[go: up one dir, main page]

CH135428A - Method and device for the production of continuous, closed channels in the ground. - Google Patents

Method and device for the production of continuous, closed channels in the ground.

Info

Publication number
CH135428A
CH135428A CH135428DA CH135428A CH 135428 A CH135428 A CH 135428A CH 135428D A CH135428D A CH 135428DA CH 135428 A CH135428 A CH 135428A
Authority
CH
Switzerland
Prior art keywords
cladding
continuous
supports
cross
production
Prior art date
Application number
Other languages
German (de)
Inventor
Steiner Paul
Original Assignee
Steiner Paul
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Steiner Paul filed Critical Steiner Paul
Publication of CH135428A publication Critical patent/CH135428A/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • F16L1/038Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being made in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Description

  

  Verfahren und     Einriehtung    zur Herstellung von fortlaufenden, geschlossenen  Kanälen im Erdboden.    Die vorliegende Erfindung bezieht sich  auf ein Verfahren und eine Einrichtung  zur Herstellung von fortlaufenden, ge  schlossenen     Kanälen    im Erdboden. Nach  dem Verfahren     bemass    der Erfindung wird  zuerst der die Sohle bildende untere Teil  und dann der .die Seitenwände und die  Wölbung bildende obere Teil mit Hilfe  einer im Querschnitt veränderbaren bügel  förmigen Verschalung hergestellt.  



       Auf    der Zeichnung ist ein Ausfüh  rungsbeispiel einer zur Durchführung .des  Verfahrens geeigneten Einrichtung zur  Herstellung von im Querschnitt. eiförmigen  Kanälen     dargestellt.     



       Fig.    1 ist ein Querschnitt desselben, und       Fig.    2 ein Längsschnitt hierzu.  



  Die dargestellte Einrichtung besitzt  eine im     Qurschnitt    hufeisenförmige Ver  schalung 1 aus Blech, .die auf der Innen  seite aus Winkeleisen bestehende Verstei  fungsrippen 2 und unten einwärts gebogene    Auflageränder 3 aufweist. An den einan  der gegenüberliegenden Endteilen der Rip  pen 2 greifen sogenannte Spannwirbel  an, mit deren Hilfe die Verschalung im  Querschnitt verbreitert oder verengert wer  den kann.

   Zum Auflegen dieser     Verscha-          I        ang    auf die richtige Höhe dienen zwei  (oder mehr) Läger mit je zwei horizontalen  übereinander liegenden Platten 5 und 6,  von welchen Platten die obere, 6, einen  flachen Stützbügel 7 mit schräg aufwärts  gebogenen Schenkeln trägt und mit Hilfe  zweier Keilpaare 8 in der Höhenrichtung  auf der untern Platte 5 abgestützt     ist.    Zur  Führung der     obern        Platte    sind' an     .den    Stirn-     -          seiten    der untern Platte nach oben über  diese vorstehende Blechplatten 9 ange  bracht.

   Die Keile 8 liegen in entsprechen  den, das heisst an Tiefe nach aussen zu  nehmenden Längsnuten 10 der Platten 5  und 6. Durch Eintreiben der Keile zwi  schen diese Platten wird die obere der  selben gehoben. Auf beiden Längsseiten      sind die Platten 5 und 6 dem lichten Pro  fil des die Sohle bildenden untern Teils des  herzustellenden Kanals entsprechend aus  gebildet, so     dass    sie beidseitig gut an der  Innenwand des untern Kanalteils aufliegen.  



  Das Verfahren zur Herstellung eines  fortlaufenden     Kanials,    der sich zum Bei  spiel in einem Graben befindet, wird mit  Hilfe der beschriebenen     Einrichtung    wie  folgt durchgeführt: Zuerst wird in dem auf  geworfenen Graben der die .Sohle des her  zustellenden Kanals bildende untere Teil     S     erstellt.

   Dieses Teilstück<B>8</B> kann aus Beton  mit     säure-    oder     alkalienbeständigen    Einlagen,  oder direkt aus säurefestem Beton (zum Bei  spiel     Prodorith)    in einzelnen vorher her  gestellten     Sohlstücken    verlegt werden, oder  direkt im Graben bis auf die Höhe der     -e-          nannten    Einlagen betoniert werden. Nach  her erfolgt die Herstellung des die Wider  lager und die Wölbung bildenden obern  Teils 0 des Kanals. Zu diesem Zweck wer  den die Läger 5 bis 9 in passender Entfer  nung voneinander in .den Teil     S    gelegt und  die Verschalung 1 mit ihren Auflagerändern  3 auf die Stützbügel 7 aufgesetzt.

   Durch  entsprechendes Eintreiben der Keile 8 zwi  schen die Platten 5 und 6 wird die Verscha  lung 1 in eine solche Höhe eingestellt, dass  die Ränder 3 zirka 1 cm tiefer liegen  als die     obern    Innenkanten des untern Kanal  teils. Durch entsprechendes Drehen der       iSpannwirbel    4     wird    die     Verschalung    1 un  ten auf die Entfernung der     Innenkanten    des  untern     Kanalteils    eingestellt, so dass die  Ränder 3     aussen    diese Innenkanten berüh  ren. Nun kann der Raum ausserhalb der  Verschalung 1 mit dem zur Herstellung des  Kanals .dienenden Material, zum Beispiel Be  ton, ausgefüllt werden.

   Hat dieser abgebun  den, so wird die Verschalung 1 durch     An-          ziefien    der     .Spannwirbel    4 zusammengezogen,  so dass sie im Querschnitt kleiner wird, sieh  infolge ihres Eigengewichtes auf den Steg  der Stützbügel 7 senkt und dann zur Her  stellung eines     weitern    Kanalstückes leicht  in .der Längsrichtung verschoben werden  kann.    Um diejenigen Teile des Kanals, die mit  schmutz- oder säurehaltigem Wasser in Be  rührung kommen,     wassemdicht    und     säurebe-          stärndig    zu machen, kann natürlich hierzu  geeignetes Material, z. B.     bituminöser    Beton,  verwendet werden.

   Nach dem beschriebenen  Verfahren und mit Hilfe der beschriebenen  Einrichtung können auf der     Innenseite    voll  kommen glatte und fugenlose Kanalisations  kanäle in kurzer Zeit hergestellt werden.       iStatt    eiförmiger Profile können auch solche  beliebiger     Querschnittsform    hergestellt wer  den.



  Process and installation for the production of continuous, closed channels in the ground. The present invention relates to a method and a device for the production of continuous, ge closed channels in the ground. According to the method according to the invention, first the lower part forming the sole and then the upper part forming the side walls and the curvature is produced with the aid of a stirrup-shaped cladding with variable cross-section.



       The drawing shows an exemplary embodiment of a device suitable for carrying out the method for producing cross-section. ovoid canals shown.



       Fig. 1 is a cross section of the same, and Fig. 2 is a longitudinal section thereof.



  The device shown has a cross-section horseshoe-shaped formwork 1 made of sheet metal, .the existing on the inside of angle iron stiffening ribs 2 and below inwardly curved support edges 3 has. At the one of the opposite end portions of the Rip pen 2, so-called tension vertebrae attack, with the help of which the formwork widened or narrowed in cross section who can.

   Two (or more) bearings, each with two horizontal plates 5 and 6, one on top of the other, of which the upper 6 supports a flat support bracket 7 with legs bent upwards and with the help of two pairs of wedges 8 is supported in the vertical direction on the lower plate 5. To guide the upper plate are 'on .den end - sides of the lower plate up on this protruding sheet metal plates 9 is introduced.

   The wedges 8 lie in the corresponding, that is to say in depth to the outside to be taken longitudinal grooves 10 of the plates 5 and 6. By driving the wedges between these plates, the upper of the same is lifted. On both longitudinal sides, the plates 5 and 6 are formed according to the clear profile of the lower part of the channel to be produced forming the sole, so that they rest well on both sides of the inner wall of the lower channel part.



  The method for producing a continuous channel, which is for example in a trench, is carried out with the aid of the device described as follows: First, the lower part S, which forms the bottom of the channel to be produced, is created in the trench thrown on.

   This section <B> 8 </B> can be made of concrete with acid- or alkali-resistant inserts, or directly from acid-resistant concrete (for example Prodorith) in individual previously made base pieces, or directly in the trench up to the level of the - called inserts are concreted. After that, the production of the abutment and the bulge forming the upper part 0 of the channel takes place. For this purpose, who placed the bearings 5 to 9 at a suitable distance from each other in .den part S and placed the formwork 1 with its support edges 3 on the support bracket 7.

   By appropriately driving in the wedges 8 between the plates 5 and 6, the casing 1 is adjusted to a height such that the edges 3 are about 1 cm lower than the upper inner edges of the lower duct part. By appropriately turning the tensioning vortex 4, the casing 1 is adjusted to the distance of the inner edges of the lower duct part, so that the edges 3 outside touch these inner edges. Now the space outside the casing 1 can be filled with the material used to produce the duct , for example Concrete.

   Once this has set, the cladding 1 is pulled together by tightening the tension vertebrae 4 so that it becomes smaller in cross-section, see lowers the support bracket 7 due to its own weight on the web and then slightly in to the manufacture of another channel piece. the longitudinal direction can be moved. In order to make those parts of the channel that come into contact with dirty or acidic water water-tight and acid-resistant, a suitable material, e.g. B. bituminous concrete can be used.

   According to the method described and with the help of the device described, fully smooth and seamless sewer channels can be produced on the inside in a short time. Instead of egg-shaped profiles, profiles of any cross-sectional shape can also be produced.

 

Claims (1)

PATENTAN SPRMHE I. Verfahren zur Herstellung von fort laufenden, geschlossenen Kanälen im Erdboden, dadurch gekennzeichnet, dass zuerst der die Sohle bildende untere Teil und dann der die Seitenwände und die Wölbung bildende obere Teil mit Hilfe einer im Querschnitt veränderbaren, ibügelförmigen Verschalung hergestellt wird. PATENTAN SPRMHE I. A process for the production of continuous, closed channels in the ground, characterized in that first the lower part forming the sole and then the upper part forming the side walls and the arching is produced with the aid of a cross-sectionally variable, U-shaped cladding. II. Einrichtung zur Durchführung des Ver fahrens nach Patentanspruch I, gekenn zeichnet durch eine im Querschnitt bü- gelförmige Verschalung, deren Schenkel gegeneinander und auseinander bewegt werden können und durch in der Höhe verstellbare Auflagen für die Verscha lung. <B>UNTERANSPRÜCHE:</B> <B>1.</B> Einrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass die Ver schalung an den freien Schenkelenden einwärts vorspringende Ränder besitzt, mit denen die Verschalung auf flachen Stützbügeln der Auflagen. aufgesetzt werden kann. 2. II. Device for performing the method according to claim I, characterized by a cladding that is bow-shaped in cross-section, the legs of which can be moved towards each other and apart, and by height-adjustable supports for the cladding. <B> SUBClaims: </B> <B> 1. </B> Device according to claim II, characterized in that the shuttering has inwardly protruding edges at the free leg ends with which the shuttering is placed on flat support brackets of the supports. can be put on. 2. Einrichtung nach Patentanspruch II und Unteranspruch 1, dadurch gekennzeich net, dass die Auflagen für die Verscha lung zwei übereinander liegende Plat ten besitzen, von denen die obere einen flachen Stützbügel mit nach oben ra- genden Schenkeln trägt und in der Höhenrichtung gegenüber der untern Platte verstellbar ist. 3. Einrichtung nach Patentamspruch IT und Unteransprüchen 1 und 2, dadurch -eliennzeichnet, dass zur Einstellung der obern Platte in der Höhenrichtung zwei Paar zwischen den Platten liegender Keile dienen. Device according to claim II and dependent claim 1, characterized in that the supports for the cladding have two superimposed plates, of which the upper one carries a flat support bracket with upwardly projecting legs and is adjustable in height relative to the lower plate is. 3. Device according to Patentamspruch IT and dependent claims 1 and 2, characterized in that two pairs of wedges lying between the plates are used to adjust the upper plate in the height direction.
CH135428D 1928-11-09 1928-11-09 Method and device for the production of continuous, closed channels in the ground. CH135428A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH135428T 1928-11-09

Publications (1)

Publication Number Publication Date
CH135428A true CH135428A (en) 1929-09-30

Family

ID=4393317

Family Applications (1)

Application Number Title Priority Date Filing Date
CH135428D CH135428A (en) 1928-11-09 1928-11-09 Method and device for the production of continuous, closed channels in the ground.

Country Status (1)

Country Link
CH (1) CH135428A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3823566A (en) * 1972-12-18 1974-07-16 Ingersoll Rand Co Earth-supporting apparatus and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3823566A (en) * 1972-12-18 1974-07-16 Ingersoll Rand Co Earth-supporting apparatus and method

Similar Documents

Publication Publication Date Title
CN111561041A (en) Cast-in-place concrete pool bottom plate and construction method thereof
CH135428A (en) Method and device for the production of continuous, closed channels in the ground.
US1461891A (en) Concrete building
DE733497C (en) Bridge cover made from rolled iron
JP5685745B2 (en) Precast bottomed gutters that strike concrete with gradient adjustment on the inner bottom
AT221262B (en) Liquid containers made from concrete, in particular from reinforced concrete
AT122321B (en) Formwork for ribbed concrete ceilings.
DE2538773A1 (en) Prefabricated road drainage concrete gutter grating support - has metal L-shaped vertical cross arms and centrally anchored horizontal cross arms
AT507841A1 (en) SWIMMING POOLS
DE606253C (en) Process for the production of hollow stone ceiling beams
DE619435C (en) Underwater tunnel shot
CH153127A (en) Hollow ceiling with a reinforced concrete supporting structure consisting of ribs and a pressure plate.
DE961433C (en) Warping board for pit lining
AT126630B (en) Road surface made of grating with filling compound.
DE1709385C3 (en) Sliding formwork for building structures
SU29581A1 (en) Interfloor overlap of prefabricated reinforced concrete
DE853954C (en) Ceiling with multitudes of intersecting ceiling beams
AT150461B (en) Multi-part concrete joist floor and process for its manufacture.
AT146088B (en) Process for draining buildings.
AT106363B (en) Reinforced concrete rib ceiling.
AT121724B (en) Reinforced concrete ceiling.
AT118880B (en) Iron framework wall, especially for high-rise buildings.
AT102675B (en) Reinforced concrete ceiling.
AT113377B (en) Rivetless wavy sheet pile wall.
DE399977C (en) Dismountable shuttering box for concrete block walls