe 23 an  geordnet ist. Auf den Einstellmuffen 23  werden die Aussenenden von obern     Rüstbret-          terträgern    3 gestützt, welche wiederum mit  tels Dübeln 2 in der von dem auf den Stan  gen 20 errichteten Zwischenboden aus bis  oberhalb dieser Höhe betonierten Mauer ver  ankert werden. Die Träger 3 werden mit  ihren     vertikalen    Zapfen 13 mit den Einstell  muffen in Eingriff gebracht.

   Zwecks     Be-          festigens    des sich gegen die Mauer abstützen  den Fusses 24 des     Rüstbretterträgers,    welch  ersterer gabelförmig ausgebildet ist und das  angeschraubte Ende der Haltestangen 20 um  fasst     (Fig.    4), muss die Mutter jedes Schrau  benbolzens 19 vorübergehend losgeschraubt  werden. Aus     Fig.    1 ist ersichtlich, dass das  angeschraubte Ende der Haltestangen 20  auch einen konischen Ansatz aufweist, wel  cher in einer entsprechenden Aussparung  der Mauer liegend die Schraube 19 in verti  kaler Richtung entlastet.  



  Dabei können die Haltestangen 20 nöti  genfalls anstatt am Beton des Bauwerkes  auch an den Schalwänden des Bauwerkes  durch die Spannschrauben, die die Schalung  binden, befestigt werden.  



  Da die Dübel 2     beiderends    mit Gewinde  versehen sind, kann auch ein Gerüst auf bei  den Seiten der Mauer vorgesehen sein. Ein  beidseitiges Gerüst ist zum Beispiel bei  Hallenbauten erwünscht.



  Scaffolding on a structure and method for its manufacture. The present invention relates to a construction scaffolding on a structure, as well as a procedural ren for producing tles scaffolding on a concrete structure. The scaffolding has a backrest attached to support members.

   According to the invention, said support members are now by means of the support back and by means of clamping parts which cooperate with .der the support back and are attached to the support members, rigidly braced together and thereby secured in the longitudinal direction of the building, with one end on the support members or respectively. on the backrest of attacking, at the other end of the building carried support rods to .Sicherung the support members in the direction perpendicular to the building are provided, the whole thing in such a way that the support rods can serve as a carrier for an intermediate floor.



  The process for producing the construction scaffolding on a concrete structure consists in anchoring lower, triangular girders for a lower scaffolding board floor in the concrete of the building and arranging support members on these girders.

   this secures by a support attached to them in the longitudinal direction of the building and by anchored at the building support rods in the direction perpendicular to the building and is supported on the support members upper carrier for an upper scaffolding board floor.



  The accompanying drawing shows an exemplary embodiment of the scaffolding, namely: Fig. 1 shows the scaffolding with scaffolding girders anchored in a concrete wall, and FIG on a larger scale, Fig. 3 shows a cross section along line III III in Fig. 2,

         Fig. 4 is a section along line IV-IV in Fig. 1, Fig. 5 is a section along line VV in Fig. 1, Fig. 6 is a partial view of the backrest at a point where it is secured in the longitudinal direction and perpendicular to the wall, and FIG. 7 shows a section along line VII-VII in FIG. 6.



  In the concrete wall 1 anchors 2 are concreted. The dowels have threads 6 that are accessible from their outer ends. At the right end of each dowel 2, a triangular scaffolding board carrier 3 is fastened with the aid of a coupling piece 4 and a bolt 5. These carriers have an upper leg 10, a support leg 3a and a stiffening leg 3u.

    For anchoring the carrier 3, however, one could also use a coupling piece 4 that has a threaded extension that is screwed into the dowel, so that in this case a special screw 5 is not necessary. At the left end of each dowel 2, a removable conical spacer ring 7 is placed on as shown in FIG.



  The coupling piece 4 has at the left end a conical approach B. Since each scaffold girder has a considerable load to tra conditions, a discharge of the coupling pieces 4 with the dowels 2 connecting screws 5 is achieved in ver vertical direction through the approaches 8. The coupling piece 4 has two opposing segment-shaped jaws 9 at the outer end. The upper side 10 of the triangle forming the scaffolding board carrier consists of a flat iron, on the inner end of which a sleeve 11 is fastened.

   At its inner end, the sleeve 11 has two segment-shaped projections 12 which cooperate with the jaws 9. Jaws 9 and projections 12 are designed and arranged in such a way that when the scaffolding board carrier is in a horizontal position, the sleeve end carrying the projections 12 can be inserted into the coupling piece 4, whereupon the projections 12 engage behind the jaws 9 by rotating the scaffolding board carrier by 90. A circumferential thickening, consisting for example of a welded-on wire 2a, is attached to the dowels 2.

   The thickening ensures that the dowels are reliably anchored in the wall.



  At the outer end of the scaffolding board carrier vertical pins 13 are attached and placed on these support tubes 14, which with means of support pieces 15 carry a support back 16 conditions. These support tubes are vertical and secured parallel to the wall. The support tubes are secured parallel to the wall by the backrest and by clamping elements that can be wedged onto the tubes 14, which press the backrest against the support pieces and thereby connect the support with the support tubes to form a rigid unit, while securing perpendicular to the wall by means of 1 valley bars 20 , which are anchored to the masonry, takes place.

   A guide pin 18 projecting out of the tube is pushed into the upper end of the tubes 14.



  The scaffolding shown in Fig. 1 is expediently created as follows: After building the structure up to a little above the lower scaffolding boards shown and attaching the latter in the manner described, the scaffolding floor is produced, the support tubes 14 are placed on, the support 16 is attached and clamped by means of the clamping members 15, 17 on the support tubes 14, the formwork walls attached further up and in a known manner with tensioning screws in connection with dowels and removable,

       conical spacer rings screwed and the wall further concreted. Then, in the lower part to a little above point M, the.Scha treatment is removed and the dowels used to brace the cladding at point M, which have no thickening, together with conical spacer rings are knocked out.



  By in the vacated holes a set screws 19 are anchored to the wall holding rods 20, which secure with their hook-shaped outer end 21, the support 16 and thus the support tubes 14 parallel to the wall. The support rods <B> 20 </B> then serve as a carrier for another wooden floor, from which higher shuttering and concreting are carried out.



  On each tube 14 is by means of the protruding from this, serve as a guide to the pin end 18, a further support tube piece 22 is placed, on the upper end of a screwable adjusting sleeve 23 is arranged on. On the adjusting sleeves 23, the outer ends of upper scaffolding boards 3 are supported, which in turn are anchored by means of dowels 2 in the wall that has been concreted from the floor erected on the Stan gene 20 up to above this height. The carrier 3 are brought into engagement with their vertical pins 13 with the adjustment sleeves.

   For the purpose of securing the support against the wall, the foot 24 of the scaffolding board carrier, which the former is fork-shaped and the screwed-on end of the support rods 20 (FIG. 4), the nut of each screw bolt 19 must be temporarily unscrewed. From Fig. 1 it can be seen that the screwed end of the support rods 20 also has a conical approach, wel cher in a corresponding recess in the wall, the screw 19 relieved in verti cal direction.



  The support rods 20 can if necessary instead of the concrete of the building also be attached to the shuttering walls of the building by the tensioning screws that bind the formwork.



  Since the dowels 2 are threaded at both ends, a frame can also be provided on the sides of the wall. A scaffolding on both sides is desirable for hall structures, for example.

 

Claims (1)

PATENTANSPRUCH I: Baugerüst an einem Bauwerk, mit einer an Stützgliedern befestigten Stützlehne, da durch gekennzeichnet, dass die genannten Stützglieder mittels der Stützlehne und mit tels mit der Stützlehne zusammenwirkenden Klemmteilen, welche an den Stützgliedern angebracht sind, starr miteinander verspannt und dadurch in der Längsrichtung des Bau- werkes gesichert sind, wobei einerends an den Stützgliedern bezw. an der Stützlehne angreifende, andernends durch das Bauwerk getragene Haltestangen zur Sicherung der Stützglieder in Richtung senkrecht zum Bauwerk vorgesehen sind, das Ganze derart, PATENT CLAIM I: Scaffolding on a building, with a support arm attached to support members, characterized in that the said support members are rigidly braced together by means of the support support and with clamping parts which are attached to the support members and which are attached to the support members, and thereby in the longitudinal direction of the building are secured, with one end respectively on the support members holding rods that engage the support and are carried at the other end by the structure are provided to secure the support members in the direction perpendicular to the structure dass die Haltestangen als Träger für einen Zwischenboden dienen können. UNTERANSPRüCHE 1. Baugerüst an einem Bauwerk nach Pa tentanspruch I, gekennzeichnet durch un tere dreieckförmige Träger für einen un tern Rüstbretterboden und für die Stütz glieder und durch von den genannten Stützgliedern unterstützte obere Träger für einen bbern Rüstbretterboden. z. that the handrails can serve as carriers for an intermediate floor. SUBClaims 1. Scaffolding on a structure according to patent claim I, characterized by lower triangular carriers for a lower scaffolding board base and for the support members and by the upper carrier supported by said support members for a bbern scaffolding board base. z. Baugerüst an einem Bauwerk nach Pa tentanspruch I, dadurch gekennzeichnet, dass die Stützlehne zwischen einem auf jedem Stützglied befestigten Tragstück und einem auf jedem Stützglied verkeilten Klemmstück geklemmt und dadurch in Längsrichtung des Mauerwerkes in bezug auf die Stützglieder gesichert ist. 3. Scaffolding on a building according to patent claim I, characterized in that the support arm is clamped between a support piece attached to each support member and a clamping piece wedged on each support member and is thereby secured in the longitudinal direction of the masonry with respect to the support members. 3. Baugerüst an einem Bauwerk nach Unter anspruch 1, dadurch gekennzeichnet, dass als Stützglieder Stützrohre dienen, auf deren oberem die obern Träger abstützen den Ende, eine verschraubbare Einstell muffe angeordnet ist, in welcher je ein am Aussenende des gestützten Trägers be festigter Zapfen geführt wird. 4. Scaffolding on a structure according to sub-claim 1, characterized in that support tubes are used as support members, on the top of which the upper girders support the end, a screwable adjusting sleeve is arranged in which a pin attached to the outer end of the supported girder is guided. 4th Baugerät an einem Bauwerk nach Un teranspruch 1, dadurch gekennzeichnet, dass die Träger mittels in das Mauerwerk des Baues eingelassenen, mit Gewinde versehenen Dübeln an das Mauerwerk ver ankert sind, wobei die Dübel eine Ver dickung besitzen, zum Zwecke, eine zu verlässige Verankerung im Mauerwerk zu erzielen. 5. Baugerüst an einem Bauwerk nach Unter anspruch 4, dadurch gekennzeichnet, dass die Träger je mittels Vorsprüngen hinter Backen eines Kupplungsstückes greifen, welches seinerseits mittels einer besonde- ren Schraube an einem Dübel angeschraubt ist. 6. Construction equipment on a building according to Un teran claim 1, characterized in that the carrier by means of threaded dowels embedded in the masonry of the building are anchored to the masonry, the dowels having a thickening, for the purpose of reliable anchoring in the To achieve masonry. 5. Scaffolding on a structure according to sub-claim 4, characterized in that the carriers each grip by means of projections behind the jaws of a coupling piece, which in turn is screwed to a dowel by means of a special screw. 6th Baugerüst an einem Bauwerk nach Unter anspruch 4, dadurch gekennzeichnet, dass die Träger je mittels Vorsprüngen hinter Backen eines Kupplungsstückes greifen, welches seinerseits mittels einer mit Ge winde versehenen Verlängerung an einem Dübel angeschraubt ist. Scaffolding on a structure according to sub-claim 4, characterized in that the carriers each grip by means of projections behind the jaws of a coupling piece, which in turn is screwed to a dowel by means of an extension provided with a thread. PATENTANSPRUCH II: Verfahren zur Herstellung eines Bau gerüstes an einem Betonbauwerk nach Pa tentanspruch I, dadurch gekennzeichnet, dass man im Beton des Baues untere dreieckför- mige Träger für einen untern Rüstbretter- Boden verankert und auf diesen Trägern Stützglieder anordnet, diese durch eine an ihnen befestigte Stützlehne in der Längs richtung des Bauwerkes und durch am Bau werk verankerte Haltestangen in Richtung senkrecht zum Bauwerk sichert und auf die Stützglieder obere Träger für einen obern Rüstbretterboden abstützt. UNTERANSPRUCH: 7. PATENT CLAIM II: A method for producing a building scaffolding on a concrete structure according to Patent Claim I, characterized in that lower triangular girders for a lower scaffolding board are anchored in the concrete of the building and support members are arranged on these girders, these by one on them secured support in the longitudinal direction of the building and by anchored on the building handrails in the direction perpendicular to the building and supported on the support members upper support for an upper scaffolding board floor. SUBClaim: 7. Verfahren nach Patentanspruch II, da durch gekennzeichnet, dass man die Halte stangen an dem Bauwerk mittels dasselbe durchdringende Schrauben befestigt. Method according to claim II, characterized in that the holding rods are attached to the structure by means of screws penetrating the same.
CH183614D 1933-10-14 1933-10-14 Scaffolding on a structure and method for its manufacture. CH183614A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH183614T 1933-10-14

Publications (1)

Publication Number Publication Date
CH183614A true CH183614A (en) 1936-04-30

Family

ID=4432429

Family Applications (1)

Application Number Title Priority Date Filing Date
CH183614D CH183614A (en) 1933-10-14 1933-10-14 Scaffolding on a structure and method for its manufacture.

Country Status (1)

Country Link
CH (1) CH183614A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE544467C2 (en) * 2018-12-11 2022-06-07 Prefab Design System Stockholm Ab Constructional system for providing structural arrangements to buildings

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE544467C2 (en) * 2018-12-11 2022-06-07 Prefab Design System Stockholm Ab Constructional system for providing structural arrangements to buildings

Similar Documents

Publication Publication Date Title
DE3641349C2 (en) Construction support
DE2142150A1 (en) Support structure for formwork and work and stabilization scaffolding for this
DE2217584C3 (en) Climbing formwork for a concrete wall formwork
DE2125422C3 (en) Climbing formwork for erecting tower-like reinforced concrete structures
EP0098962B1 (en) Erecting scaffold for shutterings for circular structures of concrete or the like
DE2402576A1 (en) SCAFFOLDING AND SUPPORTING CONSOLE, IN PARTICULAR FOR WALL FORMWORKS
DE820963C (en) Scaffolding with stands made of tubes
CH183614A (en) Scaffolding on a structure and method for its manufacture.
DE826971C (en) Work platform for the construction of factory chimneys
DE3401906A1 (en) Apparatus for the suspended fastening of a scaffold element
DE2648543A1 (en) Collapsible scaffolding structure with stiff connectors - has tubular members with pins for holding transverse platform members
DE651876C (en) Scaffolding with support members arranged on a scaffolding level
DE2530639A1 (en) FORMWORK SCAFFOLDING FOR CEILINGS
WO1984000189A1 (en) Method for wall concreting and formwork to implement such method
DE844058C (en) Formwork device for concrete walls and ceilings or their parts
AT80718B (en) Process for the production of reinforced concrete ceilings. Process for the production of reinforced concrete ceilings.
DE888161C (en) Tubular scaffolding made from individual frames made beforehand
DE510831C (en) Pull-up formwork
AT410235B (en) DEVICE FOR SHELLING CONCRETE CEILINGS
DE10038659A1 (en) Device to support formwork, especially for ceiling; has at least one support frame with at least two supports connected by at least one carrier and adjustable support element to support shoring
DE29705696U1 (en) Device for simplifying the formwork of ceiling surfaces in building and civil engineering
DE1459925C (en) Buildings made from prefabricated components
AT123685B (en) Adjustable scaffold stand.
DE2708490C2 (en) Anchoring for concrete displacement pipes
AT218229B (en) Scaffolding for supporting formwork