BR112014017652A8 - Método para estimar um tempo de irrupção do fluido injetado em um poço de produção, e, dispositivos portador não transitório e portador de programa - Google Patents
Método para estimar um tempo de irrupção do fluido injetado em um poço de produção, e, dispositivos portador não transitório e portador de programaInfo
- Publication number
- BR112014017652A8 BR112014017652A8 BR112014017652A BR112014017652A BR112014017652A8 BR 112014017652 A8 BR112014017652 A8 BR 112014017652A8 BR 112014017652 A BR112014017652 A BR 112014017652A BR 112014017652 A BR112014017652 A BR 112014017652A BR 112014017652 A8 BR112014017652 A8 BR 112014017652A8
- Authority
- BR
- Brazil
- Prior art keywords
- estimate
- production well
- irrupt
- injected fluid
- time
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/40—Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Solid-Sorbent Or Filter-Aiding Compositions (AREA)
- Compounds Of Alkaline-Earth Elements, Aluminum Or Rare-Earth Metals (AREA)
Abstract
MÉTODO PARA ESTIMAR UM TEMPO DE IRRUPÇÃO DO FLUIDO INJETADO EM UM POÇO DE PRODUÇÃO, E, DISPOSITIVOS PORTADOR NÃO TRANSITÓRIO E PORTADOR DE PROGRAMA. São descritos sistemas e métodos para estimar tempos de irrupção do fluido injetado nos locais dos poços de produção com base em simulação de propagação de fluido.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2012/024656 WO2013119248A2 (en) | 2012-02-10 | 2012-02-10 | Systems and methods for estimating fluid breakthrough times at producing well locations |
Publications (2)
Publication Number | Publication Date |
---|---|
BR112014017652A2 BR112014017652A2 (pt) | 2017-06-20 |
BR112014017652A8 true BR112014017652A8 (pt) | 2017-07-11 |
Family
ID=48948146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112014017652A BR112014017652A8 (pt) | 2012-02-10 | 2012-02-10 | Método para estimar um tempo de irrupção do fluido injetado em um poço de produção, e, dispositivos portador não transitório e portador de programa |
Country Status (10)
Country | Link |
---|---|
US (1) | US20150039276A1 (pt) |
EP (1) | EP2795528A4 (pt) |
CN (1) | CN104067290A (pt) |
AR (1) | AR089973A1 (pt) |
AU (1) | AU2012369161B2 (pt) |
BR (1) | BR112014017652A8 (pt) |
CA (1) | CA2863156A1 (pt) |
MX (1) | MX2014008897A (pt) |
RU (1) | RU2590265C2 (pt) |
WO (1) | WO2013119248A2 (pt) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105829644A (zh) * | 2014-01-24 | 2016-08-03 | 兰德马克绘图国际公司 | 含水层附近的开采井的优化酸化 |
US10191182B2 (en) | 2015-12-01 | 2019-01-29 | Saudi Arabian Oil Company | Accuracy of water break-through time prediction |
US11461512B2 (en) | 2017-01-26 | 2022-10-04 | Dassault Systemes Simulia Corp. | Multi-phase flow visualizations based on fluid occupation time |
US11714040B2 (en) | 2018-01-10 | 2023-08-01 | Dassault Systemes Simulia Corp. | Determining fluid flow characteristics of porous mediums |
US10519768B2 (en) * | 2018-02-21 | 2019-12-31 | Saudi Arabian Oil Company | Systems and methods for operating hydrocarbon wells to inhibit breakthrough based on reservoir saturation |
US11530598B2 (en) | 2018-08-21 | 2022-12-20 | Dassault Systemes Simulia Corp. | Determination of oil removed by gas via miscible displacement in reservoir rock |
CN109902329B (zh) * | 2018-09-21 | 2023-06-02 | 长江大学 | 一种油藏模拟辅助历史拟合方法、系统、存储介质及设备 |
US10983233B2 (en) | 2019-03-12 | 2021-04-20 | Saudi Arabian Oil Company | Method for dynamic calibration and simultaneous closed-loop inversion of simulation models of fractured reservoirs |
WO2020242455A1 (en) * | 2019-05-28 | 2020-12-03 | Schlumberger Technology Corporation | Streamline based creation of completion design |
US11847391B2 (en) | 2020-06-29 | 2023-12-19 | Dassault Systemes Simulia Corp. | Computer system for simulating physical processes using surface algorithm |
US12189072B2 (en) | 2020-10-05 | 2025-01-07 | Saudi Arabian Oil Company | System and method to identify high-impact discrete fracture model realizations for accelerated calibration of reservoir simulation models |
US11907625B2 (en) | 2020-12-29 | 2024-02-20 | Dassault Systemes Americas Corp. | Computer simulation of multi-phase and multi-component fluid flows including physics of under-resolved porous structures |
CN117722164B (zh) * | 2024-02-18 | 2024-04-16 | 西南石油大学 | 一种有水气藏均匀水侵控制方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2842321B1 (fr) * | 2002-07-11 | 2008-12-05 | Inst Francais Du Petrole | Methode pour contraindre un champ de permeabilite heterogene representant un reservoir souterrain par des donnees dynamiques |
EP1611508A4 (en) | 2003-03-26 | 2006-07-26 | Exxonmobil Upstream Res Co | PERFORMANCE FORECAST OF HYDROCARBON RECOVERY PROCESS |
US20080167849A1 (en) * | 2004-06-07 | 2008-07-10 | Brigham Young University | Reservoir Simulation |
MX2010006240A (es) * | 2007-12-07 | 2010-06-30 | Landmark Graphics Corp | Sistemas y metodos para utilizar resultados de simulacion de flujo a base de celda para calcular trayectorias de linea de corriente. |
US20100312535A1 (en) * | 2009-06-08 | 2010-12-09 | Chevron U.S.A. Inc. | Upscaling of flow and transport parameters for simulation of fluid flow in subsurface reservoirs |
US8775142B2 (en) * | 2010-05-14 | 2014-07-08 | Conocophillips Company | Stochastic downscaling algorithm and applications to geological model downscaling |
US8646525B2 (en) * | 2010-05-26 | 2014-02-11 | Chevron U.S.A. Inc. | System and method for enhancing oil recovery from a subterranean reservoir |
-
2012
- 2012-02-10 CN CN201280068076.7A patent/CN104067290A/zh active Pending
- 2012-02-10 BR BR112014017652A patent/BR112014017652A8/pt not_active IP Right Cessation
- 2012-02-10 AU AU2012369161A patent/AU2012369161B2/en not_active Ceased
- 2012-02-10 CA CA2863156A patent/CA2863156A1/en not_active Abandoned
- 2012-02-10 EP EP12868041.0A patent/EP2795528A4/en not_active Withdrawn
- 2012-02-10 MX MX2014008897A patent/MX2014008897A/es active IP Right Grant
- 2012-02-10 RU RU2014130786/03A patent/RU2590265C2/ru not_active IP Right Cessation
- 2012-02-10 US US14/377,800 patent/US20150039276A1/en not_active Abandoned
- 2012-02-10 WO PCT/US2012/024656 patent/WO2013119248A2/en active Application Filing
-
2013
- 2013-02-08 AR ARP130100432A patent/AR089973A1/es unknown
Also Published As
Publication number | Publication date |
---|---|
CN104067290A (zh) | 2014-09-24 |
RU2014130786A (ru) | 2016-04-10 |
AU2012369161A1 (en) | 2014-07-24 |
BR112014017652A2 (pt) | 2017-06-20 |
MX2014008897A (es) | 2014-09-22 |
AU2012369161B2 (en) | 2015-05-28 |
RU2590265C2 (ru) | 2016-07-10 |
WO2013119248A3 (en) | 2014-04-17 |
US20150039276A1 (en) | 2015-02-05 |
AR089973A1 (es) | 2014-10-01 |
EP2795528A2 (en) | 2014-10-29 |
EP2795528A4 (en) | 2016-06-29 |
CA2863156A1 (en) | 2013-08-15 |
WO2013119248A2 (en) | 2013-08-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112014017652A8 (pt) | Método para estimar um tempo de irrupção do fluido injetado em um poço de produção, e, dispositivos portador não transitório e portador de programa | |
MX347822B (es) | Representación geométrica de planos de fractura. | |
EA201691406A1 (ru) | Определение компоненты волнового поля | |
PH12016500510B1 (en) | Determination of a display angle of a display | |
MX2018009876A (es) | Encapsulamiento y desencapsulamiento de medios. | |
BR112016006470A2 (pt) | método para predizer um risco durante operações de perfuração de um poço, e, dispositivo portador de programa não transitório | |
BR112016006621A2 (pt) | método para gerenciar um risco predeterminado durante as operações de perfuração de um poço e dispositivo transportador de programa não transitório tangível | |
EP2953457A4 (en) | ERK INHIBITOR AND USES THEREOF | |
EP3674516A3 (en) | Flooding analysis tool and method thereof | |
EA201170472A1 (ru) | Реализованные посредством компьютера системы и способы для использования при моделировании геомеханической системы коллектора | |
GB201217271D0 (en) | Traffic sensor management | |
AR090762A1 (es) | Sistemas y metodos para tratar las formaciones subsuperficiales que contienen fracturas | |
UY34559A (es) | Inhibidores de bromodominios | |
EP2876119A4 (en) | GEL, LEAKAGE SEALING METHOD THEREFOR AND DRILLING TOTE PUMPING PROCESS THEREWITH | |
EA201690256A1 (ru) | Система и способ планирования площадки для транспортных средств | |
MX376265B (es) | Automatizacion de la perforacion utilizando control optimo estocastico. | |
BR112013026513A2 (pt) | método para a caracterização de fratura hidráulica usando dados microssísmicos e dispositivo portador de programa não transitório | |
MX2015005627A (es) | Sistemas y metodos para conversion de profundidad de datos sismicos 3d utlizando redes neuronales artificiales. | |
BR112013013422A2 (pt) | método para reduzir o tempo de execução do modelo do simulador de reservatório, e, dispositivo portador de programa | |
BR112017013667A2 (pt) | aparelho, sistema, e, método para determinação de afastamento. | |
BR112016002519A2 (pt) | método para a calibração de superfície de uma ferramenta de perfilagem de poço, sistema, e, produto de programa de computador | |
GB2538370A (en) | Designing wellbore completion intervals | |
EA201201285A1 (ru) | Системы и способы для определения местоположения горизонтальных скважин в пределах заданных границ | |
UY34335A (es) | ?dispositivos, sistemas, y métodos para procesar materiales heterogéneos?. | |
BR112015028553A2 (pt) | método para exibir poços e seu estado respectivo em um mapa eletrônico e dispositivo transportador de programa não transitório |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] | ||
B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |