[go: up one dir, main page]

The M5 motorway (Hungarian: M5-ös autópálya) is a Hungarian motorway which connects Budapest with the south-eastern regions of the country, the cities of Kecskemét, Szeged, and finally Röszke on the Serbian border. The motorway reached the city of Szeged in December 2005, while the remaining portion (between Szeged and Röszke) was completed in April 2006.

M5 motorway shield
M5 motorway
M5-ös autópálya
Map key - blue in use Map key - grey other highways
Route information
Part of E75
Length173 km (107 mi)
Major junctions
FromBudapest
Major intersections
  • M51 in Budapest-Soroksár
  • M0 near Gyál
  • 405 near Újhartyán
  • M8 in Kecskemét-észak (planned)
  • 445 in Kecskemét elkerülő
  • 52 in Kecskemét-nyugat
  • 54 in Kecskemét-dél
  • M43 in Szeged-észak
  • 55 in Szeged-nyugat
ToRöszke
A1 border with  Serbia
Location
CountryHungary
CountiesPest, Bács-Kiskun, Csongrád
Major citiesBudapest, Kecskemét, Kiskunfélegyháza, Szeged
Highway system
  • Roads in Hungary
The motorway near Lajosmizse
Old toll plaza in the motorway
The road near Kecskemét
Hungarian-Serbian border

The M5 continues as the A1 motorway in Serbia from the Serbian side of the border at Horgoš. It is also the main route from Budapest to Bucharest via the M43 motorway and Romania's A1 motorway, as the link has been opened to traffic since July 2015.

Openings timeline

edit
  • BudapestÓcsa (30 km): 1985.11.22.
  • Ócsa – Örkény (23 km): 1985.11.22. - half profile; (this section was extended in 1986 and 1990)
  • Örkény – Kecskemét-north (30 km): 1989 - half profile; (this section was extended in 1996)
  • Kecskemét-north – Kecskemét-south (16 km): 1997.12.06.
  • Kecskemét-south – Kiskunfélegyháza (19 km): 1998.06.09.
  • Kiskunfélegyháza – Szeged; M43 (51 km): 2005.12.10.
  • Szeged; M43 – Röszke (  border) (14 km): 2006.03.11.

Junctions, exits and rest area

edit

Distance from Zero Kilometre Stone (Adam Clark Square) in Budapest in kilometres.

  •   The route is full length motorway. The maximum speed limit is 130km/h, with   (2x2 lane road with stop lane).
  •   Planned section

Maintenance

edit

The operation and maintenance of the road by Intertoll. This activity is provided by these highway engineers.

Payment

edit

From February 1, 2015, the motorway can be used instead of the national sticker with the following county stickers:

Type of vignette Available section
Pest County between Bevásárlóközpontok junction and Lajosmizse (14 km – 67 km)
Bács-Kiskun County between Örkény and Kistelek (53 km – 140 km)
Csongrád County between Kiskunfélegyháza south and Röszke [state border] (114 km – 174 km)

Toll-free section

edit
  • The collection and distribution circuits leading to Megapark-Tesco, Soroksár-Pestszentlőrinc-Nagybani market and Auchan shopping malls are free of charge (Bevásárlóközpontok junction).

European Route(s)

edit
Name Route
  151 km   junction   (23) –     Autoput A1

See also

edit
edit