AU1090413BAU10904/13AAU1090413AAU1090413BAU 1090413 BAU1090413 BAU 1090413BAU 10904/13 AAU10904/13 AAU 10904/13AAU 1090413 AAU1090413 AAU 1090413AAU 1090413 BAU1090413 BAU 1090413B
Authority
AU
Australia
Prior art keywords
mining machine
mining
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elliott Vawter
Original Assignee
Elliott Vawter
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elliott VawterfiledCriticalElliott Vawter
Priority to AU10904/13ApriorityCriticalpatent/AU1090413A/en
Priority claimed from AU10904/13Aexternal-prioritypatent/AU1090413A/en
Publication of AU1090413BpublicationCriticalpatent/AU1090413B/en
Publication of AU1090413ApublicationCriticalpatent/AU1090413A/en