[go: up one dir, main page]

BE901756A - Method of forming closed concrete wall - involves using contractible internal shuttering with removable wedge bars - Google Patents

Method of forming closed concrete wall - involves using contractible internal shuttering with removable wedge bars Download PDF

Info

Publication number
BE901756A
BE901756A BE6/48061A BE6048061A BE901756A BE 901756 A BE901756 A BE 901756A BE 6/48061 A BE6/48061 A BE 6/48061A BE 6048061 A BE6048061 A BE 6048061A BE 901756 A BE901756 A BE 901756A
Authority
BE
Belgium
Prior art keywords
corner
formwork
guide
fixed
wedge
Prior art date
Application number
BE6/48061A
Other languages
French (fr)
Original Assignee
Lee Yuan Ho
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to GB08431545A priority Critical patent/GB2168411B/en
Priority claimed from GB08431545A external-priority patent/GB2168411B/en
Priority to US06/681,778 priority patent/US4679762A/en
Priority to DE19853501125 priority patent/DE3501125A1/en
Priority to SE8500228A priority patent/SE455210B/en
Priority to FR8502051A priority patent/FR2577263A1/en
Priority to CA000474196A priority patent/CA1235921A/en
Priority to CH666/85A priority patent/CH663443A5/en
Application filed by Lee Yuan Ho filed Critical Lee Yuan Ho
Priority to BE6/48061A priority patent/BE901756A/en
Publication of BE901756A publication Critical patent/BE901756A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/082Retractable forms for the inside face of at least three walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The method of making a multiple faced concrete wall involves positioning internal and external shuttering panels for moulding the concrete. The shuttering panels are then withdrawn without disassembling them. - At least one corner bar separates one face of the internal shuttering wall into two sections. The corner bar is inserted between the two sections during setting of the concrete. The bar is then moved in a second direction, opposite to the first, after setting. The two sections are then moved together so that the internal shuttering can be contracted and withdrawn.(0/20)

Description

       

  "Procédé pour la fabrication d'une paroi en béton verticale à plusieurs faces et agencement pour la réalisation du procédé". 

  
La présente invention est relative à un procédé pour la fabrication d'une paroi en béton verticale à plusieurs faces ainsi qu'à un agencement pour la réalisation du procédé et concerne particulièrement un coffrage pour un bâtiment, qui peut être enlevé et éloigné d'une construction en béton coulée sans démonter l'une par rapport à l'autre les plaques de coffrage et ainsi être disposé à un autre endroit pour la prochaine coulée.

  
L'érection d'un coffrage pour la construction d'un bâtiment réclame beaucoup de temps et de travail. Pour ériger un bâtiment de manière économique divers procédés ont été créés pour la réalisation de plaques de coffrage pour un coffrage qui ne requiert aucun désassemblage des plaques de coffrage, lorsqu'il est retiré de la construction coulée, et qui peut être transféré globalement, au moyen d'un dispositif de levage entre autres, en un autre endroit pour la prochaine coulée.

  
Dans un procédé type pour la fabrication d'un bâtiment d'habitation les coffrages interne et externe sont disposés de telle manière que le plafond et les deux parois latérales d'un local d'habitation soient coulés simultanément. Dans une telle disposition le coffrage ne peut être enlevé que lorsque la construction coulée est durcie, pour empêcher des dégâts aux surfaces du béton coulé, car le coffrage interne des faces internes du plafond et des parois doit être retiré dans une direction horizontale. De plus, le coffrage interne ne peut pas être enlevé de la construction coulée et être transféré tout d'une pièce pour un montage à un autre endroit.

  
Un but de la présente invention est de créer un coffrage interne, qui peut être utilisé pour couler une paroi verticale à plusieurs faces d'un bâtiment, et cela avec un agencement pour retirer tout le coffrage de la paroi coulée suivant lequel le déroulement de l'opération est simplifié et nécessite moins de temps.

  
Ce but est atteint suivant l'invention du fait qu'est prévu un agencement pour retirer le coffrage interne, qui comprend une paroi moulée verticale à plusieurs faces. L'agencement implique au moins un dispositif à coin divisant la paroi de coffrage en deux sections et qui est inséré entre les deux sections suivant une première direction. Lorsque le dispositif à coin est déplacé dans une seconde direction opposée à la première direction, les deux sections séparées sont amenées l'une vers l'autre, grâce à quoi la distance des sections séparées du coffrage, qui est réglée au moyen du dispositif à coin, est diminuée. De ce fait, le coffrage interne se contracte et est retiré du béton coulé.

  
Dans un exemple de réalisation de l'invention le dispositif à coin comporte deux premiers coins fixés aux sections séparées et un deuxième coin coincé entre les premiers coins dans une première direction. Des orifices de guidage longitudinaux sont en outre prévus dans le deuxième coin et des barres de guidage sont fixées sur les premiers coins. Les barres de guidage fixes s'étendent partiellement dans les orifices de guidage. Lorsque le deuxième coin est déplacé vers le haut, s'effectue le déplacement des orifices de guidage par rapport aux barres de guidage, de telle manière que le deuxième coin se déplace dans une seconde di-rection, grâce à quoi le coffrage interne est contracté.

  
Dans une autre forme de réalisation de l'invention le dispositif à coin comporte un coin coincé entre les deux sections séparées et dans lequel est disposé un arbre horizontal sur lequel sont fixés des roues hélicoïdales, qui viennent en prise avec des crémaillères prévues dans les premiers coins. Lorsque l'arbre est mis en rotation, le coin est déplacé dans la seconde direction.

  
Des réalisations avantageuses de l'invention sont représentées aux dessins et sont décrites ci-après. Ils montrent en :

  
Figure 1 une vue schématique d'un coffrage interne à quatre faces pour l'élaboration d'une paroi en béton à quatre faces avec un dispositif à coin ; Figure 2 une vue schématique, dans laquelle le coin est retiré vers le haut hors du coffrage ; Figure 3 une vue schématique, dans laquelle les coins sont tirés vers l'extérieur et le coffrage interne est retiré de la paroi en béton coulée ; Figure 4 un agencement de détail du coffrage interne et du coffrage externe ; Figure 5 une vue partielle du dispositif à coin avec orifices de guidage et barres de guidage ; Figure 6 la position des barres de guidage par rapport aux orifices de guidage avant que le deuxième coin ne soit retiré vers le haut ; Figure 7 la position des barres de guidage par rapport aux orifices de guidage, lorsque le deuxième coin est tiré vers le haut ;

   Figure 8 une vue en coupe du deuxième coin déplacé vers l'extérieur ; Figure 9 une vue d'un dispositif pour coincer le deuxième coin entre les premiers coins ; Figure 10 une vue d'un cylindre hydraulique utilisé pour le déplacement du deuxième coin vers le haut ; Figure 11 une vue en coupe du coin pourvu de roues hélicoïdales et de crémaillères ; Figure 12 une vue en coupe du coin représenté en figure 11, vu de côté ; Figure 13 une vue en coupe le long de la ligne
13-13 de la figure 11 ; Figure 14 une vue en plan partielle de la figure 11 après l'éloignement de la plaque de guidage ; Figure 15 une vue d'un coin, dont la section inférieure est biseautée ; Figure 16 une vue du coin de la figure 15 après le retrait vers le haut ; Figure 17 une vue en plan du coffrage interne pourvu du coin de la figure 15 ; Figure 18 une vue partielle d'une plaque de suspension ;

   Figure 19 une vue en plan partielle schématique de la plaque de suspension, et Figure 20 une vue en plan schématique d'un coffrage interne avec plus de quatre faces.

  
Dans les figures 1, 2 et 3 est représentée une paroi 3 fermée à quatre faces à l'intérieur d'un coffrage interne 1 et de quatre coffrages externes 2. Chaque coffrage

  
1, 2 consiste en plusieurs plaques de coffrage. Le coffrage 1 comprend deux paires de parois de coffrage verticales se faisant face, qui renferment chacune un dispositif à coin 4 s'étendant de la face supérieure à la face inférieure du coffrage. Le dispositif à coin 4 est monté dans le coffrage de telle manière que, lorsqu'il est tiré vers le haut comme on le voit en figure 2, un coin dans le dispositif à coin 4 se déplace vers l'extérieur de telle sorte que le coffrage 1 se resserre un peu et se sépare de la face interne de la paroi en béton coulée, comme cela est représenté dans la fi-

  
 <EMI ID=1.1> 

  
levage pour soulever le coffrage 1 d'une pièce vers un autre endroit.

  
Dans la suite la construction est décrite en détail.

  
La figure 4 montre le coffrage interne 1, les coffrages externes 2 et un coffrage de sol 71, qui sont assemblés pour former un sol en béton 73 et une paroi en béton 3 à quatre faces. Le coffrage interne 1 consiste en des plaques de coffrage 10, des cornières 11, des profilés verticaux 12, des poutrelles de renforcement de coffrage 13, etc., et est disposé au-dessus du coffrage formant le sol 71, qui est monté sur des supports 72, mis en place au moyen de goussets coniques 5 et y fixés avec des vis 54.

  
Les coffrages externes 2 sont assemblés par l'utilisation de cornières 21, de profilés verticaux 22 et de poutrelles de renforcement 23. Ils sont reliés au coffrage interne 1 au moyen de plaques d'appui 6, qui sont disposées audessus du coffrage 1. La construction des plaques d'appui est décrite dans la suite. Le coffrage externe 2 peut aussi être relié au coffrage interne 1 au moyen de traverses 8. Les sections inférieures des coffrages 2 sont fixées sur la section inférieure du coffrage 1 au moyen de vis 54 et de pièces en forme de tronc de cône 5. Les pièces 5 sont enlevées de

  
la construction en béton après la coulée et les espaces creux restant sont remplis de béton.

  
Dans les figures 4 et 5 est représenté le dispositif à coin 4, qui est prévu de chaque côté du coffrage interne 1, divise ces côtés en deux coins et maintient ces coins écartés.

  
 <EMI ID=2.1>  deux côtés inclinés, qui sont situés contre les côtés incli-

  
 <EMI ID=3.1> 

  
incliné par rapport à un axe vertical. Chacun des coins 43 est pourvu de barres de guidage 42, qui s'étendent partiel-

  
 <EMI ID=4.1> 

  
manière appropriée sur les sections séparées voisines du coffrage au moyen de vis 431. Les barres de guidage 42, qui s'étendent dans des orifices de guidage 411, sont pourvues de coiffes 421 et de vis 422. Ces barres sont insérées dans des trous 434 prévus dans les coins 43 et y fixées au moyen

  
 <EMI ID=5.1> 

  
rapport aux coins 43 car les barres de guidage 42 peuvent coulisser dans les orifices de guidage 411. De plus, sont prévues pour la fixation du coin 41 sur les coins 43 des vis
433.

  
Pour retirer le coffrage interne 1 des faces internes de la paroi en béton 3 (voir figures 6, 7 et 8) est prévu un dispositif de levage avec des crochets 90, qui sont

  
 <EMI ID=6.1> 

  
le haut avant le déplacement de tout le coffrage 1. Simultanément au déplacement vers le haut des coins 41,ces coins
41 sont déplacés vers l'extérieur horizontalement par rapport au dispositif à coin 4 par suite du déplacement des

  
 <EMI ID=7.1> 

  
fait, les coins 43 de chaque dispositif à coin 4 sont déplacés l'un par rapport à l'autre, grâce à quoi il se produit une contraction du coffrage 1 de tous les côtés par suite du déplacement de toutes les sections séparées du coffrage 1, qui sont décalées au moyen du dispositif à coin 4. Par suite de la contraction le coffrage est retiré des faces supérieures de la paroi en béton. Il faut noter que les vis 433 sont éliminées pendant le levage.

  
Lorsque le coffrage 1 est disposé après l'enlèvement hors de la paroi en béton coulée à un autre endroit,

  
 <EMI ID=8.1> 

  
crochet de levage 90 par utilisation d'une chaîne 91, qui est fixée au crochet 413 et s'étend sur une roue à chaîne

  
92. Une chaîne 93 est fixée au crochet 921 de la roue à chaîne 92 et une barre de liaison 94 est fixée à la partie inférieure du coin 43. Lorsque la chaîne 91 est tirée vers le haut, le coin 41 se déplace entre les coins 43.

  
Le coin 41 peut également être déplacé vers le haut par l'utilisation d'un cylindre hydraulique 95, comme cela est représenté dans la figure 10. Le cylindre hydraulique 95 est fixé sur le coin 41 et une tige de piston 96 est fixée sur la barre de liaison 94, prévue à la partie inférieure du coin 43. Lorsque le cylindre hydraulique 95 travaille, le coin 41 est simultanément avec son mouvement vers l'extérieur déplacé vers le haut.

  
Dans les figures 11, 12, 13 et 14 est représenté un autre dispositif pour le retrait du coffrage 1 hors du béton coulé. Ce dispositif comprend un coin 44 coincé

  
entre deux sections séparées du coffrage 1, un arbre vertical
442, sur lequel sont disposées deux vis sans fin 441respectivement à la partie supérieure et à la partie inférieure du coin 44, et deux roues hélicoïdales 45, qui sont disposées chacune sur un arbre horizontal 451 et viennent en prise avec les vis sans fin 441. Chaque arbre 451 est articulé sur deux faces opposées du coin 44 et leurs deux extrémités s'étendent dans les sections séparées du coffrage 1 à travers des ouvertures 434. Aux extrémités projectantes des arbres 451 sont prévues deux roues hélicoïdales 452, qui viennent en prise avec des crémaillères 46 prévues dans le coffrage 1. 

  
De plus, sont prévues dans les faces inclinées partielles

  
 <EMI ID=9.1> 

  
inclinées des sections séparées du coffrage 1 des fentes
431, 432 et 433 pour la réception de vis 435, qui sont utilisées pour la fixation du coin 44 et du coffrage 1, lorsque la partie convergente du coin 44 est avancée vers l'extérieur ou retirée.

  
En outre, est prévue une plaque de guidage 47, qui est fixée sur la face supérieure du coin 44. Deux blocs de guidage 48 de forme rhomboïdale sont fixés sur la face supérieure du coffrage 1 et logés dans des rainures de guidage prévues sur la face inférieure de la plaque de guidage
47.

  
Lorsque l'arbre 442 est commandé par une commande externe, le mouvement de l'arbre 442 est transmis aux roues hélicoïdales 452 qui attaquent à leur tout les crémaillères
46, grâce à quoi le coin 44 est déplacé vers l'extérieur. Pendant le déplacement vers l'extérieur du coin 44 la plaque de guidage 47 rapproche l'un vers l'autre les deux blocs de guidage 48, grâce à quoi est diminuée la distance entre les sections partielles du coffrage 1 et est retiré le coffrage

  
1. Lorsque le coin 44 est inséré dans le coffrage 1, l'arbre
442 est tourné dans une direction opposée à la direction qui déplace le coin 44 vers l'extérieur.

  
Dans les figures 15, 16 et 17 est représenté un autre exemple de réalisation d'un dispositif à coin, qui engendre une contraction du coffrage. Il se différencie du dispositif à coin décrit ci-dessus du fait que le coin est coincé à partir de la face supérieure vers le fond du coffrage 1. Il produit le même effet que le dispositif à coin décrit ci-dessus, lorsque le coin est tiré vers le haut.

  
Les figures 18 et 19 montrent des détails de la plaque d'appui 6, qui a été décrite en se référant à la  <EMI ID=10.1>  est fixé à la face supérieure du coffrage 1, et un longeron
62, qui est fixé à la face supérieure du coffrage 2. Le

  
 <EMI ID=11.1> 

  
carrée et le longeron 62 d'un logement 621 de section carrée et d'un logement 622 de section rectangulaire. Des vis de calage 63 sont prévues pour le logement 621. Lorsque le

  
 <EMI ID=12.1> 

  
les vis de calage 63 sont serrées, le coffrage 2 est suspendu au coffrage 1.

  
Le coffrage interne 1, qui a été décrit jusqu'à présent comme un coffrage à quatre faces, peut en outre également être exécuté comme un coffrage à plusieurs faces, comme cela est représenté dans la figure 20. 

REVENDICATIONS

  
1. Procédé pour la fabrication d'une paroi en béton verticale à plusieurs faces, suivant lequel sont disposées des coffrages interne et externe consistant en plusieurs plaques de coffrage et suivant lequel sont retirées du béton coulé les plaques de coffrage sans les démonter les unes des autres pour les disposer de manière simple à un autre endroit pour la prochaine coulée, avec utilisation d'un agencement pour retirer le coffrage interne à plusieurs faces du béton coulé, caractérisé en ce qu'est prévu au moins un dispositif à coin (4) séparant une face de la paroi de coffrage (1) en deux sections, dispositif qui pendant la coulée est inséré entre les deux sections dans une première direction, en ce qu'est prévu un appareillage pour le déplacement du dispositif à coin (4) après la coulée dans une seconde direction opposée à la première direction,

   grâce à quoi les deux sections sont avancées l'une par rapport à l'autre et le coffrage interne (1) est contracté et retiré du béton.

  
2. Agencement pour la réalisation du procédé suivant



  "Method for manufacturing a vertical concrete wall with several faces and arrangement for carrying out the method".

  
The present invention relates to a method for manufacturing a vertical concrete wall with several faces as well as to an arrangement for carrying out the method and particularly relates to a formwork for a building, which can be removed and removed from a concrete construction poured without dismantling the formwork plates in relation to each other and thus being placed in another place for the next pouring.

  
Erecting a formwork for the construction of a building requires a lot of time and work. To erect a building economically various methods have been created for the production of formwork plates for a formwork which does not require any disassembly of the formwork plates, when it is removed from the cast construction, and which can be transferred globally, to by means of a lifting device, among others, in another place for the next pouring.

  
In a typical process for the manufacture of a residential building, the internal and external formwork are arranged in such a way that the ceiling and the two side walls of a residential premises are poured simultaneously. In such an arrangement the formwork can only be removed when the poured construction is cured, to prevent damage to the surfaces of the poured concrete, since the internal formwork of the internal faces of the ceiling and walls must be removed in a horizontal direction. In addition, the internal formwork cannot be removed from the cast construction and be transferred all in one piece for mounting at another location.

  
An object of the present invention is to create an internal formwork, which can be used for pouring a vertical wall to several faces of a building, and this with an arrangement for removing all the formwork from the poured wall according to which the course of the The operation is simplified and requires less time.

  
This object is achieved according to the invention because there is an arrangement for removing the internal formwork, which comprises a vertical molded wall with several faces. The arrangement involves at least one wedge device dividing the formwork wall into two sections and which is inserted between the two sections in a first direction. When the wedge device is moved in a second direction opposite to the first direction, the two separate sections are brought towards each other, whereby the distance of the separate sections of the formwork, which is adjusted by means of the device to corner, is decreased. As a result, the internal formwork contracts and is removed from the poured concrete.

  
In an exemplary embodiment of the invention, the wedge device comprises two first wedges fixed to the separate sections and a second wedge wedged between the first wedges in a first direction. Longitudinal guide holes are further provided in the second corner and guide bars are fixed on the first corners. The fixed guide bars extend partially into the guide holes. When the second corner is moved upwards, the guide holes are moved relative to the guide bars, so that the second corner moves in a second direction, whereby the internal formwork is contracted .

  
In another embodiment of the invention the wedge device comprises a wedge wedged between the two separate sections and in which is disposed a horizontal shaft on which are fixed helical wheels, which engage with racks provided in the first corners. When the shaft is rotated, the wedge is moved in the second direction.

  
Advantageous embodiments of the invention are shown in the drawings and are described below. They show in:

  
Figure 1 a schematic view of an internal formwork with four faces for the development of a concrete wall with four faces with a wedge device; Figure 2 a schematic view, in which the corner is withdrawn upwards out of the formwork; Figure 3 a schematic view, in which the corners are pulled outward and the internal formwork is removed from the poured concrete wall; Figure 4 a detailed arrangement of the internal formwork and the external formwork; Figure 5 a partial view of the wedge device with guide holes and guide bars; Figure 6 the position of the guide bars relative to the guide holes before the second corner is removed upwards; Figure 7 the position of the guide bars relative to the guide holes, when the second corner is pulled up;

   Figure 8 a sectional view of the second corner moved outward; Figure 9 a view of a device for wedging the second corner between the first corners; Figure 10 a view of a hydraulic cylinder used for moving the second corner up; Figure 11 a sectional view of the corner provided with helical wheels and racks; Figure 12 a sectional view of the corner shown in Figure 11, seen from the side; Figure 13 a sectional view along the line
13-13 of Figure 11; Figure 14 a partial plan view of Figure 11 after moving away from the guide plate; Figure 15 a view of a corner, the lower section of which is bevelled; Figure 16 a view of the corner of Figure 15 after removal up; Figure 17 a plan view of the internal formwork provided with the corner of Figure 15; Figure 18 a partial view of a suspension plate;

   Figure 19 a schematic partial plan view of the suspension plate, and Figure 20 a schematic plan view of an internal formwork with more than four faces.

  
In Figures 1, 2 and 3 is shown a wall 3 closed with four faces inside an internal formwork 1 and four external forms 2. Each formwork

  
1, 2 consists of several formwork plates. The formwork 1 comprises two pairs of vertical formwork walls facing each other, which each contain a wedge device 4 extending from the upper face to the lower face of the formwork. The wedge device 4 is mounted in the formwork so that, when pulled up as seen in Figure 2, a wedge in the wedge device 4 moves outward so that the formwork 1 tightens a little and separates from the internal face of the poured concrete wall, as shown in the figure

  
 <EMI ID = 1.1>

  
lifting to lift the formwork 1 from a part to another place.

  
In the following the construction is described in detail.

  
Figure 4 shows the internal formwork 1, the external formwork 2 and a floor formwork 71, which are assembled to form a concrete floor 73 and a concrete wall 3 with four faces. The internal formwork 1 consists of formwork plates 10, angles 11, vertical profiles 12, formwork reinforcement beams 13, etc., and is arranged above the formwork forming the ground 71, which is mounted on supports 72, put in place by means of conical gussets 5 and fixed to them with screws 54.

  
The external forms 2 are assembled by the use of angles 21, vertical profiles 22 and reinforcement beams 23. They are connected to the internal form 1 by means of support plates 6, which are arranged above the form 1. The construction of the support plates is described below. The external formwork 2 can also be connected to the internal formwork 1 by means of crosspieces 8. The lower sections of the formwork 2 are fixed to the lower section of the formwork 1 by means of screws 54 and pieces in the form of a truncated cone 5. The 5 pieces are removed from

  
the concrete construction after pouring and the remaining hollow spaces are filled with concrete.

  
In Figures 4 and 5 is shown the wedge device 4, which is provided on each side of the internal formwork 1, divides these sides into two corners and keeps these corners apart.

  
 <EMI ID = 2.1> two inclined sides, which are located against the inclined sides

  
 <EMI ID = 3.1>

  
inclined with respect to a vertical axis. Each of the corners 43 is provided with guide bars 42, which extend partially-

  
 <EMI ID = 4.1>

  
suitably on the adjacent separate sections of the formwork by means of screws 431. The guide bars 42, which extend in guide holes 411, are provided with caps 421 and screws 422. These bars are inserted in holes 434 provided in the corners 43 and fixed therein by means

  
 <EMI ID = 5.1>

  
relative to the corners 43 because the guide bars 42 can slide in the guide holes 411. In addition, are provided for fixing the corner 41 on the corners 43 of the screws
433.

  
To remove the internal formwork 1 from the internal faces of the concrete wall 3 (see Figures 6, 7 and 8) is provided a lifting device with hooks 90, which are

  
 <EMI ID = 6.1>

  
the top before the displacement of the whole formwork 1. Simultaneously with the upward displacement of the corners 41, these corners
41 are moved outward horizontally relative to the wedge device 4 as a result of the movement of the

  
 <EMI ID = 7.1>

  
done, the corners 43 of each corner device 4 are moved relative to each other, whereby there is a contraction of the formwork 1 on all sides as a result of the displacement of all the separate sections of the formwork 1 , which are offset by means of the wedge device 4. As a result of the contraction the formwork is removed from the upper faces of the concrete wall. Note that the 433 screws are eliminated during lifting.

  
When the formwork 1 is placed after removal from the concrete wall poured at another location,

  
 <EMI ID = 8.1>

  
lifting hook 90 by using a chain 91, which is fixed to the hook 413 and extends on a chain wheel

  
92. A chain 93 is fixed to the hook 921 of the chain wheel 92 and a connecting bar 94 is fixed to the lower part of the corner 43. When the chain 91 is pulled upwards, the corner 41 moves between the corners 43.

  
The corner 41 can also be moved upwards by the use of a hydraulic cylinder 95, as shown in FIG. 10. The hydraulic cylinder 95 is fixed on the corner 41 and a piston rod 96 is fixed on the connecting bar 94, provided at the lower part of the corner 43. When the hydraulic cylinder 95 works, the corner 41 is simultaneously with its outward movement displaced upwards.

  
In Figures 11, 12, 13 and 14 is shown another device for removing the formwork 1 from the poured concrete. This device includes a wedge 44 wedged

  
between two separate sections of the formwork 1, a vertical shaft
442, on which are arranged two endless screws 441respectively at the upper part and at the lower part of the wedge 44, and two helical wheels 45, which are each arranged on a horizontal shaft 451 and engage with the endless screws 441. Each shaft 451 is articulated on two opposite faces of the corner 44 and their two ends extend in the separate sections of the formwork 1 through openings 434. At the projecting ends of the shafts 451 are provided two helical wheels 452, which come into engagement with racks 46 provided in the formwork 1.

  
In addition, are provided in the partial inclined faces

  
 <EMI ID = 9.1>

  
inclined separate sections of formwork 1 of the slots
431, 432 and 433 for receiving screws 435, which are used for fixing the corner 44 and the formwork 1, when the converging part of the corner 44 is advanced towards the outside or withdrawn.

  
In addition, a guide plate 47 is provided, which is fixed on the upper face of the wedge 44. Two guide blocks 48 of rhomboidal shape are fixed on the upper face of the formwork 1 and housed in guide grooves provided on the face bottom of the guide plate
47.

  
When the shaft 442 is controlled by an external control, the movement of the shaft 442 is transmitted to the helical wheels 452 which attack their racks
46, whereby the corner 44 is moved outward. During the outward movement of the corner 44 the guide plate 47 brings the two guide blocks 48 towards one another, whereby the distance between the partial sections of the formwork 1 is reduced and the formwork is removed

  
1. When the wedge 44 is inserted in the formwork 1, the shaft
442 is rotated in a direction opposite to the direction that moves the corner 44 outward.

  
In Figures 15, 16 and 17 is shown another embodiment of a wedge device, which generates a contraction of the formwork. It differs from the wedge device described above in that the wedge is wedged from the upper face towards the bottom of the formwork 1. It produces the same effect as the wedge device described above, when the wedge is pulled up.

  
Figures 18 and 19 show details of the support plate 6, which has been described with reference to <EMI ID = 10.1> is fixed to the upper face of the formwork 1, and a spar
62, which is fixed to the upper face of the formwork 2. The

  
 <EMI ID = 11.1>

  
square and the spar 62 of a housing 621 of square section and a housing 622 of rectangular section. Wedging screws 63 are provided for the housing 621. When the

  
 <EMI ID = 12.1>

  
the setting screws 63 are tightened, the formwork 2 is suspended from the formwork 1.

  
The internal formwork 1, which has hitherto been described as a four-sided formwork, can furthermore also be executed as a multi-sided formwork, as shown in FIG. 20.

CLAIMS

  
1. Method for manufacturing a vertical concrete wall with several faces, according to which are arranged internal and external formwork consisting of several formwork plates and according to which are removed from poured concrete the formwork plates without dismantling them one from the others for simple arrangement at another location for the next pour, with use of an arrangement for removing the internal formwork with several faces from the poured concrete, characterized in that at least one wedge device (4) is provided dividing one face of the formwork wall (1) into two sections, device which during the casting is inserted between the two sections in a first direction, in what is provided an apparatus for the displacement of the wedge device (4) after pouring in a second direction opposite to the first direction,

   whereby the two sections are advanced relative to each other and the internal formwork (1) is contracted and removed from the concrete.

  
2. Arrangement for carrying out the following process


    

Claims (1)

la revendication 1, caractérisé en ce que le dispositif à coin (4) est coincé dans la direction vers le bas. claim 1, characterized in that the wedge device (4) is jammed in the downward direction. 3. Agencement pour la réalisation du procédé suivant la revendication 1, caractérisé en ce que le dispositif à coin (4) est en forme de coin horizontalement dans une direction par rapport au coffrage externe. 3. Arrangement for carrying out the method according to claim 1, characterized in that the wedge device (4) is wedge-shaped horizontally in a direction relative to the external formwork. 4. Agencement pour la réalisation du procédé suivant la revendication 1, caractérisé en ce que le dispositif à coin (4) présente un coin (44) avec deux surfaces inclinées, qui sont logées contre les sections séparées, et comporte un appareillage pour le déplacement d'un arbre horizontal (451) articulé dans le coin (44), qui fait saillie avec ses deux extrémités partiellement à travers les faces inclinées dans les sections séparées et est pourvu de deux premières roues hélicoïdales correspondantes (452), en ce que sont fixées sur les sections séparées (1) des crémaillères appropriées (46), qui viennent en prise avec les premières roues hélicoïdales, en ce que sur la partie supérieure des sections séparées (1) sont fixés des blocs de guidage appropriés (48), en ce que sur le coin (44) et les sections séparées est prévue une plaque de guidage (47) 4. Arrangement for carrying out the method according to claim 1, characterized in that the wedge device (4) has a wedge (44) with two inclined surfaces, which are housed against the separate sections, and comprises an apparatus for movement of a horizontal tree (451) articulated in the corner (44), which protrudes with its two ends partially through the inclined faces in the separate sections and is provided with two corresponding first helical wheels (452), in that are fixed on the separate sections (1) suitable racks (46), which engage with the first helical wheels, in that on the upper part of the separate sections (1) are fixed suitable guide blocks (48), in that on the corner (44) and the separate sections is provided with a guide plate (47) , qui est fixée sur la partie supérieure du coin, la plaque de guidage (44) présentant deux rainures de guidage écartées pour recevoir sur sa face supérieure les blocs de guidage (48), et en ce qu'est prévu un appareillage pour la commande de l'arbre avec lequel, lorsque l'arbre est mis en rotation, le coin se déplace dans la seconde direction et le déplacement de , which is fixed on the upper part of the corner, the guide plate (44) having two guide grooves spaced apart to receive on its upper face the guide blocks (48), and in what is provided an apparatus for the control of the shaft with which, when the shaft is rotated, the wedge moves in the second direction and the displacement of la plaque de guidage provoque le déplacement des blocs de guidage entr'eux. the guide plate causes the guide blocks to move between them. 5. Agencement suivant la revendication 4, caractérisé en ce que les blocs de guidage sont conformés comme des rhomboïdes. 5. Arrangement according to claim 4, characterized in that the guide blocks are shaped like rhomboids. 6. Agencement suivant la revendication 4, caractérisé en ce que l'appareillage pour la commande comporte une deuxième roue hélicoïdale (45) fixée sur l'arbre horizontal (451) entre les premières roues hélicoïdales, une troisième roue hélicoïdale (441) venant en prise sur un arbre vertical (442) avec la deuxième roue hélicoïdale et une commande pour l'arbre vertical. 6. Arrangement according to claim 4, characterized in that the apparatus for the control comprises a second helical wheel (45) fixed on the horizontal shaft (451) between the first helical wheels, a third helical wheel (441) engaging on a vertical shaft (442) with the second helical wheel and a control for the vertical shaft. 7. Agencement pour la réalisation du procédé suivant la revendication 4, caractérisé en ce que le dispositif à coin (4) comporte deux premiers coins (43) et un second coin <EMI ID=13.1> 7. Arrangement for carrying out the method according to claim 4, characterized in that the wedge device (4) has two first corners (43) and a second wedge <EMI ID = 13.1> première direction, chacun des premiers coins (43) présentant une première face, qui est fixée de manière étroite contre une des sections séparées, et une seconde face inclinée par first direction, each of the first corners (43) having a first face, which is tightly fixed against one of the separate sections, and a second face inclined by <EMI ID=14.1>  <EMI ID = 14.1> présente deux faces déplaçables de manière étroite contre les deux susdites faces, has two faces which can be moved narrowly against the two aforementioned faces, - l'appareillage pour le déplacement comportant au moins deux rainures de guidage longitudinales (411), dont l'une est inclinée par rapport à un axe vertical et est prévue <EMI ID=15.1> - deux barres de guidage (42), s'étendant partiellement dans les orifices de guidage appropriés et coulissables le long desdits orifices de guidage, étant fixées sur les premiers coins (43), et - des appareillages pour le déplacement vers le haut du second coin étant prévus, - grâce à quoi, lorsque le second coin est tiré vers le haut, le déplacement des orifices de guidage relativement aux barres de guidage provoque le déplacement du second coin dans la seconde direction et le déplacement l'un vers l'autre des premiers coins. - the apparatus for movement comprising at least two longitudinal guide grooves (411), one of which is inclined relative to a vertical axis and is provided <EMI ID = 15.1> - two guide bars (42), partially extending in the appropriate guide holes and sliding along said guide holes, being fixed on the first corners (43), and - devices for the upward movement of the second corner being provided, - whereby, when the second corner is pulled upward, the displacement of the guide holes relative to the guide bars causes the displacement of the second corner in the second direction and the displacement of the first corners towards each other. 8. Agencement suivant la revendication 7, caractérisé en ce que l'appareillage pour le déplacement du second coin vers le haut est un appareil de levage. 8. Arrangement according to claim 7, characterized in that the apparatus for moving the second corner upwards is a lifting device. 9. Agencement suivant la revendication 7, caractérisé en ce que l'appareillage pour le déplacement du second coin vers le haut comprend un cylindre hydraulique (95) fixé au second coin et pourvu d'une tige de piston (96) fixée au premier coin (43). 9. Arrangement according to claim 7, characterized in that the apparatus for moving the second corner upwards comprises a hydraulic cylinder (95) fixed to the second corner and provided with a piston rod (96) fixed to the first corner (43).
BE6/48061A 1984-12-13 1985-02-15 Method of forming closed concrete wall - involves using contractible internal shuttering with removable wedge bars BE901756A (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
GB08431545A GB2168411B (en) 1984-12-13 1984-12-13 Formwork for casting concrete
US06/681,778 US4679762A (en) 1984-12-13 1984-12-14 Form set-up
DE19853501125 DE3501125A1 (en) 1984-12-13 1985-01-15 METHOD FOR PRODUCING A MULTI-SIDED URBAN CONCRETE WALL, AND ARRANGEMENT FOR IMPLEMENTING THE METHOD
SE8500228A SE455210B (en) 1984-12-13 1985-01-18 INTERNAL FORM FOR CASTING THE INSIDE OF THE END, MULTIPLE SIDE CONCRETE WALL CONSTRUCTION
FR8502051A FR2577263A1 (en) 1984-12-13 1985-02-13 IMPROVED FORMWORK ARRANGEMENT FOR THE BUILDING
CA000474196A CA1235921A (en) 1984-12-13 1985-02-13 Form set-up
CH666/85A CH663443A5 (en) 1984-12-13 1985-02-14 INSTALLATION FOR CONCRETE FORMWORK.
BE6/48061A BE901756A (en) 1984-12-13 1985-02-15 Method of forming closed concrete wall - involves using contractible internal shuttering with removable wedge bars

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
GB08431545A GB2168411B (en) 1984-12-13 1984-12-13 Formwork for casting concrete
BE901756 1985-02-15
BE6/48061A BE901756A (en) 1984-12-13 1985-02-15 Method of forming closed concrete wall - involves using contractible internal shuttering with removable wedge bars

Publications (1)

Publication Number Publication Date
BE901756A true BE901756A (en) 1985-05-29

Family

ID=27159497

Family Applications (1)

Application Number Title Priority Date Filing Date
BE6/48061A BE901756A (en) 1984-12-13 1985-02-15 Method of forming closed concrete wall - involves using contractible internal shuttering with removable wedge bars

Country Status (1)

Country Link
BE (1) BE901756A (en)

Similar Documents

Publication Publication Date Title
FR2487405A1 (en) WALL MODULE FOR THE CONSTRUCTION OF CONCRETE STRUCTURES AND METHOD FOR CONSTRUCTING A CONCRETE CAST CONCRETE STRUCTURE
EP0402197A1 (en) Prefabricated moulding elements for constructing walls
CH663443A5 (en) INSTALLATION FOR CONCRETE FORMWORK.
FR2564504A1 (en) MODULAR CONSTRUCTION BOX AND FORMWORK FOR ITS PRODUCTION
EP0560660B1 (en) Multistorey underground garages and construction method thereof
BE901756A (en) Method of forming closed concrete wall - involves using contractible internal shuttering with removable wedge bars
FR2491977A1 (en) Joint connection for building frame in reinforced concrete - has open reinforcement column cage retaining angled beams with connecting bars
FR2745837A1 (en) SHAPE CONTRACTION DEVICE FOR FLOOR SHAPE MOUNTING
EP0242497B1 (en) Tunnel construction process
FR2604944A1 (en) IMPROVED DEVICE FOR DEMOLDING AND HANDLING CONCRETE PRODUCTS MOLDED INTO FIXED MOLDS
EP0891458B1 (en) Construction, panel therefor and method for making same
EP0044896A1 (en) Apparatus for use in erecting the walling of an edifice by means of building blocks
FR2614052A1 (en) Precast reinforced concrete construction elements, method for manufacturing the latter and walls obtained
FR2629496A1 (en) BUILDING WALLS OF THE WALL TYPE IN PREFABRICATED CONCRETE ELEMENTS
FR2591637A1 (en) Method for constructing a building comprising concrete slabs and device for the implementation of this method
FR2659592A1 (en) Modular mould for tank
FR2483306A1 (en) Mould for concrete rails - has long trough section moulds stripped by lifting rail end so that soffit is progressively prised from mould invert
GB2224233A (en) Producing cast concrete articles
FR2525952A1 (en) Open top precast concrete box mould - uses four wall pans and floor pan in internal mould with vertical tapered inserts forming corners
FR2627792A1 (en) Stand structure for sports stadium - has reinforced concrete portal structures spaced along length of stand, supporting stepped terraces and suspended roof stanchions
FR2756310A1 (en) AUXILIARY AMOUNT OF SCAFFOLDING
FR2510167A2 (en) Suspended shutter table for reinforced concrete horizontal surfaces - has slab support boxes bearing on walls and cast in place
JP2000160834A (en) Step-up construction of concrete caisson
FR2581102A1 (en) Prefabricated wall with internal buttresses
BE353258A (en)

Legal Events

Date Code Title Description
RE Patent lapsed

Owner name: LEE YUAN-HO

Effective date: 19950228