CA2627431C - Monitoring formation properties - Google Patents
Monitoring formation properties Download PDFInfo
- Publication number
- CA2627431C CA2627431C CA2627431A CA2627431A CA2627431C CA 2627431 C CA2627431 C CA 2627431C CA 2627431 A CA2627431 A CA 2627431A CA 2627431 A CA2627431 A CA 2627431A CA 2627431 C CA2627431 C CA 2627431C
- Authority
- CA
- Canada
- Prior art keywords
- tubular element
- formation
- perforating gun
- pressure
- sensor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000015572 biosynthetic process Effects 0.000 title claims abstract description 72
- 238000012544 monitoring process Methods 0.000 title claims abstract description 23
- 238000000034 method Methods 0.000 claims abstract description 32
- 238000010304 firing Methods 0.000 claims abstract description 7
- 238000004891 communication Methods 0.000 claims description 21
- 239000004568 cement Substances 0.000 claims description 12
- 238000005755 formation reaction Methods 0.000 description 54
- 239000012530 fluid Substances 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 5
- 238000005553 drilling Methods 0.000 description 4
- 230000007774 longterm Effects 0.000 description 4
- 238000005259 measurement Methods 0.000 description 4
- 230000035699 permeability Effects 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 3
- 238000009530 blood pressure measurement Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000013213 extrapolation Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- CNQCVBJFEGMYDW-UHFFFAOYSA-N lawrencium atom Chemical compound [Lr] CNQCVBJFEGMYDW-UHFFFAOYSA-N 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000010453 quartz Substances 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N silicon dioxide Inorganic materials O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/01—Devices for supporting measuring instruments on drill bits, pipes, rods or wirelines; Protecting measuring instruments in boreholes against heat, shock, pressure or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/119—Details, e.g. for locating perforating place or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Measuring Fluid Pressure (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
- Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
- Glass Compositions (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
A method for monitoring pressure in a formation traversed by at least one wellbore comprising providing a tubular element having an outside surface, attaching a perforating gun oriented in such a way that when fired, the perforating gun does not damage the tubular element, connecting a sensor to the perforating gun in close proximity to the perforating gun wherein the sensor is exposed to the wellbore, inserting the tubular element into the wellbore, securing the tubular element in the wellbore, firing the perforating gun to penetrate the formation, exposing the sensor to the formation pressure, and monitoring the pressure in the formation with the sensor to obtain pressure data.
Description
MONITORING FORMATION PROPERTIES
Field of Invention The present invention relates to a method and apparatus for monitoring properties in a formation traversed by at least one wellbore.
Background In the oil and gas industry, the sampling of fluids and measuring formation pressure in the porous strata of the formation being drilled can provide valuable information about the formation and its ability to yield oil and/or gas.
Formation pressure is one of the key properties that engineers, geologists, and petrophysicists use to characterize the mobility of oil and gas formations and estimate reserves. Formation pressure data can be collected at specific times throughout the life of the well or it can be monitored on a long-telm basis. Ideally, operators would like to be able to obtain a real time pressure profile of the well over its lifetime to aid in optimization of production.
Formation pressures can be measured using a variety of methods. The most common method involves running a wireline formation pressure tester (FPT) in either an open or cased hole completion. This method requires drilling into the formation or shooting a hole in the casing. The FPT method works well in permeable formations; however, it is limited to one data point for pressure at a specified time. Obtaining multiple data points is desirable because it is difficult to determine whether a pressure measurement reflects the virgin formation pressure or pressure after depletion. In addition, having a number of measurements over an extended period of time allows for identification of depletion even if the actual virgin formation pressure is unknown.
In tighter, less permeable formations, the traditional FPT method has limits because it takes a long time to build up to the formation pressure. In addition, the method is less accurate in formations prone to a phenomenon known as supercharging. Supercharging is the increase of formation pressure around the wellbore as a result of exposure to the higher pressure from the mud used in the drilling process. In supercharged reservoirs, the mudcake fails to adequately hold the drilling fluid in the wellbore, causing drilling fluid to penetrate the formation and create a high-pressure or "super-charged" zone. Using the FPT method under these conditions may require extrapolation or yield an inaccurate data point for pressure that is between the mud pressure and the formation pressure.
Another method used in tighter formations is the diagnostic formation injection test (DFIT). In this method, the formation is pressured up, a fracture is created beyond the supercharged area and the pressure fall off back to the formation pressure is monitored. Usually pressure is measured at the surface and the accuracy is within hundredths of psi.
A gauge may also be placed downhole to obtain a more accurate measurement; however, in tight formations, it is still a challenge to get an accurate measurement within 100 psi.
Long-term build-up is another method for measuring formation pressure. Here the well is shut in for an extended period (weeks or months) and the pressure is measured as it builds back up to the current formation pressure. As with the DFIT method, measuring can be performed at the surface or downhole, but both methods require that the well be shut in with no production. The long-term build-up method traditionally yields one data point representing the pressure for the whole well. In principle, a profile could be obtained by placing a number of gauges between bridge plugs in the
Field of Invention The present invention relates to a method and apparatus for monitoring properties in a formation traversed by at least one wellbore.
Background In the oil and gas industry, the sampling of fluids and measuring formation pressure in the porous strata of the formation being drilled can provide valuable information about the formation and its ability to yield oil and/or gas.
Formation pressure is one of the key properties that engineers, geologists, and petrophysicists use to characterize the mobility of oil and gas formations and estimate reserves. Formation pressure data can be collected at specific times throughout the life of the well or it can be monitored on a long-telm basis. Ideally, operators would like to be able to obtain a real time pressure profile of the well over its lifetime to aid in optimization of production.
Formation pressures can be measured using a variety of methods. The most common method involves running a wireline formation pressure tester (FPT) in either an open or cased hole completion. This method requires drilling into the formation or shooting a hole in the casing. The FPT method works well in permeable formations; however, it is limited to one data point for pressure at a specified time. Obtaining multiple data points is desirable because it is difficult to determine whether a pressure measurement reflects the virgin formation pressure or pressure after depletion. In addition, having a number of measurements over an extended period of time allows for identification of depletion even if the actual virgin formation pressure is unknown.
In tighter, less permeable formations, the traditional FPT method has limits because it takes a long time to build up to the formation pressure. In addition, the method is less accurate in formations prone to a phenomenon known as supercharging. Supercharging is the increase of formation pressure around the wellbore as a result of exposure to the higher pressure from the mud used in the drilling process. In supercharged reservoirs, the mudcake fails to adequately hold the drilling fluid in the wellbore, causing drilling fluid to penetrate the formation and create a high-pressure or "super-charged" zone. Using the FPT method under these conditions may require extrapolation or yield an inaccurate data point for pressure that is between the mud pressure and the formation pressure.
Another method used in tighter formations is the diagnostic formation injection test (DFIT). In this method, the formation is pressured up, a fracture is created beyond the supercharged area and the pressure fall off back to the formation pressure is monitored. Usually pressure is measured at the surface and the accuracy is within hundredths of psi.
A gauge may also be placed downhole to obtain a more accurate measurement; however, in tight formations, it is still a challenge to get an accurate measurement within 100 psi.
Long-term build-up is another method for measuring formation pressure. Here the well is shut in for an extended period (weeks or months) and the pressure is measured as it builds back up to the current formation pressure. As with the DFIT method, measuring can be performed at the surface or downhole, but both methods require that the well be shut in with no production. The long-term build-up method traditionally yields one data point representing the pressure for the whole well. In principle, a profile could be obtained by placing a number of gauges between bridge plugs in the
2 casing, but doing so may force the operator to abandon the well or rely on retrievable bridge plugs. The long-term build-up method will also likely damage the casing integrity because the casing has to be perforated in order to have communication between the gauge and the formation.
US Patent 5,467,823 discloses a method and apparatus of monitoring subsurface formations containing at least one fluid reservoir and traversed by at least one well. The method includes lowering a sensor to a depth level corresponding to the reservoir, positioning the sensor at this depth while isolating the section of the well where the sensor is located from the rest of the well and providing fluid communication between the sensor and the reservoir.
Because this system requires isolating the section of the well where the sensor is located from the rest of the well, this could not serve as a long-term pressure measurement option. In addition, the chances of maintaining pressure isolation while achieving communication to surface over the wireline with multiple sensors are remote.
Summary of the Invention The present inventions include a method for monitoring pressure in a formation traversed by at least one wellbore comprising providing a tubular element having an outside surface, attaching a perforating gun oriented in such a way that when fired, the perforating gun does not damage the tubular element, connecting a sensor to the perforating gun in close proximity to the perforating gun wherein the sensor is exposed to the wellbore, inserting the tubular element into the wellbore, securing the tubular element in the wellbore, firing the perforating gun to penetrate the formation, exposing the sensor to the formation pressure, and monitoring the pressure in the formation with the sensor to obtain pressure data.
US Patent 5,467,823 discloses a method and apparatus of monitoring subsurface formations containing at least one fluid reservoir and traversed by at least one well. The method includes lowering a sensor to a depth level corresponding to the reservoir, positioning the sensor at this depth while isolating the section of the well where the sensor is located from the rest of the well and providing fluid communication between the sensor and the reservoir.
Because this system requires isolating the section of the well where the sensor is located from the rest of the well, this could not serve as a long-term pressure measurement option. In addition, the chances of maintaining pressure isolation while achieving communication to surface over the wireline with multiple sensors are remote.
Summary of the Invention The present inventions include a method for monitoring pressure in a formation traversed by at least one wellbore comprising providing a tubular element having an outside surface, attaching a perforating gun oriented in such a way that when fired, the perforating gun does not damage the tubular element, connecting a sensor to the perforating gun in close proximity to the perforating gun wherein the sensor is exposed to the wellbore, inserting the tubular element into the wellbore, securing the tubular element in the wellbore, firing the perforating gun to penetrate the formation, exposing the sensor to the formation pressure, and monitoring the pressure in the formation with the sensor to obtain pressure data.
3 The present inventions also include an apparatus for monitoring pressure in a formation traversed by at least one wellbore lined with casing comprising a wireless communications module mounted on the outside of the casing, a perforating gun oriented away from the casing mounted on the outside of the casing, and a sensor mounted on the outside of the casing wherein the sensor is not protected from overpressure.
The present inventions also include an apparatus for monitoring pressure in a formation traversed by at least one wellbore comprising a tubular element having an outside surface, a wireless communications module mounted on the outside surface of the tubular element, a perforating gun oriented away from the tubular element mounted on the outside surface of the tubular element, and a sensor mounted on the outside surface of the tubular element wherein the sensor is not protected from overpressure.
According to a further aspect of the present invention, there is provided a method for monitoring pressure in a formation in a wellbore comprising: providing a tubular element having an outside surface; attaching a perforating gun to said outside surface; connecting a sensor to the perforating gun; inserting the tubular element into the wellbore; securing the tubular element in the wellbore; firing the perforating gun to penetrate the formation; wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45 relative to a tangent line at the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal
The present inventions also include an apparatus for monitoring pressure in a formation traversed by at least one wellbore comprising a tubular element having an outside surface, a wireless communications module mounted on the outside surface of the tubular element, a perforating gun oriented away from the tubular element mounted on the outside surface of the tubular element, and a sensor mounted on the outside surface of the tubular element wherein the sensor is not protected from overpressure.
According to a further aspect of the present invention, there is provided a method for monitoring pressure in a formation in a wellbore comprising: providing a tubular element having an outside surface; attaching a perforating gun to said outside surface; connecting a sensor to the perforating gun; inserting the tubular element into the wellbore; securing the tubular element in the wellbore; firing the perforating gun to penetrate the formation; wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45 relative to a tangent line at the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal
4 =
paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure; and monitoring the pressure in the formation using data obtained from the pressure gauge.
According to another aspect of the present invention, there is provided an apparatus for monitoring pressure in a formation in a wellbore lined with casing comprising: a wireless communications module mounted on the outside of the casing; a perforating gun mounted on the outside of the casing;
and a sensor mounted on the outside of the casing, and wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45 relative to a tangent line at the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure.
According to still another aspect of the present invention, there is provided an apparatus for monitoring pressure in a formation traversed by at least one wellbore comprising: a tubular element having an outside surface; a wireless communications module mounted on the outside surface of the tubular element; a perforating gun mounted on the outside surface of the tubular element; and a sensor mounted on the outside surface of the tubular element wherein the sensor is not protected from overpressure and wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45 relative to a tangent line at 4a the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure.
Brief Description of the Drawings The present invention is better understood by reading the following description of non-limitative embodiments with reference to the attached drawings, wherein like parts of each of the figures are identified by the same reference characters, and which are briefly described as follows:
Figure 1 illustrates a perspective view of one embodiment of the pressure monitoring apparatus.
Figure 2 illustrates a side view of one embodiment of the pressure monitoring apparatus installed in a wellbore.
Figure 3 shows a top view of the wellbore =
illustrating the direction of the perforations.
Figure 4 illustrates a side view of another embodiment of the pressure monitoring apparatus installed in a wellbore.
4b Detailed Description of the Invention Figure 1 shows one embodiment of an apparatus for monitoring formation properties. In this embodiment, tubular element 101 is a section of casing, liner, or other material used to maintain the integrity of the wellbore. Tubular element 101 may also be a section of tubing, cement stinger, or other device used to lower equipment into a wellbore.
Perforating gun 102 and sensor 103 are mounted on the outside of tubular element 101 in close proximity to one another.
Perforating gun 102 and sensor 103 may be connected either directly or via additional tubulars or hoses.
Any type of perforating gun may be used; however the direction of the perforations must point away from the casing (tubular element 101) so that when fired, the perforating gun does not damage the casing. In a wireless embodiment of the invention, perforation gun 102 may be fired by pressuring up the casing using conventional methods of wireless perforating. In an alternative embodiment, a wire may be attached to perforating gun 102 and used for firing. In this embodiment, a conventional casing conveyed wireless perforating gun with the inward facing shaped charges removed is shown.
Any type of sensor may be used including, for example, strain gauges, quartz gages, and other conventional sensing devices. The embodiments in this application discuss using a pressure sensor; however, sensors that measure other well properties could be employed.
Wireless communications module 104 is shown connected to tubular element 101. Wireless telemetry technology is known in the industry and may be used to transmit data gathered downhole to surface production facilities. In this case, wireless communications module 104 transmits the pressure data gathered from sensor 103 real time to the surface.
paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure; and monitoring the pressure in the formation using data obtained from the pressure gauge.
According to another aspect of the present invention, there is provided an apparatus for monitoring pressure in a formation in a wellbore lined with casing comprising: a wireless communications module mounted on the outside of the casing; a perforating gun mounted on the outside of the casing;
and a sensor mounted on the outside of the casing, and wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45 relative to a tangent line at the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure.
According to still another aspect of the present invention, there is provided an apparatus for monitoring pressure in a formation traversed by at least one wellbore comprising: a tubular element having an outside surface; a wireless communications module mounted on the outside surface of the tubular element; a perforating gun mounted on the outside surface of the tubular element; and a sensor mounted on the outside surface of the tubular element wherein the sensor is not protected from overpressure and wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45 relative to a tangent line at 4a the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure.
Brief Description of the Drawings The present invention is better understood by reading the following description of non-limitative embodiments with reference to the attached drawings, wherein like parts of each of the figures are identified by the same reference characters, and which are briefly described as follows:
Figure 1 illustrates a perspective view of one embodiment of the pressure monitoring apparatus.
Figure 2 illustrates a side view of one embodiment of the pressure monitoring apparatus installed in a wellbore.
Figure 3 shows a top view of the wellbore =
illustrating the direction of the perforations.
Figure 4 illustrates a side view of another embodiment of the pressure monitoring apparatus installed in a wellbore.
4b Detailed Description of the Invention Figure 1 shows one embodiment of an apparatus for monitoring formation properties. In this embodiment, tubular element 101 is a section of casing, liner, or other material used to maintain the integrity of the wellbore. Tubular element 101 may also be a section of tubing, cement stinger, or other device used to lower equipment into a wellbore.
Perforating gun 102 and sensor 103 are mounted on the outside of tubular element 101 in close proximity to one another.
Perforating gun 102 and sensor 103 may be connected either directly or via additional tubulars or hoses.
Any type of perforating gun may be used; however the direction of the perforations must point away from the casing (tubular element 101) so that when fired, the perforating gun does not damage the casing. In a wireless embodiment of the invention, perforation gun 102 may be fired by pressuring up the casing using conventional methods of wireless perforating. In an alternative embodiment, a wire may be attached to perforating gun 102 and used for firing. In this embodiment, a conventional casing conveyed wireless perforating gun with the inward facing shaped charges removed is shown.
Any type of sensor may be used including, for example, strain gauges, quartz gages, and other conventional sensing devices. The embodiments in this application discuss using a pressure sensor; however, sensors that measure other well properties could be employed.
Wireless communications module 104 is shown connected to tubular element 101. Wireless telemetry technology is known in the industry and may be used to transmit data gathered downhole to surface production facilities. In this case, wireless communications module 104 transmits the pressure data gathered from sensor 103 real time to the surface.
5 Figure 2 depicts the apparatus shown in Figure 1 installed in wellbore 201. A section of wellbore 201 is shown traversing formation 202 with tubular element 101 lowered inside. As in Figure 1, perforating gun 102, sensor 103, and wireless communications module 104 are mounted on the outside of tubular element 101. In Figure 2 only one section of the wellbore is shown. Because the transmission system is wireless, an operator may install numerous sensors and perforating guns in a single wellbore to obtain the desired data.
In operation, once tubular element 103 is lowered to its desired position in wellbore 201, cement 203 is optionally pumped through annulus 204, securing tubular element 101 in place. Then the casing is pressured up and perforating gun 102 is activated. Figure 3 depicts the top view of the apparatus in the wellbore to indicate the direction of the perforations. Shape charges 301 are shown connected to perforating gun 102. When fired, shaped charges 301 penetrate cement 203 and formation 202 according to paths 302 thereby exposing sensor 103 to the formation pressure. During the perforating operation, tubular element 101 remains intact and sensor 103 is not damaged even though it is in direct pressure communication with the gun and not protected from the pressure shock generated by the firing of the gun (referred to as "overpressure" in the industry). Sensor 103 gathers data, which is transmitted to surface unit 205 by wireless communication module 104, thus providing pressure data without the need to drill a dedicated observation well or compromise casing integrity.
Another embodiment of the invention uses a hard-wired connection to transmit the pressure data gathered downhole.
Figure 4 depicts a hard-wired embodiment that is installed on the outside of a section of casing. Wellbore 401 is shown
In operation, once tubular element 103 is lowered to its desired position in wellbore 201, cement 203 is optionally pumped through annulus 204, securing tubular element 101 in place. Then the casing is pressured up and perforating gun 102 is activated. Figure 3 depicts the top view of the apparatus in the wellbore to indicate the direction of the perforations. Shape charges 301 are shown connected to perforating gun 102. When fired, shaped charges 301 penetrate cement 203 and formation 202 according to paths 302 thereby exposing sensor 103 to the formation pressure. During the perforating operation, tubular element 101 remains intact and sensor 103 is not damaged even though it is in direct pressure communication with the gun and not protected from the pressure shock generated by the firing of the gun (referred to as "overpressure" in the industry). Sensor 103 gathers data, which is transmitted to surface unit 205 by wireless communication module 104, thus providing pressure data without the need to drill a dedicated observation well or compromise casing integrity.
Another embodiment of the invention uses a hard-wired connection to transmit the pressure data gathered downhole.
Figure 4 depicts a hard-wired embodiment that is installed on the outside of a section of casing. Wellbore 401 is shown
6 traversing formation 402. First apparatUs 403 and second apparatus 404 are shown mounted on the outside of casing 405.
First apparatus 403 and second apparatus 404 are connected by wire 406, which extends to the surface (not shown). First apparatus 403 and second apparatus 404 consist of perforating guns (407 and 410), sensors (408 and 411), and communications modules (409 and 412). The entire apparatus is secured in the wellbore using cement 413. In this embodiment, the data collected by sensors 408 and 411 is transmitted using wire 406 to the surface (not shown). Transmission with a wire may be less reliable than using wireless communication because the wire might be damaged during placement in the hole or when zones are perforated for production. However, hard-wired transmission systems are advantageous because they provide higher frequency data, can transmit data for longer periods, and enable deeper measurements to be contained. Furthermore the wire may also be used to fire the perforating guns.
Although the system of some embodiments of the present invention was developed for tight, low permeability reservoirs, some embodiments of the invention may also be useful in high permeability reservoirs. In many areas, multiple reservoirs penetrated by a single wellbore are produced and managed separately because of legal or reservoir management requirements. Some embodiments of the present invention enable the operator to have a single well produce one horizon, while acting as a pressure observation well for one or more other reservoirs, thus obviating the need to drill dedicated pressure observers.
Advantages of the embodiments of the invention include one or more of the following:
(i) Provides accurate pressure measurement in tight low permeability formations (ii) Maintains casing integrity
First apparatus 403 and second apparatus 404 are connected by wire 406, which extends to the surface (not shown). First apparatus 403 and second apparatus 404 consist of perforating guns (407 and 410), sensors (408 and 411), and communications modules (409 and 412). The entire apparatus is secured in the wellbore using cement 413. In this embodiment, the data collected by sensors 408 and 411 is transmitted using wire 406 to the surface (not shown). Transmission with a wire may be less reliable than using wireless communication because the wire might be damaged during placement in the hole or when zones are perforated for production. However, hard-wired transmission systems are advantageous because they provide higher frequency data, can transmit data for longer periods, and enable deeper measurements to be contained. Furthermore the wire may also be used to fire the perforating guns.
Although the system of some embodiments of the present invention was developed for tight, low permeability reservoirs, some embodiments of the invention may also be useful in high permeability reservoirs. In many areas, multiple reservoirs penetrated by a single wellbore are produced and managed separately because of legal or reservoir management requirements. Some embodiments of the present invention enable the operator to have a single well produce one horizon, while acting as a pressure observation well for one or more other reservoirs, thus obviating the need to drill dedicated pressure observers.
Advantages of the embodiments of the invention include one or more of the following:
(i) Provides accurate pressure measurement in tight low permeability formations (ii) Maintains casing integrity
7 (iii) Allows for simultaneous production and monitoring (iv) Avoids need to drill separate observation well (v) May be used in high permeability formations in which multiple reservoirs are penetrated by single wellbore (vi) Uses multiple bullets, improving the chance of establishing pressure communication with formation.
Those of skill in the art will appreciate that many modifications and variations are possible in terms of the disclosed embodiments, configurations, materials, and methods without departing from their scope. Accordingly, the scope of the claims appended hereafter and their functional equivalents should not be limited by particular embodiments described and illustrated herein, as these are merely exemplary in nature.
=
Those of skill in the art will appreciate that many modifications and variations are possible in terms of the disclosed embodiments, configurations, materials, and methods without departing from their scope. Accordingly, the scope of the claims appended hereafter and their functional equivalents should not be limited by particular embodiments described and illustrated herein, as these are merely exemplary in nature.
=
8
Claims (15)
1. A method for monitoring pressure in a formation in a wellbore comprising:
providing a tubular element having an outside surface;
attaching a perforating gun to said outside surface;
connecting a sensor to the perforating gun;
inserting the tubular element into the wellbore;
securing the tubular element in the wellbore;
firing the perforating gun to penetrate the formation;
wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45° relative to a tangent line at the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure; and monitoring the pressure in the formation using data obtained from the pressure gauge.
providing a tubular element having an outside surface;
attaching a perforating gun to said outside surface;
connecting a sensor to the perforating gun;
inserting the tubular element into the wellbore;
securing the tubular element in the wellbore;
firing the perforating gun to penetrate the formation;
wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45° relative to a tangent line at the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure; and monitoring the pressure in the formation using data obtained from the pressure gauge.
2. The method of claim 1 further comprising attaching a wireless communications module to the outside of the tubular element.
3. The method of claim 2 wherein the tubular element is casing.
4. The method of claim 3 wherein the securing is performed by cementing the casing against the formation.
5. The method of claim 4 wherein the firing is performed by pressuring up the casing to detonate a plurality of shaped charges.
6. The method of claim 5 further comprising transmitting the pressure data to a surface control unit using the wireless communications module.
7. The method of claim 1 further comprising connecting the sensor to a surface control unit using a hard wire connection.
8. The method of claim 7 wherein the inserting is performed by a cement stinger.
9. The method of claim 7 wherein the inserting is performed by tubing.
10. The method of any one of claims 1 to 9 further comprising producing oil from the formation.
11. An apparatus for monitoring pressure in a formation in a wellbore lined with casing comprising:
a wireless communications module mounted on the outside of the casing;
a perforating gun mounted on the outside of the casing; and a sensor mounted on the outside of the casing, and.
wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45° relative to a tangent line at the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure.
a wireless communications module mounted on the outside of the casing;
a perforating gun mounted on the outside of the casing; and a sensor mounted on the outside of the casing, and.
wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45° relative to a tangent line at the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure.
12. The apparatus of claim 11 further comprising a surface control unit, which is operatively connected to the wireless communications module.
13. An apparatus for monitoring pressure in a formation traversed by at least one wellbore comprising:
a tubular element having an outside surface;
a wireless communications module mounted on the outside surface of the tubular element;
a perforating gun mounted on the outside surface of the tubular element; and a sensor mounted on the outside surface of the tubular element wherein the sensor is not protected from overpressure and wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45° relative to a tangent line at the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure.
a tubular element having an outside surface;
a wireless communications module mounted on the outside surface of the tubular element;
a perforating gun mounted on the outside surface of the tubular element; and a sensor mounted on the outside surface of the tubular element wherein the sensor is not protected from overpressure and wherein the sensor is a pressure gauge mounted in close proximity to the perforating gun, the perforating gun comprising shaped charges that are oriented at an angle of about 45° relative to a tangent line at the circumference of the tubular element to penetrate the cement and formation according to mutually substantially orthogonal paths such that when fired, the perforating gun does not damage the tubular element and exposes the pressure gauge to the formation pressure.
14. The apparatus of claim 13 further comprising a deployment device selected from the group consisting of tubing, cement stingers, and wireline.
15. The apparatus of claim 14 further comprising a surface control unit which is operatively is connected to the wireless communications module.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US73346105P | 2005-11-04 | 2005-11-04 | |
US60/733,461 | 2005-11-04 | ||
PCT/US2006/042924 WO2007056121A1 (en) | 2005-11-04 | 2006-11-02 | Monitoring formation properties |
Publications (2)
Publication Number | Publication Date |
---|---|
CA2627431A1 CA2627431A1 (en) | 2007-05-18 |
CA2627431C true CA2627431C (en) | 2015-12-29 |
Family
ID=37831614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA2627431A Expired - Fee Related CA2627431C (en) | 2005-11-04 | 2006-11-02 | Monitoring formation properties |
Country Status (11)
Country | Link |
---|---|
US (1) | US20070193740A1 (en) |
EP (1) | EP1945905B1 (en) |
CN (1) | CN101300402A (en) |
AT (1) | ATE489535T1 (en) |
AU (1) | AU2006311880B2 (en) |
BR (1) | BRPI0618246A2 (en) |
CA (1) | CA2627431C (en) |
DE (1) | DE602006018508D1 (en) |
EA (1) | EA200801260A1 (en) |
NO (1) | NO20082490L (en) |
WO (1) | WO2007056121A1 (en) |
Families Citing this family (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8540027B2 (en) | 2006-08-31 | 2013-09-24 | Geodynamics, Inc. | Method and apparatus for selective down hole fluid communication |
US8607864B2 (en) * | 2008-02-28 | 2013-12-17 | Schlumberger Technology Corporation | Live bottom hole pressure for perforation/fracturing operations |
US8672031B2 (en) * | 2009-03-13 | 2014-03-18 | Schlumberger Technology Corporation | Perforating with wired drill pipe |
US20120048539A1 (en) * | 2010-08-24 | 2012-03-01 | Baker Hughes Incorporated | Reservoir Pressure Monitoring |
GB2503575B (en) * | 2010-12-17 | 2014-04-09 | Halliburton Energy Serv Inc | Modelling shock produced by well perforating |
US8397800B2 (en) | 2010-12-17 | 2013-03-19 | Halliburton Energy Services, Inc. | Perforating string with longitudinal shock de-coupler |
US8397814B2 (en) | 2010-12-17 | 2013-03-19 | Halliburton Energy Serivces, Inc. | Perforating string with bending shock de-coupler |
US8985200B2 (en) * | 2010-12-17 | 2015-03-24 | Halliburton Energy Services, Inc. | Sensing shock during well perforating |
AU2010365401B2 (en) * | 2010-12-17 | 2015-04-09 | Halliburton Energy Services, Inc. | Well perforating with determination of well characteristics |
US8393393B2 (en) | 2010-12-17 | 2013-03-12 | Halliburton Energy Services, Inc. | Coupler compliance tuning for mitigating shock produced by well perforating |
MX2011011468A (en) * | 2010-12-17 | 2012-09-27 | Halliburton Energy Serv Inc | Modeling shock produced by well perforating. |
MX2013006898A (en) * | 2010-12-17 | 2013-07-17 | Halliburton Energy Serv Inc | Sensing shock during well perforating. |
US20120241169A1 (en) | 2011-03-22 | 2012-09-27 | Halliburton Energy Services, Inc. | Well tool assemblies with quick connectors and shock mitigating capabilities |
US8881816B2 (en) | 2011-04-29 | 2014-11-11 | Halliburton Energy Services, Inc. | Shock load mitigation in a downhole perforation tool assembly |
US9091152B2 (en) | 2011-08-31 | 2015-07-28 | Halliburton Energy Services, Inc. | Perforating gun with internal shock mitigation |
US9297228B2 (en) | 2012-04-03 | 2016-03-29 | Halliburton Energy Services, Inc. | Shock attenuator for gun system |
US8978749B2 (en) | 2012-09-19 | 2015-03-17 | Halliburton Energy Services, Inc. | Perforation gun string energy propagation management with tuned mass damper |
MX356089B (en) | 2012-09-19 | 2018-05-14 | Halliburton Energy Services Inc | Perforation gun string energy propagation management system and methods. |
WO2014084866A1 (en) | 2012-12-01 | 2014-06-05 | Halliburton Energy Services, Inc. | Protection of electronic devices used with perforating guns |
US20150008003A1 (en) * | 2013-07-02 | 2015-01-08 | Baker Hughes Incorporated | Selective plugging element and method of selectively plugging a channel therewith |
NO340917B1 (en) * | 2013-07-08 | 2017-07-10 | Sensor Developments As | System and method for in-situ determination of a well formation pressure through a cement layer |
WO2015130785A1 (en) | 2014-02-25 | 2015-09-03 | Schlumberger Canada Limited | Wirelessly transmitting data representing downhole operation |
US9970286B2 (en) | 2015-01-08 | 2018-05-15 | Sensor Developments As | Method and apparatus for permanent measurement of wellbore formation pressure from an in-situ cemented location |
WO2016111629A1 (en) | 2015-01-08 | 2016-07-14 | Sensor Developments As | Method and apparatus for permanent measurement of wellbore formation pressure from an in-situ cemented location |
WO2017160305A1 (en) | 2016-03-18 | 2017-09-21 | Schlumberger Technology Corporation | Along tool string deployed sensors |
GB2550869B (en) | 2016-05-26 | 2019-08-14 | Metrol Tech Ltd | Apparatuses and methods for sensing temperature along a wellbore using resistive elements |
GB2550866B (en) | 2016-05-26 | 2019-04-17 | Metrol Tech Ltd | Apparatuses and methods for sensing temperature along a wellbore using semiconductor elements |
GB2550867B (en) | 2016-05-26 | 2019-04-03 | Metrol Tech Ltd | Apparatuses and methods for sensing temperature along a wellbore using temperature sensor modules connected by a matrix |
GB2550868B (en) | 2016-05-26 | 2019-02-06 | Metrol Tech Ltd | Apparatuses and methods for sensing temperature along a wellbore using temperature sensor modules comprising a crystal oscillator |
US11377937B2 (en) | 2017-04-19 | 2022-07-05 | Halliburton Energy Services, Inc. | System, method, and device for monitoring a parameter downhole |
CA3148433A1 (en) * | 2019-07-22 | 2021-01-28 | Saudi Arabian Oil Company | Methods of determining wellbore integrity |
US11261727B2 (en) | 2020-02-11 | 2022-03-01 | Saudi Arabian Oil Company | Reservoir logging and pressure measurement for multi-reservoir wells |
US11519245B2 (en) | 2020-05-07 | 2022-12-06 | Halliburton Energy Services, Inc. | Well intervention-less control of perforation formation and isolation |
CN112729603A (en) * | 2020-12-25 | 2021-04-30 | 中海石油(中国)有限公司海南分公司 | Discrete multipoint temperature measuring device and measuring method thereof |
US11506048B2 (en) * | 2021-01-21 | 2022-11-22 | Halliburton Energy Services, Inc. | Perforating gun assembly for use within a borehole |
Family Cites Families (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4480690A (en) * | 1981-02-17 | 1984-11-06 | Geo Vann, Inc. | Accelerated downhole pressure testing |
GB9021253D0 (en) * | 1990-09-29 | 1990-11-14 | Metrol Tech Ltd | Method of and apparatus for the transmission of data via a sonic signal |
US5551344A (en) * | 1992-11-10 | 1996-09-03 | Schlumberger Technology Corporation | Method and apparatus for overbalanced perforating and fracturing in a borehole |
GB2296924B (en) * | 1993-10-07 | 1997-04-23 | Conoco Inc | Method and apparatus for downhole activated wellbore completion |
FR2712626B1 (en) * | 1993-11-17 | 1996-01-05 | Schlumberger Services Petrol | Method and device for monitoring and controlling land formations constituting a reservoir of fluids. |
GB2325479B (en) * | 1997-05-24 | 1999-11-24 | Sofitech Nv | Plug placement method |
US6766854B2 (en) * | 1997-06-02 | 2004-07-27 | Schlumberger Technology Corporation | Well-bore sensor apparatus and method |
US6148916A (en) * | 1998-10-30 | 2000-11-21 | Baker Hughes Incorporated | Apparatus for releasing, then firing perforating guns |
US6325146B1 (en) * | 1999-03-31 | 2001-12-04 | Halliburton Energy Services, Inc. | Methods of downhole testing subterranean formations and associated apparatus therefor |
US6173772B1 (en) * | 1999-04-22 | 2001-01-16 | Schlumberger Technology Corporation | Controlling multiple downhole tools |
US6386288B1 (en) * | 1999-04-27 | 2002-05-14 | Marathon Oil Company | Casing conveyed perforating process and apparatus |
US7287589B2 (en) * | 2000-03-02 | 2007-10-30 | Schlumberger Technology Corporation | Well treatment system and method |
GB2366578B (en) * | 2000-09-09 | 2002-11-06 | Schlumberger Holdings | A method and system for cement lining a wellbore |
US6820693B2 (en) * | 2001-11-28 | 2004-11-23 | Halliburton Energy Services, Inc. | Electromagnetic telemetry actuated firing system for well perforating gun |
US6834233B2 (en) * | 2002-02-08 | 2004-12-21 | University Of Houston | System and method for stress and stability related measurements in boreholes |
US7152676B2 (en) * | 2002-10-18 | 2006-12-26 | Schlumberger Technology Corporation | Techniques and systems associated with perforation and the installation of downhole tools |
US6837310B2 (en) * | 2002-12-03 | 2005-01-04 | Schlumberger Technology Corporation | Intelligent perforating well system and method |
GB2406870B (en) * | 2002-12-03 | 2006-04-12 | Schlumberger Holdings | Intelligent well perforating systems and methods |
GB2398805B (en) * | 2003-02-27 | 2006-08-02 | Sensor Highway Ltd | Use of sensors with well test equipment |
US7213648B2 (en) * | 2004-03-30 | 2007-05-08 | Kirby Hayes Incorporated | Pressure-actuated perforation with continuous removal of debris |
US7325612B2 (en) * | 2005-04-28 | 2008-02-05 | Schlumberger Technology Corporation | One-trip cut-to-release apparatus and method |
-
2006
- 2006-11-02 AT AT06827430T patent/ATE489535T1/en not_active IP Right Cessation
- 2006-11-02 EP EP06827430A patent/EP1945905B1/en not_active Not-in-force
- 2006-11-02 DE DE602006018508T patent/DE602006018508D1/en active Active
- 2006-11-02 CA CA2627431A patent/CA2627431C/en not_active Expired - Fee Related
- 2006-11-02 WO PCT/US2006/042924 patent/WO2007056121A1/en active Application Filing
- 2006-11-02 US US11/555,985 patent/US20070193740A1/en not_active Abandoned
- 2006-11-02 BR BRPI0618246-1A patent/BRPI0618246A2/en not_active Application Discontinuation
- 2006-11-02 CN CNA2006800407878A patent/CN101300402A/en active Pending
- 2006-11-02 AU AU2006311880A patent/AU2006311880B2/en not_active Ceased
- 2006-11-02 EA EA200801260A patent/EA200801260A1/en unknown
-
2008
- 2008-06-03 NO NO20082490A patent/NO20082490L/en not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
WO2007056121A1 (en) | 2007-05-18 |
NO20082490L (en) | 2008-08-04 |
CA2627431A1 (en) | 2007-05-18 |
EP1945905A1 (en) | 2008-07-23 |
EP1945905B1 (en) | 2010-11-24 |
EA200801260A1 (en) | 2009-02-27 |
CN101300402A (en) | 2008-11-05 |
ATE489535T1 (en) | 2010-12-15 |
AU2006311880A1 (en) | 2007-05-18 |
US20070193740A1 (en) | 2007-08-23 |
AU2006311880B2 (en) | 2010-06-03 |
BRPI0618246A2 (en) | 2011-08-23 |
DE602006018508D1 (en) | 2011-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2627431C (en) | Monitoring formation properties | |
US11680454B2 (en) | Method of plugging and pressure testing a well | |
EP1335105B1 (en) | A method for collecting geological data | |
CA3003709C (en) | Bridge plug sensor for bottom-hole measurements | |
CA2841040A1 (en) | System and method for performing wellbore stimulation operations | |
US20140014331A1 (en) | Method and tool for evaluating a geological formation | |
CN106062312A (en) | Method and apparatus for reservoir testing and monitoring | |
US20080230221A1 (en) | Methods and systems for monitoring near-wellbore and far-field reservoir properties using formation-embedded pressure sensors | |
Quint et al. | From liability to cost effective data gathering opportunity | |
WO2011012838A2 (en) | Measurement apparatus | |
Denney | 4D-Pressure Pilot Determines Well Spacing in Tight Gas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EEER | Examination request | ||
MKLA | Lapsed |
Effective date: 20191104 |