BR0316168A - Método para estender uma plataforma de calado extensìvel para produção de óleo e gás fora-da-costa - Google Patents
Método para estender uma plataforma de calado extensìvel para produção de óleo e gás fora-da-costaInfo
- Publication number
- BR0316168A BR0316168A BR0316168-4A BR0316168A BR0316168A BR 0316168 A BR0316168 A BR 0316168A BR 0316168 A BR0316168 A BR 0316168A BR 0316168 A BR0316168 A BR 0316168A
- Authority
- BR
- Brazil
- Prior art keywords
- deck
- pontoon
- chains
- extending
- gas production
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B77/00—Transporting or installing offshore structures on site using buoyancy forces, e.g. using semi-submersible barges, ballasting the structure or transporting of oil-and-gas platforms
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/06—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for immobilising, e.g. using wedges or clamping rings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/08—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
- E02B17/0836—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks
- E02B17/0863—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks with rack and pawl mechanism
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Architecture (AREA)
- Transportation (AREA)
- Bridges Or Land Bridges (AREA)
- Cleaning Or Clearing Of The Surface Of Open Water (AREA)
Abstract
"MéTODO PARA ESTENDER UMA PLATAFORMA DE CALADO EXTENSìVEL PARA PRODUçãO DE óLEO E GáS FORA-DA-COSTA". Extensão de uma plataforma de produção de óleo e gás fora-da-costa compreende colocar um convés de equipamento flutuante sobre um pontão de modo que as pernas alongadas sobre o pontão, cada uma compreendendo uma bóia, se estenda movelmente através das respectivas aberturas no convés. Correntes se estendendo dos guinchos sobre o convés são passadas através de ponteiras sobre o pontão e conectadas de volta ao convés. As correntes são estiadas ara prender o convés à pontão para movimentação conjunta para um local fora-da-costa. As correntes são afrouxadas e o pontão e as bóias de pernas lastreados de modo que o pontão e as bóias de pernas afundem abaixo do convés flutuante. As correntes são, então, reapertadas até que ling³etas sobre as bóias de pernas encaixem o convés. A flutuação de pelo menos um do pontão e bóias de pernas é aumentada de modo que o convés seja, desse modo, elevado acima da superfície da água. As correntes são conectadas às linhas de amarração ao redor de um local de poço fora-da-costa, e o convés elevado e o pontão submersa são mantidos em uma posição selecionada sobre o local com os guinchos.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/292,310 US6718901B1 (en) | 2002-11-12 | 2002-11-12 | Offshore deployment of extendable draft platforms |
PCT/IB2003/005036 WO2004043776A1 (en) | 2002-11-12 | 2003-11-05 | Offshore deployment of extendable draft platforms |
Publications (1)
Publication Number | Publication Date |
---|---|
BR0316168A true BR0316168A (pt) | 2005-09-27 |
Family
ID=32042992
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI0316168 BRPI0316168B1 (pt) | 2002-11-12 | 2003-11-05 | Método para estender uma plataforma de calado extensível para produção de óleo e gás fora-da-costa |
BR0316168-4A BR0316168A (pt) | 2002-11-12 | 2003-11-05 | Método para estender uma plataforma de calado extensìvel para produção de óleo e gás fora-da-costa |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BRPI0316168 BRPI0316168B1 (pt) | 2002-11-12 | 2003-11-05 | Método para estender uma plataforma de calado extensível para produção de óleo e gás fora-da-costa |
Country Status (7)
Country | Link |
---|---|
US (1) | US6718901B1 (pt) |
EP (1) | EP1560748B1 (pt) |
AU (1) | AU2003274625A1 (pt) |
BR (2) | BRPI0316168B1 (pt) |
DK (1) | DK1560748T3 (pt) |
OA (1) | OA13085A (pt) |
WO (1) | WO2004043776A1 (pt) |
Families Citing this family (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4283085B2 (ja) * | 2003-01-09 | 2009-06-24 | 寄神建設株式会社 | レベル自動調整式浮体装置 |
US6899492B1 (en) * | 2003-05-05 | 2005-05-31 | Nagan Srinivasan | Jacket frame floating structures with buoyancy capsules |
US6932326B1 (en) * | 2003-06-13 | 2005-08-23 | Richard L. Krabbendam | Method for lifting and transporting a heavy load using a fly-jib |
US7037044B2 (en) * | 2003-10-15 | 2006-05-02 | Technip France | Deck-to-column connection for extendable draft platform |
US7293939B2 (en) * | 2004-02-10 | 2007-11-13 | Phillip Andrew Abbott | Inclined leg floating production platform with a damper plate |
US6945737B1 (en) * | 2004-02-27 | 2005-09-20 | Technip France | Single column extendable draft offshore platform |
US7467912B2 (en) * | 2004-09-30 | 2008-12-23 | Technip France | Extendable draft platform with buoyancy column strakes |
US20070224000A1 (en) * | 2006-03-21 | 2007-09-27 | Mills Trevor R | Deep draft semi-submersible offshore floating structure |
US7575397B2 (en) * | 2006-08-14 | 2009-08-18 | Sergey Sharapov | Floating platform with non-uniformly distributed load and method of construction thereof |
ITMI20072112A1 (it) * | 2007-11-02 | 2009-05-03 | Insulae Natantes Srl | Modulo ad assetto variabile per la realizzazione di piattaforme galleggianti o semigalleggianti. |
US7854570B2 (en) * | 2008-05-08 | 2010-12-21 | Seahorse Equipment Corporation | Pontoonless tension leg platform |
FR2934635B1 (fr) | 2008-07-29 | 2010-08-13 | Technip France | Installation de conduite montante flexible de transport d'hydrocarbures pour grande profondeur |
DE102009055773B4 (de) * | 2009-11-25 | 2015-05-28 | Uwe von Briel | Vorrichtung zum Homogenisieren von in einer Güllegrube befindlicher Gülle |
US9086057B2 (en) * | 2010-01-21 | 2015-07-21 | The Abell Foundation, Inc. | Ocean thermal energy conversion cold water pipe |
EP4273372A3 (en) | 2010-01-21 | 2024-01-24 | The Abell Foundation Inc. | Ocean thermal energy conversion power plant |
US8899043B2 (en) * | 2010-01-21 | 2014-12-02 | The Abell Foundation, Inc. | Ocean thermal energy conversion plant |
CN101857072B (zh) * | 2010-06-09 | 2012-09-26 | 中国海洋石油总公司 | 无条件稳性整装型深吃水浮式采油平台及其海上安装方法 |
US9032896B2 (en) | 2010-06-09 | 2015-05-19 | China National Offshore Oil Corporation | Grouting and welding combined connection joint applied to a deepwater floating type platform and an offshore installation method thereof |
US8757081B2 (en) | 2010-11-09 | 2014-06-24 | Technip France | Semi-submersible floating structure for vortex-induced motion performance |
US8430050B2 (en) | 2011-02-24 | 2013-04-30 | Technip France | System and method for deck-to-column connection for extendable draft offshore platforms |
US8757082B2 (en) | 2011-07-01 | 2014-06-24 | Seahorse Equipment Corp | Offshore platform with outset columns |
US8707882B2 (en) | 2011-07-01 | 2014-04-29 | Seahorse Equipment Corp | Offshore platform with outset columns |
US9151279B2 (en) | 2011-08-15 | 2015-10-06 | The Abell Foundation, Inc. | Ocean thermal energy conversion power plant cold water pipe connection |
CN102616344A (zh) * | 2012-03-22 | 2012-08-01 | 中国海洋石油总公司 | 一种深吃水桁架式浮式平台 |
US8967068B2 (en) | 2012-06-27 | 2015-03-03 | Technip France | Floating offshore platform and centralized open keel plate |
EP3591327B1 (en) | 2012-10-16 | 2021-12-08 | The Abell Foundation Inc. | Heat exchanger including manifold |
US9302747B2 (en) | 2013-04-10 | 2016-04-05 | Technip France | Floating offshore platform with pontoon-coupled extension plates for reduced heave motion |
WO2016114820A1 (en) * | 2015-01-12 | 2016-07-21 | Bp Corporation North America Inc. | Floating deep draft semi-submersible offshore platforms and methods for assembling and deploying same |
ES2683779B1 (es) * | 2015-09-24 | 2019-07-02 | Obrascon Huarte Lain S A | Pontona sumergible y procedimiento de funcionamiento |
CN109823484A (zh) * | 2019-01-18 | 2019-05-31 | 中国海洋石油集团有限公司 | 一种抑制平台垂荡运动的浮箱结构 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1473781A (en) * | 1976-01-22 | 1977-05-18 | Downs G | Construction and installation of semi-submersible platform structures for use in connection with underwater drilling and working of oil and gas wells |
BE887576A (fr) * | 1981-02-19 | 1981-08-19 | Ocean Drilling Exploration | Methode de construction d'une structure marine de grande dimension |
FR2581020A1 (fr) * | 1985-04-24 | 1986-10-31 | Marion Henri Albert | Procede de transport et de transfert d'une charge constituee d'un equipement complet d'un pont de plate-forme marine et moyens pour la mise en oeuvre du procede |
NO882421L (no) * | 1988-06-02 | 1989-12-04 | Per Herbert Kristensen | Flytekonstruksjon. |
FR2737179B1 (fr) | 1995-07-26 | 1997-10-17 | Technip Geoproduction | Plate-forme d'exploitation petroliere en mer |
DK0942102T3 (da) | 1998-03-11 | 2005-01-10 | Technip France | Selvlöftende platform med nedsænket reservoir og fremgangsmåde til anbringelse og ophejsning af reservoiret |
DE29823737U1 (de) * | 1998-12-23 | 1999-09-30 | Siemens AG, 80333 München | Halbeintauchbarer Schwergutfrachter |
CN1437543A (zh) * | 2000-03-02 | 2003-08-20 | 劳动承包公司 | 可潜入水中的提升重物的双体船 |
US6524032B2 (en) | 2000-10-10 | 2003-02-25 | Cso Aker Maritime, Inc. | High capacity nonconcentric structural connectors and method of use |
-
2002
- 2002-11-12 US US10/292,310 patent/US6718901B1/en not_active Expired - Lifetime
-
2003
- 2003-11-05 BR BRPI0316168 patent/BRPI0316168B1/pt unknown
- 2003-11-05 DK DK03758599T patent/DK1560748T3/da active
- 2003-11-05 AU AU2003274625A patent/AU2003274625A1/en not_active Abandoned
- 2003-11-05 EP EP03758599A patent/EP1560748B1/en not_active Expired - Lifetime
- 2003-11-05 BR BR0316168-4A patent/BR0316168A/pt not_active IP Right Cessation
- 2003-11-05 OA OA1200500142A patent/OA13085A/en unknown
- 2003-11-05 WO PCT/IB2003/005036 patent/WO2004043776A1/en active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
EP1560748A1 (en) | 2005-08-10 |
EP1560748B1 (en) | 2006-11-08 |
US6718901B1 (en) | 2004-04-13 |
AU2003274625A1 (en) | 2004-06-03 |
BRPI0316168B1 (pt) | 2015-05-12 |
DK1560748T3 (da) | 2007-02-26 |
WO2004043776A1 (en) | 2004-05-27 |
OA13085A (en) | 2006-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR0316168A (pt) | Método para estender uma plataforma de calado extensìvel para produção de óleo e gás fora-da-costa | |
BR0114579A (pt) | Plataforma flutuante de perfuração e produção em alto mar, e, método para instalar, em local de perfuração e produção em águas profundas, uma plataforma flutuante com supressão de balouço | |
DE3767484D1 (de) | Schwimmendes kraftwerk fuer meere und fluesse. | |
BR0110788B1 (pt) | método para instalar uma estrutura offshore. | |
ATE492723T1 (de) | Unterwasser-wasserströmungsturbine | |
BRPI0408057A (pt) | método para ancorar um perfurador flutuante de hidrocarboneto ou uma embarcação flutuante a uma pluralidade de tendões, método para instalação de uma embarcação costeira flutuante, disposição para instalação de uma embarcação costeira flutuante e método de instalação de tendão | |
GB1459706A (en) | Floating structures | |
AR008225A1 (es) | Plataforma con patas de tension | |
MY126947A (en) | Extended-base tension leg platform substructure. | |
ATE265611T1 (de) | Gefesseltes schwimmfähiges auflager für steigrohre zu einem schwimmenden wasserfahrzeug | |
BRPI0919570B1 (pt) | estrutura de offshore semissubmersível | |
SE8303346L (sv) | Borrningsplattform | |
BR9806733A (pt) | Construção de casco para embarcação de um único casco, e, utilização da mesma. | |
BRPI0400027A (pt) | Processo e disposição para instalação e remoção de objetos no mar | |
BR9901436A (pt) | Processo e aparelho para a montagem de um estrutura de offshore flutuante. | |
ATE138711T1 (de) | Meeresbauwerk | |
GB1473781A (en) | Construction and installation of semi-submersible platform structures for use in connection with underwater drilling and working of oil and gas wells | |
SE8302157L (sv) | Offshorekonstruktion | |
SE8703132D0 (sv) | Forsterkningselement vid farkoster for off-shorearbeten | |
BR0102602A (pt) | Métodos de instalar plataformas fora da costa | |
BR0111822B1 (pt) | plataforma flutuante para perfuração ou produção de hidrocarbonetos em alto-mar. | |
SU1178838A1 (ru) | Опорна колонна самоподъемной плавучей установки | |
Chakrabarti et al. | Role of physical simulation of deepwater floating offshore structures | |
RU98102427A (ru) | Способ перемещения морской платформы | |
WO2001062583A3 (en) | Method and apparatus for increasing floating platform buoyancy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06A | Notification to applicant to reply to the report for non-patentability or inadequacy of the application [chapter 6.1 patent gazette] | ||
B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
B16A | Patent or certificate of addition of invention granted |
Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 12/05/2015, OBSERVADAS AS CONDICOES LEGAIS. |
|
B21F | Lapse acc. art. 78, item iv - on non-payment of the annual fees in time | ||
B24J | Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12) |