[go: up one dir, main page]

Jump to content

PKP class EW90

From Wikipedia, the free encyclopedia
EW90
Type and origin
Power typeElectric
BuilderAEG, O&K, Siemens, WUMAG
Build date1928-1932
Specifications
Configuration:
 • AARs+d
engine car + trailer
Gauge1 435 mm
Driver dia.900 mm
Length34 460 mm
Fuel typeElectric
Electric system/s800 V.
Current pickup(s)Pantograph
Engine type4 x GBM700
Transmission68:16
Train brakesKnorr EP
Performance figures
Maximum speed80 km/h
Power output308 kW
Career
OperatorsPKP
ClassEW90
NicknamesEwunia
Retired1976

EW90 is the name for German Reichsbahn ET 165 electric multiple units working for Polish State Railways (PKP) after World War II.

History

[edit]
Berlin S-Bahn ET 165

The German ET 165 units were built in the period between 1928 and 1936 to service Berlin S-Bahn lines. While many units of this type were destroyed during the war, 189 ET 165, ET 166 and ET 167 vehicles were stabled in Schweidnitz (Świdnica), which after 1945 became part of Poland. As part of German reparations 54 were taken over by the PKP. From 1951 to 1957 were refurbished in Lubań as EW90, EW91 and EW92 units to service SKM lines in the Tricity area of Gdańsk, Sopot and Gdynia. It was necessary to rebuild cars to change the power supply from third rail system into pantographs.

EW90 EMUs finished their service in 1976 when the power supply on SKM lines changed from 800 V. into 3 000 V.

Technical data

[edit]

Each unit consisted of two cars: engine car and trailer. It was possible to connect four units in order to gain an eight car train.

GBM-700 type electric engines used in EW90, EW91 and EW92 units have four main poles and four commutation poles. Two-step reduction of engine excitation (up to 50%) is made by a short-circuit of parts of main poles. Engine cooling is done with a fan installed on the engines' shafts.

[edit]

See also

[edit]