Zhang et al., 2024 - Google Patents
Investigation of chemical injection valve system structure for high-temperature and high-pressure gas reservoirsZhang et al., 2024
View PDF- Document ID
- 574155141963458266
- Author
- Zhang B
- Wei J
- Jing H
- Bai X
- Cui H
- Qi J
- Cheng C
- Publication year
- Publication venue
- Fifth International Conference on Green Energy, Environment, and Sustainable Development (GEESD 2024)
External Links
Snippet
Aiming at the problem of wax deposition in the wellbore of High-Temperature, High- Pressure (HPHT) and high wax-bearing deep condensate gas reservoirs, using mechanical principles and structural design methods, the development scheme of chemical injection …
- 238000002347 injection 0 title abstract description 146
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/1015—Locating fluid leaks, intrusions or movements using tracers: using radioactivity
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112459760B (en) | A carbon dioxide energy storage compound fracturing experimental device | |
Kuleshova et al. | Design changes of injection and supply wellhead fittings operating in winter conditions | |
CN105571647A (en) | Natural gas hydrate exploitation multi-physical field evolution simulation test device and method | |
CN111322066B (en) | Wellhead throttling high-pressure gas well hydrate monitoring method and control device | |
CN1332195C (en) | High temperature, high pressure core dynamic harm valuation test instrument | |
CN111764885A (en) | A visualized gas well intermittent production simulation experiment device and method | |
CN114088316A (en) | Fracturing ball sealing performance testing device and dynamic operation pressure regulating and controlling method | |
CN105443093A (en) | Combined well mouth testing device for polymer injection well and method thereof | |
CN102373918A (en) | Oil well batch production simulation experimental facility for low-permeability reservoir | |
CN205786538U (en) | Hypertonic stress drill in fluid protective capability field evaluation device | |
CN206737911U (en) | An experimental device for simulating formation temperature erosion degree of sand control screen after gas well discharges water | |
CN114509531B (en) | High-acid gas well annulus protection fluid performance evaluation device and evaluation method | |
CN112082877A (en) | A liquid nitrogen anhydrous fracturing simulation experiment device and method at different temperatures and pressures | |
Zhang et al. | Investigation of chemical injection valve system structure for high-temperature and high-pressure gas reservoirs | |
CN205449698U (en) | Anti outer crowded intensity experimental apparatus of sand control pipe under evaluation high temperature environment | |
CN113031097A (en) | Hydraulic geothermal mining and irrigating simulation device and method | |
Chen et al. | Parameter Estimations of Complex Fracture Networks Using Pressure Transient Analysis in “Fracturing-shutting” Data from Shale Oil Wells | |
CN112610203A (en) | Simulation device and method for natural fracture stratum respiration effect | |
CN107725028A (en) | A kind of horizontal well AICD intelligent water-controlleds screen casing performance test system | |
CN201363142Y (en) | Damage evaluation instrument for high temperature and high pressure multifunctional horizontal well | |
CN211785431U (en) | Drag reducer evaluation instrument for convenient slickwater fracturing | |
Chen et al. | Residual mechanical strength evaluation of corroded tubing in cryogenic carbon dioxide injection wellbore | |
Wei et al. | Research and development of injection valves for HPHT, high wax content, and deep condensate gas reservoirs | |
Zhao et al. | Numerical fracture width model considering complex stress distribution and its application | |
CN114034565A (en) | Online evaluation device and method for sand consolidation effect of chemical sand consolidation agent |