AU3578899A - Drill rig - Google Patents
Drill rig Download PDFInfo
- Publication number
- AU3578899A AU3578899A AU35788/99A AU3578899A AU3578899A AU 3578899 A AU3578899 A AU 3578899A AU 35788/99 A AU35788/99 A AU 35788/99A AU 3578899 A AU3578899 A AU 3578899A AU 3578899 A AU3578899 A AU 3578899A
- Authority
- AU
- Australia
- Prior art keywords
- drill
- drill rig
- assembly
- boom
- lower frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Landscapes
- Earth Drilling (AREA)
Description
AUSTRALIA
Patents Act 1990 COMPLETE SPECIFICATION STANDARD PATENT Applicants: 1) HYDRO POWER ENGINEERING (PROPRIETARY)
LIMITED
2) NORTHAM PLATINUM LIMITED Invention Title: DRILL RIG The following statement is a full description of this invention, including the best method of performing it known to me/us: P13670 .FOR -2- DRILL RIG FIELD OF THE INVENTION This invention relates to a drill rig and, more particularly, a drill rig which is particularly, although not exclusively, suitable for use in drilling blast holes in the development end of a tunnel in an underground mining operation.
BACKGROUND TO THE INVENTION In the drilling of such blast holes it is important that the axes of the holes extend in the correct direction and that the holes are drilled in a predetermined pattern.
The holes near the side edges of the tunnel and at the roof and hanging walls need to be drilled at an incline to the general grade or axial direction of the tunnel itself in order to ensure that sufficient rock is broken out to maintain the required cross-sectional dimensions of the tunnel.
It is accordingly necessary to align a drill correctly both with regard to inclination relative to the grade in the vertical direction as well as in the horizontal direction in order that the tunnel follow the required direction.
OBJECT OF THE INVENTION It is the object of this invention to provide a drill rig which greatly facilitates the drilling of a series of blast holes in their correct relative positions, as well as their correct inclinations both in the horizontal and vertical direction.
-3- SUMMARY OF THE INVENTION In accordance with this invention there is provided a drill rig comprising an upper and a lower frame assembly wherein the lower frame assembly is adapted to support the drill rig during use as well as during transport and the upper frame assembly supports a drill boom and associated drill and carriage assembly, the drill rig being characterised in that the lower frame assembly and upper frame assembly are interconnected by elongate supports pivotally interconnected intermediate their ends to divide each support into a foremost limb and a rear-most limb wherein at least the operatively upper and rear-most support limb is shorter than the operatively upper and foremost support limb, the arrangement being adapted to automatically adjust the inclination of the drill boom to the grade as the upper frame assembly is raised and lowered relative to the lower frame assembly.
Further features of the invention provide for the forward ends of the elongate supports to be movable along part of the length of the upper and lower frames 15 respectively; for the lower frame to have a series of stop positions co-operating with the associated end of the co-operant support, the stop positions corresponding to desired heights of holes to be drilled by the drill rig; and for a single hydraulic piston and cylinder assembly to be coupled between the lower frame assembly and the lower end region of the lower rear-most limb of the supports.
Still further features of the invention provide for the lower frame assembly to have a single pair of supporting rail wheels intermediate its ends; for both the forward and rearward ends of the lower frame assembly to have adjustable jacks for supporting the lower frame on a foot wall in adjustable manner; and for at least the upper, and optionally also the lower frame assembly to have laterally extendible outrigger arms for locking against the side walls during drilling operations.
Preferably, the upper frame assembly of this invention includes a transversely extending track made to a required profile and substantially supporting the drill boom assembly with a rearward guide co-operating with a guide formation on the rear end of the drill boom assembly whereby the drill boom assembly can be moved laterally with a drill parallel to the grade in the central region and at or towards the extremities with the drill being inclined somewhat outwardly from the -4grade in plan view, in which case the track preferably includes a rack co-operating with a pinion associated with the drill boom so that rotation, say by means of a crank, of the pinion can be employed to move the drill boom laterally along the length of the track from one side of the upper frame to the other.
In order that the above and other features of the invention may be more fully understood one embodiment thereof will now be described with reference to the accompanying drawings.
BRIEF DESCRIPTION OF THE DRAWINGS In the drawings:- FIG.1 is a side elevation showing a drill rig according to the invention in a :10 vertically extended position; FIG. 2 is an enlarged view of the area indicated by circle in Figure 1; and, FIG.3 is a plan view of the rig.
DETAILED DESCRIPTION WITH REFERENCE TO THE DRAWINGS S"In the embodiment of the invention illustrated in the drawings a drill rig generally indicated by numeral comprises an upper frame and a lower frame The lower frame has a single roughly centrally disposed spaced pair of rail wheels whereby it can be moved around and each end of the lower frame has screw threaded jacking arrangements and at the rear and front thereof respectively. The upper frame supports above it a drill boom carrying a carriage with a drill thereon slung underneath the boom The boom is actually supported on a transverse track (10) (see Figure 2) carried by the upper frame in a manner which will be described hereinafter.
The upper frame and lower frame are interconnected by two elongate supports (11) and (12) pivotally connected together by means of a pivot (13) intermediate their ends. The one elongate support has its lower end (14) attached to the lower one end of the rear of the lower frame by a pivot (15) and its upper end (16) is pivotally connected to a slide (not shown) confined to longitudinal movement along a lipped groove (17) extending along the forward portion of the upper frame The upper end (18) of the other elongate support is pivotally attached to the rear end of the upper frame by a pivot (19) and its lower end (20) is similarly slidable along an inwardly lipped guide (21) which forms the forward portion of the lower frame and in fact carries at its forward end the forward screw threaded jack The lower end (20) of the latter elongate support (11) has a formation adapted to co-operate with notches (22) spaced apart along the length of a gauge member (23) extending parallel to the guide The gauge member has notches on two 10 opposite edges and is rotatable about its own axis to direct one edge or the other .upwardly. Also it can be rotated to an intermediate position in which no notches are directed upwardly for co-operation with the lower end of the support (11) in which case the drill rig can be totally collapsed to bring the upper and lower o.
frame substantially together for transport or storage purposes.
S 15 The positioning of the pivot along the lengths of the two supports (11) and (12), and the respective lengths from the pivot to their extremities, is arranged such that when the drill rod (24) itself is located centrally and on the grade of the tunnel being developed the central region holes can be drilled in the exact direction of the tunnel. As the upper frame is raised or lowered the drill rod will become increasingly more inclined towards the hanging or foot wall, as the case may be, until at the extremities the drill rod is directed at the exact desired inclination for the upper-most and lower-most holes respectively. The former position is illustrated in Figure 1.
The notches in the gauge member (23) are arranged such that they determine fixed elevations of the upper frame relative to the lower frame which correspond to the desired positions of holes to be drilled in a standard pattern for the tunnel development. Accordingly once the rig has been set up no measuring or marking of a development face is necessary only adjustment of the height according to the notches in the gauge member (23).
Regarding the lateral positioning of the drill and drill boom the transverse, roughly horizontal track (10) follows a substantially straight path across the central region of the upper frame and has a rearwardly deflected end region (26) on each side. The central region enables holes to be drilled in the face in vertical planes parallel to the development grade. However the end regions (26) cause the drill -6rod (24) to be directed laterally outwardly at an inclination to the side walls of the tunnel for the same purpose of breaking out rock in a manner resulting in a straight rock wall being developed. In this case fixed lateral positions of holes to be drilled are determined by a series of spaced holes (27) in the track which are to be aligned with a hole associated with the boom, and a pin can be placed through the aligned holes to lock the boom in position for drilling a particular hole. This determines all the lateral positions at which holes are to be drilled in the predetermined pattern and, once more, no measuring is necessary on site.
In order to stabilise the boom its rear end is provided with a slotted slider member (28) movable along a transverse rail (29) of the rear of the upper frame assembly.
In order to employ the drill rig of this invention the rig can be wheeled along a rail even of a temporary and undulating nature as is often the case in development '':regions of tunnels and because it only has two wheels it can be swivelled sideways to greatly facilitate its setting up. It is then raised and supported on its o° screw threaded jacks in the correct orientation so that in the central position the drill rod will extend along the grade in the centre of the tunnel. The rig can then be locked in position by means of laterally extending outrigger jacks (not shown) and an entire set of holes can be drilled simply by moving the drill boom laterally 20 along the track, stopping it at each hole in the track and then moving the upper frame up and down through the various vertical positions determined by the :notches in the gauge member (23).
Movement of the boom along the track is achieved by means of a pinion gear (31) engaging a rack (32) extending along the length of the track. Rotation of the pinion gear is effected by a crank (33) operable at the rear of the rig.
It will be understood that numerous variations may be made to the embodiment of the invention described above without departing from the scope of this invention.
For the purposes of this specification it will be clearly understood that the word "comprising" means "including but not limited to", and that the word "comprises" has a corresponding meaning.
Claims (7)
- 3. A drill rig as claimed in claim 2 in which the lower frame has a series of stop positions co-operating with the associated end of the co-operant support, the stop positions corresponding to desired heights of holes to be drilled by the drill rig.
- 4. A drill rig as claimed in claim 1 in which a single hydraulic piston and cylinder assembly is coupled between the lower frame assembly and the lower end region of the lower rear-most limb of the supports. A drill rig as claimed in claim 1 in which the lower frame assembly has a simple pair of supporting rail wheels positioned intermediate its ends.
- 6. A drill rig as claimed in claim 1 in which the forward and rearward ends of the lower frame assembly have adjustable jacks for supporting the lower frame on a foot wall in adjustable manner. -8-
- 7. A drill rig as claimed in claim 1 in which at least the upper frame assembly has laterally extendible outrigger arms for locking against the side walls of a tunnel during drilling operations.
- 8. A drill rig as claimed in claim 1 in which the upper frame assembly includes a transversely extending track made to a required profile and substantially supporting the drill boom assembly with a rearward guide co-operating with a guide formation on the rear end of the drill boom assembly whereby the drill boom assembly can be moved laterally with a drill parallel to the grade in the central region and at or towards the extremities with the drill being inclined somewhat outwardly from the grade in plan view. S9. A drill rig as claimed in claim 8 in which the track includes a rack *co-operating with a pinion associated with the drill boom and wherein S•rotation of the pinion is adapted to move the drill boom laterally along the length of the track.
- 10. A drill rig as claimed in claim 9 in which the pinion is rotatable by means of a crank.
- 11. A drill rig assembly as claimed in claims 8 in which the track has a series of formations extending along its length and the boom has one or more formations for registration therewith in a series of positions corresponding to positions of holes to be drilled. Dated this 22nd day of June 1999 1) HYDRO POWER ENGINEERING (PROPRIETARY) LIMITED and 2) NORTHAM PLATINUM LIMITED By their Patent Attorneys GRIFFITH HACK Fellows Institute of Patent and Trade Mark Attorneys of Australia
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ZA985646 | 1998-06-18 | ||
ZA98/5646 | 1998-06-29 |
Publications (1)
Publication Number | Publication Date |
---|---|
AU3578899A true AU3578899A (en) | 2000-01-13 |
Family
ID=25587103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU35788/99A Abandoned AU3578899A (en) | 1998-06-18 | 1999-06-22 | Drill rig |
Country Status (2)
Country | Link |
---|---|
AU (1) | AU3578899A (en) |
CA (1) | CA2276220A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002103162A1 (en) * | 2001-06-18 | 2002-12-27 | Russell Mineral Equipment Pty Limited | Rock-bolting apparatus and method |
CN110878673A (en) * | 2018-09-05 | 2020-03-13 | 徐州中新机械科技有限公司 | Angle-adjustable automatic drilling machine |
CN110878674A (en) * | 2018-09-05 | 2020-03-13 | 徐州中新机械科技有限公司 | Movable type tunneling drilling machine |
CN110878675A (en) * | 2018-09-05 | 2020-03-13 | 徐州中新机械科技有限公司 | Portable roof drilling equipment |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130838A (en) * | 2019-06-28 | 2019-08-16 | 陕西陕煤韩城矿业有限公司 | Broken side anchor cable drilling rig support |
CN113738279B (en) * | 2021-08-30 | 2023-10-13 | 山东君德智能装备有限公司 | Drilling equipment suitable for mine underground end face |
CN118481541B (en) * | 2024-07-10 | 2024-10-29 | 中铁七局集团西安铁路工程有限公司 | Drilling machine for construction of railway tunnel drain hole |
-
1999
- 1999-06-22 AU AU35788/99A patent/AU3578899A/en not_active Abandoned
- 1999-06-23 CA CA002276220A patent/CA2276220A1/en not_active Abandoned
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002103162A1 (en) * | 2001-06-18 | 2002-12-27 | Russell Mineral Equipment Pty Limited | Rock-bolting apparatus and method |
US6981559B2 (en) | 2001-06-18 | 2006-01-03 | Rme Underground Pty Ltd. | Rock-bolting apparatus and method |
CN110878673A (en) * | 2018-09-05 | 2020-03-13 | 徐州中新机械科技有限公司 | Angle-adjustable automatic drilling machine |
CN110878674A (en) * | 2018-09-05 | 2020-03-13 | 徐州中新机械科技有限公司 | Movable type tunneling drilling machine |
CN110878675A (en) * | 2018-09-05 | 2020-03-13 | 徐州中新机械科技有限公司 | Portable roof drilling equipment |
Also Published As
Publication number | Publication date |
---|---|
CA2276220A1 (en) | 1999-12-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7191839B2 (en) | Drilling rig apparatus and downhole tool assembly system and method | |
US4359089A (en) | Carrier for blowout preventer | |
CN107060749A (en) | Using the pick anchoring integral fully-mechanized digging machine of 4 advanced Anchor Cares of jumbolter | |
US4079792A (en) | Mine roof support for a mobile drilling machine | |
CN106593437A (en) | Digging, supporting, anchoring and drilling all-in-one fully-mechanized excavating machine | |
AU2004231158A9 (en) | Drilling and bolting head for a bolting machine | |
US4710064A (en) | Movable roof support and bolter system | |
US5794721A (en) | Drilling apparatus | |
US3865197A (en) | Protective canopy for a portable drilling machine | |
AU3578899A (en) | Drill rig | |
US4687375A (en) | Circular heading machine | |
CN206957709U (en) | Using the pick anchoring integral fully-mechanized digging machine of 4 advanced Anchor Cares of jumbolter | |
WO1992020614A1 (en) | Displaceable working platform with extensible boom | |
KR100306895B1 (en) | Master drill machine for installation of reinforcing anchor to protect slope | |
CN112879008B (en) | Support system and support method suitable for self-tunneling type retraction process | |
AU751818B2 (en) | Drill boom support for a drill rig | |
KR20190001317A (en) | Slope perforation system with a multistage boom cylinder and boring method using the same | |
US4108253A (en) | Elevatable operator's compartment having a drill steel guide for a mine drilling machine | |
US4676697A (en) | Movable roof support and bolter system | |
WO2000060211A1 (en) | A drill rig for use in an underground mine | |
US4540065A (en) | Apparatus for wall timbering of drifts, tunnels, and the like | |
CN217028920U (en) | Onboard support platform system for development machine | |
US10428650B2 (en) | Launch platform for high wall mining | |
CN113882813B (en) | Underground rapid tunneling advanced drilling device and method for coal mine | |
DE19649108A1 (en) | Short front mining machine, especially for driving galleries along seam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MK5 | Application lapsed section 142(2)(e) - patent request and compl. specification not accepted |