Major Issues with SAP Financials in Queensland Government
She-I Chang1, Guy G. Gable2
Information Systems Management Research Centre, Queensland University of Technology
sx.chang@student.qut.edu.au, g.gable@qut.edu.au
(Davenport, 1996; Bancroft, 1998; Hiquet et al, 1998;
Shtub, 1999), improved understanding of client-centered
ERP lifecycle issues is required in order that research,
management and educational resources can be allocated
and implemented effectively.
Abstract
This short paper reports a research project that seeks
to give improved understanding of client-centered ERP
lifecycle support issues in order that research,
management and educational resources can be allocated
and implemented effectively. The paper presents (1) the
study background; (2) the research context and object; (3)
the research questions and aims; (4) previous literature on
major IS issues employing the Delphi method; (5) the
research strategy and design; (6) progress to date; (7)
expected benefits and outcomes; and (8) limitations and
future research suggestions.
The Research Context and Object
Background
Since 1983, the Queensland Government Financial
Management System (QGFMS) has been successfully
developed to provide a high quality, client-responsive
financial management system to all state government
agencies. To remain relevant, the QGFMS must continue
to evolve in support of new initiatives aimed at improving
the effectiveness of the budget sector. In 1995, an ERP
system, SAP Financials, was chosen to become the "new
generation" QGFMS. Since that time, SAP Financials has
been implemented across 28 state government agencies.
Organizations world-wide are moving away from
developing information systems in-house and are
spending billions of dollars each year on implementing
Enterprise Resource Planning (ERP) systems and other
packaged software (Price Waterhouse IT Surveys, 1995;
AMR Research, 1998). Although ERP sales have
plateaued or declined in late 1999 for the main vendors
(e.g., due to Y2K curtailment in IS activity and to
saturation of large organizations), IDC (1999) predicts the
ERP market will continue to grow by more than 21
percent through to 2005.
Based on Pinsonneault and Kraemer (1993)
arrangements, the current study’s unit of analysis is the
individual stakeholder or project team member who has
had substantial involvement with the SAP Financials
lifecycle implementation, management and ongoing
support. These individual staff members of the three key
players are being identified at all levels (e.g., strategic,
technical and operational users) and in all roles (e.g.,
project management, process management, knowledge
management, change management) for participation in the
study.
Keyword: ERP, ERP Lifecycle, Delphi Method, Key
IS Issues Studies
The ‘90s global rush to implement ERP systems and
the resultant massive installed base of this software,
provide the rationale for this study (the need for research
into packaged software is further espoused in Gable et al
1997a, 1997b, 1998a, Gable 1998b). The three key
players involved in ERP life-cycle support; namely
vendors, implementation partners, and user organizations;
must continually make difficult judgments on major
issues in relation to the ERP lifecycle (Figure 1)
(Davenport, 1998; Dailey, 1998; Gable et al, 1998a). As
the number of organizations implementing ERP increases
and ERP applications within organizations proliferate
The Research Questions and Aims
The study intends to systematically identify and
rigorously analyze responses to the major research
question: "What do you consider have been the major
issues in implementing, managing and/or supporting the
SAP Financials in [your agency]?"
Having gathered and synthesized weighted issues, we
aim to compare responses across (1) government
agencies, (2) management levels within agencies, (3)
clients, vendors and implementation partners, (4) different
size agencies, and (5) other differentiating contextual
factors (e.g. unique combinations of R/3 modules
implemented, timing of implementation, etc.). Further, we
aim to identify (data driven analysis) (6) other meaningful
combinations of respondents through cluster analysis on
issue weights.
Figure 1 - The Stages of ERP lifecycle
. Requirements
. Selection
. Business Case
. Rollout Planning
Pre-Implementation
. Gap Analysis
. Integration/Interfacing
. New Doc./Process
. Data Design & Migration
. End-User Training
. Custom Modifications
. Parameter Configuration
. Infrastructure Setup
. Project and Change Management
Implementation
. Cut-Over
. Rollout
. Call Center Operations
. Upgrades
. Payback Review
Thus further questions of the issues include: (1) What
is their relative importance? (2) What differences and
Post-Implementation
972
to respondents (e.g., account managers, quality control
managers, project managers, project consultants, IT/IS
executives/managers, business managers) has been
undertaken in many countries, and many different
research methodologies have been used making
comparison of findings across studies difficult, if not
suspect.
similarities exist across predefined demographic
groupings? (3) What differences are observed across
clusters of respondents identified from the data? (4) What
differentiates these clusters of respondents?
In a more prescriptive mode, we seek to understand:
(5) The extent to which the major issues might be
ameliorated through improved knowledge management,
and (6) Where clients, vendors and implementation
partners should focus their energies in order to avoid,
minimize, or eliminate these major issues? More broadly,
we seek to understand what implications and
recommendations this study suggests for improved ERP
lifecycle implementation, management and support.
Similarities among these major IS studies include: (1)
a sample, starting list of issues is provided; (2) a
heterogeneous respondent group is surveyed; (3) 3-4
consensus rounds are applied; (4) a 10-point item scale is
used; (5) reasonable consensus is achieved; and (6) a final
list of 20-30 issues is summarized. Important
methodological features of these DM-type prior studies
are summarized in Table 1.
Previous Literature on Major IS Issues
Employing the Delphi Study
The Research Strategy and Design
During the past thirty years IT/IS has played an
influential role in organizations. The overall importance,
and in particular, the rapidly changing character of IS,
demands ongoing assessment of major issues in the IS
field. The “Delphi Method” (DM) has been used to
evaluate strengths and weaknesses of IS relative to
developmental planning, and to identify key issues and
problems in IS. The identification and prioritization of
key issues in IS that are critical to US-based IS managers,
was the focus of a study by Dickson and Nechis (1984),
who used a revised Delphi method. A similar approach
for investigating critical IS issues was used in subsequent
studies (i.e., Brancheau and Wetherbe, 1987; Niederman,
Brancheau and Wetherbe, 1991; and Brancheau, Janz and
Wetherbe, 1996 in the USA; in Australia Watson, 1989
and Pervan, 1993; Dexter, Janson, Kiudorf and LaastLaas, 1993 in Estonia; and Dekleve and Zupancic, 1996
in Slovenia), to investigate critical information systems
management issues.
Owing to a relatively small amount of mostly
practitioner and some academic literature, which exists in
the area of major issues with ERP lifecycle support, the
research strategy conducted in this reference study can be
described as exploratory, descriptive, and comparative. A
DM-type, 2-round, non-anonymous, open survey was
conducted using personalized email with attached survey
instrument.
This Delphi approach is particularly appropriate for
the reference study. First, questionnaires are used to
solicit expert opinion. This means that the respondents
can be geographically remote. Second, though
respondents are known to the researchers, confidentiality
and anonymity amongst respondents is ensured, thus
dominant individuals are unable to overly influence the
results. Third, because respondents are known to the study
team, the researchers are able to group respondents based
on various demographics and follow up ambiguous and
missing details. Fourth, an email-out is inexpensive and
can be completed in a short time. Fifth, an open-ended
survey allows respondents to fully express and delineate
their views. Sixth, a two-round questionnaire enables
information feedback, thereby stimulating reflection,
Watson and Brancheau (1991) recommend that using
the Delphi method is appropriate for comparing and
contrasting current findings with those of earlier studies,
and contributes to a cumulative IS discipline.
Nonetheless, identifying and prioritizing IS issues critical
Table 1 - The Comparison of Delphi-Type Major IS Issues Studies
Respondents
Number of Method of
Starting Set Final number Number of
Rounds
Prioritizing
of Issues
of Issues Respondents
Dickson
American SIM 4 rounds,
ranking
No
19
52, 102, 62, 54
et al 1984.
members
Brancheau and American SIM 3 rounds,
ranking
Yes
20
90, 54, 68
Wetherbe 1987 members
Watson 1989
Australian IS
3 rounds,
10 point scale
Yes
36
52, 55, 48
executives
Niederman
American SIM 3 rounds,
10 point scale
Yes
25
114, 126, 104
et al. 1991
members
Pervan 1993
Australian IS
3 rounds,
10 point scale
Yes
27
88, 97, 88
managers
Dexter
Estonian IS
3 rounds,
10 point scale
No
30
10, 24, 24
et al. 1993
professionals
4 rounds,
10 point scale
No
26
105, 163,
Slovenian IS
Dekleve and
129, 148
Zupancic 1996 managers
Brancheau
American SIM 3 rounds,
10 point scale
Yes
20
78, 87, 83
et al. 1996
members
Researchers
973
Response Rate
Not reported
50%, 62%,
76%
26%, 28%,
24%
47%, 52%,
49%
29%, 32%,
29%
35%, 85%,
85%
32%, 49%,
69%, 80%
36%, 40%,
38%
consisting of approximately 10 major issues and 30 subissues is aimed to be constructed.
movement toward a certain level of consensus or
difference, and a greater depth of insight emerges.
Seventh, the Delphi quantitative scores allow statistical
summarization and comparison to demonstrate group
consensus or differentiation. Finally, because many
previous studies investigating IS issues have employed
Delphi, comparing and contrasting findings with those of
earlier studies may be possible (note possible difficulties
mentioned earlier), and contributes to the cumulative
information systems discipline. Thus, Delphi is deemed
an appropriate method, since a major goal of this study is
to systematically identify, analyze and determine the
relative importance of major ERP lifecycle issues.
Expected Benefits and Outcomes
If members of the IS community (academic and
professional) are to serve the public effectively, they must
be aware of current major issues with ERP, a significant
phenomenon in IS. Professional societies serve the
community by arranging conferences, sponsoring guest
lectures, and disseminating information through their
publications. Educators and trainers need current
information on key concerns to help graduates develop
the necessary skills to address these issues. Researchers
will be more successful in attracting sponsorship if they
undertake studies that are closely aligned to the concerns
of the marketplace.
Figure 2 depicts the overall reference study design,
which includes six major phases: (1) Define Strategy &
Context; (2) Review Literature; (3) Conduct Data
Collection; (4) Perform Data Analysis; (5) Interpret
Findings; and (6) Suggest Future Research Opportunities.
In the diagram, the rectangles represent processes or
phases of the research framework. Other symbols
represent input/output information flows.
More specifically, key players involved in ERP
lifecycle support stand to benefit from a better
understanding of client-centered issues. Software vendors
seek to redress negative perceptions that ERP
implementation duration and costs are difficult to manage,
and to improve customer support and satisfaction.
Consulting firms seek to streamline implementation and
share the savings with clients; and both software vendors
and consultants seek to increase the size of the ERP
market through reduced costs and increased benefits to
clients. Also, to the extent that software vendors and their
implementation partners are more attuned to clientcentred issues, they will be well placed to further support
clients throughout the ERP lifecycle. Potential benefits to
clients from identifying and analyzing ERP lifecycle
support related issues include: rationalized and more
effective support from both the software vendor and
implementation partner, improved ability to react to a
changing environment, lower costs, and an ERP that more
accurately reflects business needs.
Figure 2 - The Over Research Design
. Research Issues &
Problems
. Movitation &
Objectives
. Context & Object
1. Define
Context &
Strategy
. Major MIS Issues
. Major ERP
Lifecycle Issues
. Research Method
Relevant Theory
2. Review
Literature
. Clustered,
Synthesized, Structured
& Statistical Analysized
of the Multiple Sets of
the Major Issues
3. Conduct
Data
Collection
Research Strategy
& Design
4. Perform
Data
Analysis
. Survey Instruments
& Contact Database
for the Study
. The List of Issues
5. Interpret
Findings
6. Suggest
Future
Research
Directions
. Implications
. Recommendations
. comparison Reports
. Strategy/Framework
. Comparison Studies
Using other Variables
. Approache other than
the Delphi-type method
Progress to Date
Acknowledgements
The study is being piloted in five Queensland
Government agencies that implemented SAP Financials
as a team. As Table 2 demonstrates, 111 questionnaires
were distributed to individuals who have had substantial
involvement with the five government agencies' SAP
Financials project. Seventy-one questionnaires were
returned yielding a 64% response rate. Sixty-one valid
questionnaires were eventually obtained from the first
round survey, providing a net response rate of 55%. 274
issues were identified from the 61 respondents, or 4.5
issues per respondent on average. Table 3 provides a
profile of the respondents’ roles with SAP Financials in
their agency, and the duration of their involvement.
This study is being conducted by the Information
Systems Management Research Centre (ISMRC),
Queensland University of Technology, in collaboration
with Sapient College (SAP Australia) and with the full
support of the Queensland Government. The study is a
component of Gable's (1998a) Strategic Partnerships with
Industry - Research and Training (SPIRT) research
project 'Cooperative ERP Lifecycle Knowledge
Management'.
References
AMR Research, "AMR Research Predicts Industrial
Enterprise Applications Market Will Reach $72.6 Billion
By 2002", AMR, www.amrresearch.com/press/981102.htm,
1997.
The raw data has not yet been fully collected and no
statistical analysis has yet been completed at this stage. A
rationalized, reduced and structured set of major issues,
974
Teaching: the case of SAP R/3", Proceedings of the AIS
Americas Conference, Indianapolis, USA, 15-17 August,
1997b.
Gable, G. G.; Scott, J.; Davenport, T. “Cooperative
EWS Life-cycle Knowledge Management,” Proceedings
of the Ninth Australasian Conference on Information
Systems, 29 September – 2 October 1998, Sydney,
Australia, 1998a, pp.227-240.
Gable, G. G. “Large Package Software: a Neglected
Technology”, Journal of Global Information
Management, Vol 6, No 3, Summer, 1998b, pp.3-4.
Hiquet, B. D., Kelly, A. F., Kelly-Levey and
Associates. SAP R/3 Implementation Guide: A Manager's
Guide to Understanding SAP, USA: Macmillan Technical
Publishing, 1998.
Niederman, F., Brancheau, J. C. and Wetherbe, J. C.
"Information Systems Management Issues for the 1990s",
MIS Quarterly, December, 1991, pp. 474-500.
Pinsonneault, A. and Kraemer, K. L. "Survey
Research Methodology in Management Information
systems: An Assessment", Journal of Management
Information Systems, Vol. 10, No. 2, 1993, pp. 75-105.
Price Waterhouse, "Information Technology Survey",
Price Waterhouse, London, 1995.
Shtub, A. Enterprise Resource Planning (ERP): The
Dynamics of Operations Mangement, 2nd Ed., The
Netherlands: Kluwer Academic Publishers Group, 1999.
Watson, R. T. and Brancheau, J. C. "Key issues in
information systems management: An international
perspective", Information & Management, 20, 1991, pp.
213-223.
Watson, RT, Kelly, GG, Galliers, RD and Brancheau,
J. C. "Key issues in information systems management: an
international perspective", Journal of Management
Information Systems, 13(4), 1997, pp. 91-115.
Bancroft, N. H. Implementing SAP R/3: How to
introduce a large system into a large organization,
London: Manning/Prentice Hall, 2nd ed, 1998.
Brancheau, J. C. and Wetherbe, J. C. "Key Issues in
Information Systems Management", MIS Quarterly,
March, 1987, pp. 22-45.
Brancheau, J. C., Janz, B. D. and Wetherbe, J. C.
"Key Issues in Information Systems Management: 199495 SIM Delphi Results", MIS Quarterly, June, 1996, pp.
225-242.
Dailey, A. "SAP R/3: Managing the Life Cycle",
GartnerGroup Symposium/Itxpo 98, 28-30 October,
Brisbane Australia, 1998.
Davenport, T. E. "Holistic Management of
Megapackage Change: The Case of SAP," Proceedings of
the AIS Americas Conference on Information Systems,
August 16-18, 1996, pp.51a-51c.
Davenport, T. H. "Putting The Enterprise Into The
Enterprise System", Harvard Business Review, JulyAugust, 1998, pp. 121-131.
Deans, C. P., Karwan, K. R., Goslar, M. D., Ricks, D.
A. and Toyne, B. "Key international IS issues in the U.S.based multinational corporations", Journal of
Management Information Systems, 7, 4, 1991, pp. 27-50.
Dexter, A. S., Janson, M. A., Kiudorf, E. and LaastLaas, J. "Key information techonology issues in Estonia",
The Journal of Strategic Information Systems, Jun, 1993,
pp. 139-152.
Dickson, G. W. and Nechis, M. "Key Information
Systems Issues for the 1980’s", MIS Quarterly,
September, 1984, pp. 135-159.
Gable, G.G.; van Den Heever, Roelf; Erlank, Steve;
Scott, Judy. "Large Packaged Software: the need for
research", Proceedings of the 3rd Pacific Asia Conference
on Information Systems, Brisbane, Australia, 1-5 April,
1997a, pp.381-388.
Gable, G.G.; van Den Heever, Roelf; Erlank, Steve;
Scott, Judy. "Using Large Packaged Software in
975
T a b le 2 - T h e F ir s t R o u n d R e s u lt o f R e s p o n d e n ts b y A g e n c ie s
A g e n c ie s I n v o l v e d
C o r p o r a te S e r v ic e s A g e n c y
D e p a r t m e n t o f N a tu r a l R e s o u r c e s
D e p a r t m e n t o f P r i m a r y I n d u s tr ie s
F o r e s tr y B u s i n e s s G r o u p
S ta te W a te r P r o j e c t
T o ta l C o u n t o f R o w
T o ta l % o f R o w
N onR e s p o n d e n ts
15
14%
4
4%
12
11%
7
6%
2
2%
40
37%
N o t a b le to
P a r tic ip a te d
2
2%
2
2%
4
3%
1
1%
1
1%
10
8%
R e s p o n d e n ts
33
31%
12
11%
3
3%
6
5%
7
6%
61
55%
N o of
S u rv e y ed
50
46%
18
16%
19
17%
14
13%
10
9%
111
100%
N o o f Issu e s
C o lle c te d
136
50%
53
19%
14
5%
37
14%
34
12%
274
100%
T a b le 3 P r o f ile o f R e s p o n d e n ts
R o le s o f In v o lv e m e n t
N o t In d ic a t e d
S te e r in g C o m m itte e M e m b e r
P r o je c t M a n a g e r
C o n s u lta n t
B u s in e s s P r o c e s s T e a m M e m b e r
Power U ser
T r a in e r
H e lp D e s k T e a m M e m b e r
C hange M anagem ent T eam M em ber
D e v e lo p e r
A d m in is tr a to r
C ount
11
8
2
9
15
13
3
1
4
3
2
Tot
71
976
D u r a tio n o f In v o lv e m e n t
N o t In d ic a t e d
W ith in 1 y e a r
1 to 2 y e a r s
2 to 3 y e a r s
3 to 5 y e a r s
C ount
12
24
26
8
1
Tot
71