TA1128 : Alexandra Dock, Kingston upon Hull
taken 3 years ago, near to Marfleet, Kingston Upon Hull, England

In 2011, Siemens Gamesa and Associated British Ports signed a memorandum of understanding concerning the construction of a wind energy machine manufacturing plant at Alexandra Dock. The factory was formally inaugurated on 1 December 2016. Siemens Gamesa submitted plans in February 2021 to double the size of its wind turbine blade manufacturing facility in the city in a move that could support the creation of hundreds of jobs. Further details in Insider Media Limited: Link
Construction works began in September 2021. Further details in Offshorewind: Link
Further information in Wikipedia: Linkand Green Port Hull: Link
and Siemens Gamesa: Link
The Deep, a public aquarium, built 2000-01, designed by Sir Terry Farrell, opened to the public March 2002. Voted best family attraction in Kingston upon Hull in 2013.
Further reading:
The Deep: Link![]()
Wikipedia: Link![]()
Visit Hull: Link![]()