Device for monitoring electrical lines.

Info

Publication number
CH116225A
CH116225A CH116225DA CH116225A CH 116225 A CH116225 A CH 116225A CH 116225D A CH116225D A CH 116225DA CH 116225 A CH116225 A CH 116225A
Authority
CH
Switzerland
Prior art keywords
line
pointer
fault
relay
dependent
Prior art date
Application number
Other languages
German (de)
Inventor
Aktiengesellschaft Siem Halske
Original Assignee
Siemens Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Ag filed Critical Siemens Ag
Publication of CH116225A publication Critical patent/CH116225A/en

Links

Landscapes

  • Locating Faults (AREA)

Description

  

  Vorrichtung zur     Überwachung    elektrischer     Zeitungen.       Es ist wünschenswert, dass beim Auf  treten eines Fehlers in einer Leitung nicht  nur die Leitung selbsttätig abgeschaltet wird,  sondern dass auch die Lage des Fehlers we  nigstens angenähert erkennbar wird. Hierzu  kann das zur Sicherung der Leitung die  nende Gerät     mitverwendet    werden.

   Es sind  Geräte zur Abschaltung fehlerhafter Lei  tungen bereits bekannt, bei denen sich ein  Zeigerglied entsprechend dem Verhältnis von  Spannung und Stromstärke einstellt,     _    das  heisst also entsprechend dem Widerstand des       Kurzschlusskreises.    Da der Widerstand der  Längeneinheit der Leitung bekannt ist und  der Widerstand des     Kurzschlusslichtbogens     dem Widerstand der Leitung gegenüber wenig  stens anfänglich gewöhnlich vernachlässigt  werden kann, so ist die Messung des Wider  standes praktisch gleichbedeutend mit der  Messung der Entfernung des Fehlerortes.  



  Gegenstand der Erfindung ist eine- Vor  richtung, welche: die Stellung, die ein der  artiges     Fehlerortmesswerk    infolge eines Lei  tungsfehlers angenommen hat, derart kennt-    lieh macht, dass die Entfernung des Fehler  ortes auch dann noch erkennbar bleibt, wenn  das     Messwerk    bereits wieder in eine andere  Stellung übergegangen ist.

   Einerseits ändert  sich nämlich der Widerstand des     Kurzschluss-          kreises    sehr schnell, da der anfänglich kurze  Lichtbogen seine Länge wesentlich zu     ver-          vergrössern    pflegt, anderseits treten auch we  nige     Sekunden    nach dem Entstehen des Feh  lers die automatischen     Abschalteeinrichtun-          gen    in Tätigkeit, so dass die fehlerhafte Lei  tungsstrecke abgeschaltet wird und das       Fehlerortmesswerk    wieder in seine normale  Stellung zurückgeht.  



  Wichtig für die möglichst genaue-     Be-          stimmung    des Fehlerortes ist natürlich, dass  das Messgerät zur Anzeige des Widerstandes  möglichst genau arbeitet. Diese     Genauigkeit     könnte beeinträchtigt werden, wenn das  Drehmoment des Zeigergliedes zur Betätigung  irgendwelcher mechanischer oder elektrischer  Einrichtungen benutzt würde. Es ist da  her zweckmässig, die Stellung des Zeiger  gliedes durch ein besonderes     Hilfsrelais         kenntlich zu machen, das durch den ein  getretenen Leitungsfehler in Tätigkeit ge  setzt wird.

   Das Hilfsrelais kann beispiels  weise     eintberstromrelais    sein; noch sicherer  spricht ein     Spannungsabfallrela.is    oder ein  weiteres     Widerstandsmessgerät    auf den Ein  tritt eines Leitungsfehlers an.  



  Das     Fehlerortmesswerk    kann statt den  Quotienten aus Spannung und Stromstärke,  also den scheinbaren Widerstand, auch den  Quotienten multipliziert mit dem     Cosinus     des     Phasenverschiebungswinkels    messen, also  den Wirkwiderstand, oder auch den Quo  tienten multipliziert mit dem Sinus des       Phasenverschiebungswinkels,    also den Blind  widerstand. Im allgemeinen wird es von  der Art des Netzes und seinen Betriebs  bedingungen abhängen, welcher dieser Wi  derstandswerte am zweckmässigsten zur  Grundlage des Schutzsystems gemacht wird.  



  Die Figuren betreffen verschiedene Aus  führungsbeispiele der Erfindung.  



  Wir beginnen mit der Erläuterung von       Fig.    7. Der Zeiger der Einrichtung zum  Messen des Widerstandes ist mit 201 be  zeichnet. Sobald die Spannung in der Lei  tung auf einen bestimmten Minimalwert  sinkt, der auf das Auftreten eines Fehlers  schliessen lässt,     lässt    das Relais 230 seinen  Anker fallen und unterbricht dadurch einen  Kontakt, über den die Stromquelle 206 den  Elektromagneten 231 speiste, so     da.ss    dieser  den Fallbügel 202 fallen lässt. Der Zeiger  901 trägt an seinem Ende ein Kontaktstück  233.

   Dieses spielt über einer Kontaktbahn,  die aus einzelnen Kontaktstücken 203, 203',  903", 203<B>'</B> und 204 besteht.     Liegt    der  Fehler in der zu     überwachenden    Strecke, so  bewegt sich der Zeiger 201. über den Kon  taktstücken 203 bis 203"; liegt der Fehler  in der Nachbarstrecke, so steht der Zeiger 201  über dem Kontaktstück 204. Wird der Zei  ger 201 bei der gezeichneten Stellung durch  den Fallbügel 202 niedergedrückt, so ent  steht ein Kontakt zwischen seinem Kontakt  stück 233 und dem Kontaktstück 203'.

   Hier  durch wird ein in dieser Figur nicht ge  zeichnetes     Abschalterelais    in Tätigkeit ge-    setzt, zugleich aber auch ein Stromkreis ge  schlossen, der von der Batterie 206 über 208,  209, Zeiger 201, Kontaktstück 203', Fall  klappe 205', Batteriepol 207 verläuft. Die  Fallklappe 205' lässt erkennen, dass der Fehler  im Teil B der zu überwachenden Strecke  liegt. Die ganze zu überwachende Strecke  ist in vier Teile<I>3, B. C, D</I> zerlegt, und jede  der Fallklappen 205, 205', 205", 205"' kenn  zeichnet einen dieser Teile. Steht beim Nie  dergehen des Fallbügels 202 der Zeiger mit  seinem Kontakt 233 über dem     Kontaktstück     204, so liegt der Fehler in der Nachbar  strecke. Der entstehende Kontakt betätigt  dann eine Fallklappe 212.

   Man kann das  Kontaktstück     20.1    so weit ausdehnen,     da_ss     es auch dann noch einen Kontakt macht,  wenn die Leitung fehlerfrei ist. Von dem  Kontaktstück 204 führt ausserdem eine Lei  tung 232 zu den Kontakten des     Minimal-          5pannungsreIais    230. Infolgedessen wird bei  einem Kontakt zwischen 233 und 204 diese  Kontaktstelle überbrückt und dadurch der  Elektromagnet 231. erregt, der den Fallbügel  202 wieder anhebt. Hierdurch erhält der  Zeiger 201 die Möglichkeit, sich auf einen  inzwischen veränderten Wert des Wider  standes einzustellen, vor allem also auch  einen in der eigenen     Strecke    nachträglich ent  stehenden Kurzschluss anzuzeigen.  



  Wenn mehrere     Leitungsstrecken    von einer  einzigen Stelle aus überwacht werden sollen,  ist es zweckmässig, die Fallklappen aller  dieser Leitungsstrecken in einem gemein  samen Tableau zusammenzubauen.     Fig.    7       zeigt;    eine derartige Ausführung. Die Fall  klappen 215 bis 215"' dienen zur Anzeige des  Fehlerortes in einer zweiten Nachbarstrecke  und werden durch ein zweites     Messinstrument     gesteuert. wie in der Zeichnung angegeben.  Eine Fallklappe     2?2,    die nahe der Fallklappe  233 angeordnet ist. zeigt an, dass der Fehler  nicht innerhalb dieser zweiten Leitungs  strecke liegt.  



  In der Abbildung ist die Schaltung so  eingerichtet, dass jeweils nur eine Fallklappe  fällt oder höchstens zwei, wenn der Zeiger  gerade zwischen zwei Kontaktstücken steht.      Die Anordnung kann aber auch so getroffen  werden, dass sämtliche Fallklappen bis zu der  dem Fehlerort zugeordneten Klappe fallen.  Die Fallklappen können beispielsweise durch  Buchstaben, wie in     Fig.    7 dargestellt, be  zeichnet werden, aber auch durch Kilometer  zahlen oder Mastnummern. Sie können auch  durch Lampen oder andere Signalvorrich  tungen ersetzt werden.  



  Das     Abschalterelais    zum Öffnen der  Schalter, das in     Fig.    7 nicht mit dargestellt  ist, ist in     Fig.    1 beispielsweise gezeichnet.  Die durch die Kontakte 208, 203'     (Fig.    7)  geschlossenen Stromkreise könnten natürlich  auch zur Betätigung des     Abschalterelais     dienen.

   Der Übersichtlichkeit wegen ist in       Fig.    1 für diesen Zweck eine besondere Kon  taktbahn 18 dargestellt, mit der der Zeiger  201 ebenfalls einen     Kontaktschluss    herstellt,  wenn er von dem Fallbügel niedergedrückt  wird.' Der Fallbügel ist in     Fig.    1 mit 1  bezeichnet und wird bei Eintritt eines Lei  tungsfehlers durch einen Magneten 2 gegen  die Kraft einer Feder 18 nach unten gezogen,  während er gemäss     Fig.    7 durch den Mag  neten 231 losgelassen wird, so dass er nach  unten fällt. Dieser Unterschied ist jedoch  für die Erfindung unwesentlich.

   Die zu  überwachende Leitungsstrecke ist mit 9 be  zeichnet und soll durch den     Schalter!    15  abgetrennt werden, sobald ein Kurzschluss  innerhalb dieser Strecke     auftritt.    Das Mini  malspannungsrelais 3, das über den Span  nungswandler 16 erregt wird, lässt seinen  Anker 4 fallen, sobald infolge eines Kurz  schlusses die Spannung in der Leitung 9  unter einen bestimmten Wert sinkt. Dadurch  wird bei 17 ein Kontakt geschlossen, so dass  der Elektromagnet 2 durch die Batterie 5 er  regt wird. Der Fallbügel 1     wird    nach unten  gezogen und drückt den Zeiger 201 auf die  Kontaktbahn 13, vorausgesetzt, dass der Zei  ger sich über dieser Kontaktbahn 13 befindet.

    Das ist nur dann der Fall, wenn der Wider  stand unter das Mass gesunken ist, das er bei  fehlerloser Leitung haben kann. Durch den  Kontakt, den der Zeiger 201 mit der Kon  taktbahn. 13 herstellt, erhält das Relais 11    von der Batterie 5 Strom und     schliesst    einen  weiteren Stromkreis, durch den das Relais 14       erregt    wird. Dieses öffnet den Schalter 15.  



  Diese Einrichtung könnte jedoch auch  dann in Wirkung treten, wenn der Teil des  Netzes, dem die Leitung 9 angehört, ord  nungsmässig abgeschaltet ist. Auch dann  würde, da ja. keine Spannung weht vorhan  den ist, der Anker 4 abfallen, und der Zei  ger 201 könnte     möglicherweise    eine Ein  stellung über der Kontaktbahn 13 einneh  men,     da,    kein Drehmoment mehr auf ihn ein  wirkt, wenn sowohl die Spannung, wie die  Stromstärke, deren Quotienten er misst, ver  schwinden. Aus diesem Grunde ist in den  Stromkreis des Elektromagnetes- 2 noch eine  Kontaktstelle 6 eingeschaltet, die durch den  Anker 10 eines Stromrelais 7 im allgemeinen  überbrückt wird. Das Stromrelais wird über  den Stromwandler 8 erregt.

   Wird aber in  folge     Abschaltens    des betreffenden Teils des  Leitungsnetzes die Leitung 9 stromlos, so  fällt auch der Anker 10 ab, und der Strom  kreis für den Elektromagneten 2 bleibt  unterbrochen, so dass die Schutzvorrichtung  überhaupt nicht in Wirksamkeit treten kann.  Der Fallbügel 1 kann durch das Stromrelais 7  auch vermittelst einer mechanischen Sperre  am Heruntergehen verhindert werden.  



  Die Schutzvorrichtung kann anstatt durch  ein     Minimalspannungsrelais    auch     durch.    an  dere Relais in Tätigkeit gesetzt werden, bei  spielsweise durch ein Relais, das, ebenso wie  der Zeiger 201, vom     Widerstande    der Lei  tung abhängig ist.  



  Es kann vorkommen, dass auch bei fehler  freier Leitung aus irgendwelchem Grunde,  zum Beispiel infolge einer     vorübergehenden          Überlastung,    die Spannung über die Normal  grenze hinaus sinkt, so dass das Minimal  spannungsrelais 3 in Tätigkeit tritt und der  Fallbügel 1 herabgeht. Der Streckenschalter  15 wird dann zwar nicht geöffnet, da der  Zeiger 201 nicht oberhalb der Kontaktbahn  13 steht. Der Zeiger ist aber durch den  Fallbügel 1 festgehalten, und wenn     zufällg     während der Spannungserniedrigung ein      Kurzschluss in der Leitung auftritt, kann die       Schutzvorrichtung    nicht wirksam werden.

    Um diesen Nachteil zu beseitigen, wird bei  der Ausführung nach     Fig.    7 der bereits er  wähnte Kontakt 204 geschlossen.  



  In     Fig.    2 sind weitere Ausführungs  formen     dargestellt.     



  Der Zeiger 201 steht über der Kontakt  bahn 13 nur dann, wenn in der zu über  wachenden Leitungsstrecke 9 ein Kurzschluss  ist. Die Relais und Leitungen zum Öffnen  der Streckenschalter sind ebenso angeordnet  wie in     Fig.    1, und sind in     Fig.    2 daher  der Übersichtlichkeit wegen nicht noch ein  mal     mitgezeichnet.    Ist ein Kurzschluss in  der zu überwachenden Leitungsstrecke und  das Verhältnis Spannung zu Stromstärke in  folgedessen unter einen     bestimmten        Betrag     gesunken, so steht der Zeiger 201. über der  Kontaktbahn 13, wie in     Fig.    2 gezeichnet.

    Das     Minimalspannungsrelais    mit der Spule  26 und dem Anker 27 ist über den Span  nungswandler 28 an die Leitung 9 ange  schlossen. Bei normaler Spannung schliesst  der Anker 27 die Kontakte 20. Infolgedes  sen liegt der Elektromagnet 22 an der     Hilfs-          stromquelle    31. Der Elektromagnet 22 hält  dann den Fallbügel 21 angehoben. Sinkt die  Spannung unter den vorgesehenen Grenz  wert, so wird der Stromkreis unterbrochen  und der Magnet 22 lässt den Fallbügel 21  fallen. Ist die Leitung in Ordnung, so dass  der Zeiger 201. in der punktierten Stellung  steht, so entsteht ein Kontakt zwischen dem  Zeiger und der Kontaktbahn 25.

   Da. der  Drehpunkt des Zeigers 201. mit dem einen  der Kontakte 20, die Kontaktbahn 25 mit  dem andern dieser     Kontakte        verbunden    ist,       -wird    die     Unterbrechung    dieser Kontaktstelle  wieder aufgehoben, der Magnet 22 wird wie  der erregt und der Fallbügel erneut an  gehoben. Der Kontakt zwischen Zeiger und  Kontaktbahn 25 wird dadurch wieder unter  brochen und der Fallbügel 21. geht auf und  nieder. Der Zeiger 201 hat infolgedessen die  Möglichkeit, sich auf geänderte Widerstands  werte in der Leitung _ fortlaufend einzu  stellen.

      Will     man    die Bewegung des auf- und  niedergehenden Fallbügels 21 verzögern, so  kann man, statt den Kontakt 20 unmittel  bar zu überbrücken, ein in     Fig.    2 punktiert  angedeutetes Hilfsrelais 33 verwenden, das  seinen Anker 34 nur mit Verzögerung fallen  lässt. Der Zeiger 201. und die Kontaktbahn  25 sind dann nicht an die Kontakte 20 an  geschlossen. Durch den Kontakt zwischen  dem Zeiger 201 und der Kontaktbahn 25  wird vielmehr dieses Verzögerungsrelais 33  erregt, dessen Anker 34 eine elektrische  Verbindung der Kontakte 35 herstellt und  erst durch diese die Kontaktstelle 20 über  brückt. Statt ein     besonderes    Relais 33 an  zuordnen, kann man auch auf dem Span  nungsrelais eine zweite Spule anordnen.  



  Die Einrichtung kann auch so ausgebildet  werden, dass zwischen dem Zeiger 201 und  dein F     a.llbüg(11    21 ein elektrischer Kontakt  geschlossen wird. Der Fallbügel wird in die  sem Falle so     eingerichtet,    dass er mit dem  Zeiger nur an demjenigen Teil der Skala  der dem fehlerfreien Zustand der Leitung  entspricht, also im Bereiche der     Kontakt-          babn    25 einen Kontakt herstellt.

   Über dem  Teil der     Skala.    dagegen, innerhalb dessen der  Zeiger einen Fehler in der Leitung anzeigt,  ist der Fallbügel isoliert, beispielsweise  durch eine Belegung mit     Pressspan.        Fig.    3       zeigt    in schematischer Darstellung die Vor  derseite eines derartigen Fallbügels 36, dar  unter die Kontaktbahn 13, über der der  Zeiger 201 bei fehlerhafter Leitung spielt.

    Oberhalb dieser     Kontaktbahn    ist die Unter  seite des Fallbügels 36 mit einer isolieren  den Schicht 37 verseben.     tfiber    dem Teil der       Skala    dagegen, über dem der Zeiger bei  fehlerfreier     Leitring    spielt:, hat der Fall  bügel 36 eine leitende Unterfläche 38. Die       Verbindungsleitung,    -welche bei     Fig.    2 an  die Kontaktbahn 25 gelegt -war, muss bei       Abb.    3 an den Fallbügel 36 gelegt werden.  



  Bei den beschriebenen Ausführungsbei  spielen wird die     überwachte    Leitungsstrecke  dann abgeschaltet, wenn der aus dem Ver  hältnis von Spannung und Stromstärke her  vorgehende     )Ä'ider:standswert    geringer ist      als der Widerstand der ganzen zu über  wachenden Leitungslänge. Wenn der Fehler  nicht mehr innerhalb der     überwachten    Lei  tungsstrecke, sondern im     ersten    Anfang der  Nachbarstrecke liegt, so könnte infolge von  Ungenauigkeiten der     Messeinrichtung    der Fall  eintreten, dass die Überwachungsvorrichtung  trotzdem zur Wirkung kommt. Man kann  dies vermeiden, wenn man sie auf einen ge  nügend kleinen Widerstand einstellt.

   Dann  ist aber die Gefahr vorhanden, dass ein  Fehler ganz am andern Ende der Strecke  sie nicht zum Ansprechen bringt. Es emp  fiehlt sich unter solchen Umständen, eine  zweite Schutzvorrichtung anzuordnen, die in  ihren Wirkungskreis die benachbarte Strecke  einschliesst. Damit diese zweite Schutzvor  richtung nur in Wirksamkeit tritt, wenn die  erste Schutzvorrichtung versagt, wird die       Auslösezeit    der zweiten Vorrichtung grösser       ewählt    als die     Auslösezeit    der ersten.  Zur Erläuterung dieser Anordnung dient  die schematische Darstellung der     Fig.    4.  Hier ist ein zu überwachender Teil eines  Leitungsnetzes dargestellt, der zwischen den  Knotenpunkten 47, 48, 49, 50 liegt.

   Jede  zwischen zwei Knotenpunkten liegende Lei  tungsstrecke kann an jedem Ende durch  Schalter     a        abgetrennt    werden, und zwar  :steht jeder Schalter unter dem Einfluss zweier  Relais. Die Relais 41, 42, 43, 44, 45, 46  sprechen beispielsweise eine Sekunde nach  Auftreten eines Fehlers an, aber nur dann,  wenn der Blindwiderstand der überwachten  Leitungsstrecke auf drei Viertel des Wertes  sinkt, den die gesamte überwachte Leitungs  strecke hat. So tritt zum Beispiel das Re  lais 43 dann in Tätigkeit, wenn ein Kurz  schluss     zwischen        Knotenpunkt    48 und dem  Punkte 43' der Leitung entsteht, das Re  lais 44 dann, wenn der Fehler zwischen dem  Knotenpunkt 49 und dem Punkte 44' liegt.

    Die Relais 51, 52, 53, 54, 55, 56 dagegen  schalten die Schalter mit einer Verzögerung  von zwei Sekunden aus, überwachen dabei  aber die Leitung bis zur Mitte der Nachbar  strecke. So schaltet das Relais 53 zum Bei  spiel seinen Schalter aus, wenn den Fehler    zwischen dem Punkte 43' und dem Punkte  53' liegt. Das Relais 54 überwacht die  Strecke von 44' bis 54'. Demgemäss über  wacht das Relais 56 auch die Strecke     48--49     bis zu ihrer Mitte 56'. Bis zu demselben  Punkte überwacht das Relais 51 diese Lei  tung von der andern Seite aus.

   Die dop  pelte Relaiseinrichtung lässt sich noch da  durch     vereinfachen,    dass beide Relais, die  ein und denselben Streckenschalter betätigen,  zur Bestimmung     der;    Lage der Fehlerstelle,  das heisst zum Messen des Widerstandes, ein  gemeinsames     Fehlerortmesswerk    haben. Ent  steht ein Kurzschluss, etwa bei 58, so tritt  sowohl das von 48 bis 43' wirkende Relais 43,  als auch das von 49 bis 44' wirkende Relais  44 in Tätigkeit, und zwar beide mit einer  Verzögerung von einer Sekunde. Nach dieser  Zeit ist also die fehlerhafte Leitungsstrecke  zwischen den Knotenpunkten 48 und 49 bei  derseitig abgetrennt und die langzeitigen  Relais 53 und 56, die erst nach zwei Se  kunden angesprochen hätten, kommen nicht  mehr zur Wirkung.

   Befindet sich aber der  Fehler beispielsweise bei 17, so liegt er in=  dem Bereich nur eines kurzzeitigen Relais,  nämlich des Relais 44. Dies öffnet seinen  Schalter nach einer Sekunde, während das  Relais 43 nicht in Tätigkeit tritt. Die ein  seitige Abschaltung der fehlerhaften Lei  tungsstrecke genügt im allgemeinen nicht,  um den Spannungszusammenbruch zu besei  tigen. Infolgedessen kommt nun sowohl das  Relais 53, wie auch -das Relais 56 zur  Wirkung, die beide auf die gleiche längere       Auslösezeit    eingestellt sind, und es ist  zweifelhaft, welches von ihnen beiden zuerst  anspricht.

   Das ist ein Mangel der geschilder  ten Anordnung, da gewünscht wird, dass  zwecks beiderseitiger Abtrennung der Feh  lerstelle das Relais 53 anspricht, aber nicht  das Relais 56, das die Strecke 50; 49 ganz       über±lüssigerweise    mit abschalten würde.  Um diese Mängel zu beseitigen, werden       zweckmässigerweise    die     F'ehlerortzeiger    wieder  freigegeben, nachdem die Zeit zur Abschal  tung der kürzeren Leitungsstrecken abgelau  fen ist. Nachdem die     Zeizer    Zeit     zehabt         haben, sich neu einzustellen, werden sie von  neuem mit ihrer Unterlage in Berührung ge  bracht.  



  Ein Ausführungsbeispiel ist in     Fig.    5  dargestellt. Die Leitung 60 wird durch  Sehalter 61 abgetrennt, sobald der Sperrzahn  62 durch die Klinke 63 freigegeben wird.  Diese ist an.     einem    Winkelhebel befestigt,  gegen dessen freies Ende 64 der Bolzen 65  stösst, sobald das     Solenoid    66 Strom bekom  men hat. Dieses zieht den Kern 67 an.  Ein Hemmwerk 68 verzögert die Bewegung,  so dass die Klinke 63 erst nach     einer    halben  Sekunde ausgelöst wird. Solange die Span  nung im Netz aufrechterhalten bleibt, wer  den die Anker 69 und 70 von ihren Sole  noiden festgehalten, die von dem     Messwand-          ler    71 gespeist werden.

   Fällt aber die Span  nung ab, so wird durch den Anker 69, etwa.  nach Ablauf einer halben Sekunde, ein Kon  takt geschlossen, von dem Anker 70, der  mit einem     Hemmwerk    72 versehen ist, ein  anderer Kontakt erst nach Ablauf von  anderthalb Sekunden. Ein Zeiger 73, der  über einer Skala spielt, misst den     Wider-          .stand    der Leitung. Der Zeiger ist an seinem  Ende mit einem Kontaktstück 75 versehen,  das über einer Kontaktbahn 76 wandert,  ohne sie zu berühren. Über dem Spielbereich  des Zeigers sind ferner zwei Fallbügel 77  und 78 angeordnet, die unter dem Einfluss  zweier     Elektromagnete    79 und 80 stellen.

    Der Magnet 79 erhält von Batterie 82 Strom,  sobald der Anker 69 Kontakt macht, der  Elektromagnet 80 von der Batterie 83, so  bald der Anker 70 Kontakt macht. Befindet.  sich der Zeiger 73 im Bereich desjenigen  Fallbügels, der durch seinen Elektromagneten  leeruntergezogen wird, so entsteht zwischen  dem     Kontaktstück    75 und der Kontaktbahn  76 ein Kontakt und das     Solenoid    66 wird von  der Stromquelle 81. erregt.  



  Die Vorrichtung arbeitet also folgender  massen: Sobald ein Fehler in der Leitung  auftritt, sinkt die     Spannung,    und beide An  ker 69 und 70 werden losgelassen. Nach  einer halben     Sekunde    führt der Anker 69  einen     Stromschluss    herbei, durch den der    Elektromagnet 7 9 erregt und der Fallbügel  77 heruntergezogen wird. Liegt der Fehler  innerhalb der eigenen Strecke, so ist der  gemessene     Blindwiderstand    klein und der  Zeiger 73 liegt im Bereich des niedergehen  den Fallbügels<B>77.</B> Es entsteht dann zwi  schen 75 und 7 6 Kontakt, das     S'olenoid    66  wird erregt und nach einer weiteren halben  Sekunde wird     infolgedesseil    der Schalter 61  geöffnet.

   Liegt     dagegen    der Fehler innerhalb  des überwachten     ,Teils    der Nachbarstrecke,  so gelangt der Zeiger 73 in den Bereich des  Fallbügels 78. Das Niedergehen des Fall  bügels 7 7 bleibt vollkommen wirkungslos.  Nach einer     Sekunde    haben die andern kurz  zeitigen Relais der Leitung Zeit gehabt, ihre  Schalter zu öffnen. Ist dadurch die Fehler  stelle von dem hier     betrachteten    Relais ab  getrennt, so     zeigt    der Zeiger 73 wieder grö  sseren     Widerstand    an, verlässt also den Be  reich beider Fallbügel. Der Schalter 61 wird  daher auch dann nicht geöffnet, wenn der  Spannungszusammenbruch noch weiter be  stehen bleibt.

   Ist dagegen durch die kurz  zeitigen Relais die Fehlerstelle nicht abge  trennt, so bleibt der Zeiger 73 an der ge  zeichneten Stelle stehen, wird, sobald nach  Ablauf von anderthalb Sekunden, der An  ker 70     einen        Stromschluss    herbeiführt, zum       Kontakt    mit der     Kontaktbahn    76 gebracht  und der     Sclialt.er    61 wird nach insgesamt  zwei Sekunden geöffnet.  



  In     Fig.    6 ist ein Ausführungsbeispiel  dargestellt, bei dem nur ein Fallbügel er  forderlich ist. Zur     Auslösung    des Schalters  61 sind zwei Relais vorgesehen. Das eine  bestellt aus; dem     Solenoid    90 und dem An  ker 91. Dieses arbeitet mit einer Verzögerung  von einer halben     Sekunde.    Das zweite Relais,  bestehend aus dem     Solenoid    92 und dem  Anker 93, arbeitet mit einer Verzögerung  von einer Sekunde.

   Der Zeiger 73, der den  Widerstand misst, arbeitet mit zwei Kontakt  bahnen     9.1    und 95 zusammen. Über der  ersten     Kontaktbahn    spielt er, wenn der  Fehler in der eigenen Strecke liegt, über  der zweiten     Kontaktbahn,    wenn der Fehler  jenseits der eigenen     Überwachungsstrecke         liegt. Ein Fallbügel 96 liegt über dem ge  samten     Ausschlagsbereich    des Zeigers 73.  Durch den     Spannungsmesswandler    71 erhält  das     Solenoid    97 Strom, dessen Anker     mit     einer Zahnstange 98 ausgerüstet ist.

   Sobald  die     Spannung    abfällt, sinkt die Zahnstange  nach     unten    und versetzt eine Kurvenscheibe  99 in Drehung, auf der die Rolle 100 läuft.  Ein Uhrwerk 101 bestimmt ihre Geschwin  digkeit.     Sie    ist so gestaltet, dass sie die auf  ihr laufende Rolle 100 nach Ablauf einer  halben Sekunde anhebt, nach weiteren Brei  viertel Sekunden wieder fallen lässt, um sie  dann wieder anzuheben. Die Einrichtung  arbeitet folgendermassen:  Wenn infolge der abfallenden Spannung  die Kurvenscheibe 99 in Drehung versetzt  wird, hebt sie nach einer halben Sekunde  die Rolle 100 an, so dass der Kontakt 110  geschlossen wird. Infolgedessen wird der  Elektromagnet<B>111</B> durch die Batterie 112  erregt. Er zieht den Fallbügel 96 nach un  ten.

   Steht der Zeiger 73 in der gezeichneten  Stellung, so fliesst von der. Batterie 113 ein  Ström über die Kontaktbahn 94 und be  tätigt das     Solenoid    90, das nach einer wei  teren halben Sekunde den Schalter 61 öffnet.  



  Liegt dagegen der Fehler in einer Nach  barstrecke, so     da.ss    der Zeiger 73 über der  Kontaktbahn 95 steht, so wird eine halbe  Sekunde nach Eintreten des Fehlers das       Solenoid    92 über die Kontaktbahn 95 erregt.  Nach Ablauf von insgesamt     11/1    Sekunden  aber lässt die Kurvenscheibe 99 die Rolle 100  wieder sinken. Der Kontakt 110     öffnet    sich  und der Zeiger 73 wird durch den Fallbügel  96 wieder freigegeben. Ist inzwischen von       kurzzeitigen    Relais an anderer Stelle der  Leitung die Fehlerstelle abgetrennt worden,  so hat der Widerstand den ordnungsmässigen  hohen Wert wieder angenommen und der  Zeiger 73 kann sich darauf einstellen.

   Wenn  dann infolge des Weiterlaufens der Kurven  scheibe 99 der Kontakt 110 wieder geschlos  sen wird, steht der Zeiger 73 nicht mehr im  Bereich der Kurvenbahnen und das     Solenoid     92 bleibt     unerregt.    Ist aber die Fehlerstelle  nicht abgetrennt, so bleibt der Zeiger 73 über    der Kontaktbahn 95, und beim zwei-[en Nieder  gehen des Fallbügels 96 wird das     Solenoid    92  wieder erregt und öffnet nach Ablauf einer  weiteren Sekunde den Trennschalter 61.



  Device for monitoring electrical newspapers. It is desirable that when a fault occurs in a line, not only is the line automatically switched off, but that the location of the fault is also at least approximately recognizable. The device that secures the line can also be used for this purpose.

   Devices for switching off faulty lines are already known in which a pointer element adjusts itself according to the ratio of voltage and current intensity, i.e. according to the resistance of the short circuit. Since the resistance of the unit length of the line is known and the resistance of the short-circuit arc to the resistance of the line can usually be neglected at least initially, the measurement of the resistance is practically synonymous with measuring the distance from the fault location.



  The subject of the invention is a device which: makes known the position that such a fault location measuring unit has assumed as a result of a line fault in such a way that the distance from the fault location remains recognizable even when the measuring unit is already back in another position has passed.

   On the one hand, the resistance of the short circuit changes very quickly because the initially short arc tends to increase its length considerably; on the other hand, the automatic disconnection devices also come into operation a few seconds after the fault has arisen, so that the faulty line is switched off and the fault location measuring unit returns to its normal position.



  It is of course important for the most precise possible determination of the fault location that the measuring device for displaying the resistance works as precisely as possible. This accuracy could be impaired if the torque of the pointer member were used to operate any mechanical or electrical device. It is therefore advisable to indicate the position of the pointer element by means of a special auxiliary relay that is activated by the line fault that has occurred.

   The auxiliary relay can, for example, be a single current relay; A voltage drop relay or another resistance measuring device speaks even more reliably when a line fault occurs.



  Instead of measuring the quotient of voltage and current strength, i.e. the apparent resistance, the fault location measuring unit can also measure the quotient multiplied by the cosine of the phase shift angle, i.e. the effective resistance, or the quotient multiplied by the sine of the phase shift angle, i.e. the reactive resistance. In general, it will depend on the type of network and its operating conditions which of these resistance values is most appropriately made the basis of the protection system.



  The figures relate to various exemplary embodiments of the invention.



  We begin with the explanation of FIG. 7. The pointer of the device for measuring the resistance is marked with 201 be. As soon as the voltage in the line drops to a certain minimum value, which suggests the occurrence of an error, the relay 230 drops its armature and thereby interrupts a contact via which the current source 206 fed the electromagnet 231, so that it drops drop bracket 202. The pointer 901 has a contact piece 233 at its end.

   This plays over a contact path which consists of individual contact pieces 203, 203 ', 903 ", 203 <B>' </B> and 204. If the error lies in the path to be monitored, the pointer 201 moves over the con bars 203 to 203 "; If the fault is in the neighboring section, the pointer 201 is above the contact piece 204. If the pointer 201 is depressed by the drop bracket 202 in the position shown, there is contact between its contact piece 233 and the contact piece 203 '.

   This activates a cut-off relay (not shown in this figure), but at the same time also closes a circuit which runs from battery 206 via 208, 209, pointer 201, contact piece 203 ', flap 205', battery terminal 207 . The drop flap 205 'shows that the fault lies in part B of the route to be monitored. The entire section to be monitored is divided into four parts <I> 3, B. C, D </I>, and each of the drop flaps 205, 205 ', 205 ", 205"' identifies one of these parts. If the pointer with its contact 233 is above the contact piece 204 when the drop bracket 202 goes low, the fault is in the neighboring route. The resulting contact then actuates a drop flap 212.

   The contact piece 20.1 can be expanded to such an extent that it still makes contact when the line is fault-free. A line 232 also leads from the contact piece 204 to the contacts of the minimum voltage relay 230. As a result, if there is a contact between 233 and 204, this contact point is bridged and the electromagnet 231 is excited, which raises the drop bracket 202 again. This gives the pointer 201 the opportunity to set itself to a value of the resistance that has changed in the meantime, so above all to indicate a short circuit that has subsequently arisen in its own route.



  If several line sections are to be monitored from a single point, it is advisable to assemble the drop flaps of all these line sections in a common panel. Figure 7 shows; such a design. The drop flaps 215 to 215 "'are used to display the fault location in a second neighboring route and are controlled by a second measuring instrument. As indicated in the drawing. A drop flap 2-2, which is arranged near the drop flap 233. indicates that the Fault is not within this second line section.



  In the illustration, the circuit is set up so that only one drop flap falls at a time, or at most two if the pointer is between two contact pieces. However, the arrangement can also be made such that all drop flaps fall as far as the flap assigned to the fault location. The drop flaps can, for example, be identified by letters, as shown in FIG. 7, but also by numbers of kilometers or mast numbers. They can also be replaced by lamps or other signaling devices.



  The cut-off relay for opening the switch, which is not shown in FIG. 7, is shown in FIG. 1, for example. The circuits closed by the contacts 208, 203 '(FIG. 7) could of course also serve to actuate the cut-off relay.

   For the sake of clarity, FIG. 1 shows a special contact path 18 for this purpose, with which the pointer 201 also establishes a contact connection when it is pressed down by the drop bracket. The drop bracket is denoted by 1 in FIG. 1 and is pulled down when a line fault occurs by a magnet 2 against the force of a spring 18, while it is released according to FIG. 7 by the magnet 231 so that it is down falls. However, this difference is not essential to the invention.

   The line to be monitored is marked 9 and should be through the switch! 15 are disconnected as soon as a short circuit occurs within this distance. The mini malvoltage relay 3, which is excited via the voltage converter 16, can drop its armature 4 as soon as the voltage in the line 9 falls below a certain value as a result of a short circuit. As a result, a contact is closed at 17, so that the electromagnet 2 is excited by the battery 5. The drop bracket 1 is pulled down and presses the pointer 201 onto the contact track 13, provided that the pointer is located above this contact track 13.

    This is only the case if the resistance has sunk below the level it can have with faultless management. By the contact that the pointer 201 with the con tact path. 13 produces, the relay 11 receives power from the battery 5 and closes another circuit through which the relay 14 is energized. This opens switch 15.



  However, this device could also come into effect when the part of the network to which the line 9 belongs is properly switched off. Even then, yes. There is no voltage blowing, the armature 4 will drop, and the pointer 201 could possibly be in a position above the contact path 13, since no more torque acts on it if both the voltage and the current strength, their quotients he measures, vanish. For this reason, a contact point 6 is switched on in the circuit of the electromagnet 2, which is generally bridged by the armature 10 of a current relay 7. The current relay is excited via the current transformer 8.

   But if the line 9 is de-energized as a result of the relevant part of the line network, the armature 10 also drops and the circuit for the electromagnet 2 remains interrupted, so that the protective device cannot come into effect at all. The drop bar 1 can also be prevented from going down by the current relay 7 by means of a mechanical lock.



  Instead of a minimum voltage relay, the protection device can also be other relays are activated, for example by a relay which, like the pointer 201, is dependent on the resistance of the line.



  It can happen that even if the line is fault-free for whatever reason, for example as a result of a temporary overload, the voltage drops beyond the normal limit, so that the minimum voltage relay 3 comes into operation and the drop bracket 1 goes down. The section switch 15 is then not opened because the pointer 201 is not above the contact track 13. However, the pointer is held in place by the drop bracket 1, and if a short-circuit occurs accidentally in the line while the voltage is being lowered, the protective device cannot take effect.

    In order to eliminate this disadvantage, in the embodiment according to FIG. 7, the contact 204 already mentioned is closed.



  In Fig. 2 further execution forms are shown.



  The pointer 201 is above the contact path 13 only when there is a short circuit in the line section 9 to be monitored. The relays and lines for opening the section switch are arranged in the same way as in FIG. 1, and are therefore not shown again in FIG. 2 for the sake of clarity. If a short circuit in the line section to be monitored and the ratio of voltage to current intensity has consequently fallen below a certain amount, then pointer 201 is above contact track 13, as shown in FIG.

    The minimum voltage relay with the coil 26 and the armature 27 is connected to the line 9 via the voltage converter 28. When the voltage is normal, the armature 27 closes the contacts 20. As a result, the electromagnet 22 is connected to the auxiliary power source 31. The electromagnet 22 then keeps the drop bracket 21 raised. If the voltage falls below the intended limit, the circuit is interrupted and the magnet 22 lets the drop bracket 21 fall. If the line is OK, so that the pointer 201 is in the dotted position, contact is made between the pointer and the contact track 25.

   There. the fulcrum of the pointer 201. with one of the contacts 20, the contact track 25 is connected to the other of these contacts, the interruption of this contact point is canceled again, the magnet 22 is again excited and the drop arm is raised again. The contact between the pointer and the contact track 25 is thereby interrupted again and the drop bracket 21. goes up and down. As a result, pointer 201 has the option of continuously adjusting to changed resistance values in line _.

      If you want to delay the movement of the rising and falling drop bracket 21, you can, instead of bridging the contact 20 immediately, use an auxiliary relay 33, indicated by dots in FIG. 2, which only lets its armature 34 drop with a delay. The pointer 201st and the contact track 25 are then not closed to the contacts 20. Rather, the contact between the pointer 201 and the contact track 25 energizes this delay relay 33, the armature 34 of which establishes an electrical connection between the contacts 35 and only bridges the contact point 20 through this. Instead of assigning a special relay 33, you can also arrange a second coil on the voltage relay.



  The device can also be designed in such a way that an electrical contact is made between the pointer 201 and the bow (1121). In this case, the drop bow is set up in such a way that it only works with the pointer on that part of the scale of the corresponds to the fault-free state of the line, that is to say establishes contact in the area of the contact babn 25.

   Above that part of the scale. on the other hand, within which the pointer indicates a fault in the line, the drop bracket is isolated, for example by being covered with pressboard. Fig. 3 shows a schematic representation of the front of such a drop bracket 36, below the contact track 13, over which the pointer 201 plays in the event of a faulty line.

    Above this contact track, the lower side of the drop bracket 36 is verseben with an isolating layer 37. On the other hand, over the part of the scale over which the pointer plays if the guide ring is faultless: the hanger bracket 36 has a conductive lower surface 38. The connecting line - which was placed on the contact track 25 in FIG. 2 - must start in FIG the drop bracket 36 are placed.



  In the exemplary embodiments described, the monitored line section is switched off when the resistance value arising from the relationship between voltage and current is lower than the resistance of the entire line length to be monitored. If the error is no longer within the monitored line section, but rather in the first beginning of the neighboring section, then as a result of inaccuracies in the measuring device, the situation could arise in which the monitoring device nevertheless comes into effect. You can avoid this if you set it to a sufficiently small resistance.

   But then there is the danger that an error at the very other end of the route will not make you respond. In such circumstances, it is advisable to arrange a second protective device that includes the adjacent route within its scope. So that this second protective device only comes into effect when the first protective device fails, the tripping time of the second device is selected to be greater than the tripping time of the first. The schematic illustration of FIG. 4 serves to explain this arrangement. Here, a part of a line network to be monitored is shown, which lies between the nodes 47, 48, 49, 50.

   Each line between two nodes can be cut off at each end by switch a, namely: each switch is under the influence of two relays. The relays 41, 42, 43, 44, 45, 46 respond, for example, one second after a fault has occurred, but only when the reactance of the monitored line section drops to three quarters of the value that the entire monitored line section has. For example, relay 43 comes into operation when a short circuit occurs between node 48 and point 43 'of the line, relay 44 when the fault is between node 49 and point 44'.

    The relays 51, 52, 53, 54, 55, 56, on the other hand, turn off the switches with a delay of two seconds, but monitor the line to the middle of the neighboring route. For example, the relay 53 turns off its switch when the error lies between the point 43 'and the point 53'. The relay 54 monitors the distance from 44 'to 54'. Accordingly, the relay 56 also monitors the route 48-49 up to its center 56 '. Up to the same point, the relay 51 monitors this line from the other side.

   The double relay device can still be simplified by the fact that both relays, which actuate one and the same section switch, are used to determine the; Location of the fault location, i.e. to measure the resistance, have a common fault location measuring unit. If a short circuit occurs, for example at 58, both relay 43, which operates from 48 to 43 ', and relay 44, which operates from 49 to 44', both come into operation, both with a delay of one second. After this time, the faulty line between the nodes 48 and 49 is cut off on the other side and the long-term relays 53 and 56, which would have responded only after two seconds, no longer come into effect.

   However, if the error is at 17, for example, it is in the area of only one short-term relay, namely relay 44. This opens its switch after one second, while relay 43 does not come into action. The one-sided disconnection of the faulty line path is generally not sufficient to eliminate the voltage collapse. As a result, both the relay 53 and the relay 56 come into effect, both of which are set to the same longer tripping time, and it is doubtful which of the two responds first.

   This is a deficiency of the arrangement described, since it is desired that the relay 53 responds for the purpose of mutual separation of the error, but not the relay 56, the line 50; 49 all over ± would like to switch off with. In order to remedy these deficiencies, the fault location pointers are expediently released again after the time to switch off the shorter line sections has expired. After the Zeizers have had time to readjust, they are brought into contact with their base anew.



  An exemplary embodiment is shown in FIG. The line 60 is cut off by the holder 61 as soon as the ratchet tooth 62 is released by the pawl 63. This is on. attached to an angle lever against the free end 64 of the bolt 65 pushes as soon as the solenoid 66 has received power. This attracts the core 67. An inhibiting mechanism 68 delays the movement so that the pawl 63 is only triggered after half a second. As long as the voltage in the network is maintained, the anchors 69 and 70 are held by their solenoids, which are fed by the transducer 71.

   But if the voltage drops, the armature 69, for example. after half a second, a contact closed by the armature 70, which is provided with an escapement 72, another contact only after a second and a half. A pointer 73, which plays over a scale, measures the resistance of the line. At its end, the pointer is provided with a contact piece 75 which wanders over a contact track 76 without touching it. Furthermore, two drop bars 77 and 78 are arranged above the play area of the pointer, which set under the influence of two electromagnets 79 and 80.

    The magnet 79 receives current from the battery 82 as soon as the armature 69 makes contact, the electromagnet 80 from the battery 83 as soon as the armature 70 makes contact. Located. If the pointer 73 is in the area of that drop bracket which is pulled empty by its electromagnet, a contact is created between the contact piece 75 and the contact track 76 and the solenoid 66 is excited by the current source 81.



  The device works as follows: As soon as a fault occurs in the line, the voltage drops and both armatures 69 and 70 are released. After half a second, the armature 69 brings about a current circuit, by means of which the electromagnet 79 is excited and the drop bracket 77 is pulled down. If the error lies within its own distance, the measured reactance is small and the pointer 73 is in the area of the drop bracket <B> 77. </B> There is then between 75 and 76 contact, the solenoid 66 is energized and after a further half a second the switch 61 is opened as a result.

   If, on the other hand, the error is within the monitored part of the neighboring route, the pointer 73 reaches the area of the drop bracket 78. The dropping of the drop bracket 7 7 remains completely ineffective. After a second, the other short-term relays on the line had time to open their switches. If the fault position is thereby separated from the relay considered here, then the pointer 73 again shows greater resistance, i.e. it leaves the area of both drop bars. The switch 61 is therefore not opened even if the voltage collapse still remains.

   If, on the other hand, the fault location is not separated by the brief relay, the pointer 73 remains at the point shown, and as soon as the armature 70 causes a current circuit after a second and a half, the armature 70 is brought into contact with the contact track 76 and the Slialt.er 61 opens after a total of two seconds.



  In Fig. 6 an embodiment is shown in which only one drop bracket he is required. To trigger the switch 61, two relays are provided. One orders from; the solenoid 90 and the armature 91. This works with a delay of half a second. The second relay, consisting of the solenoid 92 and the armature 93, operates with a delay of one second.

   The pointer 73, which measures the resistance, works with two contact paths 9.1 and 95 together. It plays over the first contact path if the fault is in its own path, and over the second contact path if the error lies beyond its own monitoring path. A drop bracket 96 lies over the entire deflection range of the pointer 73. The solenoid 97, whose armature is equipped with a rack 98, receives current through the voltage transducer 71.

   As soon as the voltage drops, the rack sinks down and sets a cam disc 99 in rotation, on which the roller 100 runs. A clockwork 101 determines its speed. It is designed in such a way that it lifts the roller 100 running on it after half a second has elapsed, lets it fall again after another quarter of a second, and then lifts it again. The device works as follows: When the cam disc 99 is set in rotation as a result of the falling voltage, it lifts the roller 100 after half a second, so that the contact 110 is closed. As a result, the electromagnet 111 is excited by the battery 112. He pulls the drop bracket 96 downwards.

   If the pointer 73 is in the position shown, it flows from the. Battery 113 a flow over the contact path 94 and be actuated the solenoid 90, which opens the switch 61 after a white direct half a second.



  If, on the other hand, the fault lies in a neighboring section, so that the pointer 73 is positioned over the contact track 95, then the solenoid 92 is excited via the contact track 95 half a second after the fault has occurred. After a total of 11/1 seconds, however, the cam disc 99 lets the roller 100 sink again. The contact 110 opens and the pointer 73 is released again by the drop bracket 96. If, in the meantime, the fault location has been cut off by short-term relays elsewhere on the line, the resistance has again assumed the normal high value and the pointer 73 can adjust to it.

   If then, as a result of the continued running of the cam 99, the contact 110 is closed again, the pointer 73 is no longer in the area of the cam tracks and the solenoid 92 remains de-energized. If, however, the fault location has not been separated, the pointer 73 remains above the contact path 95, and when the drop bracket 96 goes down two times, the solenoid 92 is again excited and opens the isolating switch 61 after a further second.

 

Claims (1)

PATENTANSPRUCH: Vorrichtung zur Überwachung elektri scher Leitungen vermittelst eines Fehlerort- messwerkes, das eine von der Entfernung der Fehlerstelle abhängige Grösse misst, gekenn zeichnet durch eine Vorrichtung, welche die Stellung, die das Fehlerortmesswerk infolge eines Leitungsfehlers angenommen hat, der art kenntlich macht, dass die Entfernung des Fehlerortes auch dann noch erkennbar bleibt, wenn das Messwerk bereits wieder in eine andere Stellung übergegangen ist. UNTERANSPRÜCHE: 1. PATENT CLAIM: Device for monitoring electrical lines by means of a fault location measuring unit that measures a variable dependent on the distance to the fault location, characterized by a device which identifies the position that the fault location measuring unit has assumed as a result of a line fault the distance from the fault location remains recognizable even when the measuring mechanism has already moved back into another position. SUBCLAIMS: 1. Vorrichtung nach Patentanspruch, da durch gekennzeichnet, dass die Stellung des Messwerkes durch die Mitwirkung eines besonderen Hilfsrelais kenntlich ge macht wird, das durch den eingetretenen Leitungsfehler in Tätigkeit gesetzt wird. 2. Vorrichtung nach Unteranspruch 1, da durch gekennzeichnet, dass das Fehlerort- messwerk in denjenigen Stellungen, die es annimmt, wenn der Leitungsfehler in nerhalb einer zu überwachenden Leitungs strecke liegt, die Abschaltung dieser Strecke mit stets gleichbleibender Aus lösezeit veranlasst. 3. Device according to patent claim, characterized in that the position of the measuring mechanism is made recognizable by the cooperation of a special auxiliary relay which is activated by the line fault that has occurred. 2. Device according to dependent claim 1, characterized in that the fault location measuring mechanism in those positions that it assumes when the line fault is within a line to be monitored, causes the shutdown of this line with a constant trigger time. 3. Vorrichtung nach Unteranspruch 1, da durch gekennzeichnet, dass das Hilfsrelais bei Eintritt eines Leitungsfehlers den Zeiger de,9 Fehlerortmesswerkes mit der Unterlage, über der er spielt, in Berüh rung bringt und dadurch diejenige Stel lung kenntlich macht, die der Zeiger in folge des Leitungsfehlers angenommen hatte. 4. Vorrichtung nach Unteransprüchen 2 und 3, dadurch gekennzeichnet, dass- durch die Berührung des Zeigers mit demjenigen Teil der Unterlage, über dem er dann steht, wenn der Fehler innerhalb der zu überwachenden Leitungsstrecke liegt, auch die Abtrennung dieser Leitungs strecke veranlasst wird. 5. Device according to dependent claim 1, characterized in that the auxiliary relay, when a line fault occurs, brings the pointer de, 9 fault location measuring mechanism into contact with the base over which it is playing and thereby identifies the position that the pointer is due to the line fault had accepted. 4. Device according to dependent claims 2 and 3, characterized in that- by touching the pointer with that part of the pad over which it is located when the error is within the line to be monitored, the separation of this line is also caused. 5. Vorrichtung nach Unteranspruch 1, da durch gekennzeichnet, dass das genannte Hilfsrelais durch die weitere Mitwirkung eines Minimalspannungsrelais ausgelöst wird, das durch den infolge des Leitungs fehlers entstandenen Spannungszusammen bruch in Tätigkeit gesetzt wird. 6. Device according to dependent claim 1, characterized in that said auxiliary relay is triggered by the further cooperation of a minimum voltage relay which is activated by the voltage breakdown caused by the line fault. 6th Vorrichtung nach Unteransprüchen 2 bis 5, bei der kürzere, zu überwachende Leitungsstrecken mit unveränderlicher, geringerer Auslösezeit und darüber hin ausreichende, längere Leitungsstrecken mit unveränderlicher, grösserer Auslöse zeit abgeschaltet werden, dadurch gekenn zeichnet, dass, nachdem die Zeit zur Ab schaltung der kürzeren Leitungsstrecken abgelaufen ist, den Zeigern der Fehlerort- messwerke Zeit gelassen wird, sich neu einzustellen, und dass sie erst dann mit ihrer Unterlage in Berührung gebracht werden. 7. Vorrichtung nach. Device according to dependent claims 2 to 5, in which the shorter, monitored line sections with an unchangeable, lower triggering time and, in addition, sufficient, longer line sections with an unchangeable, greater triggering time are switched off, characterized in that after the time to switch off the shorter line sections has expired, the pointers of the fault location measuring units are given time to readjust and only then are they brought into contact with their base. 7. Device after. Unteranspruch $, da durch gekennzeichnet, da,ss derjenige Teil der Unterlage, über dem der Zeiger dann steht, wenn die zu überwachende Leitungs- strecke fehlerfrei ist, die Freigabe des Zeigers veranla.sst. F. Vorrichtung nach Unteranspruch 5, ge kennzeichnet durch ein Stromrelais, durch welches das Minimalspannungsrelais ausser Tätigkeit gesetzt wird, sobald der Strom in der zu überwachenden Leitungsstrecke verschwindet.. 9. Subclaim $, characterized in that that part of the base over which the pointer is positioned when the line section to be monitored is free of errors causes the pointer to be released. F. Device according to dependent claim 5, characterized by a current relay, by means of which the minimum voltage relay is put out of action as soon as the current disappears in the line section to be monitored .. 9. Vorrichtung nach Unteransprüchen 1 bis 7, dadurch gekennzeichnet, dass die Stellung des Fehlerortzeigers durch die Mitwirkung eines Hilfsrelais kenntlich ge macht wird, das von dem Quotienten aus Spannung und Stromstärke im Fehler stromkreise abhiingig ist. Device according to dependent claims 1 to 7, characterized in that the position of the fault location pointer is made identifiable by the cooperation of an auxiliary relay which is dependent on the quotient of voltage and current in the fault circuit.
CH116225D 1925-03-18 1925-08-01 Device for monitoring electrical lines. CH116225A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE116225X 1925-03-18

Publications (1)

Publication Number Publication Date
CH116225A true CH116225A (en) 1926-09-16

Family

ID=5654618

Family Applications (1)

Application Number Title Priority Date Filing Date
CH116225D CH116225A (en) 1925-03-18 1925-08-01 Device for monitoring electrical lines.

Country Status (1)

Country Link
CH (1) CH116225A (en)

Similar Documents

Publication Publication Date Title
DE69601218T3 (en) ELECTRICAL DIFFERENTIAL PROTECTIVE DEVICE WITH TEST CIRCUIT
DE69230817T2 (en) Switch mechanism
DE1956527C3 (en) Differential protection device
DE19529474C1 (en) Automatic monitoring system for fault current protection switch
CH116225A (en) Device for monitoring electrical lines.
AT110181B (en) Device for monitoring electrical lines.
DE597524C (en) Electrical protection device
DE2708844C3 (en) Protection device for a generator-turbine unit against overloading of the shaft
DE2037390B2 (en) DISTANCE PROTECTION FOR MESHED ELECTRIC NETWORKS
DE1530415C (en) Circuit arrangement for monitoring light signals, in particular light signals fed by alternating current, in railway safety systems
DE576868C (en) Protection device for electrical lines
AT204073B (en) Safety circuit for control and signaling lines, especially for cable car operation
WO2010145757A1 (en) Control method for triggering an electronic safety switch
DE600338C (en) Selective protection circuit with tripping times depending on the distance from the fault location
DE584063C (en) Protective device for electrical system parts
DE599208C (en) Protective circuit with wattmetric earth-fault time relays excited by the total current and the zero point voltage
DE349974C (en) Arrangement for the automatic shutdown of faulty sections in ring networks
DE926800C (en) Length differential protection device
DE562191C (en) Train control device
AT134198B (en) Arrangement on selective protection relays.
CH126667A (en) Line protection relay with two measuring devices.
AT119762B (en) Switching of line protection relays for three-phase current.
DE654242C (en) Device for the selective display of asynchronous oscillations in electrical networks
AT112889B (en) Fault location relay with two measuring devices.
DE935741C (en) Selective protection device