[go: up one dir, main page]

Jump to content

MAX Orange Line

From Wikipedia, the free encyclopedia

MAX Orange Line
The Tilikum Crossing bridge with a MAX train traveling northbound and pedestrians walking alongside
An Orange Line train on Tilikum Crossing
Overview
Other name(s)Portland–Milwaukie Light Rail Project (PMLR)[1][2]
OwnerTriMet
LocalePortland, Oregon, U.S.
Termini
Stations17
WebsiteMAX Orange Line
Service
TypeLight rail
SystemMAX Light Rail
Operator(s)TriMet
Daily ridership3,480 (Weekday, September 2020)[3]
History
OpenedSeptember 12, 2015 (2015-09-12)
Technical
Line length7.3 mi (11.7 km)[a]
Number of tracks2
CharacterAt-grade and elevated
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line750 V DC
Maximum incline6.86%[5]
Route diagram

Portland Transit Mall (NW Glisan St)
 
Most southbound Yellow Line
trains become Orange Line
 
Union Station/​Northwest 5th & Glisan
Amtrak
Union Station/​Northwest 6th & Hoyt
Amtrak
Northwest 5th & Couch
Northwest 6th & Davis
Southwest 5th & Oak
Southwest 6th & Pine
Eastside MAX (SW Morrison St)
Pioneer Place/​Southwest 5th
Pioneer Courthouse/​Southwest 6th
Eastside MAX (SW Yamhill St)
City Hall/​Southwest 5th & Jefferson
Southwest 6th & Madison
B NS (SW Market St)
PSU Urban Center/​Southwest 5th & Mill
Portland Streetcar
A NS (SW Mill St/SW Montgomery St)
PSU Urban Center/​Southwest 6th & Montgomery
Portland Streetcar
PSU South/​Southwest 5th & Jackson
PSU South/​Southwest 6th & College
Terminus
Most northbound Orange Line
trains become Yellow Line
Lincoln Street/​Southwest 3rd Avenue
NS (SW Moody Ave)
South Waterfront/​South Moody
Portland Streetcar
OMSI/​Southeast Water
Portland Streetcar
Clinton Street/​Southeast 12th Avenue
Southeast 17th Avenue and Rhine Street
Southeast 17th Avenue and Holgate Boulevard
SE Harold (planned)
Southeast Bybee Boulevard
Southeast Tacoma/​Johnson Creek
Parking
Milwaukie/​Main Street
Southeast Park Avenue
Parking

The MAX Orange Line is a light rail line serving the Portland metropolitan area in the U.S. state of Oregon. Operated by TriMet as part of the MAX Light Rail system, it connects Portland City Center, Portland State University (PSU), Southeast Portland, Milwaukie, and Oak Grove. The line serves 17 stations and runs for 2012 hours per day with headways of up to 15 minutes. It averaged 3,480 daily weekday riders in September 2020.

The Orange Line runs north–south. Its route begins near Portland Union Station on the northern end of the Portland Transit Mall in downtown Portland. Within the transit mall on 5th Avenue, the Orange Line operates as a southbound through service of the Yellow Line from Union Station/Northwest 5th & Glisan station, where it interlines with the Green Line. Northbound on 6th Avenue, the Orange Line continues through to the Yellow Line from PSU South/Southwest 6th and College station. South of the transit mall, the Orange Line operates bidirectionally and terminates at Southeast Park Avenue station in Oak Grove, just outside Milwaukie proper in unincorporated Clackamas County.

The Portland–Milwaukie Light Rail Project (PMLR) began construction in 2011 following decades of failed light rail plans for the McLoughlin Boulevard corridor. The ten-station, 7.3-mile (11.7 km) extension was the second and final phase of the South Corridor Transportation Project, which expanded light rail to Interstate 205 (I-205) and the Portland Transit Mall in its first phase. As part of the PMLR project, TriMet built Tilikum Crossing, the largest "car-free" bridge in the United States, over the Willamette River. Orange Line service commenced on September 12, 2015.

History

[edit]

Early proposals to Clackamas County

[edit]

In 1975, a task force of Governor Tom McCall and the Columbia Region Association of Governments (CRAG)[6]: 1  proposed a network of "transitways" between Portland and its suburbs following calls to transfer federal assistance funds from the canceled Mount Hood Freeway project to other transportation projects in the region.[7][8] The proposal primarily envisioned a busway concept,[6]: 12  but also considered a light rail alternative, particularly for the corridor between Portland and Oregon City in Clackamas County.[9] Amid pressure to identify a use for the transfer money,[10][11] as stipulated by a provision in the Federal Aid Highway Act of 1973,[6]: 7–8 [12] CRAG prioritized redeveloping the Banfield Transitway,[6]: 12 [13]: 30  a segment of I-84 connecting I-5 in downtown Portland east to I-205,[14] and put the Oregon City corridor on hold.[6]: 12  In November of that year, regional transit agency TriMet lost its option to purchase used PCC streetcars from Toronto, which it had hoped to use on the proposed Portland–Oregon City line,[15] after the Toronto Transit Commission declined to renew TriMet's hold.[16] The Banfield Transitway received the transfer funds,[17] and despite efforts from the Oregon Department of Transportation to build a busway,[6]: 13 [7] a light rail line was built.[18][19] The first segment of the Metropolitan Area Express (MAX) opened between Gresham and Portland on September 5, 1986.[20]

Several months before the inauguration of MAX, Metro, which replaced CRAG in 1979,[21] revisited light rail plans for the Oregon City corridor via McLoughlin Boulevard, as well as proposed converting the partially realized I-205 busway into another light rail line.[22] By that time, however, TriMet had already begun planning for the formally designated "Westside Corridor" in Washington County.[23][24] Noting that federal funds could only be spent on one project at a time, Metro's Joint Policy Advisory Committee on Transportation (JPACT) made the I-205 corridor their next priority after the Westside project and the McLoughlin Boulevard corridor third priority.[25] Clackamas County officials went on to dispute the federal money, including $17 million in excess funds that had been allocated to the I-205 busway.[26][27] To settle the issue, Metro released a regional transportation plan (RTP) that reasserted the Westside Corridor's priority in January 1989.[28]

Failed South/North line

[edit]
refer to caption
A lawn sign supporting the 1998 South/North ballot measure

Despite priority given to the Westside Corridor, Metro's RTP commissioned studies for the I-205 and McLoughlin Boulevard corridors.[28][29] In September 1989, U.S. Senators and members of the Senate Committee on Appropriations Mark Hatfield of Oregon and Brock Adams of Washington secured $2 million from the federal government to assess both segments. At the request of the senators, a segment farther north to Vancouver and Clark County in Washington became part of the proposals.[30][31] As the studies analyzed alternative routes, the project's advisory committee increasingly favored an alignment closer to downtown Portland along the busier I-5 and Willamette River corridors.[32] In 1994, Metro finalized a 25-mile (40 km) light rail route from Hazel Dell, Washington through downtown Portland to Clackamas Town Center,[33] which TriMet formally called the "South/North Corridor".[34][35]: S-1 

In November that year, Metro asked Oregon voters in the Portland metropolitan area if they would authorize a $475 million bond measure, which would provide funding for Oregon's share of the project's estimated $2.8 billion cost. Nearly two-thirds of the voters said yes.[36] To fund Washington's $237.5 million share, Clark County proposed raising sales and vehicle excise taxes by 0.3 percent, also requiring voter approval. On February 7, 1995, 69 percent of those who voted in Clark County rejected the proposed tax increases, halting the project.[37][38] Planning for the South/North Corridor resumed later that year when TriMet released a revision that scaled back the line's northern half by eliminating its North Portland and Clark County segments up to the Rose Quarter.[39] To fill the funding gap that resulted from the exclusion of Clark County, the Oregon House of Representatives passed a $750 million transportation package, including $375 million for the project.[40] The Oregon Supreme Court promptly struck down this funding due to the inclusion of unrelated measures, which violated the state's constitution.[41][42] In February 1996, state legislators revised the package, but light rail opponents forced a statewide vote in November that ultimately prevented the use of state funds.[41][43]

In an effort to gain the support of North Portland residents, who had historically voted in favor of light rail, and to avoid seeking state funding,[44] TriMet announced a third plan in February 1997 that proposed a 15-mile (24 km) line from Lombard Street in North Portland to Clackamas Town Center.[45] The Portland City Council later extended the alignment through North Portland so it would terminate another 1 mile (1.6 km) north of Lombard Street in Kenton.[46] In August, due to the wording on the original ballot passed in 1994, which described the line extending into Clark County, the TriMet board decided to hold another vote on a new $475 million bond measure.[47] Portland area residents cast their vote on November 3, 1998, and rejected it by 52 percent, effectively canceling the project.[48] Despite the South/North project's cancellation, North Portland residents and city business leaders continued to push for light rail.[49][50] In 1999, they urged TriMet to revive the northern portion of the South/North project,[51] which led to the Interstate MAX and Yellow Line opening in 2004.[52][53]

Revival and funding

[edit]
A cable-stayed bridge with the deck partially built and a construction crane atop each of the two pylons
The Portland–Milwaukie Light Rail Bridge, later inaugurated as Tilikum Crossing, under construction in 2013

In April 1999, JPACT revived plans for the I-205 and McLoughlin Boulevard corridors by announcing the $8.8 million South Corridor Transportation Study.[54]: S-6  The committee published the study's report in October 2000, narrowing a range of transit alternatives for each corridor;[55][56] it outlined constructing either two light rail lines, a combination of one light rail line and one improved bus service, bus rapid transit, or dedicated bus lanes.[54]: S-6 [57] After public meetings concluded in 2003, JPACT recommended both light rail options.[58] They decided the first MAX line to Clackamas County should be built along the I-205 busway from Gateway to Clackamas Town Center, and that this would be the first of two phases, the second of which would be a Portland–Milwaukie line via McLoughlin Boulevard.[59] While planning for the second phase, alignment studies within downtown Portland showed that a fourth service along the existing tracks on Morrison and Yamhill streets, then served by the Blue, Red, and Yellow lines, would push that segment to maximum capacity. JPACT responded by amending the first phase to include adding light rail to the Portland Transit Mall.[60]: P-2 [61] The first phase would be completed in 2009, with the transit mall rebuilt with light rail and the Yellow Line rerouted to it in August.[62] The I-205 segment would open the following month with a new Green Line service.[63][64]

In July 2008, Metro adopted a locally preferred alternative (LPA) route for the second-phased Portland–Milwaukie line that began at the southern end of the Portland Transit Mall and terminated at Southeast Park Avenue in Oak Grove, just south of Milwaukie proper in unincorporated Clackamas County; the alignment was extended beyond Southeast Lake Road in downtown Milwaukie,[65]: 6  which had been the terminus in the 2003 LPA.[54]: S-7, S-11  The 2008 LPA also proposed a new bridge that would carry MAX and the Portland Streetcar over the Willamette River, in lieu of the Hawthorne Bridge, amid fears that the latter would create a traffic bottleneck.[66][67] This new bridge had been proposed to run between RiverPlace on the west end and the Oregon Museum of Science and Industry (OMSI) on the east end, but the 2008 LPA introduced a new alternative that moved its west end farther south to the South Waterfront.[65]: 6–9  The new bridge would accommodate only transit vehicles, bicycles, and pedestrians,[68] and spanning 1,720 feet (520 m),[69] it would become the largest "car-free" bridge in the country upon completion.[70][71] The project's final environmental impact statement was published in October 2010.[35]

The Portland–Milwaukie Light Rail Project was budgeted at $1.49 billion, of which federal funding covered $745.2 million under the New Starts program.[72] Despite TriMet's request for a 60-percent federal share, the Federal Transit Administration (FTA) only committed 50 percent, lower than any previous MAX project.[73] Oregon provided the second-largest share at $355.2 million, mostly sourced from state lottery bond proceeds. Metro, TriMet, Clackamas County, Portland, Milwaukie, and in-kind property donations contributed $249.3 million to the remaining local-match funds. TriMet and the FTA entered into a funding agreement in May 2012.[72] Clackamas County had originally agreed to allocate $25 million to the project but later negotiated a reduction to $22.6 million due to Measure 3-401,[74] an anti-light rail initiative that light rail opponents placed on the ballot. The measure stipulated voter approval before officials could use county funds to finance, design, construct, or operate rail lines in the county.[75] On September 18, 2012, Measure 3-401 passed with 60 percent of the vote.[76] Afterwards, Clackamas County attempted to end its involvement with the project, appealing to TriMet to terminate the extension at Southeast Tacoma/Johnson Creek station, just north of the county line. TriMet filed a lawsuit, and in July 2013, a circuit court upheld the county's financial obligation and the project's continuation.[13]: 95–96 

Construction and opening

[edit]
A MAX train stopped at the crowded platform of Milwaukie/Main Street station
Riders at Milwaukie/Main Street station on opening day

On April 5, 2011, the FTA approved the start of the Portland–Milwaukie Light Rail Project's final design,[77][78] which meant TriMet could begin purchasing rights-of-way and construction materials.[77] Construction began on June 30, initially limited to the site of the new Willamette River crossing,[70] which was temporarily named the "Portland–Milwaukie Light Rail Bridge".[79] Utility relocation and other preparation work along the project route began later that year.[80][81] By 2013, major light rail construction work had started in Clackamas County.[82] Safety improvements were made at several street-level crossings in Southeast Portland and Milwaukie, allowing these areas to be designated quiet zones where freight and MAX trains do not have to use their horns when crossing an intersection.[83] The project was halfway completed by July 2013.[84] In April 2014, TriMet officially named the new bridge "Tilikum Crossing, Bridge of the People", which it selected from over 9,500 public submissions.[85] The agency purchased 18 new Siemens S70 light rail vehicles, designated "Type 5"; the first car arrived in Portland that September.[86] When construction finished the following year, the line was around $40 million under budget. A petition from Senator Jeff Merkley led the FTA to approve previously eliminated project elements such as switch heaters and additional station shelters, at a total cost of $3.6 million.[87]

On May 15, 2015, the first public train ride, which carried 500 passengers including Governor Kate Brown and Senator Merkley, ran at regular operating speed along the entirety of the 7.3-mile (11.7 km) Portland–Milwaukie extension.[88] On August 30, test trains began running along the entire Orange Line route, ahead of the following month's opening date.[89] The extension opened for service on September 12 at 11 am.[90][91] The Orange Line became interlined with the Yellow Line when it took over service of the southbound 5th Avenue segment of the Portland Transit Mall. TriMet said separating the services would allow it to better control service frequencies from North Portland and Milwaukie to downtown Portland because it expected higher ridership of the Orange Line and that few riders from these communities would travel beyond the city center.[92]

Route

[edit]
refer to caption
The Portland–Milwaukie extension at the south end of downtown Portland, on the viaduct carrying it over Harbor Drive and River Parkway

The Orange Line serves the 7.3-mile-long (11.7 km) Portland–Milwaukie extension.[a] Orange Line service begins farther north of the Portland–Milwaukie segment at Union Station/Northwest 5th & Glisan station near Portland Union Station in downtown Portland, where southbound Yellow Line trains operate through into the Orange Line to serve the 5th Avenue segment of the Portland Transit Mall. Conversely, northbound Orange Line trains operate through into the Yellow Line to serve the 6th Avenue segment of the transit mall.[93][94] Just south of the PSU South stations, the Portland-Milwaukie segment begins where tracks travel east along the median of Lincoln Street to a stop on 3rd Avenue. From here, the line continues east along Lincoln to an elevated viaduct after an intersection with Naito Parkway.[95] The viaduct carries the line over Harbor Drive and River Parkway to the South Waterfront, where tracks merge with those of the Portland Streetcar's A and B Loop. The lines then cross the Willamette River on Tilikum Crossing.[96][97]

On the opposite end of Tilikum Crossing in Southeast Portland, the streetcar tracks diverge near OMSI. The MAX tracks turn southeast and run parallel to the Union Pacific Railroad (UP).[98] A stop is located near the intersection of Clinton Street and 12th Avenue.[99] At 17th Avenue, the line turns south and runs along the median of 17th Avenue with stops at Holgate Boulevard and Rhine Street.[100] It exits the median just north of McLoughlin Boulevard and continues parallel to this road, the Portland and Western Railroad, and UP through to Milwaukie, with stops at Bybee Boulevard and Tacoma Street.[101]: 15–16  After a stop at Main Street in downtown Milwaukie,[102] the line traverses the Kellogg Bridge across Kellogg Lake to 22nd Avenue.[96] From here, the tracks leave the viaduct and again travel at-grade alongside McLoughlin Boulevard to a three-track stub terminal at Park Avenue in Oak Grove, just south of Milwaukie proper.[98][103]

Map
A geographic map of the MAX Orange Line (in red) relative to the rest of the network (in black) with icons marking the line's termini. The official system schematic can be viewed on the TriMet website.

Stations

[edit]
The platform of Union Station/Northwest 5th & Glisan station with riders waiting near the shelter and the Portland Union Station clock tower in the background
Union Station/Northwest 5th & Glisan station, where most southbound Yellow Line trains switch to Orange Line service
A MAX train stopped at Southeast Bybee Boulevard station seen from above on the Bybee Bridge
Southeast Bybee Boulevard station
A train stopped on the middle tracks of Southeast Park Avenue station
Southeast Park Avenue station, the Orange Line's southern terminus

Ten stations were built as part of the Portland–Milwaukie Light Rail Project, from Lincoln Street/Southwest 3rd Avenue to Southeast Park Avenue. The Orange Line serves the stations along the Portland–Milwaukie segment,[4] as well as the seven stations along the southbound 5th Avenue segment of the Portland Transit Mall in downtown Portland, where it interlines with the Green Line.[94] Transfers to the Yellow Line, which runs northbound from PSU South station to Expo Center station in North Portland, can be made at any of the seven stations along the transit mall's 6th Avenue segment, although most northbound Orange Line trains operate through to the Yellow Line.

Riders can transfer to the Blue and Red lines by detraining at Pioneer Place/Southwest 5th station and boarding at the Pioneer Square stations one block west.[93] The Orange Line also connects to Amtrak at Union Station/Northwest 5th & Glisan station;[94] to the Portland Streetcar at the PSU Urban Center/Southwest 5th & Mill and OMSI/Southeast Water stations;[104] and to Frequent Express (FX),[105] local, and intercity bus services at several stops.[94]

In 2015, as part of a future pilot program to test the Hop Fastpass automated fare collection system, TriMet proposed installing turnstiles through which passengers would access paid fare zones within the Southeast Bybee Boulevard and Southeast Park Avenue stations.[106] As of 2019, these plans have not been enacted.[107]: 6–7 [108] Many stations along the Orange Line have public artwork, commissioned as part of TriMet's public art program.[109]: 7 

Key
Icon Purpose
Terminus
Southbound travel only[b]
List of MAX Orange Line stations
Station[4] Location Commenced Line transfers[110] Other connections and notes[94][110][c]
Union Station/Northwest 5th & Glisan†↓ Portland
Transit
Mall
September 12, 2015   Connects to Amtrak, C-Tran, FX, Greyhound, POINT, TCTD
Most trains through operate from the Yellow Line
Northwest 5th & Couch   Connects to C-Tran, FX
Southwest 5th & Oak   Connects to C-Tran, FX
Pioneer Place/Southwest 5th     Connects to C-Tran, FX
City Hall/Southwest 5th & Jefferson   Connects to C-Tran, FX
PSU Urban Center/Southwest 5th & Mill   Connects to C-Tran, FX, Portland Streetcar
PSU South/Southwest 5th and Jackson   Connects to C-Tran, FX
Lincoln Street/Southwest 3rd Avenue Portland Connects to FX
South Waterfront/South Moody Connects to FX, Portland Streetcar
OMSI/Southeast Water Connects to FX, Portland Streetcar
Clinton Street/Southeast 12th Avenue
Southeast 17th Avenue and Rhine Street
Southeast 17th Avenue and Holgate Boulevard
Southeast Bybee Boulevard
Southeast Tacoma/Johnson Creek
Milwaukie/Main Street Milwaukie
Southeast Park Avenue Oak Grove

Service

[edit]
refer to caption
MAX along the median of Southeast 17th Avenue, passing TriMet's Operations Headquarters

As of May 2021, the Orange Line operates for approximately 2012 hours per day. On weekdays, the first train arrives as a southbound service at Union Station/Northwest 5th & Glisan station at 5:02 am. The first northbound train departs Southeast Park Avenue station at 6:14 am. End-to-end travel takes approximately 35 minutes.[111] During peak hours, some Orange Line trains do not become Yellow Line trains; they loop back along the Transit Mall and return to Milwaukie. This is due to higher projected ridership along the Orange Line than the Yellow Line.[92] The last Milwaukie-bound train departs Union Station/Northwest 5th & Glisan station at 12:02 am and the last Portland City Center-bound train departs Southeast Park Avenue station at 12:56 am. Service shifts slightly to an earlier schedule on weekends.[111] TriMet designates the Orange Line as a "Frequent Service" route, running on a headway of 15 minutes during most of the day. Service is less frequent in the early mornings and late evenings, with headways of up to 30 minutes.[112] In the late evenings, the Orange Line is replaced by TriMet bus route 291–Orange Night Bus, which runs south from downtown Portland to Milwaukie following the Orange Line route. Two trips run on weekdays and one trip runs on Saturdays and Sundays.[113][114]

Ridership

[edit]

The Orange Line is the least-busy MAX service. Due to the COVID-19 pandemic, service averaged 3,480 riders on weekdays in September 2020,[3] down from 11,500 for the same month in 2019.[115] Forecasts that were used to help justify federal funding for the project predicted an average of 17,000 weekday trips in 2016 but by October of that year, the Orange Line was averaging fewer than 11,000 passengers.[116]

Explanatory notes

[edit]
  1. ^ a b TriMet publications only provide the total length of the Portland–Milwaukie extension, i.e., the 7.3-mile (11.7 km) section that was newly built. The total length of Orange Line service, which includes a segment of the Portland Transit Mall, is not provided.[4]
  2. ^ Most Orange Line trains on the Portland Transit Mall travel southbound only. Most northbound trains operate through into the Yellow Line bound for Expo Center in North Portland at PSU South/Southwest 6th and College.[110]
  3. ^ This list of service connections excludes TriMet's local bus routes. For a complete list that includes all transfers, see: List of MAX Light Rail stations.

References

[edit]
  1. ^ "Portland-Milwaukie Light Rail Project". Metro. May 8, 2014. Archived from the original on April 2, 2021. Retrieved April 13, 2021.
  2. ^ "PMLR Project History". TriMet. Archived from the original on March 2, 2019. Retrieved September 27, 2020.
  3. ^ a b "September 2020 Monthly Performance Report" (PDF). TriMet. Archived (PDF) from the original on May 8, 2021. Retrieved May 8, 2021.
  4. ^ a b c "Portland–Milwaukie MAX Orange Line" (PDF). TriMet. July 2016. Archived (PDF) from the original on April 23, 2019. Retrieved May 14, 2019.
  5. ^ Simons, Vic (December 2015). "Portland: Green meets Orange". Tramways & Urban Transit. UK: LRTA Publishing. pp. 473–478. ISSN 1460-8324.
  6. ^ a b c d e f Thompson, Gregory L. (2005). How Portland's Power Brokers Accommodated the Anti-Highway Movement of the Early 1970s: The Decision to Build Light Rail (PDF). Business and Economic History On-Line. Vol. 3. Business History Conference. Archived from the original (PDF) on January 12, 2022. Retrieved January 12, 2022.
  7. ^ a b "Meetings on transit ideas slated". The Oregonian. May 4, 1975. p. C2.
  8. ^ Hortsch, Dan (September 28, 1975). "Mt. Hood Freeway may be dead – but it's still kicking". The Sunday Oregonian. p. D1.
  9. ^ Hortsch, Dan (September 28, 1975). "Transferred money would go toward multiplicity of confusing projects". The Oregonian. p. D1.
  10. ^ Mosey, Ed (January 8, 1976). "Delay urged in deciding use of Mt. Hood freeway funds". The Oregonian. p. A24.
  11. ^ Hortsch, Dan (January 23, 1976). "Shift of freeway funds stirs complex situation". The Oregonian. p. A15.
  12. ^ "Freeway fund report delayed". The Oregonian. December 19, 1975. p. F8.
  13. ^ a b Selinger, Philip (October 2019). "Making History: 50 Years of Transit in the Portland Region" (PDF). TriMet. Archived from the original (PDF) on February 25, 2020. Retrieved February 25, 2020.
  14. ^ United States. Federal Highway Administration; United States. Urban Mass Transportation Administration; Oregon. State Highway Division (August 1980). Banfield Transitway Project: Light Rail Transit Line and Banfield Freeway Improvements: Final Environmental Impact Statement. TriMet Collection (Report). p. ii. Archived from the original on January 5, 2021. Retrieved June 12, 2020 – via Portland State University Library.
  15. ^ "Bus firm OKs option to buy 15 old streetcars". The Oregonian. May 7, 1974. p. 6.
  16. ^ Hobart, Sue (November 30, 1975). "Tri-Met loses option to buy used streetcars". The Oregonian. p. D6.
  17. ^ "The Death of the Mt. Hood Freeway and the Birth of MAX Light Rail". TriMet. December 10, 2021. Archived from the original on January 12, 2022. Retrieved January 12, 2022.
  18. ^ Hortsch, Dan (September 27, 1978). "Tri-Met board votes to back Banfield light-rail project". The Oregonian. p. F1.
  19. ^ Alesko, Michael (November 17, 1978). "CRAG endorses light rail plan". The Oregonian. p. D3.
  20. ^ Federman, Stan (September 5, 1986). "All aboard! MAX on track; ride free". The Oregonian. p. 1.
  21. ^ Abbott, Carl; Abbott, Margery Post (May 1991). "Abbott: A history of Metro" (PDF). Metro. p. 12. Archived (PDF) from the original on April 10, 2021. Retrieved April 10, 2021.
  22. ^ "Where's east side light rail going next?". The Oregonian. April 3, 1986. p. 2.
  23. ^ Kohler, Vince (May 23, 1988). "Joint efforts of business, government could spur rail line; both groups need to finance, back line along I-205, panel says". The Oregonian. p. B5.
  24. ^ United States. Department of Transportation; United States. Urban Mass Transportation Administration (March 1982). Westside Corridor Project, Draft Environmental Impact Statement, Alternatives Analysis (Report). Northwestern University. p. S-1. Archived from the original on September 15, 2023. Retrieved January 12, 2022 – via Google Books.
  25. ^ Bodine, Harry (October 27, 1987). "Panel puts top priority on mass transit, major highway projects". The Oregonian. p. B4.
  26. ^ Green, Ashbel (October 6, 1988). "County officials debate light-rail routes". The Oregonian. p. W1.
  27. ^ Kohler, Vince (January 17, 1991). "Clackamas County seeks federal money for rail line". The Oregonian. p. C2.
  28. ^ a b Bodine, Harry (January 14, 1989). "Metro OKs $1.5 billion transit plan". The Oregonian. p. D1.
  29. ^ Mayer, James (April 9, 1989). "Tri-Met looks to the future: The success of MAX sparks dreams of expanding". The Oregonian. p. A1.
  30. ^ Kohler, Vince; Stewart, Bill (September 10, 1989). "Light-rail proposals gain ground in Congress; senate panel approves transportation funding bill, aiding plans for new Oregon City, Vancouver lines". The Oregonian. p. C2.
  31. ^ Stewart, Bill (January 12, 1993). "County light-rail project gains momentum". The Oregonian. p. B2.
  32. ^ Oliver, Gordon (March 11, 1993). "Citizens advisory committee endorses pair of light-rail routes". The Oregonian. p. B3.
  33. ^ Maves, Norm Jr. (October 27, 1994). "25-mile route encompasses hundreds of steps". The Oregonian. p. 1.
  34. ^ Selinger, Philip (2015). "Making History: 45 Years of Transit in the Portland Region" (PDF). TriMet. pp. 80, 83–85. OCLC 919377348. Archived (PDF) from the original on May 9, 2018. Retrieved July 26, 2018.
  35. ^ a b United States. Federal Transit Administration; Oregon. Metro; Oregon. Tri-County Metropolitan Transportation District of Oregon (October 2010). South Corridor Portland–Milwaukie Light Rail Project Final Environmental Impact Statement (PDF) (Report). Vol. 1. TriMet. Archived from the original (PDF) on March 2, 2019. Retrieved April 14, 2021.
  36. ^ Oliver, Gordon (November 10, 1994). "One down, more to go for reality of north–south rail line". The Oregonian. p. C10.
  37. ^ Oliver, Gordon (February 8, 1995). "Clark County turns down north–south light rail". The Oregonian. p. 1.
  38. ^ Oliver, Gordon (February 9, 1995). "Light-rail rejection stirs doubt on project". The Oregonian. p. C1.
  39. ^ Oliver, Gordon; Stewart, Bill (March 1, 1995). "MAX may skip Clark County, N. Portland". The Oregonian. p. B1.
  40. ^ Green, Ashbel S.; Mapes, Jeff (August 4, 1995). "Legislature is finally working on the railroad". The Oregonian. p. A1.
  41. ^ a b "Some light-rail history". The Oregonian. October 7, 1996. p. A8.
  42. ^ Spicer, Osker (January 31, 1996). "Light-rail expansion would be good for areas". The Oregonian. p. C2.
  43. ^ Oliver, Gordon; Hunsberger, Brent (November 7, 1996). "Tri-Met still wants that rail line to Clackamas County". The Oregonian. p. D1.
  44. ^ Oliver, Gordon (February 12, 1997). "South–North light-rail issue keeps on going". The Oregonian. p. A1.
  45. ^ Oliver, Gordon (February 12, 1997). "Returning to light rail". The Oregonian. p. A20.
  46. ^ Stewart, Bill (June 19, 1998). "Portland officially maps a South–North rail line". The Oregonian. p. B3.
  47. ^ Oliver, Gordon (August 6, 1998). "Tri-Met will put rail plan on ballot". The Oregonian. p. B1.
  48. ^ Oliver, Gordon (November 7, 1998). "South–North Line backers find themselves at a loss after election day defeat". The Oregonian. p. B1.
  49. ^ Oliver, Gordon (March 16, 1999). "New light-rail plan rises from the ashes". The Oregonian. p. 1.
  50. ^ Stewart, Bill (March 25, 1999). "Tri-Met involvement urged in north light-rail line". The Oregonian. p. B3.
  51. ^ Oliver, Gordon (May 3, 1999). "Tri-Met adds detail to proposal to build light rail in north". The Oregonian. p. C2.
  52. ^ Leeson, Fred (April 25, 2004). "The Yellow Line: Open for business". The Oregonian. p. B5.
  53. ^ Leeson, Fred (May 4, 2004). "Yellow Line: They came, they rode, they offered opinions". The Oregonian. p. B1.
  54. ^ a b c South Corridor I-205/Portland Mall Light Rail Project Final Environmental Impact Statement (Report). Federal Transit Administration. November 2004. Archived from the original on July 10, 2021. Retrieved September 21, 2020 – via Google Books.
  55. ^ Rose, Joseph (May 8, 2001). "New MAX plan tries to the double-team approach". The Oregonian. p. D1.
  56. ^ Rose, Joseph (June 6, 2001). "Metro planners will study two south light-rail lines". The Oregonian. p. E3.
  57. ^ Oppenheimer, Laura (January 27, 2003). "New MAX plans arrive for input; a revived bid to expand light rail to Milwaukie, one of five transit proposals, may fare better now that former critics are on board". The Oregonian. p. E1.
  58. ^ Oppenheimer, Laura (February 17, 2003). "South Corridor MAX plan unveiled". The Oregonian. p. E1.
  59. ^ Leeson, Fred (March 27, 2003). "TriMet board agrees to plan for southeast light-rail lines". The Oregonian. p. C2.
  60. ^ Downtown Amendment to the South Corridor Project Supplemental Environmental Impact Statement (Report). Federal Transit Administration. October 2003. Archived from the original on January 5, 2021. Retrieved June 25, 2019 – via Google Books.
  61. ^ Leeson, Fred (April 15, 2003). "Light-rail line likely addition to transit mall". The Oregonian. p. B1.
  62. ^ "New MAX line opens downtown". Portland Tribune. August 28, 2009. Archived from the original on January 3, 2015. Retrieved May 13, 2014.
  63. ^ Rivera, Dylan (September 13, 2009). "Thousands on MAX go Green Festivities and free rides draw takers for the new downtown–Clackamas Town Center line". The Oregonian.
  64. ^ Rivera, Dylan (September 13, 2009). "Riders pack MAX Green Line on first day of service". The Oregonian. Archived from the original on September 22, 2009. Retrieved September 20, 2009.
  65. ^ a b South Corridor Portland–Milwaukie Light Rail Project Locally Preferred Alternative Report (PDF) (Report). Metro. July 24, 2008. Archived from the original (PDF) on March 2, 2019. Retrieved September 26, 2020.
  66. ^ McCarthy, Dennis (December 20, 2001). "Milwaukie group poses surprise light-rail option". The Oregonian. p. C3.
  67. ^ Mortenson, Eric (May 2, 2008). "Panel realigns route of new light-rail span". The Oregonian. p. D1.
  68. ^ Rose, Joseph (December 8, 2010). "TriMet board gives greenlight to Portland-Milwaukie Light Rail bridge funding". The Oregonian. Archived from the original on January 5, 2021. Retrieved September 29, 2020.
  69. ^ Smit, Norman; Goodyear, David; Beier, Aaron (Spring 2015). "Tilikum Crossing, Bridge of the People: New light-rail structure over the Willamette River to open in the fall of 2015" (PDF). Aspire. p. 21. Archived from the original (PDF) on January 22, 2021. Retrieved May 8, 2021.
  70. ^ a b Rose, Joseph (June 29, 2011). "Construction begins on new light-rail bridge in Portland that will go up 'piece by piece'". The Oregonian. Archived from the original on January 5, 2021. Retrieved July 27, 2013.
  71. ^ "Tilikum Crossing: Bridge of the People". City of Portland, Oregon. Archived from the original on February 25, 2021. Retrieved May 8, 2021.
  72. ^ a b "Portland-Milwaukie Light Rail Project Portland, Oregon" (PDF). Federal Transit Administration. December 2017. Archived (PDF) from the original on January 5, 2021. Retrieved September 28, 2020.
  73. ^ Rose, Joseph (July 26, 2010). "Feds say Portland-Milwaukie MAX line must settle for 50-50 funding". The Oregonian. Archived from the original on January 5, 2021. Retrieved September 30, 2020.
  74. ^ Zheng, Yuxing (August 24, 2012). "County OKs controversial funding for light-rail line". The Oregonian.
  75. ^ Zheng, Yuxing (June 9, 2012). "County looks at ways to fight MAX measure". The Oregonian.
  76. ^ Zheng, Yuxing (September 18, 2012). "Clackamas County anti-rail measure passes comfortably; effect could resonate for decades". The Oregonian. Archived from the original on March 4, 2016. Retrieved February 22, 2016.
  77. ^ a b "Portland light rail extension starts final design". Railway Gazette International. April 5, 2011. Archived from the original on April 8, 2011. Retrieved April 5, 2011.
  78. ^ Rose, Joseph (March 29, 2011). "Feds approve design for Portland-Milwaukie light rail line". The Oregonian. Archived from the original on January 5, 2021. Retrieved April 5, 2011.
  79. ^ "Portland–Milwaukie Light Rail Bridge Fact Sheet" (PDF). TriMet. August 2012. Archived (PDF) from the original on January 5, 2021. Retrieved July 27, 2013.
  80. ^ Fehrenbacher, Lee (July 5, 2012). "Portland-Milwaukie Light Rail project construction passes 1-year mark". Daily Journal of Commerce. Archived from the original on January 5, 2021. Retrieved October 2, 2020.
  81. ^ "Portland-Milwaukie light rail construction to impact traffic". The Oregonian. October 8, 2012. Archived from the original on January 5, 2021. Retrieved October 2, 2020.
  82. ^ Bamesberger, Michael (March 23, 2013). "It's the year of heavy light rail construction in Clackamas County". The Oregonian. Archived from the original on January 5, 2021. Retrieved October 2, 2020.
  83. ^ "Stay safe near the new MAX Orange Line" (PDF). TriMet. Archived (PDF) from the original on January 5, 2021. Retrieved April 5, 2015.
  84. ^ Rose, Joseph (July 26, 2013). "TriMet announces opening date for Portland-Milwaukie light rail line". The Oregonian. p. B3. Archived from the original on January 5, 2021. Retrieved July 27, 2013.
  85. ^ Rose, Joseph (April 16, 2014). "Tilikum Crossing: New Portland bridge named after Chinook word for 'people'". The Oregonian. Archived from the original on January 5, 2021. Retrieved April 16, 2014.
  86. ^ Rose, Joseph (September 30, 2014). "TriMet's first new 'Type 5' MAX light-rail vehicle has rolled into Portland (or has it?)". The Oregonian. Archived from the original on January 5, 2021. Retrieved October 2, 2020.
  87. ^ Fetsch, Mary (March 27, 2015). "MAX Orange Line – on time and under budget". TriMet. Archived from the original on July 25, 2018. Retrieved April 5, 2015.
  88. ^ Tomlinson, Stuart (May 15, 2015). "Gov. Kate Brown, 500 others are first passengers on MAX's new Orange line". The Oregonian. Archived from the original on May 17, 2015. Retrieved May 18, 2015.
  89. ^ "MAX Orange Line to begin test runs". Trains. August 28, 2015. Archived from the original on January 5, 2021. Retrieved August 29, 2015.
  90. ^ "Fall 2015 Service Improvements". TriMet. August 2015. Archived from the original on September 27, 2015. Retrieved September 1, 2015.
  91. ^ Njus, Elliot (September 12, 2015). "The wait's over: TriMet's Orange Line, Tilikum Crossing up and running". The Oregonian. Archived from the original on August 1, 2018. Retrieved September 18, 2015.
  92. ^ a b Lum, Brian (June 19, 2015). "You asked: How will the Orange Line work in downtown Portland?". TriMet. Archived from the original on October 26, 2015.
  93. ^ a b "MAX Orange Line Route Description". TriMet. Archived from the original on January 8, 2021. Retrieved April 30, 2021.
  94. ^ a b c d e Portland City Center and Transit Mall (PDF) (Map). TriMet. Archived from the original (PDF) on July 2, 2020. Retrieved July 30, 2018.
  95. ^ "Lincoln Street/SW 3rd Ave Station". TriMet. October 2014. Archived from the original on January 5, 2021. Retrieved October 2, 2020.
  96. ^ a b "Portland–Milwaukie Light Rail Transit Project Structures" (PDF). TriMet. October 2013. Archived (PDF) from the original on January 5, 2021. Retrieved May 17, 2020.
  97. ^ "South Waterfront/SW Moody Ave Station". October 2014. Archived from the original on January 5, 2021. Retrieved October 2, 2020.
  98. ^ a b Google Maps coordinates:
  99. ^ "Clinton/SE 12th Ave Station". TriMet. October 2014. Archived from the original on January 5, 2021. Retrieved May 17, 2020.
  100. ^ "SE 17th Avenue: Holgate Boulevard and Rhine Street stations". TriMet. October 2014. Archived from the original on January 5, 2021. Retrieved May 17, 2020.
  101. ^ Portland-Milwaukie Light Rail Project Locally Preferred Alternative Report (PDF) (Report). Metro. July 24, 2008. Archived (PDF) from the original on March 2, 2019. Retrieved May 17, 2020.
  102. ^ "Milwaukie/Main Street station area". TriMet. October 2014. Archived from the original on January 5, 2021. Retrieved May 17, 2020.
  103. ^ "SE Park Ave Station Area" (PDF). TriMet. October 2014. Archived (PDF) from the original on January 5, 2021. Retrieved May 18, 2020.
  104. ^ "Maps + Schedules – Portland Streetcar". Portland Streetcar. Archived from the original on February 10, 2019. Retrieved October 11, 2018.
  105. ^ "2022–23 Transit Service Improvements". TriMet. Archived from the original on September 20, 2022. Retrieved September 16, 2022.
  106. ^ Rose, Joseph (March 20, 2015). "Fare turnstiles coming to Portland-Milwaukie MAX stations". The Oregonian. Archived from the original on January 5, 2021. Retrieved August 6, 2019.
  107. ^ "Ordinance 351 of the Tri-County Metropolitan Transportation District of Oregon (TriMet) Amending TriMet Code Chapter 29 and Updating Procedures for Requests for Proof of Payment (Second Reading)" (PDF). TriMet. November 14, 2018. Archived from the original (PDF) on March 2, 2019. Retrieved March 17, 2021.
  108. ^ Theen, Andrew (November 13, 2019). "TriMet ends ad campaign intended as a 'friendly reminder' to pay fares, cites negative reactions". The Oregonian. Archived from the original on November 27, 2020. Retrieved March 17, 2021.
  109. ^ "TriMet MAX Orange Line Public Art Guide" (PDF). TriMet. 2015. Archived from the original (PDF) on March 2, 2019. Retrieved March 18, 2021.
  110. ^ a b c Rail System Map with transfers (PDF) (Map). TriMet. Archived from the original (PDF) on March 28, 2020. Retrieved July 25, 2018.
  111. ^ a b MAX Orange Line schedules:
  112. ^ "Frequent Service". TriMet. Archived from the original on January 9, 2019. Retrieved August 6, 2018.
  113. ^ "291–Orange Night Bus". TriMet. Archived from the original on January 5, 2021. Retrieved October 8, 2020.
  114. ^ 291–Orange Night Bus schedules:
  115. ^ "September 2019 Monthly Performance Report" (PDF). TriMet. Archived (PDF) from the original on April 26, 2020. Retrieved January 9, 2020.
  116. ^ Njus, Elliot (October 16, 2016). "Predicted riders not showing up". The Oregonian. p. A4.
[edit]