AU3051600A - Method and device for forming a foundation pipe pile in the ground - Google Patents
Method and device for forming a foundation pipe pile in the groundInfo
- Publication number
- AU3051600A AU3051600A AU30516/00A AU3051600A AU3051600A AU 3051600 A AU3051600 A AU 3051600A AU 30516/00 A AU30516/00 A AU 30516/00A AU 3051600 A AU3051600 A AU 3051600A AU 3051600 A AU3051600 A AU 3051600A
- Authority
- AU
- Australia
- Prior art keywords
- ground
- forming
- pipe pile
- foundation pipe
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/56—Screw piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR9900103 | 1999-01-07 | ||
FR9900103A FR2788289B1 (en) | 1999-01-07 | 1999-01-07 | METHOD AND DEVICE FOR CONSTITUTING A FOUNDATION PILE IN A SOIL |
PCT/FR2000/000027 WO2000040808A1 (en) | 1999-01-07 | 2000-01-07 | Method and device for forming a foundation pipe pile in the ground |
Publications (1)
Publication Number | Publication Date |
---|---|
AU3051600A true AU3051600A (en) | 2000-07-24 |
Family
ID=9540681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU30516/00A Abandoned AU3051600A (en) | 1999-01-07 | 2000-01-07 | Method and device for forming a foundation pipe pile in the ground |
Country Status (3)
Country | Link |
---|---|
AU (1) | AU3051600A (en) |
FR (1) | FR2788289B1 (en) |
WO (1) | WO2000040808A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU783773B2 (en) * | 2000-10-24 | 2005-12-01 | John Wagstaff Constructions Pty Ltd | Variable displacement pile former |
CN112302014A (en) * | 2020-10-26 | 2021-02-02 | 中建四局第一建筑工程有限公司 | Construction method for reinforcing H-shaped steel bottom karst cave of pile in SMW construction method |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1898397A (en) * | 1929-06-29 | 1933-02-21 | Rotinoff Alexander George | Pile and pile driving |
FR697339A (en) * | 1930-02-08 | 1931-01-15 | Pieux Simplex Super Chabot Et | Stilts |
US3206935A (en) * | 1962-03-01 | 1965-09-21 | Raymond Int Inc | Methods and apparatus for producing cast-in-place shells and piles |
US3455832A (en) * | 1963-09-09 | 1969-07-15 | Monsanto Co | Schiff bases |
CH466997A (en) * | 1964-05-13 | 1968-12-31 | Failla Ignazio | Process for the creation of building structures in the ground |
DE2231923A1 (en) * | 1972-06-29 | 1974-01-17 | Siemens Ag | FOUNDATION PILE, IN PARTICULAR FOR DRIVE AND OVERHEAD LINES |
US4127002A (en) * | 1977-11-25 | 1978-11-28 | Dewitt Arthur W | Method for forming a concrete piling foundation |
NL7808047A (en) * | 1978-07-31 | 1980-02-04 | Koninkl Nederhorst Bouw B V | Reinforced concrete foundation post positioning - involves cement and grout pressure-fed beneath post, excess water removal and pressure application around post location |
NL8301556A (en) * | 1983-05-03 | 1984-12-03 | Pieter Faber | CONCRETE FOUNDATION POLE, APPARATUS FOR MANUFACTURING AND APPARATUS FOR GROUNDING THEREOF. |
JPS62202117A (en) * | 1986-02-28 | 1987-09-05 | Totsuki Kogyo Kk | Formation work of cement mortar pile in ground with wooden pile |
NL8802944A (en) * | 1988-11-30 | 1990-06-18 | Jacob Bouten | METHOD FOR APPLICATION OF CONCRETE FOUNDATION POSTS AND HOLLOW DRILL FOR USE THEREFOR |
DE9002781U1 (en) * | 1990-03-09 | 1991-07-04 | Delmag Maschinenfabrik Reinhold Dornfeld GmbH & Co, 7300 Esslingen | Displacement drill |
-
1999
- 1999-01-07 FR FR9900103A patent/FR2788289B1/en not_active Expired - Lifetime
-
2000
- 2000-01-07 AU AU30516/00A patent/AU3051600A/en not_active Abandoned
- 2000-01-07 WO PCT/FR2000/000027 patent/WO2000040808A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2000040808A1 (en) | 2000-07-13 |
FR2788289A1 (en) | 2000-07-13 |
FR2788289B1 (en) | 2001-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU6009899A (en) | Method and device for moving a tube in a borehole in the ground | |
AU3594201A (en) | Foundation for a tower and a method for its deployment on site | |
AU2001275196A1 (en) | Foundation funds generation system and method | |
AU5833498A (en) | Installation of a foundation pile in a subsurface soil | |
AUPQ479699A0 (en) | Earth retention and piling systems | |
EP1069246A4 (en) | Pile foundation structure | |
AU7124700A (en) | In situ water and soil remediation method and system | |
AU5431100A (en) | Process and device for producing a pile in the earth | |
AU2002241207A1 (en) | Improved concrete pile made of such a concrete and method for drilling a hole adapted for receiving the improved concrete pile in a weak ground | |
AU5492900A (en) | A method and apparatus for side wall passivation for organic etch | |
AU2195301A (en) | System and method for telemetry in a wellbore | |
AU2001286338A1 (en) | Method and apparatus for continuously forming a concrete structure | |
HK1043821B (en) | Sumptuary and timesaving semi-shield method for constructing a pipeline in the ground | |
AU3051600A (en) | Method and device for forming a foundation pipe pile in the ground | |
AU2001256395A1 (en) | Method and arrangement for adjusting the percussion energy in a percussion drilling apparatus | |
AU2001288153A1 (en) | Coupling device and a method for coupling | |
FR2802304B1 (en) | METHOD FOR EXPLORATION IN A RADAR SITE AND RADAR IMPLEMENTING THE METHOD | |
AU5715000A (en) | Method and device for cleaning soil | |
AU3215400A (en) | Method and apparatus for formation isolation in a well | |
AU5436100A (en) | Method and device in a multi-tone transmission system | |
AU5914296A (en) | Method for making a contaminated site suitable for building purposes, in which site foundation piles must be placed | |
GB2363133B (en) | A method and apparatus for forming foundations | |
EP1407085B8 (en) | Method and device for creating a reinforced concrete wall in the ground | |
AU5234400A (en) | Improvements in or relating to the introduction of a device into a pressurised pipe | |
AU2002333979A1 (en) | Method and device for creating a reinforced concrete wall in the ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MK6 | Application lapsed section 142(2)(f)/reg. 8.3(3) - pct applic. not entering national phase |