Klados, 1998 - Google Patents
Experiences with hard rock shielded TBMs in special conditionsKlados, 1998
- Document ID
- 4061705705190781058
- Author
- Klados G
- Publication year
- Publication venue
- Tunnel Construction: Proceedings of the Fifth International Symposium on Tunnel Construction
External Links
Snippet
Difficulties are encountered and solutions are found almost every time in every tunnelling project. This presentation describes in three projects the selected tunnelling methods, with shielded TBMs and integrated lining systems as best answers to the foreseen situations and …
- 239000011435 rock 0 title description 37
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
- E21D9/1006—Making by using boring or cutting machines with rotary cutting tools
- E21D9/1013—Making by using boring or cutting machines with rotary cutting tools on a tool-carrier supported by a movable boom
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C35/00—Miscellaneous items relating to machines for slitting or completely freeing the mineral from the seam
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C27/00—Machines which completely free the mineral from the seam
- E21C27/20—Mineral freed by means not involving slitting
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lunardi | Design and construction of tunnels: analysis of controlled deformation in rocks and soils (ADECO-RS) | |
CN111997639B (en) | Method for getting rid of trouble and reinforcing and improving geology of TBM construction tunnel bad geology section card machine | |
Shirlaw et al. | Local settlements and sinkholes due to EPB tunnelling | |
CN108661655B (en) | Large-section U-shaped earth pressure balance shield tunnel construction method based on U-shaped shield machine | |
CN207377565U (en) | Constructing metro tunnel structure containing complicated geological and without shield launching place | |
Li et al. | Creating a working space for modifying and maintaining the cutterhead of a large-diameter slurry shield: A case study of Beijing railway tunnel construction | |
CN110439579B (en) | Advanced pre-grouting method for open-type TBM (tunnel boring machine) water-rich tunnel | |
CN110080789A (en) | A kind of shield sky, which pushes away, spells section of jurisdiction construction | |
CN102518470A (en) | Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel | |
Goel | Experiences and lessons from the use of TBM in the Himalaya–A review | |
CN210564541U (en) | Quick heading machine | |
Phadke et al. | Construction of tunnels, by new austrian tunneling method (NATM) and by tunnel boring machine (TBM) | |
CN112502719A (en) | Method for TBM construction of lens body altered through high-pressure water-rich | |
CN113818889B (en) | Construction method for crossing underground shield tunnel through civil air defense roadway | |
CN112901204B (en) | Safe construction method for cliff tunnel | |
Tsuji et al. | Extraordinary Inundation Accidents in the Seikan Undersea Tunnel.(paper Presented at 13TH International Conference on Soil Mechanics & Foundation Engineering in New Delhi in 1994). | |
Klados | Experiences with hard rock shielded TBMs in special conditions | |
CN112709579A (en) | Quick-forming development machine for river and canal | |
CN117231227A (en) | TBM diversion inclined shaft construction method | |
Clark | Extreme excavation in fault zones and squeezing ground at the Kargi HEPP in Turkey | |
Tarkoy et al. | The advantages of tunnel boring: a qualitative/quantitative comparison of D&B and TBM excavation | |
Prakash et al. | Associated Risk and Rectification during TBM Tunnelling [J] | |
Hulme et al. | Bored tunneling for Singapore metro | |
Braga et al. | Challenges experienced during simultaneous backfill grouting using single shield large diameter TBM driven in a sharp negative slope | |
Knight-Hassell et al. | Tunnelling through challenging ground conditions in Singapore |