Xinjie et al., 2022 - Google Patents
A Multiple Survey Network for Super High-Rise BuildingXinjie et al., 2022
View PDF- Document ID
- 15645362361005484149
- Author
- Xinjie D
- Mingming K
- Yin Y
- Publication year
- Publication venue
- Journal of Physics: Conference Series
External Links
Snippet
Super high-rise building is one kind of common modern construction mode. The increasing height makes the establishment more complex than the ordinary building's construction and brings more risks to project management. The work of the survey includes a control survey …
- 238000010276 construction 0 abstract description 29
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/22—Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/002—Active optical surveying means
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/04—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102943565B (en) | Construction method of large-sized arc-shaped wall | |
CN107101621B (en) | A kind of supervision control method of high-rise building engineering survey | |
CN110427692A (en) | Construction site high-precision monitoring system and method based on Beidou/GNSS and dynamic BIM | |
CN101700527B (en) | Alignment method of thick-wall and large-diameter tube mill | |
Bryn et al. | Geodetic monitoring of deformation of building surrounding an underground construction | |
CN113310472B (en) | Method for checking position of prestressed pipeline of containment | |
KR101177889B1 (en) | Measuring the vertical management of high-rise buildings | |
CN111914317A (en) | High-precision monitoring system and method of construction site based on Beidou/GNSS and dynamic BIM | |
CN111609833B (en) | Settlement observation method for high-rise building | |
CN201391091Y (en) | Super high-rise building giant steel member mounting measurement pre-control and correcting system | |
Xinjie et al. | A Multiple Survey Network for Super High-Rise Building | |
CN109750603A (en) | The Geometry monitoring system and monitoring method constructed in conjunction with segment girder construction short line casting | |
CN103016914A (en) | Multifunctional forced centering leg bracket | |
CN115354750A (en) | Construction and installation method for large-span overweight special-shaped arch truss | |
Niewiem et al. | Geodetic deformation measurement and analysis of the ATLAS experimental cavern at CERN | |
CN116446293A (en) | Construction method of concrete beam cable guide pipe of cable-stayed bridge | |
CN115821753A (en) | Precision positioning method for main tower cable guide pipe of cable-stayed bridge | |
CN203023751U (en) | Multifunctional forced centering foot stool | |
KR102359081B1 (en) | Method of perpendicularity supervising survey | |
He et al. | Alignment strategy for HALF and some research process on alignment technologies at NSRL | |
Pimshina et al. | Determination of accumulated deformation of a high-altitude chimney for its operational reliability restoration | |
Ata et al. | Monitoring the structural deformation of davutpasa barrack by using geodetic methods | |
Hayes et al. | Core Wall survey control system for high rise buildings | |
Milovanović et al. | Designing and realization of the control networks of the telecommunication tower Avala | |
Xu et al. | Application and analysis of inverted ruler method in vault settlement monitoring of underground excavation station |